PROGRESS GALLERY Advancing our projects
April 2018
Underground in one of the twin declines being developed to provide access to the ultra-high-grade copper resources at the Kakula Discovery on the Kamoa-Kakula Copper Project in the Democratic Republic of Congo.
![Page 2: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/2.jpg)
Copper discoveries & mine development Democratic Republic of Congo’s Central African Copperbelt
KIPUSHI Zinc, copper, silver
& germanium at upgraded, historic,
high-grade mine D.R. Congo’s Copperbelt
PLATREEF Platinum-group elements, nickel,
copper & gold discovery & mine development
South Africa’s Bushveld Complex
KAMOA-KAKULA
![Page 3: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/3.jpg)
3
Kamoa-Kakula, DRC – Kakula Mine
Workers with contractor JMMC installing water pipes and ventilation tubing in one of the twin declines at the Kakula Discovery.
![Page 4: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/4.jpg)
4
JMMC team members adjusting one of the jumbo drills used in the underground tunnelling operations that have advanced Kakula’s twin declines approximately 400 metres toward the high-grade copper deposit.
Kamoa-Kakula – Kakula Mine
![Page 5: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/5.jpg)
5
Jumbo drill in operation in the Kakula services decline.
Kamoa-Kakula – Kakula Mine
![Page 6: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/6.jpg)
6
A member of the decline construction team testing the thickness of shotcrete applied to the walls of the conveyor decline at Kakula. Shotcrete is used to provide additional support in the underground excavations.
Kamoa-Kakula – Kakula Mine
![Page 7: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/7.jpg)
A Health and Safety representative at the Kamoa-Kakula Project supplying an underground safety lamp to a member of the decline-development team.
Kamoa-Kakula – Kakula Mine
7
![Page 8: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/8.jpg)
Kamoa-Kakula – Kakula Mine
8
Oliver Nzam and Christelle Kyungu, members of Kakula’s geology team, logging high-grade core samples from a hole recently drilled in the Kakula West area.
![Page 9: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/9.jpg)
One of 13 rigs at the Kakula Discovery. More than 21,000 metres have been drilled since the beginning of 2018, including step-out holes to expand the resources, in-fill holes to upgrade the resources, and wedge holes for metallurgical test work.
9
Kamoa-Kakula – Kakula Mine
![Page 10: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/10.jpg)
Kamoa-Kakula
10
Geologist Nestor Kambaj at a mobile, seismic vibrator rig being used by Hi-Seis, a leading international services company, to survey the Kamoa-Kakula licence area. The device creates seismic waves to produce reliable, quality images of hard-rock environments to help identify drilling targets to test for potential, Kakula-like discoveries.
Kamoa-Kakula
![Page 11: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/11.jpg)
11
Kamoa-Kakula
Metallurgist Mahamodou Traore (right) at a new communications tower installed at the Kamoa-Kakula Project by Vodacom DRC, which provides mobile communications and related services across five Southern African nations.
![Page 12: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/12.jpg)
Kamoa-Kakula Project employees Celestine Kasongo and Olivier Kahilu harvesting lettuce from the Livelihoods garden as part of the program supplying produce to the Kamoa-Kakula Project.
12
Kamoa-Kakula
![Page 13: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/13.jpg)
Poultry project, which supplies chickens and eggs to the Kamoa-Kakula Project, is one of the initiatives of the Kamoa-Kakula Sustainable Livelihoods Project working to build a sustainable, independent economy in nearby communities.
13
Kamoa-Kakula
![Page 14: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/14.jpg)
Platreef, South Africa
14
Sinah Tjale, a Health and Safety representative, arriving at one of the underground substations in Shaft 1 at Ivanhoe’s Platreef mine development project in South Africa.
Employees from local communities, who had
no previous mining experience, now comprise about 40%
of Platreef’s shaft-sinking team
![Page 15: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/15.jpg)
Drilling of blast holes as part of early-works construction for Shaft 2 at the Platreef Mine in South Africa.
Platreef
15
![Page 16: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/16.jpg)
Platreef
16
Fabian Fredericks, Platreef’s Strata Control Officer, measuring the depth of a blast hole prior to loading with explosives.
![Page 17: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/17.jpg)
Platreef
17
Loading explosives for the first blast for the Shaft 2 box cut development, which took place on April 12, 2018.
![Page 18: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/18.jpg)
Contract metalworker from Aveng Mining fabricating a safety grate for installation in Platreef’s Shaft 1.
Platreef
18
![Page 19: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/19.jpg)
Platreef
19
Three of 15 student interns – (from left) Prince Malatji, Dikeledi Maakanedi and Titus Mashitisho – participating in the Mining & Engineering Learnership program at the training academy for Ivanplats. The Platreef Project is owned by Ivanplats, which is 64%-owned by Ivanhoe Mines.
![Page 20: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/20.jpg)
Platreef
20
Surveyor Augustin Dikhudu at the Platreef Project’s Shaft 2 box cut.
![Page 21: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/21.jpg)
Platreef
21
Sipho Manyeke (left), Ivanplats’ Human Resources Manager, with one of the recipients of Platreef’s local community scholarship program.
![Page 22: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/22.jpg)
Infrastructure upgrading work along the main haulage way on the Kipishi Mine’s 1,150-metre level, between the Big Zinc access decline and Shaft 5.
Ivanhoe now has a much clearer path to its planned start of production from the unmined, incredibly high-grade Big Zinc orebody.
Kipushi, DRC
22
![Page 23: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/23.jpg)
The crusher and rock load-out facilities at the bottom of Shaft 5.
Kipushi
23
![Page 24: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/24.jpg)
The Shaft 5 rock-hoisting winder now is fully operational.
Kipushi
24
![Page 25: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/25.jpg)
Inspecting electrical panels in the Shaft 5 rock-hoisting winder room that are required to meet global industry standards and safety criteria.
Kipushi
25
![Page 26: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/26.jpg)
Inspecting pumping station electrical panels at the 1,200-metre level underground. Kipushi has been upgraded and modernized to meet international industry standards and safety criteria.
Kipushi
26
![Page 27: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/27.jpg)
Final upgrading work on Kipushi’s new, underground ore-conveyor system.
Kipushi
27
![Page 28: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/28.jpg)
New rollers being installed on the ore conveyor on the Kipushi Mine’s 1,150-metre-level as part of the infrastructure upgrading program.
Kipushi
28
![Page 29: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/29.jpg)
Deki devices provide automated readings of rapid diagnostic tests, removing the human-error factor and avoiding unnecessary prescription of medication, as part of the Ivanhoe-sponsored Fionet program to improve malaria diagnostics and treatment in Haut-Katanga and Lualaba provinces, in southern DRC, which host Ivanhoe’s Kipushi and Kamoa-Kakula projects..
Kipushi
29
![Page 30: PROGRESS GALLERY April 2018 Advancing our projects · PROGRESS GALLERY Advancing our projects April . 2018. Underground in one of the twin declines being developed to provide access](https://reader034.fdocuments.in/reader034/viewer/2022042908/5f37e54cdff2a242995adefa/html5/thumbnails/30.jpg)
Regular maintenance of one of the Grifo pumps at the 1,200-metre-level pump station.
Kipushi
30