ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16
Transcript of ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA...
![Page 1: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/1.jpg)
ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16
![Page 2: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/2.jpg)
• Peak Polish Rod loading was ~51Klbs prior to testing, Currently showing Peak Polish Rod loading at ~41Klbs.
• Allowed well to increase spm accounting for a ~170 bbl increase. (Still preliminary- 90 average is needed)
388-13Z Beam Pump Well
![Page 3: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/3.jpg)
44W-3G PCP Well
![Page 4: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/4.jpg)
54N-3G PCP Well
![Page 5: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/5.jpg)
• Peak Polish Rod loading was ~51Klbs prior to testing, Loads increased to ~48Klbs after treatment stopped. Currently showing Peak Polish Rod loading at ~45Klbs.
• Allowed well to increase to 3.2 spm accounting for a ~170 bbl increase
388-13Z Beam Pump Well
Before A(er
![Page 6: ProFlow Testing - American Well Technology...ProFlow Testing California Resources Corporation GEHA Subsurface • 4-28-16 • Peak Polish Rod loading was ~51Klbs prior to testing,](https://reader030.fdocuments.in/reader030/viewer/2022040916/5e8e65359edfe462f2681871/html5/thumbnails/6.jpg)
388-13Z Beam Pump Well
• 8000# drop in rod load in a 24hr period