Project – 3 stars Hotel - 4 stories - ”Vigla”Consultancy, Supervising and Construction Management
2004-2006
Owners
Vigla Touristic Company Ltd.
Consultants and Supervisor Engineers
Design and construction Management
Angelos Papavasileiou
Civil-Structural-Architectural Engineer
Angelos Papavasileiou Surveying and Geoinformatics Engineer
Georgios Iliopoulos Geologist Engineer
Euaggelos Mermigas Mechanical Engineer
Orestis Basileios Electrical Engineer
Vlachavas Dimitrios
Project InformationLocation: Greece, Thessaly, Trikala, Pirra
Building Information4 Stories -3 Stars Hotel
-2 Basement Level for general facilities use -1 Basement Level for spa and Gym facilities 0 Floor Level for Reception, Lobby, Restaurant, Bar, Coffee, Areas 1 Upper Floor for Rooms 2 Roof Level
417 m2 per Floor
1650 m2 all levels of Hotel Budget 2.250.000 Euros
Technical Challenges
High falling gradient field
Unstable climate/weather conditions
Headwaters control
Rain water control
Rock falls in Construction site
Slow moving underground clay layers
Layers of earth fill in the area of excavation
Big rocks in the excavation area
Low Tension of ground σ=0,11MPa and Soil elastic modulus K=400 KPa/cm
Long distance of concrete construction site more than 60 Kilometres
Construction Management challenges
Long distance of Supplies contractors of the construction materials .
High material transfer cost.
4 months stop in the winder period.
Health and Safety challenges
Long distance from Hospital in the accident conditions .
High falling gradient field.
Quick daily change of the weather conditions.
Phase 1 - Excavation
Phase 1 - Excavation
Phase 2 – Setting out – Foundations
Phase 2 –Foundations
Phase 3 –
Roof Basement-2
Phase 3 – Basement -2
Phase 3 –
Roof Basement -1
Phase 3 –
Roof Ground Floor
Phase 3 –
Roof Floor 2 (2 parts)
Phase 4 –
Walls -Roofs