Progress Report on Airport Land Use Planning Study
April 2011
- 2 -
Parcel Overview
Consolidated Rental Car Facility
- 3 -
• A Consolidated Rental Car Facility (CONRAC) is a complex that hosts numerous rental car companies
• CONRACs are served by common or consolidated transportation systems for transport of customers to and from the airport terminals
• The use of some portions of CONRACs may be shared by rental car companies
Planning Activity Levels (PAL)
- 4 -
CONRAC facility requirements were developed for 3 PALs:
• PAL 1 6 Million Annual Enplaned Passengers
• PAL 2 9 Million Annual Enplaned Passengers
• PAL 3 12 Million Annual Enplaned Passengers
A Planning Activity Level (PAL) is planning horizon expressed in millions of annual enplaned passengers (MAEP.) PALs are not based on forecasts of future passenger activity. In 2010, there were 4.5 million enplaned passengers.
Consulting Team for Airport Land Use Planning Study
- 5 -
• JDavis Architects – Lead Consultant - Lawrence Zucchino, Project Manager
• Ricondo and Associates – CONRAC Planning
• Martin/Alexiou/Bryson and Lea & Elliot – Transportation Planning
• Withers & Ravenel – Utility Planning
• Robert J. Goldstein & Associates – Environment Planning
• CH Engineering – Stormwater Planning
Preliminary CONRAC Space Program Methodology
- 6 -
• Questionnaire sent to all rental car companies in November 2010 – 100% response rate
• Space program created using two different methodologies – Questionnaire methodology
– Utilization rate methodology
• PAL 1, 2, and 3 planning horizon – Total growth between existing (4.5 MAEP) and PAL 1 – 2020 (6 MAEP) = 33%
– Total growth between existing (4.5 MAEP) and PAL 2 – 2030 (9 MAEP) = 100%
– Total growth between existing (4.5 MAEP) and PAL 3 – 2044 (12MAEP) = 167% • Growth of approximately 3% per year was assumed to reach corresponding PAL years.
• Review and compare space programs
Functional CONRAC Facility Components
- 7 -
• Customer service area
• Ready/return area
• Vehicle service area
— Fuel islands
— Wash bays
— Maintenance bays
— Admin space
— Employee parking
• Overflow vehicle storage area
• Bus maintenance facility
Projected CONRAC Area Requirement
- 8 -
Square Footage Acreage
Existing (2010) 1,230,100 28
PAL 1 2,090,900 48
PAL 2 2,746,000 63
PAL 3 4,140,200 95
Summary of Parcel Suitability for CONRAC
- 9 -
Consolidated Summary
Parcel A
High/Moderate Suitability
Parcel B
Moderate/Low Suitability
Parcel C
Moderate Suitability
Parcel D
Low Suitability
Parcel E
Not Suitable
Parcel F
Moderate/Low Suitability
Primary Opportunities
•Multiple Prime Sites •Excellent Regional
Access •Close to Future TTA
Station
•Good I-40/I-540 Accessibility
•Multiple Prime Sites •Minimal Environmental
Impacts •Good Regional Access
•Good Regional Access
•Good Access I-540/US-70
•Strong Accessibility •Existing
Infrastructure •Transit in Place
Primary Constraints
•Costly Direct Access Improvements
•Limited US-70 Accessibility •Airspace
Impacts at PAL 2/3
•Limited US-70 Accessibility
•Remote Parking Conflicts
•Adjacency to Umstead Park
•Inconvenient Access •Wake County Park
Adjacent •Limited US-70
Accessibility •Poor Site Geometry
•Deficient Site Size PAL 2/3
•Poor I-40 Access •Environmental
Impacts •Airspace Impacts
•Constructability •Deficient Site Size
PAL 2/3
- 10 -
Parcel Overview
Parcel A
- 11 -
East CONRAC Site Alternative
- 12 -
West CONRAC Site Alternative
- 13 -
Central CONRAC Site Alternative
- 14 -
Consolidated Bus Routes
- 15 -
---- Preferred Route
---- Alternate Route
Residual Development Parcels
- 16 -
Next Steps
- 17 -
• Meet with Rental Car Companies and Review Work to Date on CONRAC
• Develop Order of Magnitude Cost Estimate for CONRAC
• Review Parcels B, C, D, E and F for:
• Available Land
• Transportation Infrastructure
Progress Report on Airport Land Use Planning Study
April 2011
TERMINAL 1 – SCHEMATIC DESIGN Presentation to the Raleigh-Durham Airport Authority
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
AGENDA 1_Floor Plans – Cal Edmondson
2_Walk-Through Images – Jeffrey Lee
3_Exterior Envelope – Jeffrey Lee
4_Next Steps – Dave Powell
5_Schedule – Dave Powell
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
LEVEL 1 FLOOR PLANS
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
FLOOR PLANS LEVEL 2
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
WALK-THROUGH IMAGES
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
1a
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
1b
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
2a
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
2b
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
3
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
4
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
5
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
6
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
7
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
8
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
9
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
10
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
11
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
12
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
13
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
14
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
15a
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
15b
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
EXTERIOR ENVELOPE _canopy
_landside
_airside
_materials: translucent skin, metal panel, glass
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Landside: Facing northeast
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Landside: Facing southeast
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Airside: Facing northwest
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Airside: Facing northwest
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Airside: Facing southwest
NEXT STEPS
_Update on Schematic Design (May 2011)
_Presentation on Final Design for Building Exterior (June
2011)
_Presentation on Final Design for Building Interior (July 2011)
SCHEDULE
_Compete Schematic Design April 2011
_Design Development April 2011 – July 2011
_Construction Documents Aug. 2011 – Nov. 2011
_Construction Agreement with Dec. 2011 – March 2012
Construction Manager at Risk (CMR) & Bidding by CMR
_Commence Construction of Terminal Building Contract March 2012
_Construction Duration To Be Determined
RDU TERMINAL 1 RENOVATIONS
Raleigh-Durham International Airport
Pearce Brinkley Cease + Lee, PA
(04.21.2011)_Terminal 1_SD
Landside: Facing northeast