PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building...
Transcript of PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building...
![Page 1: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/1.jpg)
PROGRESS GALLERY / MARCH 2020
Building futures. Strengthening communities.
On behalf of everyone at Ivanhoe Mines, we salute our front-line medical
professionals who are working hard to keep us safe during the COVID-19
global pandemic. Pictured above are members of Kamoa-Kakula’s team of
doctors, nurses and paramedics (names on page 4).
![Page 2: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/2.jpg)
Building what will be 3 of the world’s best
mines and exploring for the next copper giant
in Southern Africa’s legendary mineral fields
Copper mine development
and exploration
Democratic Republic of Congo’s
Central African Copperbelt
Mine development at
platinum-group elements, gold,
nickel and copper discovery
South Africa’s
Bushveld Complex
Zinc, copper, silver
and germanium at historic,
high-grade mine
Democratic Republic of Congo’s
Central African Copperbelt
Copper exploration
Democratic Republic of Congo’s
Central African Copperbelt
WESTERN FORELAND
PLATREEF KIPUSHI
KAMOA-KAKULA
2
![Page 3: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/3.jpg)
3
In early March, Ivanhoe
appointed a task team from
senior management with
overall responsibility for
COVID-19 response planning.
The team is led by Dr.
Nicolette Du Plessis, a
specialist in Paediatric
Infectious Diseases and a
Professor at the University of
Pretoria in South Africa, and
includes specialist doctors,
paramedics, nurses, as well
as counsel from several
external, world-leading
epidemiologists.
![Page 4: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/4.jpg)
4
Workers installing the “apron
feeder” that will load ore from the
one of Kakula’s underground ore
bins onto the conveyor belt, for
transport to surface.
Members of Kamoa-Kakula’s on-site medical team in place to quickly identify and
treat any potential COVID-19 cases and prevent the spread to other personnel.
Front row, L-R: Salva Mujinga Tshimanga (nurse); Augustin Kabedi Mujinga (nurse);
Papy Wedialumbele Lumasa (nurse); Asmara Ally (ALS paramedic); Dr. De
Delvareine Kabwayi Buyamba (medical doctor).
Second row, L-R: Tresor Kasongo Dibwe (nurse); Paulin Mwanza Umbanga (nurse);
Greg Hillen (ALS paramedic); Timothee Bwana Ngoie (nurse); Christian Masengo
Ngoy (nurse); Adellard Muyambo Kazenga (nurse); Prince Hlongwane (ALS
paramedic); Dr. Patrick Kasongo Ngoyi (health manager); and Alain Sambwe
Masengo (nurse).
KAMOA-KAKULA, DRC
![Page 5: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/5.jpg)
5
Workers installing the “apron
feeder” that will load ore from the
one of Kakula’s underground ore
bins onto the conveyor belt, for
transport to surface.
Dr. Delvareine Kabwayi Buyamba (Medical Doctor), Papy
Wedialumbele Lumasa (Paramedic), and Dr. Patrick Kasongo Ngoyi
(Manager, Occupational Health) (left to right) practice medical response
procedures at the Kakula hospital.
KAMOA-KAKULA
![Page 6: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/6.jpg)
6
Workers installing the “apron
feeder” that will load ore from the
one of Kakula’s underground ore
bins onto the conveyor belt, for
transport to surface.
Underground development at the Kakula Copper Mine continues to
advance at a rapid pace. Approximately 12 kilometres of underground
development now is complete, which is roughly 3.4 kilometres ahead of
plan. In March, the mining team set another new monthly development
record of more than 1,350 metres − more than 330 metres ahead of
plan for the month.
KAMOA-KAKULA
![Page 7: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/7.jpg)
7
In early March, a delegation of senior members from the DRC
government, together with members of Kamoa-Kakula’s technical team,
saw first hand the excellent underground development progress at the
Kakula Mine.
![Page 8: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/8.jpg)
8
A sample of Kakula's chalcocite-rich development ore
grading 62.9% copper.
KAMOA-KAKULA
![Page 9: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/9.jpg)
9
The construction team installing an apron
feeder underneath one of the underground ore
bins. The apron feeder controls the extraction
of ore from the bin onto a sacrificial conveyor,
which feeds the main decline conveyor.
KAMOA-KAKULA
![Page 10: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/10.jpg)
10
View looking down the east ore bin, one of two 5000-tonne
underground ore bins currently being constructed at Kakula.
KAMOA-KAKULA
![Page 11: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/11.jpg)
11
Workers preparing the conveyor system
for the installation of the tail pulley.
KAMOA-KAKULA
![Page 12: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/12.jpg)
12
Construction crew members extending the wall
at Kakula’s main underground water storage dam.
KAMOA-KAKULA
![Page 13: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/13.jpg)
13
Belt installation is underway on the high-volume conveyor system
at the Kakula Mine that will transport broken ore from
underground to the surface processing plant. Commissioning of
the belt is expected to start in April 2020.
KAMOA-KAKULA
![Page 14: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/14.jpg)
14
Completion of reaming of Kakula’s Ventilation Shaft 2 earlier this
month. The 5.5-metre diameter shaft is the third of five ventilation
shafts to be raise bored in Kakula’s first phase of development.
KAMOA-KAKULA
![Page 15: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/15.jpg)
15
Newly completed housing units at Kakula Village.
KAMOA-KAKULA
![Page 16: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/16.jpg)
16
Construction of the concrete foundations for the ball malls is
advancing rapidly for the 3.8 million-tonne-per annum copper
processing plant at the Kakula Mine. Watch a time-lapse video
of the progress here: https://vimeo.com/400919101
KAMOA-KAKULA
![Page 17: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/17.jpg)
17
Pouring the concrete foundations for the processing plant’s
concentrate thickener.
KAMOA-KAKULA
![Page 18: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/18.jpg)
18
Offloading oversized
equipment for Kakula’s
processing plant.
KAMOA-KAKULA
![Page 19: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/19.jpg)
19
The new, eight-kilometre, by-pass road on the Kamoa-Kakula
mining licence, officially opened on March 27th. The private road
allows all traffic to and from the mine to safely by-pass the small
villages of Israel and Kaponda.
KAMOA-KAKULA
![Page 20: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/20.jpg)
20
The Kamoa-Kakula Sustainable Livelihoods Program is creating a local
supply chain by selling produce from its community-run gardens to the
Kamoa-Kakula mine, supporting economic diversification in surrounding
communities and improving living standards for local farmers.
KAMOA-KAKULA
![Page 21: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/21.jpg)
21
The Mumba community-run garden and fish farms, another
Kamoa-Kakula Sustainable Livelihoods initiative that is
providing quality, local produce for citizens living near the
project.
KAMOA-KAKULA
![Page 22: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/22.jpg)
22
PLATREEF, SOUTH AFRICA
Mid-shift safety meeting for the shaft-sinking team.
![Page 23: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/23.jpg)
23
Ayakha Mbongonya, Justin Taylor and
Johannes Nkhoma (Geotechnical
Engineering Department) before going
underground for resin bolt pull tests.
PLATREEF
![Page 24: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/24.jpg)
24
Johannes Nkweng (Driver); Gilbert Sampa (Engineer) and Phago
Daniel (Driver) coming back to surface from underground.
PLATREEF
![Page 25: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/25.jpg)
25
Drilling rig at the Platreef’s 950-metre-level. Platreef’s Shaft 1 is now at a
depth of 975.3 metres below surface. The shaft will be sunk to a final depth
of approximately 1,000 metres.
PLATREEF
![Page 26: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/26.jpg)
26
Frans Serite (Stage Team Leader) paints the sidewall of the
950-metre-level station with whitewash, after the installation
of permanent wall support.
PLATREEF
![Page 27: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/27.jpg)
27
Raisibe Ntini (Geology Intern) identifies samples of development rock
to be used in backfill testwork. Approximately six tonnes of rock will be
tested to determine the percentage of the mine’s tailings that will be sent
back underground as pasted backfill.
PLATREEF
![Page 28: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/28.jpg)
28
David Kgomo (right, Crane Operator) and Kobus
Jordaan (left, Boilermaker) collecting their personal
tracking devices prior to beginning their shifts. The
digital safety system allows the mine to evacuate
personnel quicker and safer, to help ensure they all
come home safely everyday.
PLATREEF
![Page 29: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/29.jpg)
29
Spraying disinfectant
as part of Platreef’s
COVID-19 mitigation
measures.
PLATREEF
![Page 30: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/30.jpg)
30
Gilbert Sampa (Mine Engineer) after conducting an underground safety inspection.
PLATREEF
![Page 31: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/31.jpg)
31
Precious Madiba (HR Assistant) monitoring noise levels outside the perimeter of the Platreef Project to ensure the project remains compliant with all regulations.
PLATREEF
![Page 32: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/32.jpg)
32
Mulamba Belangana (Boilermaker), smoothing an underground
handrail at Kipushi.
KIPUSHI, DRC
![Page 33: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/33.jpg)
33
Mechanics Kisenga kayumba (left) and Tshibangu Kamwanga
(right) at Kipushi’s 850-metre-level pumping station.
KIPUSHI
![Page 34: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/34.jpg)
34
Mechanics perform routine maintenance on an underground
transport vehicle at Kipushi’s 1150-metre-level workshop.
KIPUSHI
![Page 35: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/35.jpg)
35
Miners Mpoyo Lenge (left) and Katende Muya (right) supporting
shaft sidewalls with welded mesh and rock bolts in Shaft 5 at the
850-metre-level station.
KIPUSHI
![Page 36: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/36.jpg)
36
Paul Muyembi (right) installing fiber-optic cables on the 850-metre-
level to provide high-speed data connection between underground
working areas and the surface control center.
KIPUSHI
![Page 37: PROGRESS GALLERY / MARCH 2020 Building futures ...€¦ · PROGRESS GALLERY / MARCH 2020 Building futures. Strengthening communities. On behalf of everyone at Ivanhoe Mines, we salute](https://reader034.fdocuments.in/reader034/viewer/2022042919/5f6327b0d1d8f92560260169/html5/thumbnails/37.jpg)
37
Mukendi Kabongo (Mine Superintendant) one of Kipushi’s new
generation of bright, young Congolese employees who we expect
to lead the launching of a new era of commercial production
at the ultra-high-grade mine.
KIPUSHI