Project 2 north central expy-high 5 interchange 092210

16
1 Project 2 North Central Freeway (US 75) and High Five Interchange Reconstruction Dallas, Texas

description

Case Study #2 for UTCM Report #08-14-03 "Making Mobility Improvements a Community Asset: Transportation Improvements Using Context-Sensitive Solutions"

Transcript of Project 2 north central expy-high 5 interchange 092210

Page 1: Project 2   north central expy-high 5 interchange 092210

1

Project 2North Central Freeway (US 75) and High

Five Interchange ReconstructionDallas, Texas

Page 2: Project 2   north central expy-high 5 interchange 092210

2

North Central Expressway Constructed 1947 (4-6 lanes) Capacity exceeded after

about 10 years Initial planning for more capacity

Started in early 1970s More lanes in existing ROW Double deck (similar to Austin I-35) Broadly opposed (twice)

Noise Aesthetics Maintenance of traffic concerns ROW acquisition

By 1980, congestion 12 hours/day

NCE near Walnut Hill looking south toward downtown in 1959. Source: http://www.texasfreeway.com/dallas/historic/photos/images/us75_central_walnut_hill_looking_south_2_1959.jpg

Page 3: Project 2   north central expy-high 5 interchange 092210

3

North Central Expressway

Same segment 29 years later (before improvement)

NCE near Walnut Hill looking south toward downtown in 1988. Source: http://www.texasfreeway.com/dallas/historic/photos/images/tti_us75_walnut_hill_may_88.jpg

Page 4: Project 2   north central expy-high 5 interchange 092210

4

Collaborative Approach – Early 1980s North Central Task Force

City of Dallas TxDOT Chamber of Commerce DART Property owners Business leaders Elected officials

Initiated North Central Project (~10 miles) 10 miles Collaborative Consensus plan Meet corridor objectives, concerns Led by C of C Transportation Committee chair Nationally respected project manager Multidisciplinary deign team

North Central Task Force Organization. Source: North Central Task Force reports

Page 5: Project 2   north central expy-high 5 interchange 092210

Ultimate Proposal 8+ lanes

At-grade and depressed sections

Extensive retaining wall to reduce ROW needs

Cantilevered frontage roads (some)

LRT in tunnel under frontage road

Aesthetics package (renowned architect)

5

Typical cross-sections: north, central, south sections

Page 6: Project 2   north central expy-high 5 interchange 092210

Features – Before and After

6

Section of NCE at Northwest Highway interchange showing existing and improved configurations (visualization). Source: Regional Mobility Initiatives, NCTCOG, Vol. 11, No. 1, July 1997.

Page 7: Project 2   north central expy-high 5 interchange 092210

Features

7

Source: http://www.texasfreeway.com/Dallas/photos/us75/us75.shtml

Page 8: Project 2   north central expy-high 5 interchange 092210

Features

8

Source: TTI

Page 9: Project 2   north central expy-high 5 interchange 092210

Features

9

DART LRT line at north end of tunnel under NCE. Source: Regional Mobility Initiatives, NCTCOG, Vol. 11, No. 1, July 1997.

Page 10: Project 2   north central expy-high 5 interchange 092210

“High Five” Interchange Project

Last part of NCE project Followed NCE north and south of I-635 Delayed due to cost and funding Full replacement

10Before reconstruction. Looking south on US 75 at I-635. Source: TTI

Page 11: Project 2   north central expy-high 5 interchange 092210

Project Components

Fully directional high speed ramps NCE widened to 8 basic lanes Accommodate wider I-635 Include HOV ramps Maintain existing number of lanes during

construction

11

Construction duration Impact of construction on businesses

Issues

Page 12: Project 2   north central expy-high 5 interchange 092210

CSS Solution

Collaboratively discuss needs and possible solutions Extensive public outreach Reduce construction duration

Innovative construction techniques Contractor flexibility to innovate Incentives/disincentives Night construction Off-site pre-casting

Maintenance of traffic Existing number of lanes during day

Coordinate other improvements with High Five schedule

12Photo: Segment erector technology. Source: http://www.urbantransport-technology.com/projects/dallas_1/dallas_19.html

Page 13: Project 2   north central expy-high 5 interchange 092210

Expediting Construction

13

Erecting bridges by pre-cast sections. Source: http://www.houstonfreeways.com/modern/dfw_high_five_2003-10-27.aspx

Page 14: Project 2   north central expy-high 5 interchange 092210

Expediting Construction

14

Expedited construction while maintaining original number of lanes. Source: Eric Slotboom

Page 15: Project 2   north central expy-high 5 interchange 092210

Result

15

Source: Google Earth

Before reconstruction. Looking south on US 75 at I-635. Source: TTI

Page 16: Project 2   north central expy-high 5 interchange 092210

16

NCE near downtown in 1958. Source: http://www.texasfreeway.com/dallas/historic/photos/images/us75_central_n_of_downtown_july_1958.jpg