Project CHIMNEY DESIGN AND BUILD Participants › pdf › PastProject-CaseStudy › New BEC...Email:...
Transcript of Project CHIMNEY DESIGN AND BUILD Participants › pdf › PastProject-CaseStudy › New BEC...Email:...
BEC Group of Companiesc/o 18 Boon Lay Way
TradeHub 21Singapore 609966
Tel: +(65) 6778 6858
Website: www.be-con.comEmail: [email protected]
Cert No: QS - 2009 - 14
Member of the IAF MLA for QMS
CASE STUDY
PROJECT
CHIMNEY DESIGN AND BUILDProjectParticipants
Detail of work by BECBEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor and earthing works.
Challenges• The remote location of this stack required importing all materials and equipment for the construction
Owner
Client
Formosa Heavy Industries Corporation
Chimney EPC Contractor
TOLEDO POWER
TOLE
DO
PO
WE
R P
LAN
T
#10-159 to 162 Fax: +(65) 6690 9259
Toledo Power Project
Cebu Energy Development Corporation
Cebu Energy Development Corporation was constructing a 3 300T/H Coal Fired Boiler Power Plant located in Toledo City, Cebu. Formosa Heavy Industries Corporation was its mainEPC contractor.
Cebu Energy Development Corporation (CEDC) is a 246MW Clean Coal-Fired Power Plant located in Toledo City,Cebu. This CEDC Plant provides affordable energy and improves the power system reliability of the island. Similar to itstwin power plant in Iloilo City, CEDC utilizes the latest boiler technology to set the beginning of a cleaner transitionaltechnology.
Balanced Engineering & Construction Pte Ltd
Lining System
SCR-Ten 2
stack elevation
100m
3
2.8m
Chimney data:
Height
No. of internal steel flues
No. of internal platforms
Diameter of internal flues
External concrete diameter
Piles
Toledo
3
17.2m
79nos
Prebored precast concrete
Pile cap
500 diameter
2.8mUnit trusses connected to main ring
Internal liner
Manufacturing liner cans Slipforming in progress