Project 1 M&E.pptx

30
Project 1: Understanding Different types of Professions and Drawings in the Built Environment Topic: Mechanical and Electrical Engineer Mechanical and Electrical Drawings Group : NG Members : Lew Quo Ming (Leader) Michelle Wong Sook Yin Kok Xuan Ying Melvyn Poh Ern Meng Liew Cherng Qing (Mike) Mohammad Hafiz bin Zainal Tutor : Miss Noorul Iffa Mohd Nayan Miss Ann See Peng Ms. Thivilojana

Transcript of Project 1 M&E.pptx

Page 1: Project 1 M&E.pptx

Project 1: Understanding Different types of Professions and Drawings in the Built Environment

Topic: Mechanical and Electrical EngineerMechanical and Electrical Drawings

Group : NGMembers : Lew Quo Ming (Leader)

Michelle Wong Sook YinKok Xuan YingMelvyn Poh Ern MengLiew Cherng Qing (Mike)Mohammad Hafiz bin Zainal

Tutor : Miss Noorul Iffa Mohd NayanMiss Ann See PengMs. Thivilojana

Page 2: Project 1 M&E.pptx

Content- Responsibilities- Scope of work- Tasks at different stage of construction- Types and Functions of drawings

Page 3: Project 1 M&E.pptx

Who are Mechanical & Electrical

Engineers?- work with architects and structural engineers.- Instrumental part of the design team.

Sizing and layout of Heating Ventilation and Air Conditioning (HVAC) , routing treated air and design of lighting & communications system.

Page 4: Project 1 M&E.pptx

Mechanical Engineer provide solutions to development of processes and products, ranging from small component to extremely large plant, machinery or vehicles.[ construction industry : HVAC]

Scope of Work

Electrical Engineer work on development of lighting and communication systems.

Page 5: Project 1 M&E.pptx

What do they do?

Page 6: Project 1 M&E.pptx

Before Construction- Implementing cost-effective equipment modifications.

(help improve safety and reliability)- Developing and evaluating theoretical designs.- Research, analyze, planning (mathematical modeling ).- Recommending modifications following prototype test

results. (Design & Experimenting )

Page 7: Project 1 M&E.pptx

During ConstructionMonitoring and commissioning systems.

Direct and coordinate manufacturing, construction,installation and maintenance activities.

Page 8: Project 1 M&E.pptx

After ConstructionMake sure a system can function again reliably and will perform consistently in specified operating environments.

Inspect complete installations and observe operations, ensure operational compliance (teamwork).

Page 9: Project 1 M&E.pptx

Mechanical and Electrical Drawings

Page 10: Project 1 M&E.pptx

Typical Electrical Layouts

Page 11: Project 1 M&E.pptx

Base Sheet

Page 12: Project 1 M&E.pptx

Step1: draw light fixtures

Step2: Place electrical outlets

Step3: Draw electrical symbols

Step4: Switch locations and characteristics

Page 13: Project 1 M&E.pptx
Page 14: Project 1 M&E.pptx
Page 15: Project 1 M&E.pptx
Page 16: Project 1 M&E.pptx
Page 17: Project 1 M&E.pptx
Page 18: Project 1 M&E.pptx
Page 19: Project 1 M&E.pptx
Page 20: Project 1 M&E.pptx
Page 21: Project 1 M&E.pptx
Page 22: Project 1 M&E.pptx
Page 23: Project 1 M&E.pptx
Page 24: Project 1 M&E.pptx
Page 25: Project 1 M&E.pptx
Page 26: Project 1 M&E.pptx
Page 27: Project 1 M&E.pptx

Summary

Page 28: Project 1 M&E.pptx

ReferenceJefferis,A., Madsen,D.A., Madsen,D.P. (1986). Architectural Drafting

and Design, United State : Delmar Cengage Learning. Bownass. D (2001), Building Services Design Methology, USA and

Canada , Spon Press. Graduate Prospects Ltd. (2015) “Mechanical Engineer Job

Description”, “Typical work activities” Retrieved February 24th 2015 http://www.prospects.ac.uk/mechanical_engineer_job_description.htm

Graduate Prospects Ltd. (2015) “Electrical Engineer Job Description”, “Typical work activities” Retrieved February 24th 2015 http://www.prospects.ac.uk/electrical_engineer_job_description.htm

CAREERPLANNER.COM (1997-2015) “Job Duties and Tasks for : Electrical Engineer” Retrieved February 24th 2015 http://job-descriptions.careerplanner.com/electrical-engineers.cfm

Page 29: Project 1 M&E.pptx

Q&A

Page 30: Project 1 M&E.pptx

THANK YOU