Procurement Plan Community Development Program...

26
May 05, 2017 Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold US$ Comments 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Procurement Plan Community Development Program...

May 05, 2017

Procurement PlanCommunity Development Program Support Project – Phase III(Programme National de Développement Participatif – Phase III)

I. General

1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017

2. Date of General Procurement Notice: February 15, 20163. Period covered by this procurement plan: The procurement period of project covered

from year January to December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review ThresholdUS$

Comments

1. ICB and LIB (Goods) Above US$ 1,500,000 All2. NCB (Goods) None3. ICB (Works) Above US$ 5 million All4. NCB (Works) Above US$ 5 million5. DC (Non-Consultant Services) none

2. Prequalification. Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank.

4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016

5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing

6. Summary of the Procurement Packages planned during the first 18 months after project

effectiveness (including those that are subject to retroactive financing and advanced

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

May 05, 2017

procurement)

1 2 3 4 5 6 7

Ref. No.

Description EstimatedCost

US$ million

Packages Domestic Preference

(yes/no)

Reviewby Bank(Prior / Post)

Comments

Summary of the ICB (Goods)

2.328 2 No Prior

Summary of the NCB (Goods)

0.700 1 No Post 1st contract for Prior Review

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments1. Competitive Methods (Firms) Above US$ 500,0002. Single Source (Firms) Above US$ 500,000 Justification prior

reviewed by bank3. Individual Above US$ 200,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: not applicable

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 7Ref. No

Description of Assignment Estimated cost (US$

equivalent)

Selection method

Review by the Bank

(prior/post)

Expected proposals

submission date

Comments/completion

date

1 Support for the preparation of Statutory Instruments 20,000 IC Post 21/08/15

For the first year

24/09/15 (30 days)

2 Study on the definition of a planning methodology at regional level

40,000 CQS Post25/01/16 22/04/16

(03 months)

3 Study on the planning process in the communes and urban communities

40,000 CQS Post 25/01/16 22/04/16 (03 months)

May 05, 2017

1 2 3 4 5 6 7Ref. No

Description of Assignment Estimated cost (US$

equivalent)

Selection method

Review by the Bank

(prior/post)

Expected proposals

submission date

Comments/completion

date

4 Study for the establishment of local public service in communes

20,000 IC Post 19/02/16 24/03/16 (30 days)

5 Study on the sustainability of the PNDP

40,000 CQS Post 11/04/16 18/07/16 (03 months)

6 Evaluation of the decentralization process in Cameroon/supports to the finalization of the national strategy for decentralization

40,000 CQS Post 13/07/16 18/10/16 (03 months)

7 Selection of a consultant to develop the practitioner's manual for the 31 communes

20,000 IC Post 20/11/15 30/12/15 (30 days)

8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Convention)

9 Training of procurement commissions

100,000 SSS Prior NA Service provided by

ARMP (Convention)

10 Financial Audits of the project for the first 2 years

150,000 LCS Post 10/03/15 Contract for 2 years

11 legal advice 10,000 IC Post 28/12/15 Annual contract

12 Design and development of an internet portal on the PNDP and communes

90,000 CQS Post 12/02/16 22/08/16 (06 months)

13 Translation of documents 90,000 CQS Post 11/05/16 20/08/16 (03 months)

14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months)

15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months)

16 Environmental and Social Assessment

70,000 QCBS Post 13/12/16 26/06/17 (06 months)

17 Follow-up of training deployment and technical assistance to Sim_ba software in communes

70,000 SSS Prior NAService

provided by AIMF expert (Convention)

18

Insurance advice

10,000

IC Post 27/05/15 Annual contract (the

current contract ends

June 30, 2015)

19 Preparation of CDPs for the 31 communes 80,000 QCBS Post 01/12/16 16/04/16

(06 months)

May 05, 2017

Page 1

PROCUREMENTPLAN Cameroon : Community Development Program Support Project-Phase IIIGeneral InformationCountry: Cameroon Bank�s Approval Date of the Original Procurement Plan: 2016-09-06

Revised Plan Date(s): (comma delineated, leave blank if none) 2017-07-12Project ID: P144637 GPN Date: Project Name: Community Development Program Support Project-Phase IIILoan / Credit No: IDA / 57180Executing Agency(ies):NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROGRAM, CELLULE REGIONALE DE COORDONATION - EST, CELLULE REGIONALE DE COORDONATION - LITTORAL, CELLULE REGIONALE DE COORDONATION - SUD, CELLULE REGIONALE DE COORDONATION - SOUTH WEST, CELLULE REGIONALE DE COORDONATION - EXTREME NORD, CELLULE REGIONALE DE COORDONATION - OUEST, CELLULE REGIONALE DE COORDONATION - NORTH WEST, CELLULE REGIONALE DE COORDINATION - CENTRE, CELLULE REGIONALE DE COORDINATION - ADAMAOUA, CELLULE REGIONALE DE COORDONATION - NORD

WORKSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-CRC EXTREME NORD-8012-CW-RFQ / Petits travauxd'aménagement des bureaux(cloisonnement des bureaux,équipement étagères pourclassement, etc...) à la CRC EN

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,600.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-06-04

CM-CRC EXTREME NORD-8013-CW-RFQ / Construct et équiptd'01 bloc de 02 de sc et d'un blocde Lt à trois comparts à l'EP deDogba, au lycée de Gayack etConstruction de 01 bloc dehangar de 52 pces et d'un blocde Lt à trois comparts aumarché de Papata,Commune deMra II

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 154,638.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-09-17

CM-CRC EXTREME NORD-8016-CW-RFQ / Constructde 6 forageséquipés de PMH à Tchékéhi,Mbokouré, Magaldao Toupéo,Soukkoungo Galdima, Bourangoet Bandalaré, commune de Pétté

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 96,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8035-CW-RFQ / Construct d'unmagasin de stockage à Kéné-Kéné, Construct d'un bloc de 02sc équipées à l'EP de Djafgué,et Construct d'un bloc de Lt àl'EP de Djafgué commune dePétté

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 82,609.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8036-CW-RFQ / Constr d'un foragepastoral à énergie solaire équipéde 02 abreuvoirs à BalazaLawane (Tchalloudi mango) etConstr d'un forage pastoral àénergie solaire équipé de 02abreuvoirs à Kongola Saïd, CneMaroua 3

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 82,196.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8037-CW-RFQ / Construct d'un blocde 02 sc équipées et d'un blocde Lt à trois comparts à l'EP deMayel Béi, à l'EP de BaoHosséré II et à l'EP de Palaoudi,commune Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 136,106.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8040-CW-RFQ / construction d'un blocmaternel à l'école Maternelle deZokok-Laddo et branchement auréseau d'alimentation en eaupotable, commune de Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 57,421.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8042-CW-RFQ / Construction de troisforages équipés de pompe àmotricité humaine à Ouro Dow,Goni Bello et Yoldéo Guiziga,Commune Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 46,689.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8043-CW-RFQ / Construction de d'unbloc de 02 salles de classeéquipées et d'un bloc de latrinesà trois compartiments à l'EPMasfaï et au CES de Boula,commune de Mokolo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 92,247.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8045-CW-RFQ / Construction de 2forages équipés de PMH un àOuro Kessoum et à Mounam,commune de Mokolo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 33,787.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8047-CW-RFQ / Construction d'unouvrage de franchissement etassainissement(radier-dalot) surle Mayo Kwayaga, dans lacommune de Mogodé

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 87,751.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8050-CW-RFQ / Construction d'un blocde 02 salles de classe équipéeset d'un bloc de latrines à troiscompartiments à l'EP de Saoudjoet au CES de Madaka, communede Bogo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 90,443.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8053-CW-RFQ / Construction d'unforage équipé de PMH àDambaye et à Bagalaf communede Bogo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 32,294.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8054-CW-RFQ / construction d'un blocde deux (02) salles de classeequipees et un (01) bloc latrinea trois (03) compartiments al'EP de honkol, a l'EP de darsala,a l'EP de dabanga etl'equipement en meubles al'ecole maternelle de logone birni

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 178,787.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-09-17

CM-CRC EXTREME NORD-8056-CW-RFQ / construction de troisforages équipés de pompe àmotricité humaines: un à l'EP deDabanga, un à l'EP de Honkol etun à l'EP de Darsala dans laCommune de Logone Birni

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,245.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8057-CW-RFQ / construction d'unforage pastoral équipé de pompeimmergée à énergiephotovoltaique à Sahaba 1 dansla Commune de Logone Birni

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 45,860.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

CM-CRC EXTREME NORD-8068-CW-RFQ / réhabilitation de lamare artificielle et la constructiond'un forage pastoral à energiephotovoltaique à Mogong dans lacommune de Moutourwa

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 114,601.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-09-17

CM-CRC EXTREME NORD-8072-CW-RFQ / construction de 2blocs de deux salles de classeéquipées et de 2 blocs delatrines à trois compartimentsEP NGré et EP Afadé dans lacommune de Makary

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 115,353.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-08-18

01/T/CRC/CE/2017 / Petitstravaux d'aménagement dans lesnouveaux locaux Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,800.00 0.00 Pending

Implementation 2017-07-25 2017-09-19 2017-10-19

CM-CRC ADAMAOUA-8083-CW-RFQ / Aménagement du marchéKassouan-Dolé (Marché B) deBanyo par la construction de 32Boutiques Bloc A & B, 01Hangar de marché (48 comptoirs)Vivres frais et 01 Blocs de 03Latrines, Commune de Banyo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 176,700.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

CM-CRC ADAMAOUA-8090-CW-RFQ / Travaux de constructiond'un Pont de 8 m de long et de 5m de large sur le Mayo-Soulabé,Commune de Banyo, RégionAdamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 105,819.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

CM-CRC NORTH WEST-8096-CW-RFQ / Construction of 2equipped Classrooms, VIPtoilet,H/M's office and extensionof water to GS TUKU-TABENKENin Nkambe councilarea, dans la Commune denkambè Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-10 2017-08-05 2018-02-01

CM-CRC ADAMAOUA-8095-CW-RFQ / Travaux de constructiond'un Pont de 8 m de long et de 5m de large sur le Mayo Mandjoa,Commune de Banyo, RégionAdamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 77,184.00 0.00 Pending

Implementation 2017-04-07 2017-06-18 2017-12-15

001/T/CE/ENDOM/2017 /Construction 02 hangars de 30comptoirs avec bloc latrines 02compartiments dans 02 sites desmarchés de Edjom et deMengwa à d'Endom

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 92,720.00 0.00 Pending

Implementation 2017-04-28 2017-07-03 2017-10-31

002/T/CE/ENDOM/2017 /Travaux de Construction de deux(02) puits productifs équipés dePompe à Motricité Humaine dansdeux (02) localités (Edjom,Mengwa) d'Endom

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

CM-CRC ADAMAOUA-8099-CW-RFQ / Travaux de constructiondu parc vaccinogène àBoudjounkoura, commune deBanyo, Région Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 19,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

CM-CRC ADAMAOUA-8104-CW-RFQ / Travaux de constructiond'un pont de 12 m de portée sur7 mètre de large en béton armésur le cours d'eau Baraya reliantle quartier Marouaré à l'EPAnnexé de Tignère, Commune deTignère, Département du Faro etDéo, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 123,669.00 0.00 Pending

Implementation 2017-04-05 2017-06-16 2017-12-13

003/T/CE/AKOEMAN/2017 /Construction de 04 puitséquipés de Pompes à MotricitéHumaine dans quatre localités(Ngamba, Akoéman ville, Melenet Akoa Zolé) dans la Communed'Akoéman, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 48,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-18 2017-10-16

CM-CRC ADAMAOUA-8106-CW-RFQ / Travaux de constructiond'un bâtiment R+1 de 20boutiques avec bureau et latrinesincorporées au Marché deTignère, Région Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 173,600.00 0.00 Pending

Implementation 2017-03-18 2017-06-22 2017-12-19

40/T/CE/NANGA/2017 / Travauxde réhabilitation de deux (02)puits équipés de Pompe àMotricité Humaine au marché deEssimeyong et au marché deBiboa, dans la Commune deNanga et Eboko, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

004/T/CE/AKOEMAN/2017 /Travaux de Construction d'unhangar de 32 comptoirs et 01bloc de 04 latrines a Akoemanville, dans la Communed'Akoéman, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,406.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

39/T/CE/NANGA/2017 / Travauxde Construction de deux (02)hangars avec comptoirs etConstruction de deux (02) blocsde latrines à trois (03)compartiments dans 02 marchésà Essimeyong et à Biboa dans lacommune de Nanga et Ebokodans la Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 104,743.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

38/T/CE/MINTA/2017 / Travauxde construction d'un puits équipéde PMH à l'EP de Ndjombe,dans la commune de Minta,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,200.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

005/T/CE/MBANDJOCK/20177 /Travaux de Construction d'unabattoir avec latrinesincorporées, au centre ville deMbandjock dans la Commune deMbandjock, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 56,000.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

CM-CRC ADAMAOUA-8113-CW-RFQ / Travaux de constructiond'un forage équipe d'un systèmesolaire pour l'approvisoinnementen eau et en électricité du d'unbâtiment R+1 du Marché deTignère, Commune de Tignère,Région Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,100.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

006/T/CE/MBANDJOCK/20177 /Construction d'une mini AEP parraccordement au reseau CDE etconstruction d'un château d'eauavec un cubitenaire de 4000 litresau centre ville de Mbandjockdans la Commune deMbandjock, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,427.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

CM-CRC ADAMAOUA-8115-CW-RFQ / Travaux de constructiond'une case communautaire avecbloc latrines à Galim-Tignére,Région Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 75,546.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

CM-CRC ADAMAOUA-8117-CW-RFQ / Travaux de constructiond'un marché à bétail composéd'un Parc de contention, d'unQuai d'embarquement, d'unHangar simple et d'un Bloc dedeux latrines à Galim-Tignère,Commune de Galim Tignère,Département du Faro et Déo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 93,948.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

37/T/CE/NANGA/2017 / Travauxde construction d'un bloc de 03salles de classe équipées etconstruction d'un bloc de troislatrines à l'EP de Ndjombe dansla commune de Nanga et Eboko,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

CM-CRC ADAMAOUA-8121-CW-RFQ / Travaux de constructiond'un abattoir avec latrinesincorporées à Galim-Tignére,Région Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 85,333.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

CM-CRC NORTH WEST-8098-CW-RFQ / Construction andequipping of a block of twoclassrooms, a block of VIPlatrine, H/M's office andextension of potable water toGNS Njindom", dans laCommune de mbengwi Régiondu Nord O..

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-10 2017-08-05 2018-02-01

Page 2

CM-CRC ADAMAOUA-8124-CW-RFQ / Travaux de constructionde 02 forages dont l'un équipé dePMH au Marché à bétail et l'autreéquipé de pompe solaire avecsupport métalique et réservoirede 2 m3 à l'abattoir de GalimTignère, Commune de GalimTignère, Département du Faro etDéo, Région de

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-29 2017-11-25

36/T/CE/NTUI/2017 / Travaux deConstruction de deux (02)magasins de stockage de cacaoet construction de 02 blocslatrines à deux (02)compartiments dans leslocalités de Nguila, et Ntui ville)dans la Commune de Ntui,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 125,749.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

CM-CRC ADAMAOUA-8127-CW-RFQ / Travaux de constructiond'un magasin de stockage et unbloc de deux latrines à NgouriHAMAN, Commune de GalimTignère, Département du Faro etDéo, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,048.00 0.00 Pending

Implementation 2017-04-05 2017-04-26 2017-10-23

007/T/CE/EBEBDA/2017 /Travaux de Construction de 02hangars de 32 comptoirs avec 02blocs latrines à 03compartiments au marché deNkog Edzen et au marché deElig-Edouma dans la Communed'Ebebda, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 89,801.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

35/T/CE/BOT MAKA/2017 /Travaux de Construction d'un (01)puits équipés de pompes àmotricité humaine à NdjockBané, dans la Commune de BotMakak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-04-08 2017-06-03 2017-10-01

008/T/CE/EBEBDA/2017 /Travaux de Construction d'un (01)forage équipé de Pompe àMotricité Humaine sur le site dumarché de Elig-Edouma, dans laCommune d'Ebebda, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

009/T/CE/NKOTENG/2017 /Travaux de Construction d'unabattoir avec un bloc latrine àtrois (03) compartiments àl'abattoir de Nkoteng dans laCommune de Nkoteng, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 32,014.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

CM-CRC NORTH WEST-8137-CW-RFQ / Rehabilitation of theBafut main market(transformation of open marketssheds to closed market shedsand construction of fence) inBafut council area, dans laCommune de bafut, Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-10 2017-08-05 2018-02-01

010/T/CE/NKOTENG/2017 /Travaux de Construction d'unemini adductiond'approvisionnement en eaupotable sur le site de l'abattoir deNkoteng dans la Commune deNkoteng, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 16,000.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-09-24

CM-CRC NORD-8659-CW-RFQ /Exécution des travaux deconstruction d'un bâtiment àusage de bloc sanitaire et d'unbloc de latrines à quatrecompartiments au Centre deSanté Intégré de Rey Bouba

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 104,000.00 0.00 Pending

Implementation 2017-03-07 2017-04-18 2017-08-18

CM-CRC NORD-8660-CW-RFQ /Exécution des travaux deréalisation d'un forage équipé dePMH au Centre de Santé Intégréde Rey Bouba

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2017-03-20 2017-05-02 2017-09-04

CM-CRC LITTORAL-9509-CW-RFQ / Travaux de Constructionde quatre forages positifséquipés d'une pompe à motricitéhumaine à Moukouda, Mbagna,Nyamtam et Yabassi centre,dans la Commune de Yabassi,Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 69,175.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

CM-CRC LITTORAL-9510-CW-RFQ / Travaux de Constructiond'un pont mixte acier-béton sur larivière Mounè dans la localité deMandjap sur une portée de8,00m, dans la Commune deNgambé, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 80,757.00 0.00 Pending

Implementation 2017-03-14 2017-05-09 2017-11-05

CM-CRC LITTORAL-9511-CW-RFQ / Travaux de Constructionde deux blocs de boutiques, àraison de 10 boutiques chacun,au marché de Loum Centre, dansla Commune de Loum, dans laCommune de Loum, Région duLittoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 100,000.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

CM-CRC LITTORAL-9512-CW-RFQ / Travaux de Constructiond'un bloc de 10 boutiques ycompris bloc de 04 latrines etd'un hangar de marché de 16comptoirs au marché de Missole,dans la Commune de Dibamba,Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 92,834.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

CM-CRC LITTORAL-9513-CW-RFQ / Travaux de Constructiond'un forage positif équipé d'unepompe électrique d'au moins 2m3/h, alimentant un réservoir àcubitainer de 2000 litres montésur un support en béton armé aumarché de Missole, dans laCommune de Dibamba, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 17,933.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

CM-CRC LITTORAL-9514-CW-RFQ / Travaux de Construction etd'Equipement d'une CaseCommunautaire et d'un bloc dedeux latrines à Bisseng, dans laCommune de Ndom, Région duLittoral

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 43,457.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-09-17

001/T/SU/DJOUM/2017 /Travaux d'Extension du marchéde vivres (aménagement duhangar, construction de 03 blocsde 05 boutiques et d'un bloc de03 latrines avec local dugestionnaire) d'Ondodo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 64,085.00 0.00 Pending

Implementation 2017-04-11 2017-05-29 2017-09-26

002/T/SU/MENGONG/2017 /Travaux de Réhabilitation dupuits avec pompe à motricitéhumaine du marché d'Ondodo

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,046.00 0.00 Pending

Implementation 2017-04-11 2017-05-29 2017-07-05

004/T/SU/AKOM II/2017 /Travaux de construction de 03puits positifs équipés despompes à motricité humaine àBIBINDI, BIBOLE et MALOMBAet de 03 forages positifs équipésdes pompes à motricité humaineNLOKENG, TOKO et FENDA

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 49,748.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

005/T/SU/OVENG/2017 /Travaux d'Aménagement duhangar en complexe commercialmunicipal et de Construction d'unbloc latrines à deuxcompartiments à Oveng-centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 26,185.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

006/T/SU/BIWONG BANE/2017/ Travaux d'extension du réseauélectrique à travers laconstruction d'une ligne BT de1,3 km et l'installation d'untransformateur monophasé auvillage Melangue II

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 58,268.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-09-12

010/T/SU/DJOUM/2017 /Travaux de construction d'un blocmaternel à l'école maternelled'Aboélon

IDA / 57180 Component A: Localdevelopment support Prior Request for

Quotations Limited

Single Stage - OneEnvelope 36,375.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

011/T/SU/DJOUM/2017 /Travaux d'extension du réseauélectrique vers le village Akak

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 31,520.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

012/T/SU/KYE OSSI/2017 /Travaux de construction de 02blocs de 02 SDC équipées detables bancs et de 02 blocs de02 latrines à l'EP de Mefoup et àl'EP de Mefou

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 58,744.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

015/T/SU/MEYOMESSALA/2017/ Transformation du marché deMeyomessala en campementtouristique: (1)Travauxd'aménagement du bloc de 06chambres modernes VIP et (2)Travaux d'aménagement desespaces verts et de la clôture

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 84,100.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

017/T/SU/MINTOM/2017 /Travaux de construction de laclôture et d'aménagement desaires de jeux des écolesmaternelles de Mintom-centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,659.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

019/T/SU/MINTOM/2017 /Travaux de construction d'unforage positif équipé d'une PMHau complexe commercial deMintom

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,194.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

022/T/SU/MVANGAN/2017 /Travaux de construction d'unforage équipé d'une pompe àmotricité humaine à l'EP deZoébefam (Zoéyevan)

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,909.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

023/T/SU/MVANGAN/2017 /Travaux de construction de 01bloc de 02 latrines à l'EP deMebemenko

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,429.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

024/T/SU/SANGMELIMA/2017 /Travaux de réalisation de 10forages équipés des pompes àmotricité humaine

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 99,340.00 0.00 Pending

Implementation 2017-04-11 2017-06-14 2017-10-12

CM-CRC NORD-9682-CW-RFQ /réalisation d'un forage équipé dePMH au Centre de Santé Intégréde Rey Bouba, dans laCommune de Bouba Région duNord

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2017-03-20 2017-05-02 2017-07-03

CM-CRC NORD-9683-CW-RFQ /construction d'un bâtiment àusage de bloc sanitaire et d'unbloc de latrines à quatrecompartiments au Centre deSanté Intégré de Dembo, dans laCommune de Dembo

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 102,000.00 0.00 Pending

Implementation 2017-04-20 2017-05-25 2017-09-22

CM-CRC NORD-9684-CW-RFQ /réalisation d'un mini AEPalimenté de Pompe à EnergieSolaire au Centre de SantéIntégré de Dembo, et laréalisation d'un forage équipé dePMH à l'EP de TAPAWA dansla Commune de DEMBO

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 38,600.00 0.00 Pending

Implementation 2017-04-20 2017-05-25 2017-09-22

CM-CRC NORD-9685-CW-RFQ /construction d'un bloc de deux(02) salles de classe équipées(de 60 tables bancs, de 02bureaux d'enseignants, 02placards) et d'un bloc de latrine àtrois compartiments dans lesécoles publiques de LaindéTchakoum, et Tapawa dans laCommune de Dembo

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 90,000.00 0.00 Pending

Implementation 2017-04-20 2017-05-25 2017-09-22

CM-CRC NORD-9686-CW-RFQ /construction d'un bloc de trois(03) salles de classe équipés (de 90 tables bancs, de 03bureaux d'enseignants, 03placards) et d'un bloc de latrine àtrois compartiments dans lesétablissement suivants : 'EP deTorroye, lycee de badjoumacentre,(lot 1

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 248,000.00 0.00 Pending

Implementation 2017-04-17 2017-04-20 2017-05-11 2017-05-18 2017-06-22 2017-09-20

CM-CRC NORD-9687-CW-RFQ /construction d'un bloc de 02salles de classes équipées ( de60 tables bancs, de 02 bureauxd'enseignants, 02 placards) etd'un bloc de latrine à troiscompartiments à l'EP DOGBA etau Lycée de GOP REY dans laCommune de Tcholliré

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 98,000.00 0.00 Pending

Implementation 2017-04-20 2017-06-15 2017-09-13

CM-CRC NORD-9688-CW-RFQ /construction d'un bâtiment àusage de bloc sanitaire et d'unbloc de latrine à quatrecompartiments au Centre deSanté Intégré à Mayo GALKEdans la Commune de Tcholliré

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 108,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-10-16

CM-CRC NORD-9690-CW-RFQ /réalisation d'un mini AEPalimenté de Pompe à EnergieSolaire au Centre de SantéIntégré de de Mayo Galké dansla commune de tchollire

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-09-18

CM-CRC NORD-9692-CW-RFQ /Construction de un bloc de 03salles équipés et d'un bloc delatrine à 04 compartiments del'EP GII Rabingha, (LOT 1)Construction de 04 blocs delatrines dans les Ecole Publiquede Gounougou, Ouro Kessoum,Nelbi, Ecole Maternelle deNgouna (LOT 2) et

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 120,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-09-18

CM-CRC NORD-9693-CW-RFQ /construction des 03 magasins destockage des denrées agricolesà BADANKALI, MAYO BOCKI etDJALINGO KAPSIKI dans laCommune de Lagdo

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 142,800.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-09-18

CM-CRC NORD-9695-CW-RFQ /Electrification des quartiersMboum Aviation et Ouro bayeldans la Commune de Garoua 2,Région du Nord

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 62,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-17 2017-09-18

CM-CRC NORD-9696-CW-RFQ /construction d'un bâtiment àusage de Centre de SantéIntégré avec latrines à quatreCompartiments à DOUNDEHIdans la Commune de Touroua,Région du Nord

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 106,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9698-CW-RFQ /construction d'un mini AEP àEnergie solaire au Centre deSanté de DOUNDEHI dans lacommune de Touroua

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 26,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

Page 3

CM-CRC NORD-9699-CW-RFQ /construction et équipement d'unbloc de deux (02) salles declasse avec latrines EPBIYAOU,moudouk,dans laCommune de Madingring

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 96,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9701-CW-RFQ /construction de deux foragesEPMH dans les villages deNBIEN DOLE et BALDJOUKdans la Commune de Madingring

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 35,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9703-CW-RFQ /construction 2 blocs de 3boutiques au marché de GOR etsorobéo et d'un bloc de latrines à6 compartiments dans laCommune de Madingring

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9705-CW-RFQ /réalisation d'un forage au CESBilingue de Bibémi, et exécutiondes travaux de la constructiond'un forage de pastoral équipé dePMH et 04 abreuvoirs à BIDEHAMADICKO dans la communede Bibémi,

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 39,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-11-18

CM-CRC NORD-9706-CW-RFQ /construction d'un bloc de 02salles de classes avec latrinesau CES Bilingue de Bibémi

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 46,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-11-18

CM-CRC NORD-9707-CW-RFQ /travaux de l'aménagement de lapiste agricole BIBEMI-MBELLA(4Km) dans la Commune deBibémi

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9709-CW-RFQ /Construction de 04 foragesEPMH à l'abattoir, municipal,Mbaou et Mbissiri et au lycée deGOP REY dans la Commune deTcholliré

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 64,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-12-18

CM-CRC NORD-9710-CW-RFQ /construction d'un forage pastoraléquipé de Pompe à énergiesolaire dans la commune deBASCHEO,

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-06-25 2017-08-20 2017-11-18

001/T/PNDP/EST/2017 /NORMALISATION DU COURANTELECTRIQUE

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-08-01 2017-08-22 2017-09-21

002/T/PNDP/EST/2017 /AMENAGEMENT SALLED'ARCHIVAGE EN ETAGERE

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-04-11 2017-04-29 2017-05-29

013/T/CE/ELIG MFOMO/2017 /Travaux de Construction de sept(07) forages productifs équipésde Pompe à Motricité Humainedans sept (07) localités (Nkol-Obang, Ban Edouma 2, EP deMebomo, Lekoukoua, Bodo,Enobita et CES de Kokodo)dans la Commune d'Elig Mfomo,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 113,854.00 0.00 Pending

Implementation 2017-03-31 2017-05-26 2017-09-23

014/T/CE/OBALA/2017 /Travaux de Construction d'unpuits equipe de PMH à nkol-Ekuidans la Commune d'Obala,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-04-04 2017-05-30 2017-07-29

015/T/CE/OBALA/2017 /Travaux de Construction d'unbloc de deux (02) salles declasses équipé de 60 table-bancs de niveau 2, de 02bureaux pour enseignants à nkol-Ekui dans la Commune d'Obala,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-04-04 2017-05-30 2017-08-28

016/T/CE/OBALA/2017 /Travaux d'extension du réseauélectrique à sur la route Eligbodo- Yemsoa dans la communed'Obala, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 84,221.00 0.00 Pending

Implementation 2017-04-04 2017-05-30 2017-08-28

016/T/CE/MONATELE/2017 /Travaux de Construction deux(02) hangars de 32 comptoirsavec deux (02) blocs latrines àtrois (03) compartiments auxmarchés de deux (02)respectivement dans les localitésde Ezezang et Lenouk, dans laCommune de Monatélé, Régionde Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 102,904.00 0.00 Pending

Implementation 2017-04-04 2017-05-30 2017-09-27

019/T/CE/OMBESSA/2017 /Travaux de Construction d'unemini AEP avec forage productif etconstruction d'un château àOmbessa, dans la Commune deOmbessa, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-04-05 2017-05-31 2017-06-30

017/T/CE/MONATELE/2017 /Travaux de Construction deux(02) hangars de 32 comptoirsavec deux (02) blocs latrines àtrois (03) compartiments auxmarchés de deux (02)respectivement dans les localitésde Ezezang et Lenouk, dans laCommune de Monatélé, Régionde Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 102,904.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

020/T/CE/OLANGUINA/2017 /Travaux de Construction dun (01)hangar de 32 comptoirs aumarché de Koltock etrehabilitation du marchéd'Olanguina (10 boutiques) etConstruction de (02) bloc latrinesà trois (03) compartiments, dansla Commune d'Olanguina, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 94,057.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

021/T/CE/OLANGUINA/2017 /Travaux de Construction d'un (01)forage productif équipé d'unepompe à motricité humaine aumarche de Koltock dans laCommune d'Olanguina, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

022/T/CE/YAOUNDE 7/2017 /Travaux de Construction d'unmagasin de stockage avec unbloc latrines à deux (02)Compartiments à Minkoameyosdans la commune de Yaoundé 7,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

023/T/YAOUNDE 7/2017 /Travaux de rehabilitation d'unpont definitif de 06m de portee et04m de large sur la riviereAngaha et de réhabilitation d'unepiste agricole de 400m allant ducarrefour nkolnkoumou au Centrede Promotion de la Femme, dansla commune de Yaoundé 7,Région

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 76,971.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

027/T/CE/MENGUEME/2017 /Travaux de Construction de deux(02) puits équipés de Pompes àMotricité Humaine dans deux(02) localités (Yeneassi etMebemezoa) dans la communede Mengueme, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 24,000.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

026/T/CE/MFOU/2017 / Travauxde Construction d'un forageproductif équipés d'une Pompe àMotricité Humaine dans lalocalité de Nkongoa dans laCommune de Mfou, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-09-15

027/T/CE/MENGANG/2017 /Travaux de réalisationd'électrification rurale danscertaines localités, en 02 axes :lycée de Mengang-Meyo-Evounget lycée de Menoa-Ekinguili-Bifembe, Commune de Mengang,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 108,698.00 0.00 Pending

Implementation 2017-04-21 2017-06-16 2017-10-14

028/T/CE/ESEKA/2017 /Travaux de Construction de 02forages equipes de pompes amotricite humaine à l'hopital dedistrict et à l'EP G2 ABCD, dansla Commune d'Eséka, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 31,923.00 0.00 Pending

Implementation 2017-04-25 2017-06-14 2017-10-12

029/T/CE/MAKAK / Travaux deConstruction d'un (01) hangar de48 comptoirs avec un (01) bloclatrines à trois (03)compartiments au marché deMakak centre, dans la Communede Makak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 59,835.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-10-15

03/T/CE/MAKAK/2017 / Travauxde Construction d'un magasin destockage avec un bloc latrines àdeux (02) compartiments dans lalocalités de Mbeng dans laCommune de Makak, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-10-15

031/T/CE/MAKAK/2017 /Travaux de Construction d'un (01)puits équipé de Pompe àMotricité Humaine au marché deMakak Centre, dans laCommune de Makak, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-10-15

032/T/CE/DIBANG/2017 /Travaux de realisation d'uneelectrification rurale de 2700mdans le village Tamalong,Commune de Dibang, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 57,608.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

033/T/CE/DIBANG/2017 /Travaux de Construction d'unmagasin de stockage avec unbloc latrines à deux (02)compartiments à Ndongo dans laCommune de Dibang, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 50,000.00 0.00 Pending

Implementation 2017-04-21 2017-06-10 2017-10-08

034/T/CE/BOT MAKAK/2017 /Travaux de Construction de deux(02) forages productifs équipésde pompes à motricité humaineau CETIC et Centre Administratifde Bot-Makak, dans laCommune de Bot Makak, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 29,803.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-10-15

035/T/BOT MAKAK/2017 /Travaux de Construction d'un (01)puits équipés de pompes àmotricité humaine à NdjockBané, dans la Commune de BotMakak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-17 2017-10-15

036/T/CE/NTUI/2017 / Travauxde Construction de deux (02)magasins de stockage de cacaoet construction de 02 blocslatrines à deux (02)compartiments dans leslocalités de Nguila, et Ntui ville)dans la Commune de Ntui,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 125,749.00 0.00 Pending

Implementation 2017-05-01 2017-06-20 2017-10-18

CM-CRC ADAMAOUA-11713-CW-RFQ / Travaux deréalisation d'une clôture de 19KM linéaire en vue de sécuriserune zone agricole de 2 396hectares autour des villages BolaGalé-Bello, Ba-Zaïre, Mbibale,Kanan et Gbawa, Commune deTibati, Département du Djérem,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 107,992.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-CRC ADAMAOUA-11716-CW-RFQ / Travaux deconstruction d'un pont long de 8m et large de 5 m sur le MayoMassim réliant le village Pangarà Ngaoundal, Département duDjérem, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 77,661.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-CRC ADAMAOUA-11747-CW-RFQ / Travaux deconstruction de 02 dalots (01dalot simple de section 1,50m x2,00m et 01 dalot quatre desection 1,50mx2,20m) sur larivière Mbirim réliant l'EcolePublique de Mbirim au Centre duVillage Mbirim et 01 dalot simplede section 1,50mx2,00m

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 85,052.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-CRC ADAMAOUA-11749-CW-RFQ / Travaux deconstruction de cinq (05)boutiques, quatres (04) blocssécrétariats bureautiques et unbloc de deux latrines auCarrefour Malang, Commune deNgaoundéré 3, Département dela Vina, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 83,880.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

CM-CRC ADAMAOUA-11751-CW-RFQ / Travaux deconstruction de cinq (05) buseset aménagement des rigoles surles points crtiques de la routeManwi - Mbella, Commune deNgaoundéré 3, Département dela Vina, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 54,938.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

CM-CRC ADAMAOUA-11752-CW-RFQ / Travaux deconstruction d'une casecommunautaire et un bloc dedeux latrines à Martap,Commune de Martap,Département de la Vina, Régionde l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 72,697.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

CM-CRC ADAMAOUA-11753-CW-RFQ / Travaux deconstruction de deux Hangars deMarché de 32 comptoires chacunen Beton Armés et un bloc dedeux latrines au Marché desFemmes de Tekel, Commune deMartap, Département de la Vina,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 44,492.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

CM-CRC ADAMAOUA-11754-CW-RFQ / Travaux decontruction d'une AEP à traversle captage d'une source d'eau etla construction d'un reservoir de12 métres cubes, 04 bornesfontaines et 04 abreuvoirs à bétaildans le village Bawa, Communede Martap, Département de laVina, Région de l'Ada

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 131,119.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

CM-CRC ADAMAOUA-11756-CW-RFQ / Travaux deconstruction d'un bain détiqueurà Toumbouroum, Commune deMartap, Département de la Vina,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 67,572.00 0.00 Pending

Implementation 2017-04-05 2017-05-24 2017-11-20

Page 4

CM-CRC ADAMAOUA-11758-CW-RFQ / Traveaux deréalisation d'une barrière (clôtureen fils barbélés) de 13 196métres linéaires pr lasécurisation de 04 espacesagropastoraux de 2 211,5Hectares dans 04 villages :Boforo (1 589 ha), Malingara (381ha), Bindiba (153 ha) et Kalaldi(8ha)

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 76,407.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11760-CW-RFQ / Travaux deconstruction d'une casecommunautaire et un bloc dedeux latrines à Dir, Commune deDir, Département du Mbéré,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 88,855.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11763-CW-RFQ / Travaux deconstruction de 02 blocs de 02salles de classe équipés de 60tabales bancs et un bloc de 02latrines chacun au CETIC de Diret à l'EP de DOBIRI,Département du Mbéré, Régionde l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 94,598.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11764-CW-RFQ / Travux deconstruction d'un forage positiféquipe de PMH au CETIC de Dir,Département du Mbéré, Régionde l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,148.00 0.00 Pending

Implementation 2017-04-05 2017-06-06 2017-12-03

CM-CRC ADAMAOUA-11765-CW-RFQ / Travaux deconstruction de deux blocs de 02salles de classe équipés de 60tables bancs et un bloc de deuxlatrines chacun à EP de Dilectiet à l'EP Bilingue de Gadjiwan,Commune de Mayo Baléo,Département du Faro et Déo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 107,510.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11766-CW-RFQ / Travaux deconstruction de trois foragespositifs équipés des PMH dansles EP de Dilecti et Gadjiwan etau Centre de Promotion de laFemme et de la Famille (CPFF)du Mayo Baléo, Département duFaro et Déo, Région del'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 51,596.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11768-CW-RFQ / Travaux deconstruction et d'équipement d'unCentre de Promotion de laFemme et de la Famille (CPFF)avec latrines incorporées deMayo Baléo, Commune de MayoBaléo, Département du Faro etDéo, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 156,105.00 0.00 Pending

Implementation 2017-04-05 2017-06-02 2017-11-29

CM-CRC ADAMAOUA-11769-CW-RFQ / Contruction de 02forages Positifs équipés desPMH au Lycée de Béka Modiboet à l'EP de LIPAO etRéhabilitation de 04 forages:Goungel Pastoral (Quartier Tola),Baringo, Mambéré Hassimi,Mayo Badji et 01 puits équipé dePMH à l'EP Goumgel Troua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 66,399.00 0.00 Pending

Implementation 2017-04-05 2017-06-06 2017-12-03

CM-CRC ADAMAOUA-11770-CW-RFQ / Travaux de réalisationd'une mini adduction d'eau avecsept (07) bornes fontaines àBandam, Commune de Bankim,Département du Mayo Banyo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 130,910.00 0.00 Pending

Implementation 2017-04-05 2017-06-06 2017-12-03

CM-CRC ADAMAOUA-11772-CW-RFQ / Travaux deréalisation d'une clôture deséparation de 5 750 métres desespaces agricoe (3 6168Hectares) et pastoral (3 965Hectares) dans la localité deBandam, Commune de Bankim,Département du Mayo Banyo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 44,033.00 0.00 Pending

Implementation 2017-04-09 2017-06-11 2017-12-08

CM-CRC ADAMAOUA-11773-CW-RFQ / Travaux deréhabilitation de quatre (04)forages dans quatre (04)quartiers de la ville de Bankim(Nguinklo, Chefferie Bankim,Newton et Tchim), Commune deBankim, Département du MayoBanyo, Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 22,811.00 0.00 Pending

Implementation 2017-04-09 2017-06-11 2017-12-08

CM-CRC ADAMAOUA-11774-CW-RFQ / Travaux deconstruction d'un parcvaccinogène à Haïnaré,Commune de Bankim,Département du Mayo Banyo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,160.00 0.00 Pending

Implementation 2017-04-09 2017-06-11 2017-12-08

CM-CRC ADAMAOUA-11775-CW-RFQ / Travaux deconstruction d'une casecommunautaire et un bloc dedeux latrines à Diéki, Communede Bankim, Département duMayo Banyo, Région del'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 64,703.00 0.00 Pending

Implementation 2017-04-09 2017-06-11 2017-12-08

CM-CRC ADAMAOUA-11776-CW-RFQ / Travaux deconstruction d'une casecommunautaire et un bloc dedeux latrines à YIMBERE,Commune de Bankim,Département du Mayo Banyo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 64,703.00 0.00 Pending

Implementation 2017-04-09 2017-06-11 2017-12-08

001/T/SW/MENJI/CRC/2017 /Travaux de construction etéquipement d'un foyercommunautaire etmultifonctionnel et un bloc latrineà trois compartiments à MBOEHdans la Commune de Menji,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-04-27 2017-05-18 2017-11-14

001/T/SW/BAMUSSO/CRC/2017/ Travaux de Construction d'unmagasin de stockage et d'unbloc latrine à deux (02)compartiments à Bekiri Beachdans la Commune de Bamusso,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 54,967.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

001/T/SW/MUYUKA/CRC/2017 /Travaux de construction d'ungrand hangar au marché de Yokedans la Commune de Muyuka,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 63,558.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

001/T/SW/EKONDOTITI/CRC/2017 / Travaux deConstruction de l'EcoleMaternelle de Funge dans laCommune d'Ekondo Titi, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 55,020.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

001/T/SW/TOMBEL/CRC/2017 /Travaux de construction d'ungrand Hangar, d'un bloc latrine àtrois compartiments et d'uneborne fontaine au marché deTombel dans la Commune deTombel, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 72,523.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

002/T/SW/EKONDOTITI/CRC/2017 / Travaux deréalisation Réalisation d'un foragepositif équipé d'une pompeélectrique fonctionnant avecl'energie solaire à l'EM de Fungela Commune d'Ekondo Titi,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 27,657.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

001/T/SW/MBONGE/CRC/2017/ Travaux de réalisation de deux(02) forages productifs équipésde pompes à motricité humainedans les écoles publiques deMarumba et Kotto Barumbi dansla Commune de Mbonge, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 34,135.00 0.00 Pending

Implementation 2017-05-02 2017-06-27 2017-12-24

001/T/SW/MUNDEMBA/CRC/2017 / Travaux de réalisation detrois (03) forages productifséquipés de pompes à motricitéhumaine dans les écolesprimaires de Ndian Estate,Besingi et Fabe dans laCommune de Mundemba, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Open - National

Single Stage - OneEnvelope 59,575.00 0.00 Pending

Implementation 2017-05-06 2017-07-01 2017-12-28

CM-CRC NORTH WEST-12457-CW-RFQ / Construction of aBridge in Akeh Village (towardsthe market from Oku road) inFundong Council area, dans laCommune de fundong Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12464-CW-RFQ / Construction of lockup sheds in Mbokam market witha VIP toilet and extension ofwater, dans la Commune de jakiriRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-12456-CW-RFQ / Construction of abride linking Ashing and GS Shoand rehabilitation of access roadof 5km with 1 culvert(length of thebridge 14mX4m), dans laCommune de belo Région duNord Oues

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12455-CW-RFQ / Opening of Ewai -Fombe 7.5km farm to marketroad and construction of 10meters bridge and 4 culverts",dans la Commune de batiboRégion du Nord Oue

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12453-CW-RFQ / Construction of 30luck up market sheds,a bock ofVIP latrine and extension ofpotable water to Kikaikommarket, in the Kumbo Councilarea, dans la Commune dekumbo Région du Nord Ouest

Construction of 30 luck upmarket sheds,a bock of VIPlatrine

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-11955-CW-RFQ / Extension ofElectricity from Mbow entrance(GBHS Babessi Junction) toMbow Quarter and MbezohQuarter, in Babessi Council area,dans la Commune de babessi,Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-11997-CW-RFQ / Construction of twoclassrooms, VIP toilet and H/M'soffice for the newly created GSSKovki in Mbiame council area,dans la Commune de mbiameRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12006-CW-RFQ / Construction andequipment of 2 Classrooms andVIP toilet and H/M's office in GSKWEI in Misaje council area,dans la Commune de misajeRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12018-CW-RFQ / Construction of aMarket hanger and Warehouse,VIP latrine and extension ofwater to Ntundip Market, Ndu,dans la Commune de ndu Régiondu Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

CM-CRC NORTH WEST-12398-CW-RFQ / Construction of a newcatchment, Tank and extensionof water to all quarters inNdzenso in Nkum council area,dans la Commune de nkum,Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-03 2017-07-24 2018-01-20

CM-CRC NORTH WEST-12439-CW-RFQ / Construction of 15market sheds, a canteen,Restaurant and extension ofwater to the building at theNjinikom main market, dans laCommune de njinikom Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-12441-CW-RFQ / Construction of aMarket hanger and Warehouse,VIP latrine and extension ofwater to Ntundip Market, Ndu,dans la Commune de ndu Régiondu Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-12443-CW-RFQ / Construction of amodern slaughter house at Ndop(Bamunka) central and extensionof portable water to the site, dansla Commune de Ndop Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-12444-CW-RFQ / Construction of twoclassrooms, VIP toilet and H/M'soffice for the newly created GSSKovki in Mbiame council area,dans la Commune de mbiameRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-06-05 2017-06-26 2017-12-23

CM-CRC NORTH WEST-12445-CW-RFQ / Construction of twoclassrooms, VIP toilet and H/M'soffice for the newly created GSSKovki in Mbiame council area,dans la Commune de mbiameRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-07-05 2017-07-26 2018-01-22

GOODSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-PNDP-2738-GO-RFQ /Fourniture des groupesélectrogènes pour les communessim_ba

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Open - National

Single Stage - OneEnvelope 68,000.00 0.00 Pending

Implementation 2017-02-17 2017-04-14 2017-10-11

CM-PNDP-2739-GO-RFQ /Acquisition des fournitures debureau, produits d'entretien,matériel et produits pause-café,et consommables informatiques

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2016-10-26 2016-12-21 2017-06-19

Page 5

CM-PNDP-2836-GO-UN /Acquisition de véhicules etmotos par UNOPS

IDA / 57180

Component B: Support to thedecentralization processComponent C: Coordination,management, monitoring andevaluation and communication

Prior UN Agencies (Direct) Direct

2,328,000.00 0.00 PendingImplementation 2016-10-27 2016-11-01 2016-12-06 2017-06-04

CM-PNDP-2839-GO-RFQ /Edition des documents à la CNC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2016-11-01 2016-12-27 2017-06-25

CM-PNDP-2835-GO-RFB /Fourniture du mobilier de bureaupour la CNC et les 10 CRC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 200,000.00 0.00 Under

Implementation 2016-12-11 2016-12-27 2016-12-16 2017-01-27 2017-01-27 2017-02-26 2017-04-02 2017-09-29

CM-PNDP-2736-GO-RFB /Fourniture et installation dumatériel informatique et dumatériel didactique au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Prior Request for Bids Open - National

Single Stage - OneEnvelope 490,000.00 0.00 Pending

Implementation 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28

CM-PNDP-6227-GO-RFQ /Fourniture des supports decommunication dans le cadre dulancement du PNDP III

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-02-09 2017-04-06 2017-10-03

CM-PNDP-2932-GO-RFB /Production du bulletin trimestrielde certaines communes (10Agences de communications auniveau régional)

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 360,000.00 0.00 Pending

Implementation 2016-12-12 2016-12-17 2017-01-28 2017-02-27 2017-04-03 2017-09-30

001/F/PNDP/EST / Fournituresde bureau, matériels d'entretienet divers

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-03-06 2017-05-01 2017-05-31

001-F-LT-CRC-2017 /Acquisition du Kit de l'ingénieurde la Cellule Régionale deCoordination du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-28

004/F/SU/CRC/2017 /Acquisition des consommablesinformatiques

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 7,240.00 0.00 Pending

Implementation 2017-07-13 2017-08-14 2017-08-28

CM-CRC SOUTH WEST-7988-GO-RFQ / Acquisition desfournitures de bureau, du matérield'entretien et divers à la CRC,Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-04-14 2017-05-14 2017-05-31

CM-CRC EXTREME NORD-7991-GO-RFQ / Acquisition desfournitures de bureaux dumatériels d'entretien et desfournitures diverses à la CRC,Région de l'Extrême-Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-05-19

002/F/PNDP/EST /ACQUISITION DESFOURNITURES POURVEHICULE

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-03-06 2017-05-01 2017-05-31

001/F/CRCOU/2017 /Acquisition des fournitures debureaux (Papier format,Chemises, Stylos, crayons,agraphes, trombones, etc...) pourle fonctionnement de la CelluleRégionale de Coordination Ouestdu PNDP, dans la Région del'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,900.00 0.00 Pending

Implementation 2017-03-25 2017-05-20 2017-11-16

003/F/PNDP/EST /ACQUISITION DESCONSOMMABLESINFORMATIQUES A LA CRCEST

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 16,000.00 0.00 Pending

Implementation 2017-03-06 2017-05-01 2017-05-31

CM-CRC EXTREME NORD-8000-GO-RFQ / Acquisition desconsomables Informatiques(Encres, clés internet, CD, 2disques durs externes Tera, 9clés USB, antivirus) à la CRC,Région de l'Extrême-Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-05-19

CM-CRC EXTREME NORD-8001-GO-RFQ / Acquisition desfournitures pour véhicules((5pneusX3véh), 3 boîtes àpharmacie, 3 extincteurs,3pelles, 6 paires de gants,3machettes, 3manteaux...) à laCRC, Région de l'Extrême-Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-05-19

CM-CRC EXTREME NORD-8003-GO-RFQ / acquisition,aménagement et équipement de2 conteneurs de 40 pieds

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-07-04

CM-CRC EXTREME NORD-8006-GO-RFQ / aquisition etinstallation de 10 splits

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-06-04

CM-CRC LITTORAL-8007-GO-RFQ / Acquisition deconsommables informatiques etantivirus à la CRC, Région duLittoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 7,240.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-28

CM-CRC EXTREME NORD-8008-GO-RFQ / acquisition du kit àoutils du CCI(scléromètre,lazermètre, odomètre, pi àcoulisse électronique, EPI, Giletsde sauvetage

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2017-06-04

CM-CRC LITTORAL-8010-GO-RFQ / Acquisition de fournituresd'Equipement de ProtectionIndividuelle (EPI) et matérield'entretien à la CRC, Région duLittoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,800.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-21

CM-CRC EXTREME NORD-8009-GO-RFQ / fourniture des servicesde maintenance électrique,climatiseurs, groupe électrogène,plolmberie et menuiserie à laCRC, Région de l'Extrême-Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,800.00 0.00 Pending

Implementation 2017-03-10 2017-05-05 2018-05-05

CM-CRC LITTORAL-8011-GO-RFQ / Acquisition de fourniturespour véhicules (Pneus, parebuffles, pare chocs, alarmes,tapis, boîte à pharmacie,...) de laCRC, Région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-06-06

CM-CRC NORTH WEST-8005-GO-RFQ / Acquisition dumateriel d'entretien et divers à laCRC, Région du Nord-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-13 2017-05-29

CM-CRC LITTORAL-8014-GO-RFQ / Acquisition des fournituresde bureaux et divers à la CelluleRégionale de Coordination,Région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-22

CM-CRC LITTORAL-8017-GO-RFQ / Acquisition du mobilier debureau pour l'Assistant Régionalchargé de la Passation desMarchés et de l'Archivage (01chaise, 01 bureau avec retour et01 chaise de réception) de laCellule Régionale deCoordination, Région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 900.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-28

01/F/CRC/CE/2017 / Acquisitiondu kit CCI à la CRC, Région duCentre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,500.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

02/F/CRC/CE/2017 / Acquisitiondes fournitures de bureau etdivers à la CRC, Région duCentre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

CM-CRC SOUTH WEST-8044-GO-RFQ / Acquisition desconsommables informatiques àla CRC, Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

CM-CRC NORTH WEST-8051-GO-RFQ / Acquisition defournitures pour véhicules(pneus,pelles,...etc) à la CRC,Région du Nord-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 8,690.00 0.00 Pending

Implementation 2017-03-18 2017-05-13 2017-06-02

CM-CRC SOUTH WEST-8049-GO-RFQ / Acquisition desfournitures pour véhicules (pneus,boîte à pharmacie, extincteur devéhicule, petit matériel(machette, lampe de poche )Région à la CRC, du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,998.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

002/F/CRCOU/2017 /Acquisition des fournitures pourvéhicules (trousse de secours,tapis, Extincteur, Fournitures etmontage des Pneus, etc...) pourleur fonctionnement à la CelluleRégionale de Coordination Ouestdu PNDP, dans la Région del'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 21,978.00 0.00 Pending

Implementation 2017-04-06 2017-06-01 2017-07-17

CM-CRC SOUTH WEST-8055-GO-RFQ / Fourniture desservices de maintenance du parcet réseau informatique,téléphonique ainsi que dumatériel de reprographie à laCRC, Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,000.00 0.00 Pending

Implementation 2017-03-11 2017-05-06 2017-11-02

CM-CRC NORTH WEST-8060-GO-RFQ / Acquisition dumateriel de classement etd'archivage (Communes,minmapet CRC), à la CRC, Région duNord-Ouest.

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-13 2017-05-30

CM-CRC NORTH WEST-8063-GO-RFQ / Acquisition du kit del'Ingénieur, à la CRC, Région duNord-Ouest.

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-06-26

001/F/SU/CRC/2017 /Acquisition des fournitures debureaux, du matériel d'entretienet divers

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 26,000.00 0.00 Pending

Implementation 2017-03-06 2017-04-10 2017-10-21

CM-CRC SOUTH WEST-8066-GO-RFQ / Fourniture desservices de collecte, transport etdistribution des courriers et colisà la CRC, Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,400.00 0.00 Pending

Implementation 2017-03-11 2017-05-06 2017-11-02

CM-CRC NORTH WEST-8069-GO-RFQ / Acquisition deconsommables informatiques àla CRC, Région du Nord-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 7,450.00 0.00 Pending

Implementation 2017-04-01 2017-05-27 2017-06-27

04/F/CRC/CE/2017 / Acquisitiondes consommablesinformatiques à la CRC, Régiondu Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

CM-CRC SOUTH WEST-8070-GO-RFQ / Fourniture desservices de gardiennage à laCRC, Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 7,200.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

CM-CRC NORTH WEST-8073-GO-RFQ / Acquisition dumateriel d'entretien et divers à laCRC, Région du Nord-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-13 2017-06-12

003/F/CRCOU/2017 /Acquisition et fourniture desConsomables Informatiques(Encre pour Copieurs (troiscopieurs), Encre pour huitimprimantes, CD vierges, etc...)pour le fonctionnement de laCellule Régionale deCoordination Ouest du PNDP,dans la Région de l'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,800.00 0.00 Pending

Implementation 2017-03-30 2017-05-25 2017-06-08

002/F/SU/CRC/2017 /Acquisition et installation d'ungroupe électrogène complet de10 KVA

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-03-06 2017-04-10 2017-05-02

CM-CRC LITTORAL-8064-GO-RFQ / Fourniture de servicesd'assistance informatique etautres services de normalisationdu courant électrique et entretiensplit, maintenance et entretienmatériel et réseau informatique,appui technique divers, à la CRC,région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 17,200.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2018-05-07

CM-CRC SOUTH WEST-8075-GO-RFQ / Acquisition de 12boîtes étagères de rangement enbois massif 1,5x1,2x1) , unetable en bois massif et 04chaises en bois massif à laCRC, Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 7,900.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

05/F/CRC/CE/2017 / AcquisItiondes fournitures pour véhicules àla CRC, Région du Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 16,070.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

CM-CRC ADAMAOUA-8079-GO-RFQ / Acquisition caisse à outilde l'ingénieur de la CRC, RégionAdamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,445.00 0.00 Pending

Implementation 2017-05-03 2017-06-28 2017-12-25

CM-CRC NORD-8085-GO-RFQ /Acquisition de fournitures debureaux et divers à la CRC Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-03-20 2017-05-15 2017-05-29

003/F/SU/CRC/2017 /Acquisition du kit du CCI (Pied àcoulisse électronique, Odomètre,lasermètre, Scléromètre, EPI)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-07-13 2017-08-14 2017-08-28

06/F/CRC/CE/2017 / Fourniturede service de maintenance duréseau informatique ettéléphonique à la CRC, Régiondu Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 3,600.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

CM-CRC NORTH WEST-8077-GO-RFQ / Acquisition desfournitures de bureaux, à la CRC,Région du Nord-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 12,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-13 2017-06-12

CM-CRC LITTORAL-8084-GO-RFQ / Acquisition des fourniturespour assistance au classementet à l'archivage de 23 communesdans la région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,418.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2017-05-21

07/F/CRC/CE/2017 / Fourniturede service de maintenance descopieurs et imprimantes à laCRC, Région du Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,400.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

08/F/CRC/CE/2017 / Fourniturede service de transport des colisen vue de déménagement deslocaux à la CRC, Région duCentre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,800.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

09/F/CRC/CE/2017 / Fournituredes services de gardiennage à laCRC, Région du Centre

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,600.00 0.00 Pending

Implementation 2017-03-23 2017-05-07 2017-06-06

Page 6

CM-CRC LITTORAL-8092-GO-RFQ / Fourniture des services degardiennage des locaux de laCRC, région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,600.00 0.00 Pending

Implementation 2017-03-12 2017-05-07 2018-05-07

005/F/SU/CRC/2017 /Acquisition des fournitures pourvéhicules (pneus, etc...)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 6,300.00 0.00 Pending

Implementation 2017-07-13 2017-08-14 2017-08-28

CM-CRC SOUTH WEST-8091-GO-RFQ / Acquisition du kit del'Ingénieur (pied à coulisse,double deca metre,...) à la CRC,Région du Sud-Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-04-09 2017-06-04 2017-12-01

CM-CRC NORD-8105-GO-RFQ /Acquisition de fournitures pourvéhicules à la CRC NORD

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-04-17 2017-06-12 2017-06-26

CM-CRC NORD-8116-GO-RFQ /Acquisition des consommablesinformatiques à la CRC Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Open - National

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-03-20 2017-05-15 2017-05-29

CM-CRC NORD-8120-GO-RFQ /Acquisition de matériels relatifs àl'archivage des documents dansles 21 Communes du Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,000.00 0.00 Pending

Implementation 2017-04-17 2017-06-12 2017-06-26

004/F/CRCOU/2017 / Fournituredes services de gardiennage deslocaux à la Cellule Régionale deCoordination Ouest du PNDP,dans la Région de l'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,600.00 0.00 Pending

Implementation 2017-03-30 2017-05-03 2017-05-17

CM-PNDP-2737-GO-RFQ /Fourniture de Kits solaires pourles communes de sim_ba

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Open - National

Single Stage - OneEnvelope 52,000.00 0.00 Pending

Implementation 2017-02-10 2017-04-07 2017-10-04

CM-CRC NORD-8536-GO-RFQ /fourniture de service de transportpour collecte transport etdistribution de courriers et colisde la CRC NORD

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,560.00 0.00 Pending

Implementation 2017-03-20 2017-04-24 2017-12-31

CM-CRC NORD-8537-GO-RFQ /ACQUISITION KIT CCI CRCNORD

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,500.00 0.00 Pending

Implementation 2017-04-17 2017-05-29 2017-06-29

CM-CRC NORD-8538-GO-RFQ /Fourniture des services demaintenance du groupeélectrogène à la CRC Nord

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,800.00 0.00 Pending

Implementation 2017-04-17 2017-05-29 2017-12-31

CM-CRC NORD-8539-GO-RFQ /Fourniture du petit matérielmédical et du mobilier en bois auau CSI de OURO ARDO dans laCommune de BARNDAKE,Région du Nord

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,800.00 0.00 Pending

Implementation 2017-03-20 2017-04-20 2017-05-22

CM-CRC NORD-8540-GO-RFQ /Fourniture du petit matérielmédical et du mobilier en bois auCSI DE Rey-Bouba dans laCommune de Rey Bouba, Régiondu Nord

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-06-20 2017-07-20 2017-09-18

CM-CRC NORD-8541-GO-RFQ /Fourniture du petit matérielmédical et du mobilier en bois auCSI de Mayo Galké dans laCommune de Tcholliré,

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-06-20 2017-07-20 2017-09-18

CM-CRC NORD-8542-GO-RFQ /Fourniture du petit matérielmédical et du mobilier en bois auau CSI de DEMBO dans leCommune de Dembo

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-06-20 2017-07-20 2017-09-18

CM-CRC NORD-8543-GO-RFQ /Fourniture du petit matérielmédical et du mobilier en bois auau CSI de DOUNDEHI dans laCommune de Touroua

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-08-12 2017-09-11 2017-11-13

CM-CRC NORD-8544-GO-RFQ /Equipement en mobilier ( tablesbancs, bureaux, chaises etarmoires) aux lycée deFIGNOLE, Lycée technique dePOLI

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-03-20 2017-04-19 2017-06-19

005/F/CRCOU/2017 / Fournituredes services de liaison et envoidu courrier à la Cellule Régionalede Coordination Ouest du PNDP,dans la Région de l'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,080.00 0.00 Pending

Implementation 2017-03-30 2017-05-25 2017-12-31

006/F/CRCOU/2017 / Fournituredes services de maintenance duréseau et matériels informatiquesà la Cellule Régionale deCoordination Ouest du PNDP,dans la Région de l'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 4,293.00 0.00 Pending

Implementation 2017-04-11 2017-06-06 2017-12-28

007/F/CRCOU/2017 / Fournituredes services de maintenance duréseau électrique, climatiseurs,équipements sanitaires et groupeélectrogène à la CelluleRégionale de Coordination Ouestdu PNDP, dans la Région del'Ouest

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 6,440.00 0.00 Pending

Implementation 2017-04-11 2017-06-06 2017-12-28

007/F/SU/CRC/2017 / Fournituredes services de maintenance duréseau électrique et de laplomberie

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 620.00 0.00 Pending

Implementation 2017-03-17 2017-04-21 2018-04-21

008/F/SU/CRC/2017 / Fournituredes services de maintenance dugroupe électrogène et desclimatiseurs

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,500.00 0.00 Pending

Implementation 2017-03-17 2017-04-21 2018-04-21

009/F/SU/CRC/2017 / Fournituredes services de collecte,transport et distribution descourriers et colis

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,342.00 0.00 Pending

Implementation 2017-03-17 2017-04-21 2018-04-21

CM-CRC LITTORAL-9508-GO-RFQ / Fourniture des services decollecte, transport et distributiondes courriers et colis à la CRC,région du Littoral

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Open - National

Single Stage - OneEnvelope 1,200.00 0.00 Pending

Implementation 2017-03-14 2017-05-09 2018-05-09

010/F/SU/CRC/2017 / Fournituredes services de gardiennage à laCRC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,600.00 0.00 Pending

Implementation 2017-03-17 2017-04-21 2018-04-21

011/F/SU/CRC/2017 /Acquisition et installation de 03climatiseurs de 1,5CV, 01climatiseur de 2,5CV et 06barbillards (tableau de liège de150 x 90 cm)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,340.00 0.00 Pending

Implementation 2017-03-17 2017-04-21 2017-05-05

012/F/SU/CRC/2017 /Acquisition des fournitures pourclassement et archivage

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,418.00 0.00 Pending

Implementation 2017-07-13 2017-08-14 2017-08-28

001/F/SU/DJOUM / Fourniturede médicaments au CSI de Mfem

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,100.00 0.00 Pending

Implementation 2017-04-21 2017-05-18 2017-06-01

002/F/SU/DJOUM/2017 /Fourniture de tables-bancs à l'EPd'Okweng

IDA / 57180 Component A: Localdevelopment support Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,016.00 0.00 Pending

Implementation 2017-04-21 2017-05-18 2017-06-17

CM-PNDP-9661-GO-RFB /Acquisition du matérielinformatique (ordinateurs et mini-réseau) pour SIM-BA dans les184 communes

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 349,600.00 0.00 Pending

Implementation 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-05-24 2017-07-08

CM-PNDP-9664-GO-RFB /Fourniture des groupesélectrogènes dans le cadre de lamise en oeuvre du logicielSim_ba dans 187 communes (Relance)

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 480,000.00 0.00 Pending

Implementation 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-06-07 2017-07-22

CM-PNDP-9665-GO-RFB /Fourniture des plaques solairespour Sim_ba dans le cadre de lamise en oeuvre du logicielSim_ba dans 40 commune (deuxième vague)

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 440,000.00 0.00 Pending

Implementation 2017-03-27 2017-04-01 2017-05-01 2017-05-15 2017-06-12 2017-07-27

CM-PNDP-9669-GO-RFQ /Fourniture de bureau (lot 1),produits d'entretien et matériel etproduits pause-café ( lot 3) à laCNC du PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-10-28 2017-12-09 2018-12-04

CM-PNDP-9671-GO-RFQ /Fourniture des consommablesinformatiques à la CNC du PNDP(LOT4)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2017-10-28 2017-12-09 2018-12-04

CM-PNDP-9799-GO-RFQ /Acquisition des fournitures pourles véhicules de la CNC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2017-12-09 2018-01-13 2019-01-08

CM-PNDP-9806-GO-RFQ /Fourniture et installation dumobilier de bureau au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-03 2017-06-24

CM-PNDP-9813-GO-RFQ /Acquisition des fournitures dansle cadre de l'appui au Ministèredes Affaires Sociales pour laJournée Internationale desPeuples Autochtone (JIPA)

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,000.00 0.00 Pending

Implementation 2017-04-22 2017-06-03 2017-06-17

CM-PNDP-9817-GO-DIR /Souscription pour la participationdu PNDP à la Journée Africainede la Décentralisation et duDéveloppement Local (JADDEL2017)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

4,000.00 0.00 Pending

Implementation 2017-03-30 2017-04-04 2017-04-25 2017-04-27

CM-PNDP-9820-GO-RFQ /Conception et pose d'affichettessur les comportements souhaitésdans le cadre du PNDP III

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 28,000.00 0.00 Pending

Implementation 2017-06-23 2017-08-04 2017-08-25

CM-PNDP-9822-GO-RFB /Fourniture et installation dumatériel informatique etdidactique au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 322,730.00 0.00 Pending

Implementation 2017-07-07 2017-07-12 2017-08-11 2017-08-25 2017-09-08 2017-10-23

CM-PNDP-9825-GO-RFQ /Fourniture du matériel deformation (paper board) pour laCNC et les CRC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,600.00 0.00 Pending

Implementation 2017-04-22 2017-06-03 2017-06-17

CM-PNDP-9828-GO-RFQ /Fourniture de 182 téléphonesportables pour le personnel duPNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 44,120.08 0.00 Pending

Implementation 2017-04-22 2017-05-27 2017-06-03

CM-PNDP-9833-GO-DIR /Convention de partenariat avec laCRTV poste nationale pour ladiffusion des messages dansl'émission radio" CroissancePlus"

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

2,000.00 0.00 Pending

Implementation 2017-03-14 2017-03-19 2017-04-09 2018-04-04

CM-PNDP-9838-GO-DIR /Convention de partenariat pour ladiffusion de programmes sur lesstations réionales Extrême-nord,Nord, Adamaoua, et est de laCRTV

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

2,400.00 0.00 Pending

Implementation 2017-05-08 2017-05-13 2017-05-27 2018-05-22

CM-PNDP-9840-GO-DIR /Convention de partenariat avecles radios communautaires pourla difusion d'émissions sur lesthématiques chères au PNDP IIIdans les quatres régions

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

12,000.00 0.00 Pending

Implementation 2017-05-08 2017-05-13 2017-05-27 2018-05-22

CM-PNDP-9843-GO-DIR /Acquisition des ouvrages sur ladécentralisation et ledéveloppement local

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

10,000.00 0.00 Pending

Implementation 2017-05-08 2017-05-13 2017-05-27 2017-06-03

CM-PNDP-2928-GO-RFB /Production des outils decommunication du PNDP 3 (Plaquette, Kakemonos, agenda,présentoires, pagnes, polos, t-shirts, casquette, etc)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 245,200.00 0.00 Pending

Implementation 2017-04-03 2017-04-08 2017-04-29 2017-05-29 2017-06-19 2017-07-10

CM-PNDP-2931-GO-DIR /Edition du Magazine Trimestriel "LES ECHOS DU PNDP"

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

50,000.00 0.00 PendingImplementation 2017-03-17 2017-03-22 2017-04-26 2018-04-21

CM-PNDP-2837-GO-RFB /Acquisition du petit équipement(GPS et supports pour leSystème d'InformationGéographique) pour 75communes

IDA / 57180 Component B: Support to thedecentralization process Post Request for Bids Open - National

Single Stage - OneEnvelope 150,000.00 0.00 Pending

Implementation 2017-04-13 2017-04-18 2017-05-09 2017-06-08 2017-06-29 2017-08-13

CM-PNDP-2929-GO-RFQ /Production de la signalétique des11 sites du PNDP (agence decommunication)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 16,000.00 0.00 Pending

Implementation 2017-03-31 2017-05-19 2017-07-03

CM-PNDP-11813-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région del'Adamaoua dans l'édition d'unbulletin trimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 22,222.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11814-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du Centredans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 70,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11815-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région de l'Est dansl'édition d'un bulletin trimestrield'informations communal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 33,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11817-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région de l'ExtremeNord dans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 47,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11818-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du Littoraldans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 34,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11819-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du Nord dansl'édition d'un bulletin trimestrield'informations communal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 21,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11820-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du NordOuest dans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 34,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

Page 7

CM-PNDP-11821-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région de l'Ouestdans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11824-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du Sud dansl'édition d'un bulletin trimestrield'informations communal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 29,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-PNDP-11825-GO-RFQ /Accompagnement descommunes d'intervention duPNDP de la Région du SudOuest dans l'édition d'un bulletintrimestriel d'informationscommunal

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 31,000.00 0.00 Pending

Implementation 2017-04-10 2017-06-05 2017-12-02

CM-CRC ADAMAOUA-11965-GO-RFQ / Acquisition desfournitures pour véhicules de laCRC, Région Adamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-16 2017-12-13

CM-CRC ADAMAOUA-11971-GO-RFQ / Acquisition etinstallation d'un groupeélectrogène avec abri de la CRC,Région Adamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-04-27 2017-06-22 2017-12-19

CM-CRC ADAMAOUA-11973-GO-RFQ / Achat d'autresfournitures (acquisition desconsommables informatiques) dela CRC, Région Adamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 9,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-23 2017-12-20

CM-CRC ADAMAOUA-11975-GO-RFQ / Fourniture desservices de Collecte, transport etdistribution des courriers et colisde la CRC, Région del'Adamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,852.00 0.00 Pending

Implementation 2017-04-13 2017-06-08 2017-12-05

CM-CRC ADAMAOUA-11978-GO-RFQ / Fourniture desservices de maintenance desmatériels informatiques etcopieurs de la CRC, Région del'Adamaoua

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 5,520.00 0.00 Pending

Implementation 2017-05-05 2017-06-30 2017-12-27

CM-CRC ADAMAOUA-11980-GO-RFQ / Acquisition d'un standet production des supports decommunication dans le cadre dela participation à des foires etexpositions sur ladécentralisation (nationales etinternationales), RégionAdamaoua

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,000.00 0.00 Pending

Implementation 2017-04-28 2017-06-23 2017-12-20

006/F/SU/CRC/2017 / Fournituredes services de maintenance duparc informatique, téléphoniqueet matériels de reprographie

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,880.00 0.00 Pending

Implementation 2017-04-24 2017-06-01 2018-06-01

CM-PNDP-7974-GO-RFB /Fourniture et installation dumatériel informatique etdidactique au PNDP (relance)

IDA / 57180

Component B: Support to thedecentralization processComponent C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 479,740.00 0.00 Pending

Implementation 2017-06-21 2017-06-28 2017-07-12 2017-07-19 2017-08-09 2017-09-23

CM-PNDP-2834-GO-RFQ /Acquisition des fournitures pourvéhicules à la CNC

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 19,600.00 0.00 Pending

Implementation 2016-11-25 2017-01-20 2017-07-19

CM-PNDP-9803-GO-RFB /Fourniture de l'assuranceautomobile: 31 motos, 28nouveaux véhicules et 04véhicules ASGIRAP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 90,000.00 0.00 Pending

Implementation 2017-03-10 2017-03-15 2017-04-14 2017-05-14 2017-05-28 2018-02-22

CM-PNDP-9807-GO-RFB /Fourniture de 380 tablettes dansle cadre de l'appui à la mise enoeuvre du ScoreCard par lesOSC

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 95,000.00 0.00 Pending

Implementation 2017-04-03 2017-04-08 2017-05-08 2017-05-22 2017-06-05 2017-06-19

CM-PNDP-9849-GO-RFB /Souscription des policesd'assurance maladie (lot1),automobile (lot2) et multirisquebureuax (lot3) au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 300,000.00 0.00 Pending

Implementation 2017-08-25 2017-08-30 2017-09-29 2017-10-13 2017-10-27 2018-10-22

CM-CRC NORTH WEST-8002-GO-RFQ / fournitures desservices de gardiennage, laCRC, Région du Nord-Ouest.

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-03-18 2017-05-07 2017-05-22

NON CONSULTING SERVICESActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-PNDP-2947-NC-DIR /Insertion (souscription) dans lejournal de l'édition 2016 des JEC(Journées de l'Entrepreneuriat)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

9,000.00 0.00 PendingImplementation 2016-11-04 2016-11-09 2016-12-14 2017-06-12

CM-PNDP-2838-NC-RFB /Fourniture des servicesd'assurances automobiles,maladies et responsabilité civile

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request for Bids Open - National

Single Stage - OneEnvelope 218,000.00 0.00 Pending

Implementation 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28

CM-PNDP-2856-NC-DIR /Insertions et publi-reportagesspéciaux dans le Magazineinternational CAMEROUN ECO,en 2017 (Convention)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

13,000.00 0.00 PendingImplementation 2017-01-16 2017-01-21 2017-02-25 2017-08-24

CM-PNDP-2857-NC-DIR /Insertions et publi-reportagesspéciaux 1, dans le quotidien"CAMEROUN TRIBUNE"

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

6,000.00 0.00 PendingImplementation 2016-11-09 2016-11-14 2016-12-19 2017-06-17

CM-PNDP-2858-NC-DIR /Insertions et publi-reportagesspéciaux dans d'autres journaux

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

6,000.00 0.00 PendingImplementation 2016-12-17 2016-12-22 2017-01-26 2017-07-25

CM-PNDP-2860-NC-DIR /Insertions et publi-reportagesspéciaux dans les autres radioset televisions

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

6,000.00 0.00 PendingImplementation 2016-12-17 2016-12-22 2017-01-26 2017-07-25

CM-PNDP-6228-NC-RFQ /Fourniture des services demaintenance préventive etcurative du parc des machinesde la CNC du PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2017-02-09 2017-04-06 2017-10-03

CM-PNDP-6229-NC-RFQ /Fourniture des services dedédouanement et enlèvementdes 31 motos et 28 véhiculesacquis par UNOPS

IDA / 57180

Component B: Support to thedecentralization processComponent C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 120,000.00 0.00 Pending

Implementation 2017-04-05 2017-04-26 2017-10-23

CM-PNDP-2851-NC-DIR /Participation du PNDP au SAGO(Salon de l'ActionGouvernementale) en 2017(Souscription d'une Conventionavec "Mon Communicateur")

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Prior Direct Selection Direct

6,000.00 0.00 PendingImplementation 2017-06-08 2017-06-13 2017-07-04 2017-08-03

CM-PNDP-2849-NC-DIR /Participation du PNDP àPROMOTE 2017 (Souscriptiond'une Convention avec INTERPROGRESS)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Direct Selection Direct

10,000.00 0.00 PendingImplementation 2016-10-26 2016-10-31 2016-12-05 2017-06-03

CM-PNDP-2923-NC-DIR /Projection de films éducatifsdans les 10 régions sur ladécentralisation et ledéveloppement local (Conventionavec l'Association CinémaNumérique Ambulant)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

60,000.00 0.00 Pending

Implementation 2017-05-07 2017-05-12 2017-06-16 2017-12-13

CM-PNDP-2861-NC-DIR / Co-production d'une émission detélévision intitulée "GouvernanceLocale" à diffusée à la CRTV(Convention avec Zenu Network)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

36,000.00 0.00 Pending

Implementation 2017-06-11 2017-06-16 2017-07-21 2018-01-17

CM-PNDP-2862-NC-DIR / Co-production d'une émission detélévision intitulée " Lumière surla décentralisation"à diffuser surCANAL 2 (Convention avecPeace Communication)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

12,000.00 0.00 Pending

Implementation 2017-06-18 2017-06-23 2017-07-28 2018-01-24

CM-PNDP-2850-NC-RFQ /Appui à l'aménagement etanimation du stand du PNDP àPROMOTE 2017

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Pending

Implementation 2016-12-10 2017-02-04 2017-08-03

CM-PNDP-2855-NC-RFQ /Appui à l'amménagement etannimation du stand du PNDP auSACO en 2017

IDA / 57180 Component B: Support to thedecentralization process Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-05-19 2017-07-14 2018-01-10

CM-PNDP-2852-NC-RFQ /Appui à l'aménagement etannimation du stand du PNDP auSAGO

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Request forQuotations Limited

Single Stage - OneEnvelope 6,000.00 0.00 Pending

Implementation 2017-06-09 2017-08-04 2018-01-31

CM-PNDP-2854-NC-DIR /Participation du PNDP au SACO(Salon des Communes del'Ouest) en 2017 (Souscriptiond'une Convention avec les CVUCOuest)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

14,000.00 0.00 Pending

Implementation 2017-02-03 2017-02-08 2017-03-15 2017-09-11

CONSULTING FIRMSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference Expression of Interest

NoticeShort List and Draft

Request for ProposalsRequest for Proposals

as IssuedOpening of TechnicalProposals / Minutes

Evaluation of TechnicalProposal

Combined EvaluationReport and Draft

Negotiated ContractSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-PNDP-1203-CS-LCS / Auditfinancier et comptable desexercices fiscaux 2016 et 2017du PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Prior Least Cost Selection Open - National

80,000.00 0.00 Canceled 2016-08-22 2016-09-12 2016-10-26 2016-11-23 2016-12-23 2017-01-27 2017-03-03 2017-08-30

CM-PNDP-3202-CS-CQS /Gestion des doléances à traversun Centre d'Appel et un Numérovert dans le cadre du PNDP III

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

PostConsultantQualificationSelection

Open - National

44,000.00 0.00 UnderImplementation 2016-09-19 2016-10-13 2016-10-10 2016-10-24 2016-11-23 2016-12-23 2017-01-27 2017-07-26

CM-PNDP-3201-CS-CQS /Migration de Pro-ADP vers uneversion Web.2.0

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

PostConsultantQualificationSelection

Open - National

52,000.00 0.00 UnderImplementation 2016-09-19 2016-10-13 2016-10-10 2016-10-24 2016-11-23 2016-12-23 2017-01-27 2017-07-26

CM-PNDP-2939-CS-CQS /Etude sur le marketing socialdans le cadre du PNDP 3

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

PostConsultantQualificationSelection

Open - National

30,000.00 0.00 PendingImplementation 2017-04-02 2017-04-23 2017-06-06 2017-07-06 2017-08-10 2018-02-06

CM-PNDP-2944-CS-CQS /Sélection des experts (1 parrégion) en langues locales pourla conception ou la traductiond'émissions sur les thématiqueschères au PNDP 3 à diffuser surles radios communautaires

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

20,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07

001/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

002/C/OAL/PNDP/EST /ELABORATION PLANCOMMUNAL DEDEVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-07-02 2017-07-23 2017-09-05 2017-10-05 2017-11-09 2018-09-05

003/C/OAL/PNDP/EST /ÉLABORATION PLANCOMMUNAL DEDEVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-07-02 2017-07-23 2017-09-05 2017-10-05 2017-11-09 2018-09-05

004/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

005/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

006/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

007/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

008/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

009/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07

010/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07

011/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

012/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

013/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07

014/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

CM-CRC EXTREME NORD-8076-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune de Guéré,Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

63,060.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC EXTREME NORD-8082-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune de Kalfou,Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

26,970.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

015/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

016/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDEVELLOPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

Page 8

017/C/OAL/PNDP/EST /ACTUALISATION PLANCOMMUNAL DEDÉVELOPPEMENT

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,000.00 0.00 PendingImplementation 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-06-07

CM-CRC EXTREME NORD-8089-CS-CQS / élection d'unconsultant pour l'actualisation duPCD de la commune deDatcheka, Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

26,460.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC EXTREME NORD-8088-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune de Mindif,Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

63,060.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC EXTREME NORD-8094-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune deGazawa., Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

53,760.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC EXTREME NORD-8093-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune deGuidiguis, Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

15,570.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC EXTREME NORD-8097-CS-CQS / Sélection d'unconsultant pour l'actualisation duPCD de la commune de Dargala,Région de l'Extrême-Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

57,600.00 0.00 PendingImplementation 2017-03-10 2017-03-31 2017-05-14 2017-06-13 2017-07-18 2018-05-14

CM-CRC NORD-9365-CS-INDV /Elaboration du PCD de laCommune d'arrondissement deGAROUA Ier, Région du Nord

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

101,000.00 0.00 PendingImplementation 2017-04-20 2017-05-11 2017-06-24 2017-07-24 2017-08-28 2018-06-24

001/C/OAL/KOMBOITINDI/SW/2017 / Sélection d'unconsultant pour l'actualisation duPCD de la commune de KomboItindi, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

32,580.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/IDABATO/SW/2017/ Sélection d'un consultant pourl'actualisation du PCD de lacommune de Idabato, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

24,480.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/KOMBOABEDIMO/SW/2017 / Sélectiond'un consultant pourl'actualisation du PCD de lacommune de Kombo Abedimo,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

21,510.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/MUYUKA/SW/2017/ Sélection d'un consultant pourl'actualisation du PCD de lacommune de Muyuka, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

23,490.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/IDENAU/SW/2017 /Sélection d'un consultant pourl'actualisation du PCD de lacommune de Idenau, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

12,600.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/KONYE/SW/2017 /Sélection d'un consultant pourl'actualisation du PCD de lacommune de Konye, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

34,620.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/MBONGE/SW/2017/ Sélection d'un consultant pourl'actualisation du PCD de lacommune de Mbonge, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

55,560.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/NGUTI/SW/2017 /Sélection d'un consultant pourl'actualisation du PCD de lacommune de Nguti, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

42,960.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/TINTO/SW/2017 /Sélection d'un consultant pourl'actualisation du PCD de lacommune de Tinto, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

43,260.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/TIKO/SW/2017 /Sélection d'un consultant pourl'actualisation du PCD de lacommune de Tiko, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

22,500.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/LIMBE I/SW/2017 /Sélection d'un consultant pourl'élaboration du PCD de lacommune de Limbe I, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/LIMBE II/SW/2017 /Sélection d'un consultant pourl'élaboration du PCD de lacommune de Limbe II, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/LIMBE III/SW/2017 /Sélection d'un consultant pourl'élaboration du PCD de lacommune de Limbe III, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12

001/C/OAL/SU/EBOLOWA1/2017 / Sélection d'unconsultant pour l'élaboration duPCD

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-05-04 2017-05-04 2017-06-15 2017-07-07 2017-07-21 2018-05-17

002/C/OAL/SU/EBOLOWAII/2017 / Sélection d'un OAL pourl'élaboration du PCD

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-05-04 2017-05-04 2017-06-15 2017-07-07 2017-07-21 2018-05-17

003/C/OAL/SU/KRIBI I/2017 /Sélection d'un OAL pourl'élaboration du PCD

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-05-04 2017-05-04 2017-06-15 2017-07-07 2017-07-21 2018-05-17

004/C/OAL/SU/KRIBI II/2017 /Sélection d'un OAL pourl'élaboration du PCD

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

70,000.00 0.00 PendingImplementation 2017-05-04 2017-05-04 2017-06-15 2017-07-07 2017-07-21 2018-05-17

CM-CRC NORD-9713-CS-CQS /élaboration du PCD de laCommune d'arrondissement deGAROUA II,

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

101,000.00 0.00 PendingImplementation 2017-04-19 2017-05-10 2017-06-23 2017-07-23 2017-08-27 2018-06-23

CM-CRC NORD-9714-CS-CQS /élaboration du PCD de laCommune d'arrondissement deGAROUA III,

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

101,000.00 0.00 PendingImplementation 2017-04-20 2017-05-11 2017-06-24 2017-07-24 2017-08-28 2018-06-24

CM-CRC NORD-9715-CS-CQS /Elaboration du PCD de laCommune de TOUBORO,

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

80,200.00 0.00 PendingImplementation 2017-04-20 2017-05-11 2017-06-24 2017-07-24 2017-08-28 2018-06-24

CM-CRC LITTORAL-9917-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Dizangue, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

31,050.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9918-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Massok, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

42,360.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9919-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Mbanga, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

26,970.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9920-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Melong, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

41,760.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9921-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Mombo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

12,600.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9922-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Mouanko, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

31,050.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9923-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Ndobian, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

43,260.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9924-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Nkondjock, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

40,230.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9925-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Nyanon, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

40,230.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9926-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Penja, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

17,550.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-CRC LITTORAL-9927-CS-CQS / Sélection d'un Organismed'Appui Local pour l'actualisationdu Plan Communal deDéveloppement de la Communede Yingui, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

37,170.00 0.00 PendingImplementation 2017-03-20 2017-04-10 2017-05-24 2017-06-23 2017-07-28 2018-05-24

CM-PNDP-10307-CS-CQS /Sélection des OAL pour l'appui àla mise en oeuvre du Scorecardpar les OSC

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

7,102.24 0.00 PendingImplementation 2017-04-11 2017-05-02 2017-06-15 2017-07-06 2017-08-03 2017-10-02

CM-PNDP-10340-CS-INDV /Sélection d'un consultant pour lacréation et la gestion d'uneplateforme de présentation descommunes

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

37,600.00 0.00 PendingImplementation 2017-06-26 2017-07-17 2017-08-21 2017-09-04 2017-10-02 2017-11-16

CM-PNDP-3101-CS-QCBS /Audit financier et comptable desexercices fiscaux 2016 et 2017du PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Prior Quality And Cost-Based Selection Open - National

80,000.00 0.00 Pending

Implementation 2017-03-31 2017-04-21 2017-06-04 2017-07-02 2017-08-01 2017-09-05 2017-10-10 2018-10-10

CM-PNDP-2846-CS-QCBS /Recrutement d'un consultantpour l'élaboration des modèles degestion et d'entretien desouvrages d'infrastructures

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-06-13 2017-07-04 2017-08-17 2017-09-16 2017-10-07 2018-04-05

CM-PNDP-2847-CS-QCBS /Audit technique externepériodique de la cosommationdes allocations par lescommunes

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Prior Quality And Cost-Based Selection Open - National

300,000.00 0.00 Pending

Implementation 2017-07-03 2017-07-24 2017-09-06 2017-10-04 2017-10-18 2017-11-22 2017-12-27 2018-12-27

CM-CRC ADAMAOUA-11781-CS-CQS / Suivi - contrôle destravaux de réalisation d'une miniadduction d'eau avec sept (07)bornes fontaines à Bandam,Commune de Bankim,Département du Mayo Banyo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

5,236.00 0.00 PendingImplementation 2017-04-05 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30

CM-CRC ADAMAOUA-11791-CS-CQS / Suivi-controle destravaux d'Aménagement dumarché Kassouan-Dolé (MarchéB) de Banyo par la constructionde 32 Boutiques Bloc A & B, 01Hangar de marché (48 comptoirs)Vivres frais et 01 Blocs de 03Latrines, Commune de Banyo,Département du Mayo Banyo

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

7,683.00 0.00 PendingImplementation 2017-04-06 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30

CM-CRC ADAMAOUA-11872-CS-CQS / Suivi-contrôle desTravaux de construction d'unbâtiment R+1 de 20 boutiquesavec bureau et latrinesincorporées au Marché deTignère, Commune de Tignère,Département du Faro et Déo,Région de l'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

6,944.00 0.00 PendingImplementation 2017-04-06 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30

CM-CRC ADAMAOUA-11876-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du microprojetd'Aménagement d'un périmètreirrigué des cultures maraichère +un réservoir d'eau dans lapériphérie de la ville de Mayo-darlé

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

200,000.00 0.00 PendingImplementation 2017-04-06 2017-04-09 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11879-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du microprojetde construction d'un ouvrage d'artsur le Mayo-Yiel et réalisationd'une étude complémentaire pourviabiliser le pont sur le Mayo-Boumdo

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

200,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11882-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du microprojetd'extension du réseau électriquede Wourtababal I et II, dans laville de Tibati, région del'Adamaoua

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

200,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11888-CS-CQS / Sélection d'unconsultant pour étude defaisabilité technique etenvironnementale du MP deRéalisation de 6 barrières de lasécurisation en fils barbelés eten bois de 06 espacesagropastoraux dans les localitésde Djohong (2 sites), Dawé,Zone, Laïndé-Ma

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

200,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

Page 9

CM-CRC ADAMAOUA-11940-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du MP deRéalisation d'un forage positiféquipé d'une pompe immergéealimentée par l'énergie solaire +un château + 04 bornes fontainesau marché Mayo Dar

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

4,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11942-

CS-CQS / Etudes pour la const

ruction de:

- 3 hangars de Marché (Tourni

ngal, Bayara et Mayo Badji)

- 3 blocs de 2 salles de classe

s (EP LIPAO, EP DJERKOKA 2

et EP SINDERE),

- réhabilitation 2 blocs de 2 sa

lles de classe (EP Tello et EP

Ngaoudamdji)

Commune de Bélel

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

4,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11945-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale des MPd'aménagement d'un complexesportif de Bélel (Terrain de FootBall, Hand Ball, Basket Ball,Volley Ball et une tribune de 2 à5 000 places)

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

4,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-CRC ADAMAOUA-11947-CS-CQS / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du microprojetd'électrification en énergie solairedes villages Djilougou et Didjawa,Commune de Bélel

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

4,000.00 0.00 PendingImplementation 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24

CM-PNDP-10381-CS-QCBS /Recrutement d'un consultantpour l'audit environnemental desmicroprojets

IDA / 57180 Component B: Support to thedecentralization process Post

ConsultantQualificationSelection

Open - National

80,000.00 0.00 PendingImplementation 2017-11-13 2017-12-04 2018-01-17 2018-01-31 2018-02-21 2018-03-21 2018-04-25 2019-04-25

CM-CRC NORTH WEST-12066-CS-CQS / Sélection d'unconsultant(Organisme d'appuiLocal) pour l'actualisation duPCD de la Commune de KUMBO, Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

26,970.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12068-CS-CQS / Sélection d'unconsultant(Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune deMBIAME , Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

32,580.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12069-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de MISAJE, Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

18,540.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12071-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de Njikwa ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

15,570.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12072-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de NWA ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

37,680.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12075-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de TUBAH, Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

10,620.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12079-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la CommunedeWIDIKUM , Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

37,680.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12085-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de ZHOA ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

34,110.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12030-CS-CQS / Sélection d'unconsultant (Organisme d'appuilocal) pour l'élaboration du PCDde la Commune de Bamenda 1,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12032-CS-CQS / Sélection d'unconsultant (Organisme d'appuilocal) pour l'élaboration du PCDde la Commune de Bamenda 2,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12036-CS-CQS / Sélection d'unconsultant(Organisme d'appuilocal) pour l'élaboration du PCDde la Commune de Bamenda 3,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

100,000.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12042-CS-CQS / Sélection d'unconsultant (Organisme d'appuiLocal) pour l'actualisation duPCD de la Commune d' AKO ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

24,480.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12043-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune deBENAKUMA , Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

30,540.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12044-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune deFONFUKA , Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

22,500.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12045-CS-CQS / Sélection d'unconsultant( Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune deFONFUKA , Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

22,500.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12062-CS-CQS / Sélection d'unconsultant (Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune deFURUAWA, Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

21,510.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12063-CS-CQS / Sélection d'unconsultant (Organisme d'appuiLocal) pour l'actualisation duPCD de la Commune d'ANDEK ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

25,470.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-CRC NORTH WEST-12064-CS-CQS / Sélection d'unconsultant(Organisme d'AppuiLocal) pour l'actualisation duPCD de la Commune de JAKIRI ,Région du Nord-Ouest

IDA / 57180 Component A: Localdevelopment support Post

ConsultantQualificationSelection

Open - National

44,160.00 0.00 PendingImplementation 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-23 2017-11-19

CM-PNDP-18652-CS-QCBS /Sélection d'un consultant (Cabinet/ Burequ d'etude) en vuede la réalisation de l'étudediagnostique sur les impacts duPNDP auprès des acteurslocaux.

IDA / 57180 Component B: Support to thedecentralization process Post Quality And Cost-

Based Selection Open - National

160,000.00 0.00 PendingImplementation 2017-06-20 2017-07-11 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2018-12-30

CM-PNDP-18654-CS-QCBS /Selection d'un consultant (Cabinet/ Burequ d'etude) devantconduire une étude sur lesmodalités d'internalisation et depérennisation des principauxacquis du PNDP

IDA / 57180 Component B: Support to thedecentralization process Post Quality And Cost-

Based Selection Open - National

240,000.00 0.00 PendingImplementation 2017-06-20 2017-07-11 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2018-12-30

INDIVIDUAL CONSULTANTSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference

Invitation toIdentified/Selected

ConsultantDraft Negotiated

Contract Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-PNDP-2933-CS-INDV /Etude d'audience des émissions'Gouvernance Locale (CRTV)" et" Lumière sur la décentralisation(CANAL 2)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

3,600.00 0.00 Pending

Implementation 2017-01-02 2017-01-07 2017-01-28 2017-03-04 2017-08-31

CM-PNDP-2942-CS-INDV /Conception des articles duMagazine trimestriel " LESECHOS DU PNDP", en anglais

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

2,000.00 0.00 Pending

Implementation 2016-12-11 2016-12-16 2017-01-06 2017-02-10 2017-08-09

001/C/EF/CE/NDIKINIMEKI/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité de construction d'un(01) hangar de marché avec blocde trois latrines à Etoundou 1 etd'un (01) magasin de stockageavec bloc de deux latrines àNebolen, Commune deNdikinimeki

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-19

002/C/EF/CE/NDIKINIMEKI/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementale du microprojetde construction d'un 01 forageéquipé d'une PMH au hangar demarché d'Etoundou 1 dans lacommune de Ndikinimeki

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-19

001/C/EF/C/BAHAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un bloc de trois(03) salles de classe et d'un blocadministratif au Lycée Bilinguede Chengne dans la Communede Baham, Région de l

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

018/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALE DESMICROPROJETS BATIMENTDANS LA COMMUNE DEMOLOUNDOU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

019/C/EF/PNDP/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DEDIANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

1/C/SC/CE/ENDOM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction deux (02) hangarsde 30 comptoirs avec bloclatrines deux (02) compartimentsdans 02 sites des marchés deEdjom et de Mengwa dans laCommune d'Endom, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,709.00 0.00 PendingImplementation 2017-04-23 2017-06-03 2017-06-10 2017-07-02 2017-10-30

002/C/EF/C/BAHAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un bloc maternel àl'EPM de Demko dans la localitéde Cheffou dans la Commune deBaham, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

2/C/SC/CE/ENDOM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction de deux (02) puitsproductifs équipés de Pompe àMotricité Humaine dans deux(02) localités (Edjom, Mengwa)dans la Commune d'Endom,Région du Centre.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

960.00 0.00 PendingImplementation 2017-04-23 2017-05-31 2017-06-07 2017-06-29 2017-10-27

3/C/SC/CE/AKOEMAN/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction de 04 puitséquipés de Pompes à MotricitéHumaine dans quatre localités(Ngamba, Akoéman ville, Melenet Akoa Zolé) dans la Communed'Akoéman, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,056.00 0.00 PendingImplementation 2017-04-23 2017-06-14 2017-06-21 2017-07-13 2017-11-10

003/C/EF/CE/BIYOUHA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité de réhabilitation de laroute bang sombi-Song Bayang-Song Nkoumondo (7,00 km) etréfection de 02 ponts définitifssur les rivières NGO NUMBA etKELLE, dans la Commune deBIYOUHA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,400.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-04

003/C/EF/C/MALANTOUEN/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un dalot à Mandahdans la Commune deMalantouen, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

CM-CRC EXTREME NORD-8103-CS-INDV / Sélection d'unconsultant pour l'élaboration desEtudes de faisabilité techniqueset environnementales deConstruction d'un bloc saitaire etd'un bloc de latrines au CSI deDjiddeo garre, commune deMaroua III

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-06-20

4/C/SC/CE/AKOEMAN/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un hangar de 32comptoirs et 01 bloc de 04latrines a Akoeman ville, dans laCommune d'Akoéman, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,216.00 0.00 PendingImplementation 2017-04-23 2017-05-31 2017-06-07 2017-06-29 2017-10-27

Page 10

5/C/SC/CE/MBANDJOCK/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un abattoir aveclatrines incorporées, au centreville de Mbandjock dans laCommune de Mbandjock, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,240.00 0.00 PendingImplementation 2017-04-23 2017-06-03 2017-06-10 2017-07-02 2017-10-30

004/C/EF/CE/BIYOUHA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales desmicroprojets d'Electrification desaxes Song Bayang-Song dibong,Tum-Ngog-Sindjap sur 06 Km,Commune de Biyouha

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-04

CM-CRC EXTREME NORD-8107-CS-INDV / Sélection d'unconsultant pour l'élaboration desEtudes de faisabilité techniqueset environnementales deConstruction de 2 forageséquipés de PMH, un àDolddosewo et un Ngouroré et laconstruction d'un bief àKossewa, commune Maroua II

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

2,600.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-06-20

6/C/SC/CE/MBANDJOCK/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deMini AEP par raccordement aureseau CDE et construction d'unchâteau d'eau avec uncubitenaire de 4000 litres aucentre ville de Mbandjock dans laCommune de Mbandjock, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

297.00 0.00 PendingImplementation 2017-03-24 2017-04-22 2017-05-07 2017-06-01 2017-09-29

CM-CRC EXTREME NORD-8110-CS-INDV / Sélection d'unconsultant pour l'élaboration desEtudes de faisabilité techniqueset environnementales deConstruction d'un bloc sanitaireet d'un bloc de latrines au centrede santé de Rhumzou, dans lacommune de Mogodé

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-06-20

004/C/EF/C/MALANTOUEN/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour l'Extensiondu réseau électrique dans leslocalités de Njinga, Matagnumdans la Commune deMalantouen, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

005/C/EF/CE/EBEBDA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales desmicroprojets de Réhabilitation dela route rurale Ebebda 1 - Tsang,dans la commune d'Ebebda

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,200.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-04

CM-CRC EXTREME NORD-8112-CS-INDV / Sélection d'unconsultant pour l'élaboration desEtudes de faisabilité techniqueset environnementales des MP deConstruction d'un bloc de deuxsalles de classe équipées d'unbloc latrines a troiscompartiements à l'EP de SedekOurogabdo et au CES de BOGO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-06-20

005/C/EF/C/MALANTOUEN/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un bloc maternel àEM de Malentouen Gr1 dans laCommune de Malantouen,Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

7/C/SC/CE/EBEBDA/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction de 02 hangars de32 comptoirs avec 02 blocslatrines à 03 compartiments aumarché de Nkog Edzen et aumarché de Elig-Edouma dans laCommune d'Ebebda, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,592.00 0.00 PendingImplementation 2017-04-23 2017-06-03 2017-06-10 2017-07-02 2017-10-30

CM-CRC EXTREME NORD-8114-CS-INDV / Sélection d'unconsultant pour l'élaboration desEtudes de faisabilité MP deConstruction d 6 forage équipéde pompe à motricité humaine ete deux (02) forages équipé depompe à motricité humaine etrehabilitation de deux foragesexista commune de BOGO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,600.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-06-20

006/C/EF/C/BAMENDJOU/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'Electrification du village BameyaII et I en basse tension dans laCommune de Bamendjou,Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

8/C/SC/CE/EBEBDA/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un (01) forageéquipé de Pompe à MotricitéHumaine sur le site du marchéde Elig-Edouma, dans laCommune d'Ebebda, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

680.00 0.00 PendingImplementation 2017-04-23 2017-06-13 2017-06-20 2017-07-12 2017-11-09

CM-CRC EXTREME NORD-8118-CS-INDV / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction etéquipement d'01 bloc de 02salles de classe et d'un bloc delatrines à trois compartiments àl'EP Dogba, Gayack dansConstruction d1 hangar et d'unbloc de latrines A PAPATA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

6,186.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

9/C/SC/CE/NKOTENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un abattoir avecun bloc latrine à trois (03)compartiments à l'abattoir deNkoteng dans la Commune deNkoteng, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

1,281.00 0.00 PendingImplementation 2017-03-01 2017-03-06 2017-03-27 2017-05-01 2017-08-29

006/C/EF/CE/EBEBDA/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetde construction d'un (01) forageéquipé de PMH au CETIC deNgog Saa, dans la communed'Ebebda

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-19

007/C/EF/C/BAMENDJOU/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour Constructiond'un hangar de 30 comptoirs +bloc latrines à 03 compartimentsà Batchoum II dans la Communede Bamendjou, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,700.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

CM-CRC EXTREME NORD-8122-CS-INDV / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction d'unmagasin de stockage à Kéné-Kéné, Construction d'un bloc de02 salles de classe équipées àl'EP de Djafgué, et Constructiond'un bloc de latrines à l'EP deDjafgué cne

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,304.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

008/C/EF/C/GALIM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hôtelcommunal R+1 à Galim dans laCommune de Galim, Région del'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,400.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

CM-CRC EXTREME NORD-8126-CS-INDV / sélection d'unconsultant pour le sui/contrôledes travaux de réalisation de 6forages équipés de PMH àTchékéhi, Mbokouré, MagaldaoToupéo, Soukkoungo Galdima,Bourango et Bandalaré dans lacommune de Pétté

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,840.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

007/C/EF/CE/EBEBDA/2017 /Sélection d'un consultant pourl'élaboration des Etudes defaisabilité de construction d'unbloc de deux salles de classeséquipés, bloc administratif,atelier de maçonnerie, salleinformatique et bloc de 03latrines au CETIC de Ngog Saa

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-19

CM-CRC EXTREME NORD-8130-CS-INDV / sélection d'unconsultant pour le suivi/controledes travaux de Construction d'unforage pastoral à énergie solaireBalaza Lawane (Tchalloudimango) 1 forage pastoral àénergie solaire à Kongola Saïd,commune de Maroua 3

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,200.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

008/C/EF/CE/EBEBDA/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetd'Extension du réseau électriqueLendong-Ebebda 1 (2500 m),dans la commune d'Ebebda

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,740.00 0.00 PendingImplementation 2017-03-07 2017-04-25 2017-05-16 2017-06-20 2017-08-19

CM-CRC EXTREME NORD-8154-CS-INDV / sélection d'unconsultant pour le suivi/controledes travaux de Construction d'unbloc de 02 salles de classeéquipées et d'un bloc de latrinesà trois compartiments à l'EP deMayel Béi, à l'EP de BaoHosséré II et à l'EP de Palaoudi,commune Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,544.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8157-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de construction d'unbloc maternel à l'école Maternellede Zokok-Laddo et branchementau réseau d'alimentation en eaupotable, commune de Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

2,292.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8159-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de Construction detrois forages équipés de pompe àmotricité humaine à Ouro Dow,Goni Bello et Yoldéo Guiziga,Commune Maroua 1

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

1,840.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8161-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de Construction d'unbloc de 02 salles de classeéquipées et d'un bloc de latrinesà trois compartiments à l'EPMasfaï et au CES de Boula,commune de Mokolo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,690.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8163-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de Construction de2 forages équipés de PMH un àOuro Kessoum et à Mounam,commune de Mokolo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

1,350.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8165-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de construction d'unouvrage de franchissement etd'assainissement sur le mayo-kwayaga, dans la commune deMogodé

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,510.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8166-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de Construction d'unbloc de 02 salles de classeéquipées et d'un bloc de latrinesà trois compartiments à l'EP deSaoudjo et au CES de Madaka,commune de Bogo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,618.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8246-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de Construction d'unforage équipé de PMH àDambaye et à BagalafetAménagement d'un bas-fondavec un forage à énergie solaire àOuro Mésséré pour les culturesmaraichères, commune de Bogo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,913.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8247-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux deconstruction d'unbloc de deux (02) salles declasse equipees et un (01) bloclatrine a trois (03)compartiments a l'EP de honkol,a l'EP de darsala, a l'EP dedabanga et l'equipement en me

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

7,152.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-09-03

CM-CRC EXTREME NORD-8248-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux deconstruction d'unforage équipé d'une pompe àmotricité humaine à l' EP deDarsala, l' EP de Dabanga, et unforage pastoral solaire au villageSahaba 1, l'EP groupe de Logonebirni et à EP Ho

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,280.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-09-03

CM-CRC EXTREME NORD-8249-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de réalisation d'unemare artificielle à Mogon dans lacommune de Moutourwa

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,584.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-09-03

CM-CRC EXTREME NORD-8250-CS-INDV / sélection d'unconsultant pour le suivi/contrôledes travaux de construction d'unbloc de deux salles de classe etde deux blocs de latrines à l'EPde Afadé et à l'EP de NGré dansla commune de Makary

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,614.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

Page 11

CM-CRC EXTREME NORD-8251-CS-INDV / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction de 6forages équipés de PMH àTchékéhi, Mbokouré, MagaldaoToupéo, Soukkoungo Galdima,Bourango et Bandalaré dans lacommune de Pétté

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,840.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2017-08-04

CM-CRC EXTREME NORD-8252-CS-INDV / Sélection de 3consultants pour l'appui du CCIdans la passation des marchés,le suivi et l'exécution des projetsà la CRC, Région de l'Extrême-Nord

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

27,632.00 0.00 PendingImplementation 2017-03-06 2017-03-11 2017-04-01 2017-05-06 2018-05-06

009/C/EF/C/GALIM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar de 30comptoirs au marché de Galimdans la Commune de Galim,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,700.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

010/C/EF/C/BATCHAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'Electrification du villageBametim du groupementBatcham dans la Commune deBatcham, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,600.00 0.00 PendingImplementation 2017-03-01 2017-04-12 2017-05-03 2017-06-07 2017-08-06

011/C/EF/C/BATCHAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour l'Extensionet le Branchement électrique duCES de King Place de Batchamdans la Commune de Batcham,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

012/C/EF/C/BANA/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un atelier demenuiserie au Lycée Techniquede Bana dans la Commune deBana, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

013/C/EF/C/BANA/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un atelier demécanique automobile au Lycéede Bana dans la Commune deBana, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

014/C/EF/C/FOUMBAN/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour larehabilitation du pont sur lamanou desservant le bassinagricole de koupa ngagnou avecaménagement des voies d'accèsdans la Commune de Foumban

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

015/C/EF/C/BAKOU/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un pont sur larivière Yodjeu dans legroupement Bankambé dans laCommune de Bakou, Région del'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,700.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

016/C/EF/C/BATIE/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour Etude defaisabilité pour la constructiond'une salle multifonctionnelle àBatié dans la Commune deBatié, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

017/C/EF/C/BATIE/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour Etude defaisabilité pour la constructiond'un pont sur la rivière Nkuhreliant Bafamgoum I et Balagou IIdans la Commune de Batié,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,700.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

018/C/EF/C/BATIE/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour Etude defaisabilité pour la construction dedeux dalots sur les deux dernierscours d'eau à Nkomlom reliantDjeukouo à Bametchetcha dansla localité

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

019/C/EF/C/BANDJOUN/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un pont enmatériaux définitifs reliant DJA-TSEGHEM sur le cours d'eauGHECHIO dans la Commune dePété Bandjoun, Région del'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,900.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

020/C/EF/C/BAYANGAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction et équipement d'unbloc maternel à l'école MaternellePublique de Famla - Batoufamdans la Commune de Bayangam,Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

021/C/EF/C/BAYANGAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction des toilettes VIP àl'EP de Kagne - Batoufam dansla Commune de Bayangam,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,200.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

022/C/EF/C/BAYANGAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laRéhabilitation de la route famla -Marché de Kaptche et famla -Wambo Piedjou dans laCommune de Bayangam, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,900.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

023/C/EF/C/MAGBA/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour les Travauxd'ouverture de la route mbakop -matetchit - koula dans laCommune de Magba, Région del'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,900.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

024/C/EF/C/BATCHAM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'electrification MT/BT triphaseeau lycee de nzindong et auquartier tsa'a dans le groupementbangang dans la Commune deBatcham, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,900.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

025/C/EF/C/KOUTABA/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction et équipement d'unbâtiment abritant le CSI deNgoundoup dans la Commune deKoutaba, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

026/C/EF/C/DSCHANG/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'Electrification rural dans levillage NDENKOP dans laCommune de Dschang, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

027/C/EF/C/DSCHANG/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un forage avec unsystème de réserve au CSI deFotsem-Lessing dans laCommune de Dschang, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

028/C/EF/C/DSCHANG/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar aumarché de FOTETSA dans laCommune de Dschang, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-03-04 2017-04-12 2017-05-03 2017-06-07 2017-08-06

029/C/EF/C/SANTCHOU/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'une plateformemultisports dans la Commune deSantchou, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

030/C/EF/C/SANTCHOU/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour l'Ouverturede la piste agricole Bamia-Njinjang (08Km et 05 ouvragesd'art) dans la Commune deSantchou, Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

031/C/EF/C/FOUMBOT/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'Aménagement du stademunicipal de Foumbot (Clôture,tribune, terrains de volleyball,handball et Basketball, toiletteset salle d'équipement) dans l

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

032/C/EF/C/FOUMBOT/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un bloc de deuxsalles de classe équipé de tablesbancs à l'EP de NKOUONDJAdans la Commune de Foumbot,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

033/C/EF/C/FOUMBOT/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un bloc de deuxsalles de classe équipé de tablesbancs à l'EP de FOSSET dans laCommune de Foumbot, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

034/C/EF/C/BAFANG/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pourl'Aménagement de la routeCarrefour Baboutcheu-Axe Lourddans la Commune de Bafang,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

035/C/EF/C/BAFANG/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar aumarché de Bankondji dans laCommune de Bafang, Région del'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,800.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

036/C/EF/C/NJIMOM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar de 30places au marché de Machoutvi-manki 2 dans la Commune deNjimom, Région de l'Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

037/C/EF/C/NJIMOM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar de 30places au marché de Folap dansla Commune de Njimom, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

038/C/EF/C/NJIMOM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar de 30places au marché Makouetvudans la Commune de Njimom,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

039/C/EF/C/NJIMOM/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un hangar de 30places au marché Makounvi dansla Commune de Njimom, Régionde l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

040/C/EF/C/MASSANGAM/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laConstruction d'un pont sur leNKOUH reliant le quartierNJIDEN MATEMBAIN dans laCommune de Massangam,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,700.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

Page 12

041/C/EF/C/MASSANGAM/2017/ Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laconstruction de l'école maternelleà Massangam ville dans laCommune de Massangam,Région de l'Ouest.

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

042/C/EF/C/SANTCHOU/2017 /Sélection d'un consultant pourl'élaboration d'une etude defaisabilité technique etenvironnemtale pour laconstruction d'un hangar de 48comptoir, et d'un bloc latrine aquatre (04) compartiments etd'un point d'eau au marchecentral de santchou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-06-30 2017-08-11 2017-09-01 2017-10-06 2017-12-05

CM-CRC LITTORAL-9515-CS-INDV / Elaboration des Etudesde faisabilité techniques etenvironnementales des travauxde construction d'un bloc dedeux salles de classes avecbureau du Directeur à l'écolepublique bilingue de Bare-centreet d'un bloc maternel à l'ecolepublique d'Ebouh-Bare

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,360.00 0.00 PendingImplementation 2017-03-27 2017-05-15 2017-06-05 2017-07-10 2017-09-08

CM-CRC LITTORAL-9516-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction dedeux ouvrages defranchissements dans la localitéde Melong 2, un reliant le quartierKouam et le carrefour chutesd'Ekom-Nkam et l'autre reliantSambia aux plantation

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,360.00 0.00 PendingImplementation 2017-03-27 2017-05-15 2017-06-05 2017-07-10 2017-09-08

CM-CRC NORD-9716-CS-INDV /Etude de faisabilité technique etsocio-environnementale pour laréhabilitation de la maison desjeunes de Gaschiga dans lacommune de gaschiga

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

800.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9717-CS-INDV /Etude de faisabilité technique etsocio-environnementale pour laréhabilitation de la piste ruraleNGOUTCHOUMI-TONTOGO (15km) dans la commune degaschiga,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9718-CS-INDV /Etude de faisabilité technique etsocio-environnementale pourlaréhabilitation de la piste ruraleBamanga Kolléré (30 km) dans lacommune de gaschiga,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9719-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laréhabilitation du Pont de PomlaManga dans la commune degaschiga,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9720-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laréhabilitation de la mareartificielle de NGALABA dans laCommune de Gaschiga

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9721-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laréhabilitation du pont de OURO-IYA dans la Commune deGashiga,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,900.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9722-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un bloc dematernité au CMA de BEKAdans la Commune de Béka,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9723-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'une clôture àl'Ecole primaire de BEKA dans laCommune de BEKA

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

800.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9724-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un campementMunicipal à BEKA

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9725-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction et aménagementd'un stade à BEKA

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9726-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un bloc maternel àl'Ecole Maternel Bilingue de POLI

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,400.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9727-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un bloc de deuxsalles de classe équipé et d'unbloc de latrine à l'Ecole Publiquede MARKA, CES de WATE,CES de POLI RURAL dans lacommune de POLI

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9729-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un dalotquintuples sur le Mayo Zati dansla commune de POLI

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9730-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un bloc de troissalles de classe équipé et d'unbloc de latrine à troiscompartiments au lycée bilinguede Ngong, au lycée deTchéboua, et au CES de langui

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9731-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laConstruction d'un centre deSanté intégré et d'un bloc delatrine à ADAMAOUA et à ZERAdans la commune de NGONG

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9732-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laconstruction des hangars de 28places et d'un bloc de latrines àtrois compartiments dans lesmarchés des localités de:Tcheboa, langui, laindé massa,et ZERA

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9733-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laconstruction des magasins destockage des produits agricolesdans les localités de DOUKAlongo, Mafa tchéboa, laindékarewa dans la commune deNGONG,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,600.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9734-CS-INDV /réalisation de l'étude defaisabilité technique et socio-environnementale pour laconstruction des foragespastoraux dans les localités deHURUM SABONGARI KALFAI 1BAGADJI ET KALGUE

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9735-CS-INDV /Etude de faisabilité pourl'électrification du quartier Mboumaviation dans la Commune deGaroua II

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

800.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9736-CS-INDV /étude de faisabilité pourl'électrification du quartier ouroAlahdji dans la Commune deGaroua II

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

800.00 0.00 PendingImplementation 2017-05-05 2017-05-10 2017-05-31 2017-07-05 2017-09-04

CM-CRC NORD-9737-CS-INDV /contrôle des travaux de laconstruction d'un stade mltisportà Rey Bouba dans la Communede Rey Bouba,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,000.00 0.00 PendingImplementation 2017-03-13 2017-03-18 2017-04-08 2017-05-13 2017-09-10

CM-CRC NORD-9738-CS-INDV /contrôle des travaux de laconstruction d'un bâtiment àUsage du CSI, et d'un bloc delatrine à 6 compartiments à ReyBouba et la réalisation d'unforage équipé de pompe àMotricité humaine au CSI de ReyBouba dans la Commune deRey Bouba

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-03-13 2017-03-18 2017-04-08 2017-05-13 2017-09-11

CM-CRC NORD-9740-CS-INDV /contrôle des travaux de laconstruction d'un centre deSanté Intégré avec bloc delatrines au Centre de Santé deDembo, et la construction d'unbloc de deux (02) salles declasse équipé et d'un bloc delatrines dans les écoles publiquede Laindé Tchakou

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

5,940.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-10-18

CM-CRC NORD-9741-CS-INDV /contrôle des travaux de destravaux de la construction etéquipement 04 bloc de trois (03)salles de classe avec latrinesdans les établissement suivants :'EP de Torroye, lycee debadjouma centre, lycée bilinguePitoa, EP badejengo loperé, EPdjalingo

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

19,840.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-09-18

CM-CRC NORD-9742-CS-INDV /contrôle des travaux de laconstruction d'un bloc de 02salles de classes avec latrines àl'EP DOGBA et Lycée GOP REYdans la Commune de Tcholliré,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,920.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-10-18

CM-CRC NORD-9743-CS-INDV /contrôle des travaux de laconstruction d'un centre de santéavec latrines à Mayo GALKEdans la Commune de Tcholliré

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

4,320.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-10-18

CM-CRC NORD-9744-CS-INDV /contrôle des travaux de laréalisation d'un forage équipé dePompe à Energie Solaire au CSIde Mayo Galké

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,120.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-12-17

CM-CRC NORD-9745-CS-INDV /contrôle des travaux de destravaux de pour la constructiondes 03 magasins de stockagedes denrées agricoles àBADANKALI, MAYO BOCKI etDJALINGO KAPSIKI et destravaux de la Construction de unbloc de 03 salles équipés et d'unbloc de latrine à 04 comp

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

10,512.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-09-18

CM-CRC NORD-9746-CS-INDV /contrôle des travaux des travauxde la construction d'un Centre deSanté Intégré avec latrines àDOUNDEHI , construction d'unemini AEP équipé de Pompe àEnergie solaire au Centre deSanté de DOUNDEHI

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

5,280.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9747-CS-INDV /contrôle des travaux de laconstruction et équipement d'unbloc de deux (02) salles declasse avec latrines EPBIYAOU,moudouk,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,840.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9748-CS-INDV /contrôle des travaux de laconstruction de deux foragesEPMH dans les villages de nbiendolé et baldjouk frontière

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,400.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9749-CS-INDV /construction 2 blocs de 3boutiques au marché de GOR,sorobéo et d'un bloc de latrines à6 compartiments dans laCommune de Madingring

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9750-CS-INDV /contrôle des travaux deréalisation d'un forage au CESBilingue de Bibémi, et exécutiondes travaux de la constructiond'un forage de pastoral équipé dePMH et 04 abreuvoirs à BIDEHAMADICKO

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,560.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-11-18

CM-CRC NORD-9751-CS-INDV /contrôle des travaux deconstruction d'un bloc de 02salles de classes avec latrinesau CES Bilingue de Bibémi,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,600.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-11-18

CM-CRC NORD-9752-CS-INDV /contrôle des travaux del'aménagement de la pisteagricole BIBEMI-MBELLA (4Km)dans la Commune de Bibémi

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

3,200.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9753-CS-INDV /contrôle des travaux deConstruction de 03 foragesEPMH à l'abattoir municipal deTcholliré, Mbaou et Mbissiri

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

2,560.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-12-18

CM-CRC NORD-9754-CS-INDV /contrôle des travauxd'électrification des quartiersMboum Aviation et Ouro hamayeldans la Commune de Garoua 2

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,860.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-09-18

CM-CRC NORD-9755-CS-INDV /contrôle des travaux deconstruction d'un Foragepastoral équipé de Pompe àénergie solaire dans la communede BASCHEO,

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,200.00 0.00 PendingImplementation 2017-06-20 2017-06-25 2017-07-16 2017-08-20 2017-11-18

Page 13

CM-CRC LITTORAL-9757-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction delogements sociaux dans la villede Bare, Département duMoungo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,280.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9758-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'extension duréseau électrique de Mouankocentre à Nkankazok (1,5km) ettravaux d'éclairage public desvillages Mbiako, Youné 1&2 parénergie photovoltaïque

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,990.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9759-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unmotel municipal à Mouankocentre et des travaux d'extensiondu Complexe touristiquecommunal dans la Commune deMouanko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,920.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9760-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'uneusine de transformation demanioc à Bakwat et d'une unitéde fabrication des pavés à Ebonedans la Commune d'Ebone

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,736.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9761-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'éclairage public parpanneaux photovoltaïque deslocalités de Ndoungué, Ebone,Nkognine et Manengolé, dans laCommune de Ebone

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,460.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9763-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de réhabilitation duréseau d'eau potable de Salmoa,dans la Commune de Ebone,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,880.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9764-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'extension duréseau électrique dans leslocalités de Logyamben etNyahenden , dans la Communede Nyanon, Département de laSanaga Maritime, Région duLittoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,920.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9765-CS-INDV / tudes de faisabilitétechniques et environnementalesdes travaux de construction d'unbloc de deux salles de classe etun bloc latrines à l'EP deMaleke, dans la Commune deBonaléa, Département duMoungo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,180.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9768-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unposte agricole à Ndoulou, dans laCommune de Bonaléa,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,280.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9769-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de constructions de20 boutiques au Marché deLoum, dans la Commune deLoum, Département du Moungo,Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,380.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9770-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'électrification duvillage Mabombe, dans laCommune de Loum,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,460.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

001/C/SC/SU/MENGONG/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travauxd'Extension du marché de vivresd'Ondodo et d'un bloc de 03latrines et Réhabilitation du puitsavec pompe à motricité humaine

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,479.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-10-12

CM-CRC LITTORAL-9772-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unhangar au marché de Nlohe etd'une ecole matenelle à Boumdans la Commune de Manjo,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,760.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9774-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unbloc maternel à l'école maternellede Tomel dans la Commune deMassok, Département de laSanaga Maritime, Région duLittoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,380.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9775-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de réhabilitation de laroute Muyuka-Mbandja et deréhabilitation du réseau routier dela ville de Mbanga, dans laCommune de Mbanga,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,480.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

003/C/SC/SU/AKOM II/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction de 03 puits positifséquipés des pompes à motricitéhumaine à BIBINDI, BIBOLE etMALOMBA et 03 forages positifséquipés des pompes à motricitéhumaine à NLOKENG, TOKO etFENDA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,492.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-10-12

004/C/SC/SU/OVENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travauxd'Aménagement du hangar encomplexe commercial municipalet de Construction d'un bloclatrines à deux compartiments àOveng-centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,047.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-10-12

002/C/SC/SU/OVENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction de six (06) foragesproductifs équipés des Pompes àMotricité Humaine dans six (06)villages (Essamekou, Adjap,Andoung, Aboulou, Bikougou etMebassa)

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,410.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

005/C/SC/SU/BENGBIS/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction d'un bloc de deux(02) salles de classe équipées àl'école primaire de Mekas

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

910.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

006/C/SC/SU/BENGBIS/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deréalisation de 06 forages équipésdes PMH à Metom, à Endam, àl'EM de Bengbis, à Kam, Mimbilet au Ly-Tech de Bengbis

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,065.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

007/C/SC/SU/DJOUM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deréalisation de 03 forages équipésdes pompes à motricité humainedans les villages Aboelon (écolepublique), Minko'o Baka et Djop

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,184.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

008/C/SC/SU/DJOUM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction d'un bloc maternel àl'école maternelle d'Aboélon

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,273.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-10-12

009/C/SC/SU/KYE OSSI/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction de 02 blocs de 02salles de classe équipées detables bancs et de 02 blocs de02 latrines à l'EP de Mefoup et àl'EP de Mefou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,762.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-09-12

010/C/SC/SU/KYE OSSI/2017 /Sélection d'un Consultant pour leSuivi/contrôle des travaux deréalisation de 02 forages équipésdes pompes à motricité humainedans les EP de Mefoup et Mefou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

584.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

011/C/SC/SU/MEYOMESSALA/2017 / Sélection d'un Consultantpour le Suivi/contrôle desTransformation du marché deMeyomessala en campementtouristique : travauxd'aménagement et équipementd'un bloc administratif, d'unebuanderie, du bloc de 06chambres modernes VIP, etc

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

6,033.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-09-12

012/C/SC/SU/MINTOM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction de la clôture etd'aménagement des aires dejeux des écoles maternelles deMintom-centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,626.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-09-12

013/C/SC/SU/MINTOM/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travauxd'extension du complexecommercial de Mintom etconstruction d'un forage positiféquipé d'une PMH

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,492.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-09-12

014/C/SC/SU/OLAMZE/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction de 02 blocs de 02salles de classe équipées detables bancs et d'un bloc delatrines dans les EP de Yos II etde Mindjo-Koumou etconstruction d'un forage à l'EP deMindjo-Koumou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

23,970.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

015/C/SC/SU/MVANGAN/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction de 01 bloc de 02salles de classe équipées detables bancs et de 01 bloc de 02latrines à l'EP de Mebemenko etd'un forage à l'EP de Zoébefam(Zoéyevan)

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,527.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-09-12

CM-PNDP-9851-CS-INDV /Recrutement d'un consultantpour l'élaboration du Guide desautorités communales pour lesuivi de l'exécution desmicroprojets

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2017-05-17 2017-07-05 2017-07-12 2017-08-02 2017-09-01

016/C/SC/SU/SANGMELIMA/2017 / Sélection d'un Consultantpour le Suivi/contrôle des Travauxde réalisation de 10 forageséquipés des pompes à motricitéhumaine

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,490,106.00 0.00 PendingImplementation 2017-04-06 2017-05-05 2017-05-22 2017-06-14 2017-10-12

017/C/SC/SU/ZOETELE/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deréalisation de 02 forages équipésdes pompes à motricité humaineà l' EP de Zoétélé Grpe II, à l'EMde Zoétélé-ville et 01 puits équipéà Bidoumba (quartier Mfegkot)

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

975.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

018/C/SC/SU/ZOETELE/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction d'un bloc de deux(02) salles de classe équipéesde tables bancs à l'école primairede Zoétélé Groupe II et d'un blocmaternel équipé de tables etbancs à Zoétélé-ville

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,082.00 0.00 PendingImplementation 2017-05-26 2017-06-17 2017-07-04 2017-07-27 2017-11-24

001/C/CC/SU/EBOLOWA I/2017/ Recrutement d'un Agent deDéveloppment pour la Communed'Ebolowa I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

002/C/CC/SU/EBOLOWA I/2017/ Recrutement d'un AgentFinancier pour la Communed'Ebolowa I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,880.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

003/C/CC/SU/EBOLOWAII/2017 / Recrutement d'un Agentde Développment pour laCommune d'Ebolowa II

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

004/C/CC/SU/EBOLOWAII/2017 / Recrutement d'un AgentFinancier pour la Communed'Ebolowa II

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,880.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

005/C/CC/SU/KRIBI I/2017 /Recrutement d'un Agent deDéveloppment pour la Communede Kribi I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,600.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

006/C/CC/SU/KRIBI I/2017 /Recrutement d'un AgentFinancier pour la Commune deKribi I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,880.00 0.00 PendingImplementation 2017-04-27 2017-06-13 2017-06-28 2017-07-11 2018-07-11

CM-CRC LITTORAL-9902-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'électrification ruraledes villages Kombe et Matouke,dans la Commune de Mbanga,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,460.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9903-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unouvrage de franchissement àEkah, dans la Commune deMelong, Département duMoungo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,100.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

Page 14

CM-CRC LITTORAL-9904-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'aménagementd'une source amenagée, dans laCommune de Melong,Département du Moungo, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,040.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9905-CS-INDV / Etudes de faisabilitétechniques et environnementalesds travaux de reprofilage dutronçon routier Mbanga quartier 7-Mombo en passant parNkwangsi, dans la Commune deMombo, Département duMoungo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,480.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9906-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unbloc latrines dans la Communede Penja, Département duMoungo, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

560.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9907-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unposte de quai à Nkolbong parMassoumbou, dans la Communede Yabassi, Département duNkam, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,180.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9908-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'extension duréseau électrique allant ducarrefour Bimbe au CES deBambou (10km) etd'électrification du village Dikoladans la Commune de Dizangue,Département de la SanagaMaritime

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,380.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9909-CS-INDV / Etudes de faisabilitétechniques et environnementalesde construction d'un Motelmunicipal et de construction delogements sociaux dans laCommune de Ngambe,Département de la SanagaMaritime, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,760.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9910-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux d'électrificationEtouha-Song Kollo sur 3 kmdans la Commune de Ngwei,Département de la SanagaMaritime, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,460.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9911-CS-INDV / Etudes de faisabilitétechniques et environnementalesdes travaux de construction d'unauberge municipal du PK 16,construction de la Maison de lafemme à Makondo, constructiondu marché de Makondo dans laCommune de Ngwei

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,796.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-09-01

CM-CRC LITTORAL-9912-CS-INDV / Suivi/contrôle des travauxde quatre forages positifséquipés d'une pompe à motricitéhumaine à Moukouda, Mbagna,Nyamtam et Yabassi centre,dans la Commune de Yabassi,Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,767.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-10-31

CM-CRC LITTORAL-9913-CS-INDV / Suivi/contrôle des travauxde Construction de deux blocsde boutiques, à raison de 10boutiques chacun, au marché deLoum Centre, dans la Communede Loum, dans la Commune deLoum, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

400.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-10-31

CM-CRC LITTORAL-9914-CS-INDV / Suivi/contrôle des travauxde Construction d'un bloc de 10boutiques, d'un bloc de 04latrines et d'un hangar de marchérural périodique de 16 comptoirsau marché de Missole, dans laCommune de Dibamba, Régiondu Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,845.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-10-31

CM-CRC LITTORAL-9915-CS-INDV / Suivi/contrôle des travauxde Construction d'un foragepositif équipé d'une pompeélectrique d'au moins 2 m3/h,alimentant un réservoir àcubitainer de 2000 litres montésur un support en béton armé aumarché de Missole, dans laCommune de Dibamba

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

745.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-10-31

CM-CRC LITTORAL-9916-CS-INDV / Suivi/contrôle des travauxde Construction et d'Equipementd'une Case Communautaire etd'un bloc de deux latrines àBisseng, dans la Commune deNdom, Région du Littoral

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,516.00 0.00 PendingImplementation 2017-03-20 2017-05-08 2017-05-29 2017-07-03 2017-12-30

001/C/EF/SU/CAMPO/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu complexe commercial àtravers l'aménagement duhangar, la construction des blocsde 05 boutiques et d'un bloc de03 latrines)

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

002/C/EF/SU/LOKOUNDJE/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu réseau électrique dans leslocalités de Bonguen,d'Elogbatindi (Mitende), d'Ebéa,Bipaga 2

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,862.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

003/C/EF/SU/LOKOUNDJE/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laconstruction des lampadairessolaires dans les localités deMabenanga, Bandévouri I,Makouré I, Bissiang et Bidou I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,860.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

004/C/EF/SU/LOKOUNDJE/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un complexecommercial, d'un bloc de 06latrines et d'un point d'eau aumarché de la Kienké /SOCAPALM

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,278.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

005/C/EF/SU/MVENGUE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'extensiondu réseau électrique MT/BT versle village Atinzam

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,880.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

006/C/EF/SU/MVENGUE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales del'électrification par énergie solairedes villages Melondo et Ebayega

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,880.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

007/C/EF/SU/NYETE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un bloc de 02salles de classe équipées et unbloc de latrines au CETICd'Andjeck

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-03-21 2017-04-25 2017-05-02 2017-05-22 2017-06-21

008/C/EF/SU/AKOM II/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laRéhabilitation / Construction d'unbloc de 02 salles de classe, d'unbloc de latrines et d'un pointd'eau posititif équipé d'une PMHau Lycée tech

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,100.00 0.00 PendingImplementation 2017-05-26 2017-06-16 2017-07-01 2017-07-04 2017-08-18

009/C/EF/SU/AKOM II/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de la Mise enplace d'une pépinière de 3 ha debananiers plantain à Akok

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,741.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

010/C/EF/SU/AKOM II/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 06 puits équipésde PMH dans les EP de Assok1, Biboulemem, Ndjabilobé,Enyankol, Elon, Akom II centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,719.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

011/C/EF/SU/AKOM II/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'une citémunicipale à Akom II centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,200.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

012/EF/SU/AKOM II/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laconstruction d'une aubergemunicipale à Akom II centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,240.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

013/C/EF/SU/BENGBIS/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de la Mise enplace d'une pépinière de 25 000plants de cacao de nouvellegénération à Evindissi centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,716.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

014/C/EF/SU/BENGBIS/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de la Mise enplace d'une pépinière de 25 000plants de cacao de nouvellegénération à Metom

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,716.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

015/C/EF/SU/BIPINDI/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de deuxsalles de classes et un bloc delatrines au CES de Grand Zambi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,642.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

016/C/EF/SU/BIPINDI/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 08 points d'eauéquipé d'une PMH au CES deGrand Zambi, à Bifoum, Koambo,Mandoungou, Memel I,Nyaminkom, Assok et Tyango

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,426.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

017/C/EF/SU/BIWONGBANE/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laConstruction d'un foyercommunautaire et d'un bloc delatrines à Ating Bané

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,642.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

018/C/EF/SU/BIWONGBANE/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laConstruction de 04 points d'eauéquipé d'une PMH à Ofoumbi,Efoumlou Nselek, Ekout-Fong etEngogom

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,431.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

019/C/EF/SU/BIWONGBANE/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laConstruction de 15 logementssociaux à Biwong Bané centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,770.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

020/C/EF/SU/BIWONGBULU/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laRéalisation d'une adduction d'eauà Biwong Bulu centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,242.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

021/C/EF/SU/BIWONGBULU/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laconstruction d'un bloc de 02salles de classe équipées detables bancs, un bloc de latrineset un point d'eau à l'EP de AbieteYendjok

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,233.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

022/C/EF/SU/BIWONGBULU/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité techniqueset environnementales de laconstruction d'un bloc de 02salles de classe équipées detables bancs, un bloc de latrineset un point d'eau dans l'EP deNloupessa-Yevol

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,233.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

023/C/EF/SU/CAMPO/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un foyercommunautaire et un bloc delatrines à Bouandjo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,746.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

024/C/EF/SU/CAMPO/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laRaccordement du marché deCampo aux réseaux d'électricitéet d'eau

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,741.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

Page 15

025/C/EF/CAMPO/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 03 points d'eauéquipé d'une PMH à Afan-Essokié, Akak (Chefferie) etBitandé Assoé

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,313.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

026/C/EF/SU/DJOUM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eauéquipé des PMH àAkombinyeng, Nkolenyeng,Miatta et Djouze

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,181.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

027/C/EF/SU/DJOUM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu réseau électrifique vers levillage Bidoumba

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,741.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

028/C/EF/SU/EFOULAN/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 07 points d'eauéquipé des PMH à Bikoula, àl'EP de Mengale, EP de Mfalla,EP d'Adjap-Essawo, Ngalan II età la SAR/SM d'Efoulan

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,003.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

029/C/EF/SU/EFOULAN/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un bloc de 02salles de classe équipées detables bancs et d'un bloc delatrines à l'EP d'Engomba et laConstruction de 02 ateliers

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,254.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

030/C/EF/SU/KYE OSSI/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laconstruction des lampadairesLED pour l'éclairage public del'espace urbain de la ville de KYE-OSSI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,741.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

031/C/EF/SU/KYE OSSI/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de 02salles de classes équipées et unbloc de latrines dans les EPd'Ongozok et Kono-Fonossi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,254.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

032/C/EF/SU/KYE OSSI/2017 /Sélection d'un consultant pourl'actualisation des études defaisabilité techniques etenvironnementales de laConstruction des blocs deboutiques au marché de Kyé-ossi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

033/C/EF/SU/KYE OSSI/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eauéquipé d'une PMH à l'EPd'Ongozok, EP de Kono-Fonossi,Nsamgbwang et Nkan

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,405.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

034/C/EF/SU/LOLODORF/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eauéquipé des PMH à Sabally(quartier Biubvuri), Mvilé, EP deKoumbinzik et à l'EP deMelangue-Mvog

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,575.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

035/C/EF/SU/LOLODORF/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un bloc de 02salles de classes équipées etd'un bloc de latrines dans les EPde Koumbinzik et Melangue-Mvog

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,254.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

036/C/EF/SU/MAAN/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 03 points d'eauéquipé des PMH à l'écolebilingue de Ma'an centre, auCETIC de Ma'an centre et àMeyos I

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,421.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

037/C/EF/SU/MAAN/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un bloc de 02salles de classes équipées etd'un bloc de latrines à l'écolebilingue de Ma'an centre et auCETIC de Ma'an centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,053.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

038/C/EF/SU/MAAN/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu marché municipal (30boutiques) de Ma'an centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,523.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

039/C/EF/SU/MENGONG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un logementd'astreinte et d'un bloc de latrinespour les enseignants de l'EP deNnemeyong III et la Constructiond'un bloc de 02 s

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,354.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

040/C/EF/SU/MENGONG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'un bloc de 02salles de classe équipées et unbloc de latrines dans les EMd'Endam I et d'Abiete

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,254.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

041/C/EF/SU/MENGONG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eauéquipé des PMH à l'EM deEkouk, à l'EM d'Endam I, à l'EPde Nnemeyong III et à l'EMd'Abiete

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,391.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

042/C/EF/SU/MEYOMESSALA/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'une fermecommunale de production depoussins et d'un bloc de latrinesà Meyomessala

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,820.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

043/C/EF/SU/MEYOMESSALA/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 03 points d'eauéquipé de PMH à la fermecommunale de Meyomessala, auCETIC d'Endam et au CES deNgoasse

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,431.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

044/C/EF/SU/MEYOMESSALA/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'01 bloc de 2salles de classe équipées detables bancs et d'un bloc delatrines au CETIC d'Endam et laConstruction de la clôture d

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,841.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

045/C/EF/SU/MEYOMESSI/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu réseau électrique vers levillage Essong-Ndonge et vers levillage Mbilemvom

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

046/C/EF/SU/MEYOMESSI/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de la Mise enplace d'une pépinière de 10 000plants de cacaoyers à Mimbang

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

047/C/EF/SU/MEYOMESSI/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de deuxsalles de classes et d'un pointd'eau équipé d'une PMH à l'EPde Ndjelle à l'EP de Ndjelle

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,333.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

048/C/EF/SU/MINTOM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction et l'équipementd`une auberge municipale

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,200.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

049/C/EF/SU/MINTOM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eauéquipés des PMH à Mintom I,Odoumou, Zo`otou II et à l'EP deBindom

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,904.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

050/C/EF/SU/MINTOM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de deuxsalles de classes et un bloc delatrines à l'EP de Bindom

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,626.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

051/C/EF/SU/MVENGUE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`une aubergemunicipale de 25 chambresdotée d`un restaurant à Mvengue-centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

052/C/EF/MVENGUE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eaupositifs équipés des PMH aumarché de Mvengue, Wom I,Okoga et à l'EP de Mvengue III

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,840.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

053/C/EF/SU/NGOULEMAKONG/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales de laConstruction et équipement d'unecité communale à Ngoulemakong

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

054/C/EF/SU/NGOULEMAKONG/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un hangar etmagasin de stockage àNgoulemakong

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,526.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

055/C/EF/SU/NGOULEMAKONG/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité techniques etenvironnementales duRenforcement du systèmed`approvisionnement en eau(supresseur+forage) de la ville deNgoulemakong

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,993.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

056/C/EF/SU/NYETE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de l'Extensiondu réseau électrique BTversNyété

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,741.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

057/C/EF/SU/NYETE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un foyer culturelpolyvalent à Nlozok laConstruction de logementsd`astreinte pour enseignants àl`EP de Bifa

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,054.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

058/C/EF/SU/NYETE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 03 points d'eaupositif équipés des PMH à Bifa(EP), à Andjeck (CETIC) et àNlozok (Foyer culturel

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,325.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

059/C/EF/SU/OLAMZE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'une citémunicipale à OLAMZE centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

060/C/EF/SU/OLAMZE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de deuxsalles de classe et d'un bloc delatrines dans les EP deMENGUIKOM et d'Engo Nlozock

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,662.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

Page 16

061/C/EF/SU/OLAMZE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eaupositifs équipés des PMH à l`EPde MENGUIKOM, à l`EP d'EngoNlozock, dans le village Bekué etdans le village Bind

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,430.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

062/C/EF/SU/OVENG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de 02salles de classe et un bloc delatrines à l'EP d'Oveng-centre,d'Eboman et à l'EM de Medjeng

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,315.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

063/C/EF/SU/OVENG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d'01 bloc de 02salles de classe équipées et 01bloc de latrines à l'EP d'Onon etla Construction des logementsd`astreinte pour ense

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,015.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

064/C/EF/SU/OVENG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eaupositifs équipés des PMH au CSId'Akoabas, à Mvam I (chefferie),à l'EP d'Onon et à l'EP deNgoudjen

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,670.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

065/C/EF/SU/SANGMELIMA/2017 / Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 08 points d'eaupositifs équipés d'une PMH àAkomedibi (quartier Etebele), àAkoolui (quartier Bilone), àAkoolui (quartier Nkoles

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,669.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

066/C/EF/SU/SANGMELIMA/2017 / Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 07 points d'eaupositifs équipés des PMH à l'EPde Bikobosaman, à Bizang(quartier Ngoa Ekele), àEminemvom (quartier MvogZanga),

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,335.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

067/C/EF/SU/ZOETELE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction d`un bloc de deuxsalles de classe et d`un bloc delatrines dans les EP d'Adjap etd'Awout

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,200.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

068/C/EF/SU/ZOETELE/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité techniques etenvironnementales de laConstruction de 04 points d'eaupositifs équipés des PMH à l'EPd'Adjap, à l'EP d'Awout, àWoabete et à Otetek

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,461.00 0.00 PendingImplementation 2017-05-26 2017-06-19 2017-07-07 2017-07-17 2017-08-31

CM-PNDP-10172-CS-INDV /Recrutement d'un consultantpour le conseil en assurance auPNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

9,600.00 0.00 Pending

Implementation 2017-03-29 2017-04-03 2017-04-17 2017-05-08 2017-12-29

CM-PNDP-10317-CS-INDV /Sélection d'un consultant enappui à la formation des acteurslocaux à l'alignement du budgetcommunal à la nomenclature dubudget programme

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-04-03 2017-04-08 2017-04-22 2017-05-06 2017-05-13

CM-PNDP-10322-CS-INDV /Sélection d'un consultant pour laréalisation des études sur lafiscalité locale

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2017-04-10 2017-05-20 2017-06-03 2017-07-01 2017-07-31

CM-PNDP-10323-CS-INDV /Sélection d'un consultant pour laréalisation des études liées à lastratégie de décentralisation encours de validation

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-04-24 2017-06-03 2017-06-17 2017-07-15 2017-08-14

CM-PNDP-10333-CS-INDV /Sélection d'un consultant enappui à la formation des TSP(prestataires de services,consultants pour la mise enoeuvre des micropjets, etc

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Direct

3,000.00 0.00 PendingImplementation 2017-04-24 2017-05-04 2017-05-11 2017-05-25 2017-06-01

CM-PNDP-10337-CS-INDV /Sélection d'un consultant enappui au développement del'Economie Sociale et Solidaire(ESS)

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Direct

12,000.00 0.00 PendingImplementation 2017-04-04 2017-04-14 2017-04-21 2017-05-05 2017-05-12

CM-PNDP-10344-CS-INDV /Sélection d'un consultant pour laproduction d'un film documentairesur le PNDP dans le septentrion( français/anglais)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

19,200.00 0.00 Pending

Implementation 2017-04-20 2017-04-25 2017-05-09 2017-05-30 2017-06-13

CM-PNDP-10347-CS-INDV /Sélection d'un consultant pour laconception de l'applicationmobile du site internet du PNDPet mise en ligne

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Open

6,000.00 0.00 Pending

Implementation 2017-04-10 2017-05-13 2017-05-27 2017-06-17 2017-07-17

CM-PNDP-10348-CS-INDV /Sélection d'un consultant enappui à la participation du PNDPà la Journée Africaine de laDécentralisation et duDéveloppement Local (JADDEL2017)

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Direct

6,000.00 0.00 PendingImplementation 2017-04-24 2017-05-04 2017-05-18 2017-06-01 2017-06-08

CM-PNDP-10358-CS-INDV /Sélection d'un consultant pourl'étude sur la prise en compte dugenre dans le mode opératoire

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-04-25 2017-06-04 2017-06-18 2017-07-02 2017-08-01

CM-PNDP-2842-CS-INDV /Conseil juridique au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

10,000.00 0.00 Pending

Implementation 2017-03-22 2017-03-27 2017-04-17 2017-05-15 2018-05-10

CM-PNDP-2843-CS-CDS /Recrutement d'un consultantpour l'actualisation des donnéesdu système d'informationgéographique dans les 31communes d'arrondissement(Convention avec l'InstitutNational de Cartographie)

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

100,000.00 0.00 Pending

Implementation 2017-05-15 2017-05-25 2017-07-06 2018-01-02

CM-PNDP-2943-CS-INDV / Miseen page du Magazine trimestriel" LES ECHOS DU PNDP"(infographie)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

5,200.00 0.00 Pending

Implementation 2017-03-17 2017-03-22 2017-04-05 2017-04-26 2017-10-23

CM-PNDP-2941-CS-INDV /Conception des articles duMagazine trimestriel " LESECHOS DU PNDP", en français

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

3,600.00 0.00 Pending

Implementation 2017-03-17 2017-03-22 2017-04-05 2017-05-03 2017-10-30

CM-PNDP-2934-CS-INDV /Formation de journalistes sur lesthématiques chères au PNDP 3

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

4,800.00 0.00 Pending

Implementation 2017-04-24 2017-04-29 2017-05-20 2017-06-24 2017-12-21

020/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DEBELABO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

021/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALE DESMICROPROJETS BATIMENTDANS LA COMMUNE D'ABONG-MBANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-05-08 2017-05-08 2017-05-29 2017-07-13

022/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTSDANS LA COMMUNE DEBATOURI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

023/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DEGAROUA-BOULAI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

024/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISIBILITES TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSBATIMENT DANS LACOMMUNE DE KETTE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

025/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSBATIMENT DANS LACOMMUNE DE MBANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

42,000.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

026/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENT ETEQUIPEMENT DANS LACOMMUNE DE NGOYLA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

027/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DESALAPOUMBE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

028/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENT ETEQUIPEMENT DANS LACOMMUNE DE YOKADOUMA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

030/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSD'ELECTRIFICATION DUMARCHE D'ABONG-MBANGDANS LA COMMUNE D'ABONG-MBANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,600.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

031/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE D'ATOK

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

032/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENT ETEQUIPEMENT DANS LACOMMUNE DE MANDJOU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-02 2017-06-20 2017-07-11 2017-08-15 2017-09-29

033/C/PNDP/EST/2017/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALE DESMICROPROJETS BATIMENTDANS LA COMMUNE DEMINDOUROU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

034/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSBATIMENT DANS LACOMMUNE DE BETARE-OYA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

035/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DELOMIE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

036/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DENGOURA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

037/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DEDOUMAINTANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

038/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNENTALES DESMICROPROJETS BATIMENTDANS LA COMMUNE DE GARI-GOMBO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

039/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MOLOUNDOU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

42,000.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

Page 17

040/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE BELABO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

041/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE DIANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-15 2017-07-03 2017-07-24 2017-08-28 2017-10-12

042/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDE DEFAISABILITES TECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE D'ATOK

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

043/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MANDJOU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

009/C/EF/CE/MAKENENE/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementale du microprojetde constructio d'un bloc materneléquipé et d'un bloc de troislatrines à l'Ecole Maternelle deBaloua, dans la commune deMakenene

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-10 2017-04-10 2017-04-10 2017-05-01 2017-06-30

010/C/EF/CE/MAKENENE/2017/ Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetde construction d'un forageéquipé de PMH à l'écoleMaternelle de Baloua, dans laCommune de Makenene,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

011/C/EF/CE/MAKENENE/2017/ Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetde construction d'une tribune de1000 places assises àMakenene Centre, dans laCommune de Makenene

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

012/C/EF/CE/LOBO/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité des microprojets deconstruction d'un bloc de deux(02) salles de classe équipées,d'un bloc de 03 latrines à l'EP deKelle et d'un hangar de marchéà Lobo centre, commune deLobo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

013/C/EF/CE/LOBO/2017 /Sélection d'un consultant pourl'élaboration de l'Étude defaisabilité technique etenvironnementale du microprojetde construction d'un forage aumarché de Lobo centre, dans lacommune de Lobo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

014/C/EF/CE/OKOLA/2017 /Sélection d'un consultant pourl'élaboration des Etudes defaisabilité pour la const de 02blocs de 02 salles de classeséquipées, de 02 blocs de 03 latau CES de VOA et à d'okolaCentre, d'un atelier demaçonnerie et d'un bloc 03 latau CETIC d'Elig

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

015/C/EF/CE/OKOLA/2017 /Sélection d'un consultant pourles études de faisabilité deconstruction de (03) forageséquipés de PMH au CES deVOA II, au CETIC d'ELIG ONANAet à l'Ecole bilingue d'OkolaCentre et réhabilitation d'une miniadduction d'Eau Potable derrièreSOCCOPO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

016/C/EF/CE/NANGAEBOKO/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité dumicroprojet de construction d'unbloc de 02 salles de classeéquipées et d'un bloc de troislatrines à l'EP de Ndjombe, dansla commune de Nanga Eboko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

017/C/EF/CE/NANGAEBOKO/2017 / Sélection d'unconsultant pour l'élaboration del'étude de faisabilité technique etenvironnementale du microprojetde construction d'un forageéquipé de PMH à l'EP deNdjombe dans la commune deNanga et Eboko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

018/C/EF/CE/MAKAK/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité du microprojetd'éclairage à l'énergie solaire ducentre ville de Makak sur 6 km etélectrification du village Mbengsur environ 15 km, commune deMakak

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

019/C/EF/CE/MNTA/2017 /Sélection d'un consultant lesétudes de faisabilité deconstruction d'un hangar demarché avec comptoirs et bloclatrine à (04) compartiments aumarché de Minta ville et d'unbloc de 02 salles de classeséquipées avec 01 bloc de troislatrines à l'EP

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-23 2017-06-13 2017-06-20 2017-07-12 2017-11-09

020/C/EF/CE/MINTA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité pour la constructionde 05 forages équipés de PMH àl'EP de ELOT, à l'EP d'AfanOveng, à Mbargue, au marché deMinta ville et à Meba dans lacommune de Minta

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

021/C/EF/CE/MBALMAYO/2017/ Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementale du microprojetde construction d'un hangar etde boutiques avec blocs dequatre latrines au marché Japon,dans la Commune de Mbalmayo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

022/C/EF/CE/MBALMAYO/2017/ Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale duraccordement en eau potable auréseau CDE et la construction dedeux bornes fontaines au marchéJapon, dans la Commune deMbalmayo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,200.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

023/C/EF/CE/NSEM/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité de construction d'unbloc de (02) salles de classeéquipées à l'EP de Mbenda, d'unatelier d'électricité au CETIC deNsem et de 02 bloc de 03latrines à l'EP de Mbenda et auCETIC de

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

024/C/EF/CE/NSEM/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité pour la réhabilitationsd'un puits équipé de PMH à l'EPde Mbenda, du réseauCAMWATER et raccordement auCETIC de Nsem, dans lacommune de Nsem

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

025/C/EF/CE/AWAE/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetde construction d'un parc à grosporteur de 100 camions et d'unbloc latrines à deuxcompartiments à Ekiembie 1,commune d'Awae

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

044/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MINDOUROU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

045/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE BETARE-OYA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

046/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE NGOURA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

047/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE DOUMAINTANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

048/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MESSAMENA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

049/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE GARI-GOMBO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

026/C/EF/CE/AWAE/2017 /Sélection d'un consultant pourl'élaboration de l'étude defaisabilité technique etenvironnementale du microprojetde construction d'un puits équipéde PMH au parc à gros porteurde 100 camions d'Ekiembie 1,commune d'Awae

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

050/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE LOMIE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

027/C/EF/CE/AKONOLINGA/2017 / Sélection d'un consultant pourl'élaboration des études defaisabilitédu microprojet deconstruction de deux hangars de36 comptoirs + un bloc latrinesde trois (03) compartiments aumarché quartier Haoussa àAkonolinga, dans la Communed'Akonolinga

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

051/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE D'ABONG-MBANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,600.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

052/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE BATOURI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

028/C/EF/CE/AKONOLINGA/2017 / Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementale du microprojetde construction d'un forageéquipé de PMH à l'EMd'application GI, G2 du Centreadministratif, communed'Akonolinga

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

053/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE GAROUA-BOULAI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

054/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE KETTE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

029/C/EF/CE/NKOLAFAMBA/2017 / Sélection d'un consultantpour l'élaboration des études defaisabilité du microprojetd'extension de 02 réseauxélectriques : 1 km de MT et300m de BT tryphasé de MbeEkom-Lycée technique-CSId'Omvan-extension BT (900m), et3,2km de MT et BT tryphasé de

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

055/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MBANG

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

056/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE NGOYLA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

Page 18

030/C/EF/CE/NGOUMOU/2017 /Sélection d'un consultant pourl'élaboration des étude defaisabilité technique etenvironnementale du microprojetde réhabilitation de la routeNkolmen - Ovangoul sur 5 km,commune de Ngoumou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

057/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE SALAPOUMBE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

031/C/EF/CE/NGOUMOU/2017 /Sélection d'un consultant pourl'élaboration des étude defaisabilité technique etenvironnementales du microprojetd'extension du réseau électrique1,3Km de BT et MT d' Ovangoul -Tega Minboman et de MinloMinzoa 2,3Km à Ofoumbi,commune de Ngoumou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

058/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE YOKADOUMA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

032/C/EF/CE/MATOMB/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité du microprojet deconstruction de (02) hangars demarché avec comptoirs etconstruction de (02) bloc de (04)latrines aux marchés deMandoumba et Nkeng Likock,Commune de Matomb

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

059/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITESTECHNIQUES ETENVIRONNEMENTALES DESMICROPROJETSHYDRAULIQUES DANS LACOMMUNE DE MESSOK

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

033/C/EF/CE/MATOMB/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementales du microprojetde construction de 02 forageséquipés de PMH au marché deMandoumba et au marché deNkeng Likock, commune deMatomb

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,200.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

060/C/EF/PNDP/EST/2017 /ELABORATION DES ETUDESDE FAISABILITE TECHNIQUESET ENVIRONNEMENTALESDES MICROPROJETSBATIMENTS DANS LACOMMUNE DE MESSAMENA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,200.00 0.00 PendingImplementation 2017-05-08 2017-06-26 2017-07-17 2017-08-21 2017-10-05

061/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE SOMALOMO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

062/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE D'ANGOSSAS

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

063/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE MBOMA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

064/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DENGUELEMENDOUKA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

065/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE DOUME

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

066/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE NGUELEBOK

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

067/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE OULI

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

068/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE KENTZOU

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

069/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE NDELELE

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

070/C/CT/PNDP/EST/2017 /SUIVI/CONTROLE DESMICROPROJETS DANS LACOMMUNE DE DIMAKO

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2017-11-12

CM-PNDP-2938-CS-INDV /Élaboration de la chartegraphique et sonore du PNDP 3

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Open

6,201.00 0.00 Pending

Implementation 2017-03-05 2017-04-07 2017-04-21 2017-05-19 2017-11-15

CM-PNDP-2936-CS-INDV /Revue mensuelle de la pressespécialisée et les notesconjoncturelles

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

4,000.00 0.00 Pending

Implementation 2017-01-02 2017-01-07 2017-01-21 2017-02-11 2017-08-10

CM-PNDP-2935-CS-INDV /Revue de la quotidienne etmonitoring des médias

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Limited

3,000.00 0.00 Pending

Implementation 2017-01-02 2017-01-07 2017-01-28 2017-03-04 2017-08-31

CM-PNDP-2937-CS-INDV /Maintenance et animation duportail internet sur le PNDP etles communes

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

8,000.00 0.00 PendingImplementation 2017-02-05 2017-03-26 2017-04-16 2017-05-21 2017-11-17

CM-PNDP-2841-CS-CDS /Formation, assistance techniqueet déploiement du logiciel sim_badans les communes

IDA / 57180 Component B: Support to thedecentralization process Post Direct Selection Direct

70,000.00 0.00 Pending

Implementation 2016-12-03 2016-12-13 2017-02-16 2017-08-15

034/C/EF/CE/NGOGMAPUBI/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité pour laconstruction de 04 forageséquipés de pompes à motricitéhumaine à Mode chefferie, à l'EPde Ngog Mapubi, à Omog et àl'EP de Dibodi, dans laCommune de Ngog Mapubi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

035/C/EF/CE/NGOGMAPUBI/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité technique etenvironnementale du Microprojetde réhabilitation de la stationscan water de Ngog Mapubi,dans la Commune de NgogMapubi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

036/C/EF/CE/NGOGMAPUBI/2017 / Sélection d'unconsultant pour l'élaboration desétudes de faisabilité technique etenvironnementale du Microprojetd'électrification rurale de LibengoïBethel sur 4 km, dans laCommune de Ngog Mapubi

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

037/C/EF/CE/SAA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité pour la constructiond'un hangar avec comptoirs etblocs de quatre latrines et deréhabilitation d'un hangar aumarché municipal B de Sa'a,dans la Commune de Sa'a

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,800.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

038/C/EF/CE/SAA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité pour la construction de03 forages équipés de PMH aumarché municipal de Sa'a, aumarché municipal B, au villageNSAN MENDOUGA (Ayissi Elé),dans la Commune de SAA

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,200.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

039/C/EF/CE/SAA/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité technique etenvironnementale du microprojetd'Extension de l'énergieélectrique dans le quartier Engolosur 2km à l'EST du village, dansla Commune de Sa'a

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

041/C/EF/CE/DIBANG/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité de construction dequatre (04) forages dans leslocalités de Mapubi, Mahole,Ndoupe et Somapan, dans lacommune de Dibang

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

042/C/EF/CE/MAKAK/2017 /Sélection d'un consultant pourl'élaboration des études defaisabilité de construction d'uncentre commercial de 100boutiques multi standing àMakak, commune de Makak

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-10 2017-05-29 2017-06-19 2017-07-24 2017-09-22

010/C/SC/CE//NKOTENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'une miniadduction d'approvisionnementen eau potable sur le site del'abattoir de Nkoteng dans laCommune de Nkoteng, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

640.00 0.00 PendingImplementation 2017-04-16 2017-06-04 2017-06-25 2017-07-30 2017-11-27

011/C/SC/CE/NKOTENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un (01) hangaravec comptoirs et un bloclatrines à quatre (04)compartiments au carrefourNdoumba dans la Commune deNkoteng, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,760.00 0.00 PendingImplementation 2017-04-23 2017-06-11 2017-07-02 2017-07-31 2017-11-28

012/C/SC/CE/NKOTENG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un (01) puitséquipé de Pompe à MotricitéHumaine au carrefour Ndoumbadans la Commune de Nkoteng,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-23 2017-06-11 2017-06-18 2017-07-17 2017-11-14

013/C/SC/CE/ELIFMFOMO/2017 / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction desept (07) forages productifséquipés de Pompe à MotricitéHumaine dans sept (07) localités(Nkol-Obang, Ban Edouma 2, EPde Mebomo, Lekoukoua, Bodo,Enobita et CES de Kokodo)

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,554.00 0.00 PendingImplementation 2017-04-23 2017-06-11 2017-07-02 2017-07-31 2017-11-28

014/C/SC/CE/OBALA/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un puits equipe dePMH à nkol-Ekui dans laCommune d'Obala, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-17 2017-07-16 2017-11-13

015/C/SC/CE/OBALA/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un bloc de deux(02) salles de classes équipé de60 table-bancs de niveau 2, de02 bureaux pour enseignants ànkol-Ekui dans la Communed'Obala, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-17 2017-07-16 2017-11-13

016/C/SC/CE/OBALA /Sélection d'un Consultant pour leSuivi/contrôle des Travauxd'extension du réseau électriqueà sur la route Elig bodo-Yemsoa dans la communed'Obala, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,369.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

017/C/SC/MONATELE/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction deux (02) hangarsde 32 comptoirs avec deux (02)blocs latrines à trois (03)compartiments aux marchés dedeux (02) dans les localités deEzezang et Lenouk, à monatélé

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,116.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

018/C/SC/CE/MONATELE/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deConstruction d'un (01) forageproductif équipé d'une pompe àmotricité humaine au marché deLenouk, dans la Commune deMonatélé, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

680.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

019/C/SC/CE/OMBESSA /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'une mini AEPavec forage productif etconstruction d'un château àOmbessa, dans la Communed'Ombessa Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

960.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

020/C/SC/CE/OLANGUINA/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deConstruction dun (01) hangar de32 comptoirs au marché deKoltock et rehabilitation dumarché d'Olanguina (10boutiques) et Construction de(02) bloc latrines à trois (03)comp

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,762.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

021/C/SC/CE/OLANGUINA/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deConstruction d'un (01) forageproductif équipé d'une pompe àmotricité humaine au marche deKoltock dans la Communed'Olanguina, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

680.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

Page 19

022/C/SC/CE/YAOUNDE 7/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deConstruction d'un magasin destockage avec un bloc latrines àdeux (02) Compartiments àMinkoameyos dans la communede Yaoundé 7, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

023/C/SC/CE/YAOUNDE 7/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux derehabilitation d'un pont definitif de06m de portee et 04m de largesur la riviere Angaha et deréhabilitation d'une piste agricolede 400m allant du carrefournkolnkoumou au Centre dePromot

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,079.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

024/C/SC/CE/MENGUEME/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deConstruction de deux (02) puitséquipés de Pompes à MotricitéHumaine dans deux (02) localités(Yeneassi et Mebemezoa) dansla commune de Mengueme,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

960.00 0.00 PendingImplementation 2017-04-23 2017-06-02 2017-06-09 2017-07-01 2017-10-29

025/C/SC/CE/MENGUEME/2017/ Sélection d'un Consultant pourle Suivi/contrôle des Travaux deRéhabilitation des pointscritiques sur la piste agricoleNemeyong-benebelot dans lacommune de Mengueme, Régiondu Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,060.00 0.00 PendingImplementation 2017-04-24 2017-06-03 2017-06-17 2017-07-16 2017-11-13

026/C/SC/CE/MFOU/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un forage productiféquipés d'une Pompe à MotricitéHumaine dans la localité deNkongoa dans la Commune deMfou, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

680.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

027/C/SC/CE/MENGANG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deréalisation d'électrification ruraledans certaines localités, en 02axes : lycée de Mengang-Meyo-Evoung et lycée de Menoa-Ekinguili-Bifembe, Commune deMengang, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,348.00 0.00 PendingImplementation 2017-04-24 2017-06-03 2017-06-10 2017-07-02 2017-10-30

028/C/SC/CE/MAKAK/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un (01) hangar de48 comptoirs avec un (01) bloclatrines à trois (03)compartiments au marché deMakak centre, dans la Communede Makak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,393.00 0.00 PendingImplementation 2017-04-24 2017-06-03 2017-06-10 2017-07-02 2017-10-30

029/C/SC/CE/MAKAK/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un magasin destockage avec un bloc latrines àdeux (02) compartiments dans lalocalités de Mbeng dans laCommune de Makak, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

030/C/SC/CE/MAKAK/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un (01) puitséquipé de Pompe à MotricitéHumaine au marché de MakakCentre, dans la Commune deMakak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

031/C/SC/CE/DIBANG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux derealisation d'une electrificationrurale de 2700m dans le villageTamalong, Commune de Dibang,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,304.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

032/C/SC/CE/DIBANG/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction d'un magasin destockage avec un bloc latrines àdeux (02) compartiments àNdongo dans la Commune deDibang, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

033/C/SC/CE/BOTMAKAK/2017 / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction dedeux (02) forages productifséquipés de pompes à motricitéhumaine au CETIC et CentreAdministratif de Bot-Makak, dansla Commune de Bot Makak,Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,192.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

034/C/SC/CE/BOTMAKAK/2017 / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction d'un(01) puits équipés de pompes àmotricité humaine à NdjockBané, dans la Commune de BotMakak, Région du Centre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

035/C/SC/CE/NTUI/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deConstruction de deux (02)magasins de stockage de cacaoet construction de 02 blocslatrines à deux (02)compartiments dans leslocalités de Nguila, et Ntui ville)dans la Commune de Ntui,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,030.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

036/C/SC/CE/NANGAEBOKO/2017 / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de construction d'unbloc de 03 salles de classeéquipées et construction d'unbloc de trois latrines à l'EP deNdjombe dans la commune deNanga et Eboko, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

037/C/SC/CE/MINTA/2017 /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deconstruction d'un puits équipé dePMH à l'EP de Ndjombe, dans lacommune de Minta, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

038/C/SC/CE/NANGAEBOKO/2017 / Sélection d'unConsultant pour le Suivi/contrôledes Travaux de Construction dedeux (02) hangars aveccomptoirs et Construction dedeux (02) blocs de latrines à trois(03) compartiments dans 02marchés à Essimeyong et àBiboa dans la commune deNanga et

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,190.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

039/C/SC/CE/NAGA EBOKO /Sélection d'un Consultant pour leSuivi/contrôle des Travaux deréhabilitation de deux (02) puitséquipés de Pompe à MotricitéHumaine au marché deEssimeyong et au marché deBiboa, dans la Commune deNanga et Eboko, Région duCentre

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

480.00 0.00 PendingImplementation 2017-04-25 2017-06-04 2017-06-11 2017-07-03 2017-10-31

CM-PNDP-2840-CS-INDV /Sélection d'un consultant pourl'étude sur la définition d'uneméthodologie de planification auniveau des communesd'arrondissement et au niveaurégional

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

30,000.00 0.00 PendingImplementation 2017-03-05 2017-03-10 2017-03-31 2017-05-05 2017-11-01

CM-PNDP-11826-CS-INDV /Traduction des documents etautres supports du PNDP (année2017)

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-09-03 2017-10-22 2017-11-12 2017-12-17 2018-06-15

CM-PNDP-11851-CS-INDV /Recrutement d'un consultantchargé d'accompagner letechnique pour la proposition d'undispositif d'entretien et demaintenance des ouvrages dansle cadre du PNDP

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2017-04-05 2017-05-24 2017-06-14 2017-07-19 2018-01-15

001/C/EF/NGUTI/CRC/2017 /Sélection d'un consultant pourl'élaboration d'une étude defaisabilité technique etenvironnementale pour laconstruction d'une case depassage à Nguti, et laconstruction de dix boutiques, unbloc latrine à la gare routière deManyemen, commune de Ngut

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05

002/C/EF/NGUTI/CRC/2017 /Sélection d'un consultant pourl'élaboration d'une étude defaisabilité technique etenvironnementale pourl'approvisionnement en eau de lacase de passage et la gareroutière de Manyemen,communes de Nguti, Région duSud Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05

001/C/EF/TINTO/CRC/2017 /étude de faisabilité pour lestravaux de construction d'unmarché et un bloc latrine àFumbe, la construction etl'équipement d'un bloc de deuxsalles de classe, la constructiond'un bloc latrine à l'EP deSABES, commune de Tinto

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05

002/C/EF/TINTO/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dumarché de Fumbe et l'EP deSABES, commune de Tinto,Région du Sud Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/WABANE/CRC/2017 /étude de faisabilité technique etenvironnementale pour lestravaux de construction desboutiques, d'un hangar et un bloclatrine à Mbecho, constructiond'une case de passage à Bechati-Wabane, commune de Wabane

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/WABANE/CRC/2017 /étude de faisabilité technique etenvironnementale pour lestravaux de construction d'unouvrage de franchissement sur larivière Meghop dans le villageFolepi, commune de Wabane

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

003/C/EF/WABANE/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dumarché de Mbecho et la case depassage de Bechati dans lacommune de Wabane

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/BUEA/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction de dix hangars, unbloc latrine au marché deWotutu, cinq hangars et un bloclatrine au marché de Muea,commune de Buea

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/BUEA/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau desmarchés de Wotutu et Muea,commune de Buea

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/MAMFE/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction d'un hangar et unbloc latrine au marché de Mamfe

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/MAMFE/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dumarché de Mamfe, laréhabilitation du réseau d'AEP deNfaitock et la réalisation d'unforage à Eyang Ntui, communede Mamfe,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

6,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/ALOU/CRC/2017 /étude de faisabilité technique etenvironnementale pour lestravaux de construction etéquipement des écolesmaternelles de Fonjumetaw etMendia-M'mockmbie, communed'Alou

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,500.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/ALOU/CRC/2017 /étude de faisabilité technique etenvironnementale pour lestravaux de réhabilitation de 12kmde routes rurales de Atulah àMenky, ouverture de la routerurale de Akung-Njenawung à lalimite avec Wabane

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

003/C/EF/ALOU/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau desécoles maternelles deFonjumetaw et Mendia-M'mockmbie, commune d'Alou,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,500.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/EYUMOJOCK/CRC/2017 / étude de faisabilitétechnique et environnementalepour construction et l'équipementd'un bloc de deux salles declasse, un bloc latrine dans lesEP de Onaku, Bayenti etAyukaba, construction d'unmagasin de stockage à Ekok

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/EYUMOJOCK/CRC/2017 / étude de faisabilité pourl'approvisionnement en eau desécoles publiques de Onaku,Bayenti et Ayukaba, le site deconstruction du magasin destocage d'Ekok, réalisation dedeux forages positifs équipés depompes à motricité humaine àAgborkem et Ayaoke

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,009.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/TIKO/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'électrification du village OmbeNative, commune deTiko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,400.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

Page 20

002/C/EF/TIKO/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction d'un Centre deSanté Intégré à Mondoni Native,une case de passage et unrestaurant municipal à Tiko,commune de Tiko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

003/C/EF/TIKO/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dusite de construction du CSI deMondoni Native, la case depassage et le restaurantmunicipal de Tiko

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

810.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/MUYUKA/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction de l'EcoleMaternelle de Bafia, les marchésde Malende et Munyenge

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/MUYUKA/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dessite de constructrion de l'EcoleMaternelle de Bafia, les marchésde Malende et Munyenge,commune de Muyuka

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/IDENAU/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction et l'équpiement d'unfoyer communautaire à Bakingiliet une librairie à Idenaucommune d'Idenau

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/IDENAU/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dusite du foyer communautaire deBakingili et de la librairiemunicipale d'Idenau

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/MENJI/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dusite du foyer communautaire deMbeuh dans la commune deMenji

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/MENJI/CRC/2017 /étude de faisabilité technique etenvironnementale en vue destravaux de construction desboutiques et un bloc latrine aumarché de Menji

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/EF/BAMUSSO/CRC/2017/ étude de faisabilité techniqueet environnementale pour laconstruction d'une case depassage à Bamusso communede Bamusso

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/BAMUSSO/CRC/2017/ étude de faisabilité techniqueet environnementale pourl'approvisionnement en eau dusite de la case de passage deBamusso,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

003/C/EFBAMUSSO/CRC/2017/ étude de faisabilité techniqueet environnementale pourlaconstruction d'un ouvrage defranchissement à l'entrée de lacase de passage d'Iloini,commune de Bamusso

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/MUNDEMBA/CRC/2017 / étude de faisabilité techniqueet environnementale pour laconstruction et l'équipement d'unfoyer communautire et une écolematernelle à Mundemba,commune de Mundemba

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/MUNDEMBA/CRC/2017 / étude de faisabilité techniqueet environnementale pourl'approvisionnement en eau dusite de construction de la casede passage et l'école maternellede Mundemba, commune deMundemba

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/KONYE/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction et l'équipement duCentre de Santé Intégré deMatondo II, commune de Konye

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

3,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/KONYE/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau dusite de construction du Centre deSanté Intégré de Matondo II,l'alimentation en eau potable desvillages Matoh et Koba

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,000.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/TOMBEL/CRC/2017 /étude de faisabilité pour laconstruction et l'équipement del'école maternelle d'Ebonji, d'unbloc de deux salles de classedans les Ecoles primaires deMbabe et Ngab, d'un hanga aumarché d'Ebonji, des bloclatrines dans les EP de Mbabe etNgab

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,500.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

002/C/EF/TOMBEL/CRC/2017 /étude de faisabilité technique etenvironnementale pourl'approvisionnement en eau desEcoles d'Ebonji, Mbabe et Ngabainsi que le marché d'Ebonji,commune de Tombel,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,500.00 0.00 PendingImplementation 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18

001/C/EF/EKONDOTITI/CRC/2017 / étude defaisabilité technique etenvironnementale pour laconstruction et l'équipement desécoles maternelles deIribanyange et Kumbe Balue,commune d'Ekondo Titi,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-05-16 2017-07-04 2017-07-25 2017-08-29 2018-02-25

002/C/EF/EKONDOTITI/CRC/2017 / étude defaisabilité technique etenvironnementale pourl'approvisionnement en eau dessites de construction des écolesmaternelles d'Iribanyange etKumbe Balue, communed'Ekondo Titi,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-05-16 2017-07-04 2017-07-25 2017-08-29 2018-02-25

001/C/EF/KOMBOITINDI/CRC/2017 / étude defaisabilité technique etenvironnementale pour laconstruction des logementsd'astreinte pour enseignants, d'unblock latrine et aménagementd'un passage piéton à GoldCoast, commune de KomboItindi,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

6,000.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

001/C/EF/IDABATO/CRC/2017 /étude de faisabilité technique etenvironnementale pour laconstruction d'un marché et unbloc latrine à Kombo Amunja,construction de cinq bloc latrinesà Shell Creek, Idabato II, Jabaneet Kombo Amunja, communed'Idabato

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

6,000.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

001/C/EF/KOMBOABEDIMO/CRC/2017 / étude defaisabilité technique etenvironnementale pour laréhabilitation de l'Ecole Publiquebilingue et l'hôpital de districtd'Akwa, la consruction d'unmagasin de stockage et un bloclatrine à Akwa Beach, communede Kombo Abedimo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

002/C/EF/KOMBOABEDIMO/CRC/2017 / étude defaisabilité technique etenvironnementale pourl'approvisionnement en eau dusite de construction du magasinde stockage d'Akwa, communede Kombo Abedimo

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,000.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

001/C/EF/ISANGELE/CRC/2017/ étude de faisabilité techniqueet environnementale pour laconstruction des logementsd'astreinte des enseignants àIsangele , commune d'Isangele

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,600.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

002/C/EF/ISANGELE/CRC/2017/ étude de faisabilité techniqueet environnementale pourl'approvisionnement en eaupotable du site de constructiondes logements d'astreinte desenseignants à Isangele ,commune d'Isangele

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19

001/C/SC/BAMUSSO/CRC/2017/ Suivi/contrôle des Travaux deconstruction d'un magasin destockage et d'un bloc latrine àtrois compartiments à BekeryBeach dans la Commune deBamusso

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,199.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/MUYUKA/CRC/2017 /Suivi/contrôle des Travaux deconstruction des hangars aumarché de Yoke dans laCommune de Muyuka, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,542.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/EKONDOTITI/CRC/2017 / Suivi/contrôledes Travaux de Construction etd'équipement en mobilier del'Ecole Maternelle de Funge dansla Commune d'Ekondo Titi,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,201.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

002/C/SC/EKONDOTITI/CRC/2017 / Suivi/contrôledes Travaux de réalisation d'unforage productif équipé d'unepompeà energie solaire à l'EcoleMaternelle de Fonge dans laCommune d'Ekondo Titi, Régiondu Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,106.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/MENJI/CRC/2017 /Suivi/contrôle des Travaux deconstruction et d'équipement enmobilier d'un foyercommunautaire dans le villageMbeuh de la Commune de Menji,dans la Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,400.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/MUNDEMBA/CRC/2017 / Suivi/contrôle des Travaux deréalisation de trois (03) foragesproductifs équipés de pompes àmotricité humaine dans les trois(03) écoles publiques de NdianEstate, Fabe et Besingi, dans laCommune de Ndian, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,383.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/TOMBEL/CRC/2017 /Suivi/contrôle des Travaux deconstruction d'un marché, unbloc latrine à trois (03)Compartiments et une bornefontaine à Tombel, dans laCommune de Tombel, Région duSud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

2,902.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/SC/MBONGE/CRC/2017 /Suivi/contrôle des Travaux deréalisation de deux (02) foragesproductifs équipés de pompes àmotricité humaine dans lesécoles publiques de Marumba etKotto Barumbi dans la Communede Mbonge, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

1,365.00 0.00 PendingImplementation 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06

001/C/CC/LIMBE II/CEC/2017 /Recrutement d'un agent financierpour la commune de Limbe II,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,320.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

002/C/CC/LIMBE II/CEC/2017 /Recrutement d'un agent dedéveloppment pour la communede Limbe II, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,400.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

001/C/CC/LIMBE III/CEC/2017 /Recrutement d'un agent financierpour la commune de Limbe III,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,320.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

002/C/CC/LIMBE III/CEC/2017 /Recrutement d'un agent dedéveloppment pour la communede Limbe III, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,400.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

001/C/CC/KUMBA I/CEC/2017 /Recrutement d'un agent financierpour la commune de Kumba I,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,230.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

002/C/CC/KUMBA I/CEC/2017 /Recrutement d'un agent dedéveloppment pour la communede Kumba I, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,400.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

001/C/CC/KUMBA II/CRC/2017 /Recrutement d'un agent financierpour la commune de Kumba II,Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,320.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

002/C/CC/KUMBA II/CEC/2017 /Recrutement d'un agent dedéveloppment pour la communede Kumba II, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,400.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

001/C/CC/KUMBA III/CRC/2017/ Recrutement d'un agentfinancier pour la commune deKumba III, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

4,320.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

002/C/CC/KUMBA III/CRC/2017/ Recrutement d'un agent dedéveloppment pour la communede Kumba III, Région du Sud-Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Open

5,400.00 0.00 PendingImplementation 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28

CM-PNDP-2940-CS-CQS /Sélection de 10 humoristes ( 1par région ) pour la production desketchs didactiques sur lescomportements souhaités

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

20,000.00 0.00 PendingImplementation 2017-10-02 2018-01-05 2018-02-09 2018-08-08

Page 21

CM-PNDP-2848-CS-INDV /Traduction des documents etautres supports au PNDP

IDA / 57180Component C: Coordination,management, monitoring andevaluation and communication

Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2016-10-27 2016-12-15 2017-01-05 2017-02-09 2017-08-08

CM-PNDP-11771-CS-INDV /Sélection d'un consultant enappui à la participation du PNDPau Salon de l'ActionGouvernementale (SAGO) 2017

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

6,000.00 0.00 PendingImplementation 2017-06-08 2017-06-13 2017-06-27 2017-07-11 2018-01-07

CM-CRC NORTH WEST-12283-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales desMPConstruction of closed 50market sheds (lock up )atNdapang market

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12089-CS-INDV / Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP de "Constr a block of 2 classrooms,VIP toilet , H/M's office andConstruction of a Well withManual pump GS Ebochue in

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12195-CS-INDV / Sélection d'unconsultant pour l'élaboration desétudes de faisabilités techniqueset environnementales des MP de" Construction and equipment ofa block of 2 classrooms, VIPtoilet , H/M's office andConstruction of a Well withManual pump GS Ebochue in

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12197-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of amodern slaughter house at Ndop(Bamunka) central and extensionof portable water to the site, dansla Commune de Ndop, Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12203-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of amodern slaughter house at Ndop(Bamunka) central and extensionof portable water to the site, dansla Commune de Ndop, Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12213-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Extension ofElectricity from Mbow entrance(GBHS Babessi Junction) toMbow Quarter and MbezohQuarter, in Babessi Council area,dans la Commune de bafut,Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12303-CS-INDV / Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP"Construction of a gravity watersupply in Tankiy, Elak OkuCouncil Area Elak Oku Councilarea

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12386-CS-INDV / "Sélection d'unconsultant pour l'élaboration desétudes de faisabilités techniqueset environnementales des MP4-The rehabilitation of the waterscheme of the urban space ,serving the villages of Manchock,Elak, Keyon, Fekeng, and partsof .....

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

4,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12389-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MPConstruction of

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12390-CS-INDV / "Sélection d'unconsultant pour l'élaboration desétudes de faisabilités techniqueset environnementales des MP "Extension of electricity fromJoguru in Balikumbat to Njanungin Bafanji within the BalikumbatCouncil area." Extension of electricity with

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

6,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12391-CS-INDV / "Sélection d'unconsultant pour l'élaboration desétudes de faisabilités techniqueset environnementales des MPConstruction of twenty (20)closed up market sheds and ablock of VIP latrine at smallmarket in Balikumbat village inBalikumbat Council area

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

2,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12393-CS-INDV / Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales desMPConstruction and equipping of02 classrooms, H/M .....

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

6,263.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12395-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP deConstruction of Nkon Integratedhealth center, a block of VIPlatrine and provision

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12220-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction andequipping of 02 classrooms,principal's office, a block ofLatrine and provision of potablewater to GTC Bawock in BaliCouncil area dans la Communede bali, Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12223-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Opening of Ewai -Fombe 7.5km farm to marketroad and construction of 10meters bridge and 4 culverts",dans la Commune de batiboRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12225-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Opening of Ewai -Fombe 7.5km farm to marketroad and construction of 10meters bridge and 4 culverts",dans la Commune de beloRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12227-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of aBridge in Akeh Village (towardsthe market from Oku road) inFundong Council area, dans laCommune de fundong Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12229-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of lockup sheds in Mbokam market witha VIP toilet and extension ofwater, dans la Commune de jakiriRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-05-31 2017-05-31 2017-05-31 2017-06-21 2017-12-18

CM-CRC NORTH WEST-12231-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction andequipping of of 01 sciencelaboratory at GHS Shisong inKumbo council area, dans laCommune de kumbo Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12233-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction andequipping of of 01 sciencelaboratory at GHS Shisong inKumbo council area, dans laCommune de kumbo Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-05-31 2017-05-31 2017-05-31 2017-06-21 2017-12-18

CM-CRC NORTH WEST-12235-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction andequipping of a block of twoclassrooms, a block of VIPlatrine, H/M's office andextension of potable water toGNS Njindom", dans laCommune de mbengwi Régiondu Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12246-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction andequipment of 2 Classrooms andVIP toilet and H/M's office in GSKWEI in Misaje council area,dans la Commune de misajeRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12247-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of amodern slaughter house at Ndop(Bamunka) central and extensionof portable water to the site, dansla Commune de Ndop Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12249-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux deConstruction of aMarket hanger and Warehouse,VIP latrine and extension ofwater to Ntundip Market, Ndu,dans la Commune de ndu Régiondu Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12254-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of 15market sheds, a canteen,Restaurant and extension ofwater to the building at theNjinikom main market, dans laCommune de njinikom Région duNord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12257-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of 2equipped Classrooms, VIPtoilet,H/M's office and extensionof water to GS TUKU-TABENKENin Nkambe councilarea, dans la Commune denkambè Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12259-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of a newcatchment, Tank and extensionof water to all quarters inNdzenso in Nkum council area,dans la Commune de nkum,Région du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORTH WEST-12263-CS-INDV / Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MPConstruction of 20 marketssheds in Atue market

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12268-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP"Extension of Electricity fromNewtown in Bafmen to Mbein(3km) and a transformer, in ZhoaCouncil area dans la Commune de zhoa,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12271-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP "Construction of a Bridge overriver Ngoh in the Zhoa" Opening of farm to market roadfrom Weh to Ngoh with One (1)culvert,

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12274-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP "Construction of farm to marketroad from Dinku to Bullam IINyen," Construction of 20 closeshed at widikum main markets

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12277-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP "Extension of water to integratedh Widikum" Extension of electricity tointegrated haelth centreWidikum" Extension of elect

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,600.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

Page 22

CM-CRC NORTH WEST-12279-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP "Construction of five (05) culvertsand nine (09) bridges along thenewly constructed roads inTubah council area." Constru

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

3,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12282-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MP "Construction of three (03) markethangers of 40 sale stand each atBambili market, in Tubah" Construction and equipping ofa

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12285-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales desMPConstruction of a gravitywater supply system for GomVillage

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12292-CS-INDV / "Sélection d'unconsultant iondividuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MPConstruction of Kuttin-Ngwointegrated health center with ablock of VIP latrine and Provisionof potable water

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12295-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MPConstruction of water catchmentequipping it with a pumpingsystem and distribution to all 4quarters.....

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12297-CS-INDV / "Sélection d'unconsultant individuel pourl'élaboration des études defaisabilités techniques etenvironnementales des MPConstruction of a block of 02classrooms, VIP toilet and H/M'soffice at GS Nser in Furu Awacouncil area...

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

8,400.00 0.00 PendingImplementation 2017-04-11 2017-04-11 2017-04-11 2017-05-02 2017-10-29

CM-CRC NORTH WEST-12243-CS-INDV / sélection d'uncontrôleur pour le suivi destravaux de Construction of twoclassrooms, VIP toilet and H/M'soffice for the newly created GSSKovki in Mbiame council area,dans la Commune de mbiameRégion du Nord Ouest

IDA / 57180 Component A: Localdevelopment support Post Individual Consultant

Selection Limited

5,000.00 0.00 PendingImplementation 2017-06-01 2017-06-01 2017-06-01 2017-06-22 2017-12-19

CM-CRC NORD-9739-CS-INDV /contrôle des travaux de laréalisation d'un mini AEP équipéde Pompe à Energie Solaire auCentre de Santé de Dembo, etd'un forage équipé de PMH àl'EP de TAPAWA

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Limited

1,584.00 0.00 PendingImplementation 2017-04-20 2017-04-25 2017-05-16 2017-06-20 2017-10-18

CM-PNDP-18647-CS-INDV /Sélection d'un consultantindividuel devant fournir un appuiau Groupe de travail chargé deconduire la reflexion sur laperrenisation des activités duPNDP

IDA / 57180 Component B: Support to thedecentralization process Post Individual Consultant

Selection Open

40,000.00 0.00 PendingImplementation 2017-06-20 2017-08-08 2017-08-29 2017-10-03 2018-04-01