CASE STUDY
CHIMNEY DESIGN & BUILDProjectParticipants
Detail of work by BEC
Challenges
Owner
Client
Chimney EPC Contractor
#10-159 to 162 Fax: +(65) 6690 9259
ME
RA
K P
OW
ER
PLA
NT
Merak Project
MERAK CFPP PROJECT
PT Merak Energi Indonesia
Posco Engineering Corporation Ltd.
Balanced Engineering & Construction Pte Ltd
Lining System
Epigen XD005
Merak Coal Fired Power Plant is a 2x60MW coal fired electricity and steam ge nerating power plant located in Mangun-reja village in the sub-district of Pulo Ampel, district of Serang in Banten Province, Republic of Indonesia.
BEC was awarded the Design & Build package for the chimney, including piling, pile cap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and Pennguard borosilicate block protection lining system to the inside face of the flues.
• Poor ground conditions• Compact site - limited working area
Fired Power Plant stack in Banten Province, Republic of Indonesia. Posco Engineering Corporation Ltd was awarded the contract to build a 2x60MW Coal
stack elevationChimney data:
Height
No. of internal steel flues
No. of internal platforms
Diameter of internal flues
External concrete diameter
Piles
Pile cap
Merak
100m
2
2.8m
3
10080mm
61nos 500mm dia
3500mm thick
Completed ChimneyGroup photo
Internal view of liner can
Assembled liner can
ELT +40.00M