PROJECT COORDINATOR Sami Gerwick Architects Design Group

5
Sami Gerwick Architects Design Group PROJECT COORDINATOR Project List: Cocoa Beach Fire Station #51 Cocoa Beach, FL Fort Myers Fire Station No. 1 and Administratin Fort Myers, FL St. Johns County Fire Rescue and South Regional Command Center St. Johns County, FL Orlando Police Department Headquarters Orlando, FL Clermont Police Department Headquarters Clermont, FL Georgetown Public Safety Operations and Training Complex Georgetown, TX Laurence County EOC / 911 Lawrence County, PA DeSoto Fire Station #2 DeSoto, TX Evangeline Parish EOC / 911 Evangeline Parish, LA Chatham County EOC Chatham County, GA HAND OUT # For the Naples Fire Station No. 1, Sarni will serve as the Project Coordinator. He will be responsible for the overall design and production of the construction documents for the new facility. Sarni will also assist Susan with the management of the design subconsultants. Education: Master of Architecture, University of Florida Bachelor of Design, University of Florida Experience: Mr. Gerwick has over 4 years of experience in the field of architecture. He has worked on several fire rescue, public safety and municipal projects. His expertise centers around conceptual design, space planning, systems integration, design development, construction documents and construction administration for public safety facilities. He has extensive experience in extreme weather hardened facilities including building envelope detailing, exterior equipment protection, glazing protection, and site security. While dealing with the most critical of facilities, he is devoted to designing sophisticated projects that incorporate sustainable practices. Natural day lighting, solar shading and energy efficient design strategies are at the core of his philosophy. In addition to his experience in the design phase, Mr. Gerwick strives to coordinate and involve the engineering consultants, owner and end user throughout the process in order to create a more thoughtful, efficient and fleshed out design. His experience in construction administration tasks include permit submittals, RFI and permit review responses, shop drawing review, and site meeting and field reports.

Transcript of PROJECT COORDINATOR Sami Gerwick Architects Design Group

Sami GerwickArchitects Design GroupPROJECT COORDINATOR

Project List:

Cocoa Beach Fire Station #51Cocoa Beach, FL

Fort Myers Fire Station No. 1and AdministratinFort Myers, FL

St. Johns County FireRescue and South RegionalCommand CenterSt. Johns County, FL

Orlando Police DepartmentHeadquartersOrlando, FL

Clermont Police DepartmentHeadquartersClermont, FL

Georgetown Public SafetyOperations and TrainingComplexGeorgetown, TX

Laurence County EOC / 911Lawrence County, PA

DeSoto Fire Station #2DeSoto, TX

Evangeline Parish EOC / 911Evangeline Parish, LA

Chatham County EOCChatham County, GA

HAND OUT#

For the Naples Fire Station No. 1, Sarni will serve as the ProjectCoordinator. He will be responsible for the overall design and productionof the construction documents for the new facility. Sarni will also assistSusan with the management of the design subconsultants.

Education:Master of Architecture, University of FloridaBachelor of Design, University of Florida

Experience:Mr. Gerwick has over 4 years of experience in the field of architecture. Hehas worked on several fire rescue, public safety and municipal projects.His expertise centers around conceptual design, space planning,systems integration, design development, construction documents andconstruction administration for public safety facilities.

He has extensive experience in extreme weather hardened facilitiesincluding building envelope detailing, exterior equipment protection,glazing protection, and site security. While dealing with the mostcritical of facilities, he is devoted to designing sophisticated projects thatincorporate sustainable practices. Natural day lighting, solar shadingand energy efficient design strategies are at the core of his philosophy.

In addition to his experience in the design phase, Mr. Gerwick strivesto coordinate and involve the engineering consultants, owner andend user throughout the process in order to create a more thoughtful,efficient and fleshed out design.

His experience in construction administration tasks include permitsubmittals, RFI and permit review responses, shop drawing review, andsite meeting and field reports.

Dover Police HeadquartersDover, NH

Casselberry Fire StationCasselberry, FL

Charleston County Emergency Services Complex NorthCharleston, SC

Chatham County Emergency Operations CenterSavannah, GA

Clay County Emergency Services ComplexGreene Cove Springs, FL

Clermont Police DepartmentClermont, FL

Daytona Beach Shores Public Safety BuildingDaytona Beach Shores, FL

Kissimmee Fire StationKissimmee, FL

Lake County Emergency Communications & EOCTavares, FL

Manchester Police DepartmentManchester, NH

Monroe County Emergency Operations CenterMarathon, FL

Mount Dora Police DepartmentMount Dora, FL

Nacogdoches Regional Emergency Operations CenterNacogdoches, TX

Osceola County Emergency Operations &Communications CenterKissimmee, FL

Sanford Public Safety ComplexSanford, FL

Sarasota County Area Transit HubSarasota, FL

Washington Police FacilityWashington, NC

Williamson County Emergency Operations CenterFranklin, TN

OVERALL PROJECT LIST

N

af.ttyS34113M Ca.mt«Faty13121:2,

P a :IS-CU • N3p:ii 4i Z‘r.r.Cr ni:FST XeChe.C.::-ET141-ivrs AI— S-cLr

Susan Gantt, AIA, LEED APVce PrOSidEnt ArCrOti-CtS DiSir 5rptipPROJECT MANAGER/ARCHITECT

Ftoieot

Pk, 7:gigtte.

Detzr.a. FL Fffna Slaw No. E,5Denrz, FL

Q:ea1ae Statiol !Jo £5k2",p,214 FL

Comafa .0sulti Fee Statics, No. SOPativati FL

Cl_at C.1F-te Strife; No 1 arf,_ 94te F4._

Kso lure Fre Stattri No 14IG:Voyfte, FL

LUtland Fee %ire; Cer:elLate!aoc.^. FL

Cbsi Police ant F-reMt FL

ConipMVA Pi.o SafetyOp,er. 6o-s and Train; Fat ity&t.t:getwn,

Eu.1 Floet/a Stae Co_ teeStet. y Trak tgiVeliame FL

titit'30tO,Y) aLity Fut ; Wet)

72:1n;2,

For the Notites Fire Statior; No. 1 prqect. &Azar vial we os the Project

Mozogar orio' teVass ,ist Kr-,• ;,1 wIft tne orogromrh,rcg aro design of rh.e hew

Fire Strroo.1 She •vi..1 serve as the anal; point cf contact ad vor.'Y coorchrioze

orioses, tetvi9 otertloers scheOule end Midget She wih tnoirtrrh

CCertrnainZ.:01:1b•P wrth the projer: gtaiteholders 0,143 courty staff

fdt : ;ton

Saclo of tarclave • vir; 14, Favectmc twittute aid &Tate Li ',,etarel,

9e; La*.io -e; ire lettete:t I Fonda i.iik110013.043)

9e; nred Geica1Cotlactz, in: ia l*C GO071j

f:Apeer 71.Suzal Gar, AtA Vice Frecient kCh_Tia: Ett9716f043 i.rt ha/. ter) with refirm cm:e 2007. Ste : a regettere: rth11:1, 1-:,/s ageleril coot-a:to! c :rtzt,

an/ hac ten attetted at a LED ty the U S Greti E.4.1slin; Cc.inc At vieof the Stlio Deg' Dieectorc she has % :::$ced mute f7e reco..e. bay ig anaub taftry VC,t31t Ettateit of hei expvience 1=4ln-cling natter p4oran cesige there tyret of bc t she it krE Mec;table 1 tIFF,ft. CALf..A ard:17E0Ce gn an c :eft e ve hat to; taitePrereceL.:c

as 1st Irtor Or FDA bated b rig des g-1 g-..; de -es ter kit:N.-it:4e ofthe 'atect rent '1 flareted facility : rr4bothecIidl

Mt sari :erirzanc; Mal a :Aicte:cful oTojett : tot tt rut/ ine nett: of ivJ.sert the art don 's aZenng te c e1s bat;et crametffs. Cttat

a1,1 at.O.ealdr tecAmtit; axe imon:ratet an/ttuet retot.etearl; in the procerz. Frcrtirg nett :1 wa.r.LE raeholcers ;at ,:ico-tztr;flex ze czatet to; a-, be cilized for a Vele), of net:: , c a paric.da, food: ofmmglog t-e de: p-doecs tot

Thro4h :rowan an nat:ial corierertes Susat sta:res dykr.Kriacedr.anc"le,lort ler-tett v tete: to We tett.12 War 1g an ce,.rntentant, the 7opt-unce of c!ev-y cvIrr.rsicatlpte cecvrty, :twat -4an /you iabiIid obje:tet to A' rae riOldtit tr ed i ut tig, ecigtcortruzt7g. art °brain; t-ece tghly ctec:..a:2ed tailite Tez-i bL tog art

G,-11 a on In' t -tritrat 31 Of Ot,tC1I're3 vital t: her nu :River of tei:troiei type.

Aar 3.Arrr ar IWO: of kchilect: (A'At.Acc.ct.latar of Kith Safety Ccmrrilicat CfimersNatotal Tivt.t fc: tilator : Plate:

KimleyoHorn Peter Van Buskirk, P.E., AICPCivil Engineer

Representative Experience

West Villages Fire Station #1 - West Villages Improvement District, North Port, FL — Kimley-Hornworked closely with the West Villages Improvement District (VVVID) and the City of North Port todesign and permit a 9,300-square-foot fire station facility located on 3.26 acres in the City of NorthPort in Sarasota County. The project includes the fire station building, associated parking, trainingarea, a helicopter pad, and enhanced landscaping to meet the requirements of the WVID. As qualityassurance/quality control (QA/QC) reviewer, provided QA/QC review of the plans. As a requirementof the WVID standards, the project's design also incorporates the guidelines for low impact designfrom the Southwest Florida Water Management District, including reduced turf coverage, nativelandscape plantings, previous pavement, and vegetative swales, to name a few. The project iscurrently 100% designed, permitted, and awaiting the start of construction. Construction has beendelayed by the City of North Port due to the current economic conditions.

Gordon River Greenway Park, Collier County, FL — Served as project planner on the Kimley-Hornteam that provided design services for Gordon River Greenway Park. Our multidisciplinary teamcollaborated with County staff, related agencies, and the public to develop a creative, integrated,multifunctional park. The beauty of this site will awe citizens while keeping them informed about theimportance of restoration and water quality. The facility planning and design will address inevitablehuman impact and stress the potential for a healthy, sustainable ecosystem. The resulting project willbe a beautifully landscaped passive park with meandering trails, boardwalks, pavilions, shelters, anda wetland preserve. Behind these elements, the facility will provide attenuation of peak flood stagesand water quality treatment.

Sarasota Memorial Public Health System, Venice Urgent Care Center, Venice, FLRedevelopment of a 1.56 acre parcel in Venice, FL. Kimley-Horn provided the civil design servicesfor a 12,500-SF urgent care center and physicians' offices. Tasks included a new stormwatermanagement system, parking area, landscaping, and utility connections. Services included permitsubmittals to the City of Venice, Southwest Florida Water Management District, and FloridaDepartment of Transportation.

North Collier Boulevard Improvements, Marco Island, FL — Served as project manager providingdesign, permitting, and construction phase services for 2.4 miles of roadway reconstructionimprovements including a continuation of the themed hardscape and landscape improvements,specialty lighting, enhanced pedestrian and bicycle facilities, and pedestrian furnishings. Alongwith appearance and usage enhancements, curbing and drainage improvements were completed.Specific responsibilities included development of the 60% roadway plans, submittal to the watermanagement district, responding to the City's 60% comments, and finalizing the plan set. Additionalduties included coordination of the multidisciplinary roadway, utilities, traffic signals, and landscapearchitecture team. Served as the overall project manager for the design phase and as projectmanager for the construction administration.

North Port Gardens (aka Gulf Coast Gardens), North Port, FL — Project manager responsiblefor overseeing due diligence and land use research; development of, and assisting in, land userecommendations; visioning/charrette; and land use analysis and permitting processes, includingassisting on the development of regional impact for a 514-acre site located in the City of North Port.The project proposes a mixed-use commercial and office and residential development incorporatingsignificant wetland and environmental preservation. The project proposes approximately 2 millionsquare feet of combined power center and lifestyle commercial areas, approximately 150,000 squarefeet of office, 450 hotel rooms, and approximately 500 residential units. Tasks include preapplicationcoordination, preliminary development agreement development, and application for developmentapproval (ADA) coordination and preparation.

Special Qualifications• Has 34 years of experience

providing engineeringservices to the private andpublic sectors

• Served as project engineer/project manager for urbanstreet design, drainagedesign, and utility designprojects

• Experienced in theprocedures for permittingsite development projectswith local governmentagencies, FDOT,SWFWMD, FDEP, andthe U.S. Army Corps ofEngineers

• Project managementresponsibilities haveincluded client andcontractor relations,public meetings andpresentations, projectorganization, scheduling,tracking, and checking andcoordination with alliedprofessionals and supportpersonnel

• Has worked with the Cityof North Port's drainagefacilities since 1985 whenthe system was operatedand maintained by theNorth Port Water ControlDistrict

Professional Credentials• Bachelor of Science, Civil

Engineering, Union College• Professional Engineer in

Florida

Professional Organizations• American Institute of

Certified Planners• American Planning

Association ,Qmerican Society of Civil

Engineers• Florida Engineering Society

141

Kim ey>>>Horn .1,,

1 - "I Page 2

Representative Experience (continued)

Burnt Store Road Design, Phase 3, Punta Gorda, FL— Serving as principal-in-charge for the Kimley-Horn team that is providingroadway design services on this project for Charlotte County. Tasks include drainage design; utility design; permitting and coordinationwith USACE, FDEP, Charlotte County, and SWFWMD; signing and marking signalization design; traffic studies; public involvement;maintenance of traffic; structural design; landscape architecture; and construction engineering and inspection (CEI). The Kimley-Hornteam is using several innovative production and design processes, including low impact development (LID), photogrammetric mapping,phased construction.

Celery Fields Regional Park Sarasota County, FL - Served as civil engineer. Kimley-Horn provided design, planning, and communityinvolvement services related to the park projects. Master plan components for Celery Fields included: environmental enhancement andrestoration of the site agricultural areas; a five-trail system; hard trails for bicycles and rollerblades; soft trails for walking and jogging;a waterfront plaza; an interactive fountain and promenade; an interpretive signage system; provisions for a kayak and canoe launch; avisitor's center with restrooms; and a design to celebrate site history and bird watching activities.

Sumter Boulevard Improvements, Phases ll and III, North Port, FL Serving as project manager. Providing engineering designservices to widen the existing two-lane roadway to a four-lane roadway from the intersection of US 41 Tamiami Trail north; PhaseII extends to Heron Creek Boulevard and Phase III extends to Morandi Avenue. Services include signalization, new bridge design,enhancing the bicycle and pedestrian features along the corridor, stormwater management, utility relocation, intersection improvements,and CEI services.

South Collier Boulevard Improvements, Marco Island, FL. — Project manager overseeing a variety of services, including roadwaydesign, utility adjustments, landscape architecture/hardscape, corridor planning, and public involvement coordination for this project toimprove the South Collier Boulevard roadway in the City of Marco Island.

Colonia Lane Improvements, Sarasota County, FL — Project engineer involved in evaluating roadway/intersection improvements alongthis corridor for Sarasota County. The objective of this review was to provide efficient traffic flow and improve safety on this roadway. Aspart of this review, recommendations were provided regarding the restriction or modification of access from/to existing cross-streets anddriveways and the implementation of landscaped medians and roadside areas within the specific right-of-way.

Gran Paradiso, North Port, FL — Served as project planner. Gran Paradiso is a high-end residential community located at the WestVillages on 1,068 acres in the City of North Port. Composed of 1,000 single-family and multi-family units, Gran Paradiso features anamenity center building with a resort-style pool, a neighborhood center, pocket parks, and multimodal paths.

IslandWalk at the West Villages, North Port, FL — Project manager responsible for overseeing due diligence, land use research, andpreparation of the Village District Pattern Plan to conform to the West Villages Pattern Book. Managed the preparation and presentationof three public workshops during multiple stages of the Village District Pattern Plan process. Provided design services for multiplephases of the subdivision construction plans. Coordinated plan and plats with the West Villages Improvement District. The projectconsists of 1,860 single-family lots, community amenity center, internal roads, and utility infrastructure. Additional tasks included permitcoordination with local, state, and federal agencies.

Pine Street Sidewalks Design/Permitting, Charlotte County, FL — Serving as project manager providing design, permitting, andconstruction phase services for this sidewalk design project on the east side of Pine Street from SR 776 to the Sarasota County line.The project has been successfully constructed by the County.

Charlotte Harbor CRA Gateway and Harbor, Charlotte Harbor, FL — Serving as project manager and principal-in-charge providingurban design and engineering services in support of revitalization efforts on behalf of the Charlotte Harbor Community RedevelopmentAgency. Kimley-Horn's first assignment was to prepare design documents and provide permitting services for the Harbor Walk projectconsisting of a pedestrian promenade and boardwalk connecting the east and west sides of Charlotte Harbor. The project utilizesthe old US 41 bridge abutment for parking and promenade area creating a trailhead for the boardwalk which crosses a section of theHarbor shoreline going under the US 41 bridge. Upon completion the Harbor walk will extend approximately one mile from ChesterRoberts Park to Bayshore Park.