PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass...

68
State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24 th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243 DSP-0402OCI Page 1 of 1 Revised: 12/2018 PROJECT ANNOUNCEMENT Post Date: 06.12.2020 Submittal Deadline: 06.25.2020 Project Title: Memphis RC Roof Repairs and Facility Update Facility Name: Memphis City: Memphis County: Shelby SBC Project No.: Agency: DEPARTMENT OF MILITARY Maximum Allowable Construction Cost (MACC): $1,595,000.00 Development Manager: Scates, James Agency Representative: Milligan, Andrew Project Description: Repair roof leaks, mechanical, electrical, and plumbing systems; replace doors, door hardware and windows, interior/exterior facility updates, masonry repairs, site grading and drainage improvements, and all required related work. Additional information about the project can be found in the project’s program document included as a part of this announcement. Special Design or Submission Requirements: This contract will cover Program through Construction Documents. A supplement contract will be issued to cover bidding through closeout. Note: All information previously made available to consultants, by the State, and all information supplied by consultants to the State, relating to the subject project, will be made available to any potential respondents. Potential respondents desiring to review these documents can submit a request to [email protected]. Anticipated SBC Approval Date: 07.09.2020 Anticipated ESC Designer Selection Date: 07.20.2020 Anticipated Designer NTP Date: 09.30.2020 Anticipated Project Bid Date: 06.01.2021

Transcript of PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass...

Page 1: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

State of Tennessee Real Estate Asset Management (STREAM)William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

DSP-0402OCI Page 1 of 1 Revised: 12/2018

PROJECT ANNOUNCEMENT

Post Date: 06.12.2020 Submittal Deadline: 06.25.2020

Project Title: Memphis RC Roof Repairs and Facility UpdateFacility Name: MemphisCity: Memphis County: ShelbySBC Project No.: Agency: DEPARTMENT OF MILITARYMaximum Allowable Construction Cost (MACC): $1,595,000.00Development Manager: Scates, JamesAgency Representative: Milligan, Andrew

Project Description:Repair roof leaks, mechanical, electrical, and plumbing systems; replace doors, door hardware and windows, interior/exterior facility updates, masonry repairs, site grading and drainage improvements, and all required related work.

Additional information about the project can be found in the project’s program document included as a part of this announcement.

Special Design or Submission Requirements: This contract will cover Program through Construction Documents. A supplement contract will be issued to cover bidding through closeout.

Note: All information previously made available to consultants, by the State, and all information supplied by consultants to the State, relating to the subject project, will be made available to any potential respondents. Potential respondents desiring to review these documents can submit a request to [email protected].

Anticipated SBC Approval Date: 07.09.2020Anticipated ESC Designer Selection Date: 07.20.2020Anticipated Designer NTP Date: 09.30.2020Anticipated Project Bid Date: 06.01.2021

Page 2: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Readiness Center Tennessee Army National Guard

Memphis, Tennessee

Probable Costs Report

September 1st, 2017

Goodwyn Mills Cawood, Inc. GMC Project No. ANAS 170050

NASHVILLE, TENNESSEE

(DRAFT)

Page 3: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Project Narrative - Basis of Probable Costs

A. General The following narrative outlines the scope of work for the Readiness Center. The information is limited to architectural and site and does not contain any renovation pertaining to the MEP-FP scope of work. The project involves the renovation of a single-story building consisting of administrative offices, assembly halls, locker rooms, classrooms, storage. This report also accounts for some exterior improvements. The cost of the work is scaled to account for wages under the Davis Bacon act.

B. Exterior Renovation.

Demolition: All demolished equipment, fixtures and materials shall be disposed of legally.

Architectural:

o Prep Masonry for Re-pointing.

o Demolish the existing paving surface in parking lot.

o Prepare motor pool for new gravel lot.

o Demolish the existing entrance sidewalk and flag pole path.

o Demolish existing entry slabs along east side of building.

o Remove the existing roofing surface.

New Work:

Architectural:

o Re-point masonry at a 5% allowance.

o Install new driving surface base and substrate in parking lot.

o Apply driving surface coating seal and strip parking at front entrance.

o Install new sidewalk along south of building.

o Install new flagpole path.

o Install new security bollards at entrance side.

o Install new entry slabs along west side of building.

o Install new high-density insulation and PVC membrane roof throughout except where

noted.

o Install new metal roofing over assembly hall and adjacent storage.

o Install new concrete drive to storage areas on east side of building.

o Regrade landscaped areas along east side of the building to provide positive drainage.

o Install new pug mix gravel and base at motor pool.

o Provide new stone panels and signage at vestibule.

Page 4: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

C. Interior Renovation Demolition:

All demolished equipment, fixtures and materials shall be disposed of legally.

Architectural:

o Rifle Range:

� Demolish existing rubber base.

� Remove O.H. door per Fig 1.

� Remove door as show on Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

� Prep floor for sealing.

� Prep walls for paint.

� Prep roof structure for paint.

o Assembly Hall:

� Remove O.H. door per Fig 1.

� Remove doors as show on Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

� Remove hardware on doors to remain.

� Remove rolling grills as shown on Fig 1.

� Remove H.M. frames as shown on Fig 1.

� Prep floor for sealing.

� Prep ceilings for paint.

o Scullery:

� Remove hard tile flooring.

� Remove doors as show on Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

� Remove rolling grills as shown in Fig 1.

� Remove damaged sections of gypsum ceiling.

� Prep walls for paint.

� Prep ceilings for paint.

o Food Preparation:

� Remove hard tile flooring.

� Remove doors as show on Fig 1.

� Remove rolling grills as shown in Fig 1.

� Remove rolling grills as shown in Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

� Remove damaged sections of gypsum ceiling.

� Prep walls for paint.

� Prep ceilings for paint.

o Food Storage:

� Remove hard tile flooring.

� Remove doors as show on Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

� Remove damaged sections of gypsum ceiling.

� Prep walls for paint.

� Prep ceilings for paint.

Page 5: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Storage:

� Remove hardware on existing door.

� Demolish existing rubber base.

� Prep floor for sealing.

� Prep walls, door and frames for painting.

o Library:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing ACT ceiling.

� Remove hardware on existing door.

� Prep walls, door and frames for painting.

o Learning Center:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing ACT ceiling.

� Remove hardware on existing door.

� Prep walls, door and frames for painting.

o TAS:

� Demolish existing rubber base.

� Remove hardware on existing door.

� Prep floor for sealing.

� Prep walls, door and frames for painting.

o Vault A:

� No work in scope.

o Vault B:

� No work in scope.

o Vault C:

� No work in scope.

o Vault D:

� No work in scope.

o Vault E:

� No work in scope.

o Men’s TLT

� Demolish existing hard tile flooring.

� Demolish existing hard tile wainscot.

� Demolish toilet partitions.

� Prep gypsum ceilings for paint.

� Prep walls, door and frames for painting.

o Women’s TLT

� Demolish existing hard tile flooring.

� Demolish existing hard tile wainscot.

� Demolish toilet partitions.

� Prep gypsum ceilings for paint.

� Prep walls, door and frames for painting.

o FAC Maintenance:

� Demolish existing rubber base.

� Remove door as show on Fig 1.

� Remove exiting H.M. Frame as shown in Fig 1.

Page 6: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Prep floor for sealing.

� Prep walls for paint.

� Prep ceiling for paint.

o Mech A:

� Remove hardware on existing door.

� Remove roof access ladder.

� Prep walls, door and frames for painting.

o Mech B:

� No work in scope.

o Mech C:

� No work in scope.

o Mech D:

� No work in scope.

o Entry & Corridors:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing ACT ceiling.

� Remove doors as show on Fig 1.

� Remove metal frames as shown in Fig 1.

� Remove storefront system as shown on Fig 1.

� Prep walls, door and frames for painting.

o Vestibule:

� Demolish existing hard tile floor.

� Demolish existing tile base.

� Demolish existing ACT ceiling.

� Remove storefront system as shown on Fig 1.

� Prep walls for paint.

o Unit Storage A:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing wall as shown in Fig. 1

� Remove hardware on existing doors to remain.

� Remove damaged sections of gypsum ceiling.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

o Unit Storage B:

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing ceiling.

� Prep flooring for sealing.

� Remove wall paneling.

� Prep walls for paint.

Page 7: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Unit Storage C:

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Prep flooring for sealing.

� Prep walls for paint.

� Prep ceilings for paint.

o Unit Storage D:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

o Unit Storage E:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

o Unit Storage F:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

o Unit Storage G:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

Page 8: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Unit Storage H:

� Remove existing caging system.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

� Prep ceilings for paint.

o Classroom A1:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing ACT ceiling.

� Remove existing projection screen.

� Remove hardware from wood door.

� Remove movable partition wall as shown on Fig 1.

� Prep walls, door and frames for painting.

o Classroom A2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing ACT ceiling.

� Remove existing projection screen.

� Remove hardware from wood door.

� Remove movable partition wall as shown on Fig 1.

� Prep walls, door and frames for painting.

o Classroom B:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing demising wall as shown on Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Classroom C:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing walls as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing platform as shown on Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Conference Room:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Demolish existing wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing platform as shown on Fig 1.

Page 9: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin A:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition walls as shown on Fig 1.

� Remove glazing from existing windows

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A3:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A4:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A5:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

Page 10: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A6:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A7:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A8:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A9:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin A10:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A11:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

Page 11: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin A12:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin B1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove glazing from existing windows

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin B2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Demolish existing partition wall as shown on Fig 1.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin B3:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C1:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C2:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

Page 12: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin C3:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C4:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C5:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C6:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin C7:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Prep walls, door and frames for painting.

o Admin CS:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin D:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin D1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

Page 13: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Prep walls, door and frames for painting.

o Admin D2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin D3:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin D4:

� Prep floors for sealing.

� Demolish existing rubber base.

� Remove hardware of existing door.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin D5:

� Prep floors for sealing.

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin E:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin E1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin E2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

Page 14: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin E3:

� Prep floors for sealing.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin E4:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin E5:

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep flooring for sealing.

� Prep walls, door and frames for painting.

o Admin F:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin F1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin F2:

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Prep floors for sealing.

� Prep ceiling for paint.

� Prep walls, door and frames for painting.

o Admin F3:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin F4:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

Page 15: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin F5:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls, door and frames for painting.

o Admin G:

� Demolish existing VCT flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin G1:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Admin G2:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Storage Admin:

� Demolish existing carpet flooring.

� Demolish existing rubber base.

� Remove glazing from existing window.

� Remove hardware from existing doors.

� Demolish existing ACT ceiling.

� Prep walls for paint.

o Gym

� Demolish existing rubber base.

� Remove existing a/c unit as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep ceilings for paint.

� Prep walls, door and frames for painting.

o Locker Room A

� Demolish existing rubber base.

� Remove existing wall & doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Remove hardware on existing doors to remain.

� Prep flooring for sealing.

� Prep walls for paint.

� Prep ceilings for paint.

Page 16: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o TLT A

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing hard tile flooring.

� Demolish existing hard tile wainscot.

� Demolish toilet partitions and accessories.

� Prep toilet stool for ADA modification.

� Prep walls for paint.

� Prep ceilings for paint.

o Locker Room B

� Demolish existing rubber base.

� Remove existing wall & doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing louver opening as shown in Fig 1.

� Prep flooring for sealing.

� Prep walls for paint.

� Prep ceilings for paint.

o TLT B

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing hard tile flooring on shower area.

� Demolish existing hard tile wainscot on shower area.

� Demolish toilet partitions and accessories.

� Remove damaged sections of gypsum ceiling.

� Remove urinals from wall.

� Prep walls for paint.

� Prep ceilings for paint.

o Locker Room C

� Demolish existing rubber base.

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Remove existing caging system

� Prep flooring for sealing.

� Prep walls for paint.

� Prep ceilings for paint.

o TLT C

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Demolish existing hard tile flooring on shower area.

� Demolish existing hard tile wainscot on shower area.

� Demolish toilet partitions and accessories.

� Remove damaged sections of gypsum ceiling.

� Prep walls for paint.

� Prep ceilings for paint.

Page 17: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Jan Closet

� Remove existing doors as shown in Fig 1.

� Remove existing metal frames as shown in Fig 1.

� Prep walls for paint.

� Prep floor flor sealing.

New Work:

Architectural:

o Rifle Range:

� Provide new rubber base.

� Install new 6’-0”x7-0” door, frame and hardware in O.H. Opening as shown in

Fig 2.

� Infill remaining O.H. opening to match existing with block and brick.

� Install new door and hardware.

� Install new metal frame.

� Repair and seal cracks in flooring.

� Paint all walls.

� Paint ceiling and structure.

� Infill louver opening with brick and block, to match existing.

o Assembly Hall:

� Provide new rubber base.

� Install new O.H. door.

� Install new doors and hardware as shown in Fig 2.

� Install new hardware in existing doors.

� Install new metal frame.

� Paint existing jamb as required.

� Repair cracks in flooring.

� Paint all walls.

� Paint ceiling and structure.

� Seal flooring surface.

o Scullery:

� Provide new epoxy flooring and base.

� Repair gypsum ceiling to a P-2 level.

� Install new metal frame.

� Install new rolling counter door.

� Install new door and hardware as shown in Fig 2.

� Paint all walls.

� Paint gypsum ceiling.

o Food Preparation:

� Provide new epoxy flooring and base.

� Repair gypsum ceiling to a P-2 level.

� Install new metal frame.

� Install new door and hardware as shown in Fig 2.

� Install new rolling counter door.

� Paint all walls.

� Paint gypsum ceiling.

Page 18: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Food Storage:

� Provide new epoxy flooring and base.

� Repair gypsum ceiling to a P-2 level.

� Install new metal frame.

� Install new door and hardware as shown in Fig 2.

� Paint all walls.

� Paint gypsum ceiling.

o Storage:

� Provide new rubber base.

� Repair cracks in flooring.

� Install hardware on existing door.

� Paint existing jamb and door as required.

� Seal flooring surface.

� Paint all walls.

� Paint gypsum ceiling.

o Library:

� Install new resilient flooring and base.

� Install new 2x2 ACT ceiling.

� Install hardware on existing door.

� Paint existing jamb and door as required.

� Paint all walls.

o Learning Center:

� Install new resilient flooring and base.

� Install new 2x2 ACT ceiling.

� Install hardware on existing door.

� Paint existing jamb and door as required.

� Paint all walls.

o TAS:

� Install new resilient flooring and base.

� Install new 2x2 ACT ceiling.

� Install hardware on existing door.

� Paint existing jamb as required.

� Paint all walls.

o Vault A:

� No work in scope.

o Vault B:

� No work in scope.

o Vault C:

� No work in scope.

o Vault D:

� No work in scope.

o Vault E:

� No work in scope.

o Men TLT

� Provide new hard tile and base.

� Provide new HDPE toilet partitions.

� Paint existing jamb as required.

Page 19: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Paint ceiling.

� Paint all walls.

o Women TLT

� Provide new resilient flooring and base.

� Provide new HDPE toilet partitions.

� Paint existing jamb and door as required.

� Paint ceiling.

� Paint all walls.

o FAC Maintenance:

� Repair cracks in flooring.

� Provide new rubber base.

� Install new door and hardware.

� Install new metal frame.

� Seal flooring surface.

� Paint all walls.

� Paint all ceilings.

o Mech A:

� Repair cracks in floor and seal flooring surface.

� Install hardware on existing door.

� Paint existing jamb as required.

� Install new ladder for roof access.

� Install new roof access hatch.

o Mech B:

� No work in scope.

o Mech C:

� No work in scope.

o Mech D:

� Provide steel lintel.

o Entry & Corridors:

� Install new resilient flooring and base.

� Install new 2x2 ACT ceiling.

� Install new doors and hardware as shown in Fig 2.

� Install new storefront system as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing jamb as required.

� Paint all walls.

o Vestibule

� Install new hard tile flooring and base.

� Install new 2x2 ACT ceiling.

� Install new ballistic resistant storefront system as shown in Fig 2.

� Paint all walls.

o Unit Storage A:

� Repair cracks in floor and seal flooring surface.

� Install new wall as shown in Fig. 2

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

Page 20: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Repair gypsum ceiling to a P-2 level.

� Install new caging system.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage B:

� Repair cracks in floor and seal flooring surface.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new 2x2 ACT ceiling.

� Paint existing door and frames as required.

� Paint all walls.

o Unit Storage C:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage D:

� Repair cracks in floor and seal flooring surface.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new caging system.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage E:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new caging system.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage F:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new caging system.

� Paint existing door and frames as required.

Page 21: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage G:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new caging system.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o Unit Storage H:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new caging system.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o Classroom A1:

� Provide new carpet flooring and vinyl base.

� Install new hardware on wood door.

� Provide new 2x2 ACT ceilings.

� Install new projection screen.

� Install movable partition as shown on Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Classroom A2:

� Provide new carpet flooring and vinyl base.

� Install new hardware on wood door.

� Provide new 2x2 ACT ceilings.

� Install new projection screen.

� Install movable partition as shown on Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Classroom B:

� Provide new carpet flooring and vinyl base.

� Install new hardware on wood door.

� Provide new 2x2 ACT ceilings.

� Install movable partition as shown on Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Classroom C:

� Provide new carpet flooring and vinyl base.

� Install new hardware on wood door.

� Provide new 2x2 ACT ceilings.

� Infill existing opening.

Page 22: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Provide new wall as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Conference Room:

� Provide new carpet flooring and vinyl base.

� Install new hardware on wood door.

� Provide new 2x2 ACT ceilings.

� Infill existing opening

� Provide new partitions as shown on Fig. 2

� Install new doors and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin A:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new I.G.U. with reflective tint at exterior window location.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin A1:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new I.G.U. with reflective tint at exterior window location.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin A2:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin A3:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

Page 23: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin A4:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin A5:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin A6:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition wall as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin Conference:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition walls as shown on Fig. 2

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin B1:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new I.G.U. with reflective tint at exterior window location.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin B2:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin B3:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

Page 24: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Paint existing door and frames as required.

� Paint all walls.

o Admin C1:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new I.G.U. with reflective tint at exterior window location.

� Install new hardware on existing door as required.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C2:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new I.G.U. with reflective tint at exterior window location.

� Install new hardware on existing door as required.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C3:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C4:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new reflective glass window.

� Install new hardware on existing door as required.

� Install new metal frames as shown in Fig 2.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C5:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C6:

� Provide new carpet flooring and base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin C7:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Provide new partition wall as shown on Fig. 2

Page 25: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

o Admin CS:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D1:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D2:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D3:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Infill existing opening to match existing as shown on Fig 2.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D4:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin D5:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

Page 26: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin E:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin E1:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin E2:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin E3:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing frames as required.

� Paint all walls.

o Admin E4:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin E5:

� Repair cracks in floor and seal flooring surface.

� Install new hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin F:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin F1:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

Page 27: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Admin F2:

� Repair and seal cracks in flooring.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Extend walls to underside of deck.

� Paint all ceilings.

� Paint all walls.

o Admin F3:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin F4:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin F5:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

o Admin G:

� Provide new resilient flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all ceilings.

� Paint all walls.

o Admin G1:

� Provide new carpet flooring and vinyl base.

� Provide new 2x2 ACT ceilings.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all ceilings.

� Paint all walls.

o Admin G2:

� Provide new carpet flooring and vinyl base.

� Repair gypsum ceiling to a P-2 level.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all ceilings.

� Paint all walls.

Page 28: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

o Storage Admin:

� Provide new carpet flooring and vinyl base.

� Provide new I.G.U. with reflective tint at exterior window location.

� Repair gypsum ceiling to a P-2 level.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all ceilings.

� Paint all walls.

o Gym

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Paint existing door and frames as required.

� Paint ceiling and structure.

o Locker Room A:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening in exterior wall with block and brick to match existing.

� Provide new rubber base.

� Install new block wall as shown in Fig 2.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Install new door hardware on existing door.

� Paint existing door and frames as required.

� Paint all walls.

� Paint ceiling and structure.

o TLT A:

� Provide new hard tile flooring throughout.

� Provide new hard tile thin set full height on shower area. 5’-0” all other areas

� Modify stool to meet ADA requirements.

� Provide new shelf as required in shower area.

� Infill existing opening in exterior wall with block and brick to match existing.

� Install new door hardware on existing door.

� Provide new HDPE toilet partitions and accessories.

� Paint all walls.

� Paint ceiling.

o Locker Room B:

� Repair cracks in floor and seal flooring surface.

� Infill existing opening to match existing.

� Provide new rubber base.

� Install new block wall as shown in Fig 2.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint all walls.

� Paint ceiling and structure.

o TLT B:

� Provide new hard tile flooring throughout.

� Provide new hard tile thin set full height on shower area. 5’-0” all other areas

� Install new door and hardware as shown in Fig 2.

Page 29: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

� Install new metal frames as shown in Fig 2.

� Infill opening on existing wall to match existing.

� Provide new HDPE toilet partitions and accessories.

� Repair gypsum ceiling to a P-4 level.

� Paint ceiling and structure.

� Paint all walls.

o Locker Room C:

� Repair cracks in floor and seal flooring surface.

� Provide new rubber base.

� Install new caging system.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Paint ceiling and structure.

� Paint all walls.

o TLT C:

� Provide new hard tile flooring on shower area.

� Provide new hard tile thin set on walls to 5‘-0“on shower area.

� Provide new epoxy flooring and base.

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

� Provide new HDPE toilet partitions and accessories.

� Repair gypsum ceiling to a P-4 level.

� Paint ceiling.

� Paint all walls.

o Jan Closet:

� Install new door and hardware as shown in Fig 2.

� Install new metal frames as shown in Fig 2.

Page 30: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

D. Cost Summary

Costs: (See Appendix for itemized costs)

Costs shown are for the renovation work listed above. Memphis – Readiness Center Base Bid $ 5,524, 431 2018 Cost $ 5,746,286 2019 Cost $ 5,979,954

Page 31: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

E. Appendix

- Itemized Costs Estimates

Page 32: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

LOCATION: Memphis, Shelby County, Tennessee Location Cost Factor: 1

RS MEANS RS MEANS

NUMBER DESCRIPTION UNIT COST LABOR LOCATION COST QUANTITY TOTAL

DIVISION 00 GENERAL CONDITIONS

E.A. 3086.72 3,086.72$ 1 3,086.72$

Sub-total Division 00

3,086.72$

DIVISION 01

Sub-total Division 00

-$

DIVISION 02

02 41 13.17 5500 C.Y. 0.00 153.72 153.72$ 3314.37 509,480.11$

02 41 13.30 4120 S.Y. 0.00 13.94 13.94$ 233.57 3,255.83$

28200 E.A. 0.00 2130.24 2,130.24$ 1 2,130.24$

28200 E.A. 0.00 2240.00 2,240.00$ 1 2,240.00$

28200 S.F. 0.00 0.34 0.34$ 45650 15,338.40$

28200 S.F. 0.73 3.36 4.09$ 45650 186,598.21$

24119 E.A. 0.00 91.84 91.84$ 34 3,122.56$

02 41 13.30 1700 L.F. 0.00 3.77 3.77$ 816.94 3,076.45$

E.A. 0.00 750.00 750.00$ 1.00 750.00$

Sub-total Division 02

725,991.80$

DIVISION 03

03 01 30.62 0150 S.F. 8.87 4.44 13.32$ 10.00 133.19$

03 01 30.62 2200 S.F. 22.60 6.61 29.20$ 18.00 525.69$

39300 L.F. 3.03 4.01 7.04$ 120.00 845.32$

03 41 23.50 0550 Concrete Stairs, Front Entrance, 6' Wide, 5 risers, E.A. 931.53 324.11 1,255.63$ 3.00 3,766.90$

Sub-total Division 05

5,271.10$

DIVISION 04 MASONRY

04 01 20.20 0320 S.F. 0.62 5.93 6.54$ 849.79 5,560.88$

04 01 30.20 0270 S.F. 0.21 2.07 2.28$ 16995.76 38,813.76$

N/A S.F. 0.25 0.49 0.75$ 8497.88 6,351.55$

04 22 10.14 0350 S.F. 3.13 5.30 8.43$ 1390.18 11,715.93$

04 21 13.45 0300 M 479.54 1316.00 1,795.54$ 2.00 3,585.69$

04 43 10.55 0750 S.F. 22.60 6.61 $29.20 179.98 $5,256.33

Sub-total Division 04

71,284.14$

DIVISION 05 METALS

05 01 10.51 6255 S.F. 0.95 3.72 4.66$ 40.00 186.58$

05 12 23.75 3900 L.F. 88.19 7.90 96.09$ 27.50 2,642.59$

05 12 23.65 0300 S.F. 22.60 0.00 22.60$ 18.33 414.13$

05 12 23.45 2600 E.A. 36.38 21.73 58.11$ 2.20 127.84$

Sub-total Division 05

3,371.14$

DIVISION 06

06 05 05.10 6600 L.F. 0.00 0.37 0.37$ 338.64 125.43$

06 05 05.10 4240 L.F. 0.00 0.79 0.79$ 148.50 117.34$

06 05 05.10 6140 S.F. 0.00 0.68 0.68$ 5303.10 3,601.22$

Sub-total Division 06

3,844.00$

DIVISION 07

07 05 05.10 0420 L.F. 0.00 1.54 1.54$ 1082.03 1,669.97$

07 05 05.10 0120 L.F. 0.00 1.06 1.06$ 429.00 455.53$

07 05 05.10 2670 E.A. 0.00 123.47 123.47$ 2.00 246.94$

07 05 05.10 3370 SQ. 0.00 72.23 72.23$ 462.53 33,407.83$

07 26 10.10 1200 SQ. 9.76 12.53 22.29$ 462.53 10,308.91$

07 22 16.10 1755 S.F. 2.15 0.31 2.46$ 46252.50 113,704.93$

07 53 23.20 4800 SQ. 169.77 78.34 248.11$ 378.21 93,837.89$

07 61 13.10 0700 SQ. 853.26 123.47 976.73$ 116.17 113,461.42$

07 72 33.10 0600 E.A. 1515.80 204.96 1,720.76$ 2.00 3,441.52$

07 21 29.10 0340 S.F. 2.32 0.70 3.02$ 180.56 545.08$

07 60 00 L.F. 7.55 5.21 12.76$ 1115.53 14,236.24$

07 71 23 L.F. 17.52 2.91 20.43$ 1511.03 30,871.93$

07 27 26.10 S.F. 0.01 1.14 1.15$ 180.56 207.09$

Sub-total Division 07

416,395.27$

DIVISION 08

08 05 05.10 0200 E.A. 0.00 23.21 23.21$ 1 23.21$

08 05 05.10 0220 E.A. 0.00 30.87 30.87$ 6 185.20$

08 05 05.10 0500 E.A. 0.00 18.58 18.58$ 38 706.12$

08 05 05.10 0520 E.A. 0.00 23.21 23.21$ 6 139.27$

08 05 05.10 2000 E.A. 0.00 58.03 58.03$ 29 1,682.88$

08 05 05.10 2200 E.A. 0.00 29.02 29.02$ 22 638.33$

08 05 05.10 3700 E.A. 0.00 185.20 185.20$ 2 370.41$

08 05 05.10 3440 E.A. 0.00 308.67 308.67$ 2 617.34$

N/A E.A. 0.00 185.20 185.20$ 2 370.41$

8 05 05.10 0620 S.F. 0.00 2.48 2.48$ 759.01 1,883.65$

08 81 35 S.F. 37.04 23.71 60.75$ 226.60 13,765.26$

N/A S.F. 180.94 23.71 204.64$ 532.4066 $112,453.24

08 12 13.13 1200 E.A. 219.38 58.03 277.41$ 42 11,651.13$

08 12 13.13 1240 E.A. 257.96 66.06 324.02$ 10 3,240.17$

08 13 13.13 1760 E.A. 540.18 61.73 601.91$ 13 7,824.84$

08 13 13.13 1760 E.A. 644.35 61.73 706.09$ 49 34,598.27$

N/A E.A. 5655.00 61.73 5,716.73$ 2 11,433.47$

08 36 13.10 2950 E.A. 5467.90 2253.31 7,721.21$ 1 7,721.21$

08 33 13.10 2000 E.A. 1681.16 419.79 2,100.95$ 1 2,100.95$

08 33 13.10 2080 E.A. 2948.92 660.56 3,609.48$ 1 3,609.48$

N/A E.A. 552.96 129.99 682.95$ 118 80,588.31$

Sub-total Division 08

295,603.16$

DIVISION 09

09 05 05.10 1250 S.F. 0.00 0.62 0.62$ 14060.64 8,680.25$

09 05 05.10 0240 S.F. 0.00 1.04 1.04$ 2708.75 2,809.35$

09 05 05.20 0400 S.F. 0.00 0.37 0.37$ 8519.72 3,155.76$

09 05 05.20 0550 S.F. 0.00 0.15 0.15$ 2429.79 360.00$

09 05 05.30 0280 S.F. 0.00 2.06 2.06$ 608.86 1,255.43$

09 05 05.20 0850 L.F. 0.00 0.37 0.37$ 7236.73 2,680.53$

09 05 05.20 0900 S.F. 0.00 0.74 0.74$ 6267.36 4,642.94$

09 05 05.20 2020 S.F. 0.00 1.19 1.19$ 1961.67 2,325.16$

09 05 05.30 3760 S.F. 0.00 1.23 1.23$ 4492.37 5,546.67$

09 29 10.30 2050 S.F. 0.42 0.96 1.38$ 6319.77 8,733.72$

09 30 13.10 3260 S.F. 4.91 2.52 7.42$ 1961.67 14,564.28$

09 30 13.10 5800 S.F. 3.62 4.31 7.92$ 4492.37 35,601.71$

09 65 19.23 7500 S.F. 3.96 0.84 4.80$ 6267.36 30,065.80$

96713 S.F. 11.06 2.59 13.65$ 832 11,352.77$

09 51 23 L.F. 6.12 9.26 15.38$ 175.17 2,693.80$

09 51 23.10 1110 S.F. 1.00 0.74 1.74$ 14060.64 24,521.71$

09 61 19.40 0010 S.F. 0.76 0.99 1.75$ 27228.74 47,606.90$

09 91 23.72 0880 S.F. 0.13 0.25 0.38$ 6319.77 2,396.62$

09 91 23.72 3280 S.F. 0.25 0.49 0.75$ 28103.35 21,005.21$

09 91 23.72 3280 S.F. 0.25 0.49 0.75$ 62221.25 46,505.86$

09 91 03.30 0080 S.F. 0.00 0.62 0.62$ 588.81 363.50$

09 91 03.30 0150 S.F. 0.00 0.20 0.20$ 588.81 116.32$

09 91 03.40 0080 S.F. 0.00 0.62 0.62$ 5057.13 3,121.99$

09 91 03.40 0150 S.F. 0.00 0.19 0.19$ 5057.13 936.60$

99100 EA. 1.50 16.80 18.30$ 118 2,159.80$

99100 EA. 14.88 16.80 31.69$ 118 3,739.01$

09 65 13.13 0710 L.F. 1.54 1.35 2.89$ 7237 20,908.16$

09 65 13.13 0740 E.A. 2.70 1.35 4.05$ 254 1,027.86$

09 91 13.42 0310 L.F. 14.99 1.25 16.24$ 40.00 649.59$

09 91 13.42 0190 L.F. 3.65 8.22 11.87$ 40.00 474.88$

Sub-total Division 09

310,002.18$

CONCRETE

Concrete Patching, Floors, 1/4" Thick, small areas, epoxy grout

EXISTING CONDITIONS

Concrete Patching, Walls, 3/4" Thick, small areas, cleaning and epoxy grout

Selective Demolition Fencing, Chain link, posts, 8' to 10' high, remove only

Deconstruction of Existing Classroom Divider (Allowance)

Miscellaneous

GENERAL REQUIREMENTS

Division Not Used

Miscellaneous, Interior Painting, Ladder Rungs, exterior, metal, Roll & Brush Zinc Chromate, to 14", each coat

Paint Restoration, Interior Surface Prepartion, Doors, per side, Hand Wash

Painting (Door Jamb Prep)

Painting (Door Jam)

Resilient Base and Accessories, 1/8" Vinyl Base, 6" High, straight or cove, standard colors

Resilient Base and Accessories, 1/8" Vinyl Base, Corners, 6" high

Miscellaneous, Interior Painting, Ladder Stringers, metal, Roll & Brush Zinc Chromate, to 14", each coat

Interior Painting, Walls, drywall or plaster, latex, primer or sealer coat, paint 2 coats, smooth finish, spray

Interior Painting, Ceiling, Primer plus 2 finish coats, smooth, Spray

Interior Painting, CMU Walls, Primer plus 2 finish coats, smooth, Spray

Paint Restoration, Exterior Surface Prepartion, Doors, per side, Wire Brush

Paint Restoration, Exterior Surface Prepartion, Doors, per side, Power Wash

Paint Restoration, Interior Surface Prepartion, Doors, per side, Wire Brush

Ceramic Tiling, Floors, Glazed, thin set, 8"x8" tile, color group 1

Ceramic Tiling, Walls, interior, thin set, 8"x" tile

Vinyl Flooring, Vinyl Tiling, 12"x12", 3/32" Thick

Resilient Flooring (Epoxy)

Suspended Acoustical Ceiling Tiles, Mineral Fiber Tile lay-in, 5/8" thick, fine texture

Concrete Floor Painting, Paint, two coats, Acrylic Sealer, two coats

Selective Demolition, Concrete Block Walls, 8" thick

Selective Demolition, Flooring, Resilient, Sheet Goods,Vinyl or Rubber Cove Base

Selective Demolition, Flooring, Vinyl Composition Tile, 12"x12"

Selective Demolition, Flooring, Tile, Ceramic, Mud Set

Selective Demolition, Walls and Partitions, Tile, Ceramic, on walls, thin set

Gypsum Board on Walls, 5/8" thick, on walls, taped and finished

FINISHES

Selective Demoition, Ceilings,Suspended Ceiling, Mineral Fiber, 2'x2' or 2'x4' on suspension system, including system

Selective Demolition, Ceilings, drywall, nailed or screwed on suspension system, including system

Selective Demolition, Flooring, Carpet, bonded, including surface scraping

Selective Demolition, Flooring, Capet Tile, Releasable adhesive

Ballistic Resistant Doors, estimate provided from Interbank

Overhead Commercial Doors, for electric trolley operator , over 12x12, 1/2 HP, w/ clear lites,

Counter doors, coiling type, counter doors, coiling type, Aluminum, 4' high, 4' long

Counter doors, coiling type, counter doors, coiling type, Aluminum 14' long, 4' high

Door Hardware, estimate provided

Glazing System (Low-E)

Glazing System (Low-E) with Reflective Film & Ballistic Glazing

Metal Frame, 16Ga, 8 3/4" deep, 3'-0"x7'-0", single

Metal Frame, 16Ga, 8 3/4" deep, 6'-0"x7'-0", double

Standard Hollow metal doors, insulated, 1 3/4" thick, full panel, 18 Ga. 3'-0"x7'-0", w/ Vision lite

Standard Hollow metal doors, insulated, 1 3/4" thick, full panel, 18 Ga. 3'-0"x7'-0", w/o Vision Lite

Selective Demolition of Frames, including trim, metal

Selective Demolition of Frames, including trim, wood

Selective Demolition of Doors, Roll-up Grilles

Selective Demolition of Overhead Doors, Commercial, up to 20'x 16' high

Selective Demolition of Large Gate Separation Doors

Deconstruction of Storefront Aluminum Windows / Doors

DOORS AND WINDOWS

Selective Demolition of Doors, Exterior, 1-3/4" Thick, single, 3'x7' high

Selective Demolition of Doors, Exterior, 1 3/4" Thick, double, 6'x7' high

Selective Demolition of Doors, Interior, 1-3/8" Thick, Single, 3'x7' high

Selective Demolition of Doors, Interior, 1-3/8" Thick, Double, 6'x7' high

Roof Hatch Options, 2'-6"x4'-6" Aluminum Curb and Aluminum Cover

Insulation, 4" thick

Flashing, coping, etc.

Gutters and Downspouts

Fluid Applied Weather barrier

Selective Demo., Thermal and Moisture Protection Remove, Roof Hatch

Selective Demo., Roofing, Modified Bitumen Roofing

Vapor Retarders, Polyethylene Vapor Barrier, Standard, 10 mil.

Roof Deck Insulation, Fastening Excluded, Polyisocyanurate, 2# C.F. Density, 3 1/2" Thick + Tapered for Drainage

Polyvinyl Chloride Roofing (PVC), Reinforced 60mils., 0.40psf, fully adhered with adhesive

Standing Seam Sheet Metal Roofing, 24Ga.

WOOD AND PLASTICS

Selective Demolition, Wood Framing, Wood Studs, 2"x4"

Selective Demolition, Wood Framing, Joists, 2"x8"

Selective Demolition Wood Framing, Sheathing, from Walls 5/8"

Partitions Single Bottom and double top plate, 10' high, studs 16" o.c.

THERMAL AND MOISTURE PROTECTION

Selective Demo Gutters, aluminum or wood, edge hung

Selective Demo Downspouts, including hangers

Cleaning of Metal Products, Near White blast, loose scale, fine rust

Structural Steel Members, W18x55

Steel Plates, For connections & Stiffner Plates, shop fabricated, 3/8" Thick (15.3 lb/SF), Not including installation

Lintels, Steel Angles, 4" x 31/2", 1/4" thick, 5'-0" Long

Pointing Masonry, Cut and repoint brick, jard mortar, common bond (5% Allowance)

Cleaning Masonry, Low pressure wash and rinse, light restoration, average soil, biological staining

Concrete Block Back-up, Normal Weight 8"x16" units, tooled joint 1-side, not-reinforced, 8" thick

Face Brick, Standard Modular, 4" 2-2/3"x8"

Limestone, Cut to size, Veneer Facing Panel, texture finish, 5" Thick,(5x14 max panels)

Misc. Materials

Precleaning

Final Cleaning

Demo - Toilet Partitions

Concrete Crack Repair - Rout & Seal

Brick Sealant

OPINION OF PROBABLE COST

FOR

Memphis Readiness Center (William L. Terry Armory)

Renovation of Existing Building

Value Engineering Option

Air Filtration

9/1/2017

Sidewalk Removal, Concrete, Plain 6"

Selective Site Demolition, Concrete, 7" to 24" thick, plain, reinforced

kimberly.isham
Rectangle
kimberly.isham
Not Approved
Page 33: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

DIVISION 10

102113 E.A. 575.45 170.39 745.84$ 34 25,358.55$

102813 E.A. 129.43 63.59 193.02$ 10 1,930.19$

102813 E.A. 132.29 34.57 166.86$ 27 4,505.20$

102813 E.A. 56.50 26.55 83.04$ 27 2,242.18$

102813 E.A. 200.53 80.25 280.78$ 10 2,807.81$

102813 E.A. 31.69 19.45 51.14$ 27 1,380.79$

10 44 13.53 2700 E.A. 207.25 143.22 350.48$ 7 2,453.33$

10 44 16.13 0180 E.A. 435.45 0.00 435.45$ 1 435.45$

102813 E.A. 523.64 63.59 587.23$ 2 1,174.45$

102813 E.A. 6327.78 3037.33 9,365.11$ 2 18,730.22$

102813 L.F. 48.51 3.01 51.52$ 817 42,087.55$

Sub-total Division 10

103,105.72$

DIVISION 11

Sub-total Division 11

-$

DIVISION 12

123661 L.F. 66.14 40.13 106.27$ 17.69 1,880.41$

Sub-total Division 12

1,880.41$

DIVISION 13

Sub-total Division 12

-$

DIVISION 22

22 14 26.19 6770 L.F. 186.31 13.03 199.33$ 82.00 16,345.19$

Sub-total Division 23

16,345.19$

DIVISION 23

Sub-total Division 23

-$

DIVISION 26

Sub-total Division 26

-$

DIVISION 31

31 22 13.20 0150 E.A. 0.00 2190.34 2,190.34$ 1.00 2,190.34$

Sub-total Division 31

2,190.34$

DIVISION 32

320000 S.Y. 66.14 4.57 70.71$ 10.00 707.12$

321123 S.Y. 13.09 0.14 13.22$ 12724.36 168,232.63$

321216 S.Y. 33.90 2.58 36.48$ 12724.36 464,175.72$

321216 S.Y. 11.96 0.99 12.95$ 12724.36 164,765.07$

32 17 23.14 0790 L.F. 0.00 0.06 0.06$ 13129.16 810.52$

32 17 23.14 0800 STALL 4.89 3.32 8.22$ 450 3,700.47$

321216 S.Y. 50.45 7.70 58.15$ 333.33 19,383.43$

321216 S.Y. 36.86 5.63 42.49$ 20497.40 871,025.40$

32 06 10.10 0400 S.F. 2.91 2.51 5.42$ 2102.10 11,386.56$

32 17 13.13 1400 E.A. 755.14 111.74 866.88$ 19.00 16,470.78$

32 92 19.13 0020 ACRE 11.96 0.99 12.95$ 2.00 25.90$

32 33 43.13 0560 E.A. 1185.08 92.60 1,277.68$ 2.00 2,555.36$

- - - - 1 5,000.00$

Sub-total Division 32

1,728,238.95$

3,686,610.12$

SUBTOTAL CONSTRUCTION COST 3,686,610.12$

Design Contingency % 2.50% 92,165.25$

SUBTOTAL CONSTRUCTION COST 3,778,775.37$

General Conditions % 10.00% 377,877.54$

Overhead and Profit 10% + 5.00% 644,281.20$

Construction Contingency % 10.00% 480,093.41$

Permit Allowance 3,500.00$ Subtotal 5,284,527.52$

Builders Risk 0.55% 29,064.90$ 5,812.98$

Bond % 1.50% 79,703.89$

TOTAL ESTIMATED CONSTRUCTION COST 5,393,296.31$

SUBTOTAL CONSTRUCTION COST 3,834,074.52$

Design Contingency % 2.50% 95,851.86$

SUBTOTAL CONSTRUCTION COST 3,929,926.38$

General Conditions % 10.00% 392,992.64$

Overhead and Profit 10% + 5.00% 670,052.45$

Construction Contingency % 10.00% 499,297.15$

Permit Allowance 4,500.00$ Subtotal 5,496,768.62$

Builders Risk 0.55% 30,232.23$

Bond % 1.50% 82,905.01$

TOTAL ESTIMATED CONSTRUCTION COST 5,609,905.86$

SUBTOTAL CONSTRUCTION COST 3,987,437.50$

Design Contingency % 2.50% 99,685.94$

SUBTOTAL CONSTRUCTION COST 4,087,123.44$

General Conditions % 10.00% 408,712.34$

Overhead and Profit 10% + 5.00% 696,854.55$

Construction Contingency % 10.00% 519,269.03$

Permit Allowance 4,500.00$ Subtotal 5,716,459.36$

Builders Risk 0.55% 31,440.53$

Bond % 1.50% 86,218.50$

TOTAL ESTIMATED CONSTRUCTION COST 5,834,118.39$

Heavy Duty Paving, Stone Base, and Average Grading

Heavy Duty Proof-Rolled Chert Base, and Stone Paving

Layout of Pavement Marking

Lines on Pvmt., Parking Stall, Paint, White, 4" White

Landscaping Allowance

Asphalt (Base, Binder & Topping)

Asphaltic Pavement 3"

Sidewalk Concrete, 3000psi, CIP, 6x6 - W1.4xW1.4 mesh, 6" thick

Pipe Bollards, conc. Filled/paint, 8'Lx4'Dhole, 8" Diameter

Mechanical Seeding, 215 lb./Acre

Site Seating, Powder Coated Steel, with Back and 2 dividers, 6' Long

Rough Grading Open Site 5100-8000SF

EXTERIOR IMPROVEMENTS

Asphalt Demolition

Asphaltic Base Sealer

ELECTRICAL

Division Not Used

EARTHWORK

Exterior Trench Drain, 12" internal width, with heavy duty galvanized grate

MECHANICAL

Division Not Used

Special Construction

Division Not Used

PLUMBING

Division Not Used

FURNISHINGS

Countertop, Solid surface

Accordion Fixed Gate for Interior Separation use, 6'-8' Wide, 10' max height,

Classroom Divider, 41 STC, Manual Operation, Acoustical Finish, 30'x8' Max

Security Chain Dividing Fence, 7'H, standard FE-7, interior installation

EQUIPMENT

Mirrors

Soap Dispenser

San. Npkn Disposal

TP Dispenser (Jumbo Dbl Roll)

Fire Blanket, & Extinguisher Cabinet, Including Blanket, Recessed, Stainlesss Steel, 14"x40"x8"

Portable Fire Extinguisher, CO2, with hose and "H" Horn, 20 lb., for Kitchen

SPECIALTIES

Toilet Partitions (HDPE)

Grab Bars

kimberly.isham
Rectangle
kimberly.isham
Not Approved
kimberly.isham
Text Box
Total Construction Cost - 1,030,000.00 24% Inflation - 247,200.00 Total Cost - 1,277,200.00 Rounded - 1,280,000.00
kimberly.isham
Rectangle
kimberly.isham
Not Approved
Page 34: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

F. Floorplan Layouts

- Demolition Plan and New Floor Plan.

Page 35: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

UNIT

STORAGE B

RIFLE RANGE

UNIT

STORAGE A

LOCKER

ROOM C

ADMIN C1 ADMIN C2

TLT C

FOOD

PREPARATION

SCULLERY TAS

LEARNING

CENTER

LIBRARY

MECH ASTORAGEFOOD

STORAGE

ASSEMBLY

HALL

FAC.

MAINTENANCE

MEN TLT WOMEN TLT

VAULT EVAULT DVAULT CVAULT BVAULT A

MECH C

MECH B

UNIT

STORAGE C ADMIN D

ADMIN D3

ADMIN

D2

ADMIN

D1

ADMIN

D5

ADMIN

D4

ADMIN C4

ADMIN C6

ADMIN C5

ADMIN C3

ADMIN CS

ADMIN B3

ADMIN B1

ADMIN A5

ADMIN A4

ADMIN A3

ADMIN A2

ADMIN A1

ADMIN A13 ADMIN A12

ADMIN A11

ADMIN A10

ADMIN A9

ADMIN A8ADMIN A7ADMIN

A6

ADMIN A

ADMIN

E3

ADMIN

E2

ADMIN

F4

ADMIN

F3

ADMIN

E4

ADMIN

E5

ADMIN E

CLASSROOM

A2

ADMIN

E1

ADMIN

F5

CLASSROOM

C

CONFERENCE

ROOM

ADMIN F

ADMIN

F1

ADMIN

F2

ADMIN G

ADMIN G2

MECH D

ADMIN G1

UNIT

STORAGE D

LOCKER

ROOM ATLT A

GYM

UNIT

STORAGE E

UNIT

STORAGE F

LOCKER

ROOM BTLT B

UNIT

STORAGE G

UNIT

STORAGE H

STORAGE

ADMIN

ENTRY

CLASSROOM

B

CLASSROOM

A1

JAN CLT

VESTIBULE

ADMIN B2

ADMIN C7

33

10 W

es

t E

nd

Av

e, S

uit

e 4

20

T

615

.33

3.7

20

0

G M

C N

E T

W O

R K

. C

O M

Na

sh

vil

le, T

N 3

72

03

DR

AW

N

BY

:

ISS

UE

D

AT

E

CH

EC

KE

D B

Y:

sheet

of

A

B

C

D

E

F

G

H

J

K

1 2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

H

J

K

9/1

/20

17 3

:48

:49

PM

DE

MO

LIT

ION

PL

AN

FIG

1F

VG

PN

N

ME

MP

HIS

RE

AD

INE

SS

CE

NT

ER

/ T

N N

G

2

GM

C #

17

00

50

08

/3

1/2

016

PR

OB

. CO

ST

RE

P.

26

10 E

HO

LM

ES

RD

. ME

MP

HIS

, TN

38

118

1

Page 36: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

UNIT

STORAGE B

RIFLE RANGE

UNIT

STORAGE A

LOCKER

ROOM C

ADMIN C1 ADMIN C2

TLT C

FOOD

PREPARATION

SCULLERY TAS

LEARNING

CENTER

LIBRARY

MECH A

STORAGE

FOOD

STORAGE

ASSEMBLY

HALL

FAC.

MAINTENANCE

MEN TLT WOMEN TLT

VAULT EVAULT DVAULT CVAULT BVAULT A

MECH C

MECH B

UNIT

STORAGE C ADMIN D

ADMIN D3

ADMIN

D2

ADMIN

D1

ADMIN

D5

ADMIN

D4

ADMIN C4

ADMIN C6

ADMIN C5

ADMIN C3

ADMIN CS

ADMIN B3

ADMIN B1

ADMIN A5

ADMIN A4

ADMIN A3

ADMIN A2

ADMIN A1

ADMIN

A6

ADMIN A

ADMIN

E3

ADMIN

E2

ADMIN

F4

ADMIN

F3

ADMIN

E4

ADMIN

E5

ADMIN E

CLASSROOM

A2

ADMIN

E1

ADMIN

F5

CLASSROOM

C

CONFERENCE

ROOM

ADMIN F

ADMIN

F1

ADMIN

F2

ADMIN G

ADMIN G2

MECH D

ADMIN G1

UNIT

STORAGE D

LOCKER

ROOM ATLT A

GYM

UNIT

STORAGE E

UNIT

STORAGE F

LOCKER

ROOM BTLT B

UNIT

STORAGE G

UNIT

STORAGE H

STORAGE

ADMIN

ENTRY

CLASSROOM

B

CLASSROOM

A1

JAN CLT

VESTIBULE

ADMIN. CONFERENCE

ADMIN B2

ADMIN C7

33

10 W

es

t E

nd

Av

e, S

uit

e 4

20

T

615

.33

3.7

20

0

G M

C N

E T

W O

R K

. C

O M

Na

sh

vil

le, T

N 3

72

03

DR

AW

N

BY

:

ISS

UE

D

AT

E

CH

EC

KE

D B

Y:

sheet

of

A

B

C

D

E

F

G

H

J

K

1 2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

H

J

K

9/1

/20

17 3

:48

:49

PM

NE

W F

LO

OR

PL

AN

FIG

2A

uth

or

PN

N

ME

MP

HIS

RE

AD

INE

SS

CE

NT

ER

/ T

N N

G

2

GM

C #

17

00

50

08

/3

1/2

016

PR

OB

. CO

ST

RE

P.

26

10 E

HO

LM

ES

RD

. ME

MP

HIS

, TN

38

118

2

TRUE

NORTH

Page 37: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

ROOF DESIGN & CONSULTING SERVICES INC. 4610 Papermill Drive● Knoxville, TN 37909 ● Telephone (865) 584-3770 ● Fax (865) 584-9505 ● www.roofdcs.com

D E S I G N & C O N S T R U C T I O N C O N S U L T I N G ● A R C H I T E C T U R E

Roof Inspection and Building Evaluation

TO: CPT Kimberly A. Isham

Design & Project Management Chief Construction and Facilities Management Office

TNARNG Construction Facilities Management Office PO Box 41502 Nashville, TN 37204-1502

[email protected] CC: Col. Andrew Milligan Mr. Greg Steck

[email protected] [email protected]

CONSULTANT: ROOF DESIGN & CONSULTING SERVICES, INC. RDCS PROJECT NO. 18-04-04 REPORT DATE: May 20, 2018 PROJECT: Roof Inspection and Building Evaluation TENNESSEE ARMY NATIONAL GUARD Memphis Readiness Center 2610 E. Holmes Road Memphis, TN 38118

INTRODUCTION

Roof Design & Consulting Services, Inc., an independent architectural and roof consulting firm, has been retained to evaluate the existing roof systems installed on the subject property and to evaluate the condition of the interior and exterior finishes. At the time of our site visit, active leaks were reported. There was evidence of repeated water infiltration, and interior finish damages were noted.

INSPECTION

The site visit and inspection were conducted on April 19, 2018, by Mr. Josh Hankins, RRO, CMI and Mr. Jim Ferri, RRO. The weather was clear and the temperature was 65°F. Certain photographs were taken to illustrate existing conditions, and limited physical investigations were performed to verify existing conditions. No destructive or invasive examinations were made. The inspection was conducted using accepted Industry Standards and the following rules and guidelines:

• NRCA Roofing and Waterproofing Manual – National Roofing Contractors Association (NRCA)

• Property Loss Prevention Data Sheets for Roofing Contractors – Factory Mutual (FM) • International Building Code (IBC) • SMACNA Sheet Metal Manual – Sheet Metal & Air Conditioning Contractor’s National

Association (SMACNA) • Unified Facilities Criteria (UFC) – Department of Defense • Wind Design Standards for Edge Systems Used with Low Slope Roofing Systems -

Single Ply Roofing Industry (SPRI) • ANSI/SPRI/FM 4435/ES-1

RDCS was given access and was accompanied by SFC Steve Bonds.

Page 38: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 2

BACKGROUND& DESCRIPTION

The Memphis Readiness Center is a one-story structure constructed in 1982. The building was designed by Haglund and Venable, Architects of Memphis, TN. Roof repairs were performed in 1988, and the building was reroofed in 2010. The roofing contractor was Accurate Roofing Co. Inc. of Potts Camp, MS.

The building construction consists of load bearing masonry walls with exterior brick veneer, shallow spread concrete footings, and concrete slab on grade. The windows are operable and fixed aluminum units.

Over the classroom and administration areas, the building roof structure consists of steel joists and steel roof deck. Above the firing range and drill hall is a tongue and groove cementitious wood fiber board on steel trusses and purlins. A Soprema modified bitumen roof system is installed over the entire facility. A manufacturer’s roof system warranty is in effect until April 2030. Drainage on the all areas is provided by gutters and downspouts which spill to grade.

EXHIBITS

PREFACE TO EXHIBITS: The exhibits presented herein are intended to illustrate both general and specific conditions observed during the roof investigation. All deficiencies on each roof area have not been shown, and their omission does not imply that those conditions may not be present. These photographs seek to convey the overall assessment of the roofs and to emphasize particularly significant conditions.

Exhibit No. 1

The Memphis Readiness Center is a one-story structure situated on a level open site in Shelby County, TN. The building is entirely unprotected by vegetation or terrain.

Page 39: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 3

Exhibit No. 2

Above the classroom and administrative areas, the existing roof is a modified bitumen roof system installed with hot asphalt over rigid insulation, over a steel roof deck.

Exhibit No. 3

The membrane is in good condition with minimal granule loss or physical damage present.

Page 40: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 4

Exhibit No. 4

We did not do destructive testing or core cuts to verify the installation, but it appears that the underlying sheet has been run parallel (up and down) to the slope. If this is a base sheet, it does not comply with manufacturer’s requirements or industry standards. If this is a recover, and the vertical plies are the previous cap sheet, then the installation of the cap sheet appears satisfactory.

Exhibit No. 5

Blisters are forming between the cap sheet and underlying layers. Several blisters intersect seams and are beginning to pull apart. Typically, blisters indicate the presence of moisture under the sheet or delamination caused by poor adhesion.

Page 41: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 5

Exhibit No. 6

At the front entrance, a large blister has formed beneath the cap sheet and has filled with water. Because of continuous exposure to moisture, the water will infiltrate into the building.

Exhibit No. 7

This gas flue was not secured and openings were found around the umbrella and outer sleeve.

Page 42: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 6

Exhibit No. 8

A pipe boot intended for use on a metal roof was used on this penetration. This is not an acceptable detail.

Exhibit No. 9

Pre-fabricated pitch pockets (commonly referred to as lockin’ pockets) were used on several pipe penetrations.

Page 43: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 7

Exhibit No. 10

Because of their shallow depth, and the use of a single part filler, several of the pitch pockets were no longer watertight. A leak was reported in the computer lab directly beneath this penetration.

Exhibit No. 11

A large opening in the filler is present adjacent to the refrigerant lines.

Page 44: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 8

Exhibit No. 12

On all roof areas, a raised gravel stop was used instead of a low-profile drip edge. This results in standing water around the perimeter of the roof system and has caused several soft spots in the insulation.

Exhibit No. 13

Evidence of long term standing water is readily visible. Also, note the blister along the membrane edge seam.

Page 45: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 9

Exhibit No. 14

Not only was the wrong edge metal profile used, the workmanship was very poor. Note the opening into the roof system behind the fascia.

Exhibit No. 15

Directly beneath this location evidence of water penetration behind the gutter is evident. We were not able to determine if the wood nailers around the perimeter of the roof were properly protected or have been damaged by the continuous exposure to moisture.

Page 46: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 10

Exhibit No. 16

The roof system on the drill hall and firing range consists of modified bitumen roof membranes over rigid insulation over tongue and groove cementitious wood fiber roof deck over steel trusses and beams. Note the lines of the underlying plies of the roof system running perpendicular to the cap sheet.

Exhibit No. 17

The cap sheet was run parallel to the slope of the high roof. The manufacturer does not recommend installation using hot asphalt on slopes over ½:12. This roof was measured at 9° which is 2:12

Page 47: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 11

Exhibit No. 18

The cap sheets are beginning to slide down the slope and are separating at the end laps.

Exhibit No. 19 The seam at the ridge of the drill hall is likewise slipping. The sheets are separating and will eventually cause leaks. All end laps are required to be staggered which was not done along the ridge.

Page 48: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 12

Exhibit No. 20

Several locations were found where nails have backed out of the edge metal and the flashing strip is not properly bonded. Again, note the use of a raised edge gravel stop instead of a drip edge.

Exhibit No. 21

The same raised edge gravel stop was used on the rake edges of the high roof and stripped in with foil faced flashing.

Page 49: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 13

Exhibit No. 22

The foil facing has failed in multiple locations, exposing the asphalt beneath. Asphalt used in sheet materials is not a UV stable product and depends on granules or foil facing to prevent UV degradation. This condition will continue to worsen and expose more asphalt.

Exhibit No. 23

The louvers on the ventilation fans for the drill hall are loose or missing. This offers no protection against wind-blown rain which easily can penetrate into the building or into the wall system.

Page 50: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 14

Exhibit No. 24

Several of the detached louver blades were found on the roof surface. These are constructed of lightweight aluminum and could easily become wind-borne causing damage to the roof surface, vehicles surrounding the building, or pedestrians outside the readiness center.

Exhibit No. 25 An expansion joint is installed around the perimeter of the drill hall. It is a prefabricated Johns Manville “Expand-O-Flash” and has field fabricated transitions. Multiple applications of mastic are evident on the EPDM bellows. This is not considered a permanent repair nor does it meet manufacturer’s requirements or industry standards. Also, note the concrete splash block installed directly on the roof surface with no sacrificial slip sheet to protect the roof membrane.

Page 51: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 15

Exhibit No. 26

Overall, the exterior masonry of the Memphis Readiness Center was in good condition. Very minimal damage was noted to the building exterior. Less than 20 LF of masonry joints and 6 bricks were noted to require repair or replacement.

Exhibit No. 27 The exterior masonry control joints are in poor condition. The sealant is dry, brittle, and cracked and can allow moisture to enter the exterior wall.

Page 52: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 16

Exhibit No. 28

At multiple locations around the facility, evidence of moisture penetration behind or from the gutters was noted.

Exhibit No. 29

The downspouts spill to grade around the facility and at many locations have caused erosion around the splash blocks due to poor drainage. No underground drainage system is provided.

Page 53: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 17

Exhibit No. 30

One window was found with the seals failed. The haziness is a result of moisture infiltration between the panes of glass.

Exhibit No. 31

At the front entrance, several areas of spalling concrete were observed.

Page 54: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 18

Exhibit No. 32

Upon closer inspection, the pins securing the concrete panels to the lintels have corroded. When metals corrode, the iron oxide increases their overall size. This can push mortar out of joints and crack pre-cast concrete panels. This phenomenon is known as “rust jacking.”

Exhibit No. 33

No condensate drain has been installed on this window AC unit and the condensate is running down the outside face of the wall. The continuous exposure to moisture will degrade the masonry and the grout between the bricks.

Page 55: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 19

Exhibit No. 34

Similarly, the continuous exposure to moisture at the hose bib in the can wash will cause the same damage. Evidence of leaking over an extended period is obvious.

Exhibit No. 35

The louver over the ventilation fan on the firing range is inoperable and stuck in the open position. This will allow wind-blown rain into the building and into the wall assembly.

Page 56: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 20

Exhibit No. 36

The interior masonry walls were in fair to poor condition overall with cracks observed in multiple locations. Approximately 450 LF of damaged masonry joints and 20 damaged masonry units were identified.

Exhibit No. 37

Approximately 200 SF of deteriorated metal roof deck was found. Some areas were found to have rusted entirely through the deck as shown here.

Page 57: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 21

Exhibit No. 38

The structural supports for a previously installed solar collector system are still present after the reroofing in 2010. These are direct openings through the roof deck into the roof system. Warm, moist, unconditioned air can penetrate into the roof system at these locations. Also, notice the “expansion joint” running from left to right in the roof deck.

Exhibit No. 39

These “expansion joints” are detailed in the original construction documents and are built as drawn, but they do not extend through the roof system as required. These openings will allow warm, moist, unconditioned air into the roof system from below.

Page 58: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 22

Exhibit No. 40

The paint finish on exposed metal deck was in poor condition in the lockerroom areas.

Exhibit No. 41

Evidence of water intrusion is visible on the light fixtures in the computer lab. These leaks are reported to have been occurring for an extended period of time.

Page 59: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 23

Exhibit No. 42

Damaged ceiling tiles were encountered in multiple rooms. Approximately 25-30 tiles were affected. This location was reported as an active leak in the computer lab and is directly beneath the pitch pocket in Exhibit Nos. 10&11.

Exhibit No. 43

The roof structure in the Drill Hall and Firing Range is tongue & groove Tectum panels over steel framing.

Page 60: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 24

Exhibit No. 44

Approximately 6-10 Tectum panels were identified in the Drill Hall as having shifted downslope from their original position. The panel edges are tongue & groove which appear to have separated to varying degrees.

Exhibit No. 45 One panel was identified with physical damage, but it does not appear to affect the performance of the system.

Page 61: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 25

Exhibit No. 46

Significant water leaks have occurred in the firing range. Many cementitious wood fiber panels have incurred water damage and no longer appear to be structurally sound. Any panel which has become wet should be removed and replaced. Foot traffic on damaged areas should be restricted.

Exhibit No. 47

In one closet, a wall has been partially removed to an adjacent closet. The remaining masonry is not supported and is showing evidence of movement and deflection. Cracks have formed on both sides of the remaining masonry and separation is evident beneath the roof deck.

Page 62: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 26

DISCUSSION

Based on our inspection of the Memphis Armory, the overall condition of the roof system was found to be fair. Active leaks were reported in the Firing Range, Computer Lab, and in 2 different offices at the front of the Readiness Center. Evidence of repeated moisture intrusion is visible in numerous rooms and hallways throughout the building. Over the classroom and administration areas, the building roof structure consists of steel joists and steel roof deck. Above the firing range and drill hall, the roof system is a tongue and groove cementitious wood fiber board on steel trusses and purlins. A Soprema multi-ply modified bitumen roof system is installed over the entire facility. A manufacturer’s roof system warranty is in effect until April 2030. Drainage on the all areas is provided by gutters and downspouts which spill to grade. The roof system is in overall good condition. Minimal granule loss and membrane damage were found. Some delamination was found between the cap sheet and base ply, but no leaks were reported in these areas. Above the front entrance foyer, a large blister was found that had filled with water, but no leak was reported beneath. Some of the blisters intersect seams in the membrane and have started to pull apart. It appears that the base sheet has been run perpendicular to the cap sheet. Multiple flashing details do not conform to manufacturer's requirements or standard details. The hot stacks are not properly flashed and a plumbing vent stack was found with a flashing boot intended for use on a metal roof. Pre-fabricated pitch pockets have been used on some penetrations and do not appear to be properly formed or filled. A leak was reported in the computer lab directly beneath one of the pitch pockets which had a large void in the filler. Around the perimeter of all roof areas, a raised gravel stop was used in lieu of a low-profile drip edge. This has caused water to back-up and stand on the roof surface. Several areas of soft insulation were found along with significant staining of the roof membrane. The workmanship of this edge metal was very poor with several openings through the metal to the fascia and nailers beneath. This same gravel stop was used in conjunction with foil-faced flashing on the high roof areas. The foil faced flashing has failed in multiple locations exposing the asphalt beneath. Since the asphalt used in sheet goods is not UV stable, degradation and further failure of the foil facing will continue. The cap sheet on the high roof area has been installed parallel to the slope of the roof. Manufacturer’s instructions state that the cap sheet should be “…installed perpendicular to the roof slope, shingled to prevent back water laps.” Further, the manufacturer does not recommend installation using hot asphalt on slopes over 3/4:12. The high roof area was measured at 9° which is 2:12. No mechanical termination or back nailing was used when installing the cap sheet and the membranes have started to slide down the roof. Separation is evident at the end laps and along the ridge. The exterior walls of the readiness center consist of load bearing masonry walls with brick veneer. The brick is in overall good condition. Less than 20 LF of masonry joints and 6 bricks were noted to require repair or replacement. However, the exterior masonry control joints are in poor condition. The sealant is dry, brittle, and cracked, and can allow moisture to enter the exterior wall system. Some staining is present on the exterior facade as a result of leaks behind the gutters and from gutter seams. Soil erosion has occurred at many lawn areas where the downspouts discharge to grade level. The interior masonry walls were in fair to poor condition overall with cracks observed in multiple locations. Approximately 450 LF of damaged masonry joints and 20 damaged masonry units were identified. One location was found in which the opening has been knocked through a CMU wall. We are not aware by whom or when the work was done, but the CMU’s left in place above the opening are unsupported and should be corrected as soon as possible. The precast concrete panels on the front entrance have several areas of spalling and cracking. They appear to be the result of "rust jacking" where the fasteners have started to corrode. When metal corrodes, it increases in size. This increase in size has caused the cracking and spalling.

Page 63: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 27

Several ventilation fan louvers were found to have failed. On the back of the firing range, the louvers have corroded and are stuck in the open position. On the high wall of the drill hall, the two ventilation louvers are likewise corroded. The individual vanes have started to separate from the frame and are lying on the roof surface. Both of these conditions allow a direct path for wind-blown rain into the building and into the wall assembly. The steel roof deck over the administrative and classroom areas is in fair condition. A large number of areas show evidence of corrosion and moisture damage. The original construction details show expansion joints in the roof system. The expansion joints created a continuous gap in the roof deck with no seal to keep out warm, moist, unconditioned air from the interior. The expansion joint did not extend through the roof system which can result in cracking, damage, and leaks in the modified bitumen membrane. Likewise, the abandoned equipment mounts for the solar collectors which were removed, are still in place and penetrate the roof deck. Large gaps around the supports allow air into the roof system. Air penetration into the roof system can cause condensation, corrosion of the roof deck, and deterioration of the insulation composite. The tongue and groove cementitious wood fiber roof deck in the drill hall and firing range is in fair condition. Several of the panels appear to be displaced down the slope. Some tongues and grooves are not fully engaged which can compromise the structural integrity of the system. One panel was found to be cracked and one panel showed physical damage in the drill hall. In the firing range, evidence of repeated leaks is visible. Approximately 10-15 panels appear to be affected and show deterioration. Any panel which has become wet will lose its structural strength even if allowed to dry. We did not conduct any type of destructive examination to verify the attachment of the panels. Typically a combination of screws, clips, and adhesive is used to secure the panels in place. Screw spacing is dependent on uplift resistance and shear capacity of the panel attachment. Since it is apparent that some of the panels have moved, further evaluation by a licensed structural engineer may be advisable. Replacement of deteriorated panels is necessary. This type of deck panel may be removed and replaced only from above which will require removal of the roof system.

CONCLUSION & RECOMMENDATIONS

It is evident that the readiness center has experienced roof leaks and interior damage. The existing roof system is under warranty until 2030, but based on our inspection, several unusual and irregular conditions were observed which typically are not Soprema’s approved details or installation techniques. It is recommended that leak reports be filed with the manufacturer, requesting repairs be made under the roof warranty. Further, it is recommended that a manufacturer’s technical representative inspect the roof to determine if the application and condition of the roof are acceptable. We did not observe damages or conditions which could be attributed to Owner-caused traffic, abuse or neglect. Rather, the deficiencies and resulting leaks which we found appeared to be due to poor or improper installation. Defects such as blisters which cross or affect seams should be removed and repaired. The raised gravel stop on the roof edges, deteriorated foil-faced flashing, lack of back-nailing, and vertically-run sheets are manufacturer issues, which in our opinion, also should be covered under the terms of the warranty. If any deficiencies are determined to be excluded from the warranty, the Owner will be responsible for any repair costs, including manufacturer inspection fees. The roof deck expansion joint locations should be carefully and regularly monitored to detect any damage to the roofing membrane which might develop along the line of the joint. We do not recommend disturbing the intact roof unless movement begins to damage the roofing. This type of defect is not a warranted item. The exterior brick masonry appeared in satisfactory condition with only limited repointing of exterior masonry joints necessary. It is recommended that all exterior masonry control joints be cleaned out and resealed. Spot repair of the spalled concrete panels at the front entrance will be necessary to prevent further deterioration. Repairs should include treatment of the exposed steel reinforcement to arrest rust, and concrete patch materials should include a bonding agent to prevent recurrence of spalling. Once all masonry repairs are complete, it is recommended that all exterior brick surfaces be cleaned. Interior masonry has numerous cracks and broken CMU. It is recommended that deficient mortar joints be repointed and broken CMU replaced. We found no evidence that the cracking was recent or still active. The new wall opening between rooms is not structurally sound and requires a lintel and dressing out. We recommend that this be done immediately.

Page 64: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 28

Deteriorated metal roof deck was found in several locations. Replacement can be performed only if the roof system is removed from above. Most of the damage appears to have occurred around roof fasteners which penetrate the deck and have been exposed to water from roof leaks. It is recommended that once all roof leaks are corrected, all rusted areas should be cleaned and ground smooth, primed, and repainted. Loose and deteriorated cementitious wood fiber roof deck panels (commonly referred to as Tectum) were found in the Drill Hall and Firing Range. It is recommended that any deteriorated panel be removed and replaced. Since the panels can be removed only from above, this will require removal of the roofing and insulation also. The water damage appears confined to the Firing Range, so as a practical matter, roof replacement is recommended on this entire area. As illustrated in the exhibits, further investigation of the Drill Hall deck is recommended. Water leaks are occurring behind and from the perimeter gutters resulting in staining the exterior brick masonry. The combination of standing water behind the gravel stop and failed gutter joints appear to be the source of the water. It is our opinion that the gravel stop and gutter should be removed and replaced as part of the manufacturer’s responsibility. Interior finish repairs are recommended to include removal and replacement of water-damaged acoustical ceiling tile and repainting the underside of the exposed metal deck. Preparation, priming, and correct paint of the existing metal surfaces are essential to ensure that the existing paint deterioration does not recur.

Respectfully submitted, ROOF DESIGN & CONSULTING SERVICES, INC.

Sidney I. Hankins III, AIA, RRC, FRCI President

Roof Design & Consulting Services, Inc. limits the purpose and intent of this report to verification and evaluation of existing conditions. Our findings are based solely on visual observations made during a visit to the subject property. We are not responsible for latent defects which were not visible at the time of our observations. Roof Design & Consulting Services Inc. did not conduct any type of physical or destructive testing and may not be held responsible for information which such testing might have revealed, if it had been undertaken or performed. The opinions expressed by the Consultant are not intended to serve as the basis for design changes. Professional assistance is recommended for any design changes, modifications or alterations of existing conditions. Our report is not intended to assume any responsibility of the Architect or Engineers of Record.

Page 65: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 29

The cost estimates presented herein represent approximate budgets and do not include any related expenses such as structural modifications, or modifications to mechanical & electrical systems (not directly related to roofing). All estimates are based on current labor and material costs and should be adjusted on an annual basis for future capital planning. Professional fees, laboratory testing, or contingencies are not included.

DESCRIPTION OF WORK

.

PRELIM COST

ESTIMATE

$14,000.00

$6,200.00

Roof Deck Repair at Firing Range – Remove and replace damaged and deteriorated cementitious wood fiber roof deck panels, including removal and replacement of existing roof system. Approximately 3,100 SF

$61,800.00

Exterior Masonry – Repoint deteriorated mortar joints and replace broken brick units. Completely clean and reseal exterior masonry control joints. Spot repair damaged concrete fascia at front entrance. Clean all exterior brick surfaces.

$42,500.00

Interior Masonry - Repoint cracked mortar joints and replace broken CMU. Modify and stabilize new opening in interior CMU wall and install new lintel. Prepare, prime and paint masonry surfaces disturbed by work.

Inspection and evaluation of cementitious wood fiber deck in Drill Hall by licensed structural engineer. Correction of attachment deficiencies, which may include removal and replacement of roof system, are not included.

Interior finish repairs – Remove and replace damaged ceiling tile. Strip, clean and repaint exposed metal deck. Spot repair and treat rusted metal deck.

TBD

NOTE: No cost estimate is included for remediation of roofing deficiencies which are described in this report. It is our opinion that this work is covered by the manufacturer’s roof warranty. Since the 3-year roof bond from the installer has expired, corrections are the sole responsibility of the manufacturer.

Remove and replace damaged and inoperable exterior wall louvers and fans (3).

$24,000.00

kimberly.isham
Text Box
Total Construction Cost - 148,500.00 12% Inflation - 17,820.00 Total Cost - 166,320.00 Rounded - 170,000.00
Page 66: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243

Roof Inspection & Building Evaluation – ARMY NATIONAL GUARD READINESS CENTER - Memphis, TN – Page 30

MEMPHIS TNARNG READINESS CENTER

Page 67: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243
Page 68: PROJECT ANNOUNCEMENT...State of Tennessee Real Estate Asset Management (STREAM) William R. Snodgrass Tennessee Tower, 24th Floor • 312 Rosa L. Parks Blvd. • Nashville, TN 37243