Progress Tracking Sheet-Steel Piping Hydro Testing Testing Reinstated Item Man hour Weighting 20% 45% 25% 10% 1 TP-001 A 950.0 532 0.08 100% 100% 100% 100% 100% 0.084 2 TP-002 A 1700.0 952 0.15 100% 100% 100% 0% 90% 0.136 3 TP-003 A 980.0 549 0.09 100% 100% 100% 0% 90% 0.078 4 TP-004 A 1370.0 767 0.12 100% 100% 100% 0% 90% 0.110 5 TP-005 B 2200.0 1100 0.17 100% 100% 100% 0% 90% 0.157 6 TP-006 B 2950.0 1475 0.23 56% 56% 29% 0% 44% 0.102 7 TP-007 B 800.0 400 0.06 0% 0% 0% 0% 0% 0.000 8 TP-008 B 1050.0 525 0.08 57% 57% 0% 0% 37% 0.031 Progress Summary by Project Area-Piping Hydro Testing Man hour Weighting A 5000 2800 0.44 92% 40.8% B 7000 3500 0.56 52% 29.0% Total 12000 6300 1.00 69.9% Preparation Done Clear Punch List TestPack No Project Area Quantity (Meter) Individual Progress Overall Progress Project Area Quantity (Meter) Progress by Area Overall Progress Progress is updated using data from Test Pack Tracker Sheet
-
Upload
modather-salah -
Category
Documents
-
view
14 -
download
0
description
tracking sheet
Transcript of Progress Tracking Sheet for Piping Hydrotesting
Progress Tracking SheetProgress Tracking Sheet-Steel Piping
Hydro TestingPreparation DoneTestingReinstatedClear Punch
ListItemTestPack NoProject AreaQuantity (Meter)Man
hourWeighting20%45%25%10%Individual ProgressOverall
Progress1TP-001A950.05320.08100%100%100%100%100%0.0842TP-002A1700.09520.15100%100%100%0%90%0.1363TP-003A980.05490.09100%100%100%0%90%0.0784TP-004A1370.07670.12100%100%100%0%90%0.1105TP-005B2200.011000.17100%100%100%0%90%0.1576TP-006B2950.014750.2356%56%29%0%44%0.1027TP-007B800.04000.060%0%0%0%0%0.0008TP-008B1050.05250.0857%57%0%0%37%0.031Progress
Summary by Project Area-Piping Hydro TestingProject AreaQuantity
(Meter)Man hourWeightingProgress by AreaOverall
ProgressA500028000.4492%40.8%B700035000.5652%29.0%Total1200063001.0069.9%
Progress is updated using data from Test Pack Tracker
Sheet
Test Pack Tracker SheetProgress updating SectionProgress
Calculation SectionItemIso Drawing NoTestpack NoSystem
NameWorkpackProject AreaPipe Length(m)Man HourPreparation
DoneTestingReinstatedClear Punch ListPreparation
DoneTestingReinstatedClear Punch
List1ISO-01TP-001TP-001AWP-001A30016810-Jan-1010-Jan-1010-Jan-1015-Jan-103003003003002ISO-02TP-001TP-001AWP-001A20011210-Jan-1020-Jan-1022-Jan-1025-Jan-102002002002003ISO-03TP-001TP-001AWP-001A45025210-Jan-1020-Jan-1022-Jan-1025-Jan-104504504504504ISO-04TP-002TP-002AWP-001A60033610-Jan-1020-Jan-1022-Jan-1025-Jan-106006006006005ISO-05TP-002TP-002AWP-001A50028010-Jan-1020-Jan-1022-Jan-1025-Jan-105005005005006ISO-06TP-002TP-002AWP-001A60033610-Jan-1020-Jan-1022-Jan-1025-Jan-106006006006007ISO-07TP-003TP-003AWP-001A50028010-Jan-1020-Jan-1022-Jan-1025-Jan-105005005005008ISO-08TP-003TP-003AWP-001A48026910-Jan-1020-Jan-1022-Jan-1025-Jan-104804804804809ISO-09TP-004TP-004AWP-002A69038610-Jan-1020-Jan-1022-Jan-1025-Jan-1069069069069010ISO-10TP-004TP-004AWP-002A68038110-Jan-1020-Jan-1022-Jan-1025-Jan-1068068068068011ISO-11TP-005TP-005BWP-002B75037510-Jan-1020-Jan-1022-Jan-1025-Jan-1075075075075012ISO-12TP-005TP-005BWP-002B80040010-Jan-1020-Jan-1022-Jan-1025-Jan-1080080080080013ISO-13TP-005TP-005BWP-002B65032510-Jan-1020-Jan-1023-Jan-10650650650014ISO-14TP-006TP-006BWP-003B85042510-Jan-1020-Jan-1023-Jan-10850850850015ISO-15TP-006TP-006BWP-003B80040010-Jan-1020-Jan-108008000016ISO-16TP-006TP-006BWP-003B65032517ISO-17TP-006TP-006BWP-003B65032518ISO-18TP-007TP-007BWP-004B80040019ISO-19TP-008TP-008BWP-005B45022516ISO-16TP-008TP-008BWP-005B60030010-Jan-1020-Jan-1060060000Progress
Summary (work step) by TestPack levelItemTestPack NoProject
AreaLength (meter)Preparation DoneTestingReinstatedClear Punch
List0.51TP-001A950100%100%100%100%2TP-002A1700100%100%100%100%3TP-003A980100%100%100%100%4TP-004A1370100%100%100%100%5TP-005B2200100%100%100%70%6TP-006B295056%56%29%0%7TP-007B8000%0%0%0%8TP-008B105057%57%0%0%