LARSEN & TOUBRO LIMITEDPAGE NO.- 1OF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
CONTENTS
1. SCOPE
2. REFERENCE
3. PERSONNEL
$. IDENTIFICATION OF FILM
%. EQUIPMENT"MATERIAL
. TECNIQUE
7. IQI
'. LOCATION MARER
#. GEOMETRIC UNSARPNESS
10. BAC SCATTER RADIATION
11. EPOSURE
12. DENSIT!
13. DAR ROOM
1$. FILM PROCESSING
1%. QUALIT! OF RADIOGRAPS
1. EVALUATION
17. ACCEPTANCE CRITERIA
1'. DOCUMENTS
1#. SAFET!
L & T *ACOBS
-
8/12/2019 Procedure for RI
2/9
LARSEN & TOUBRO LIMITEDPAGE NO.- 2OF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
1.0 SCOPE:
This procedure describes are method & techniques of radiographic examination of
butt welds ofpiping construction work of M! "p gradation #ro$ect% O'( #anipat))
2.0 REFERENCE:
2.1 *M+ +') , *rticle - 2 . /on destructi0e Testing - adiographic
+xamination)
2.2 */ 31)3 4For acceptance tandard5. 'ode for #rocessing #iping)
2.3 */T ecommended practice6 /T.T'.1*.#ersonnel qualification and
certification in /on destructi0e testing)
2.$ * pecification /o).77777.8.231
3.0 PERSONNEL:
*ll radiograph acti0ities shall be carried out b *' certified personnel onl)
adiograph shall be e0aluated b certified */T:/T le0el personnel)
'ertificate of O : site.in.charge% adiographers shall be submitted)
$.0 IDENTIFICATION OF FILM :
+ach radiograph shall ha0e permanent identification to establish its precise
location to $ob at least ;mm awa from the weld edge) dentification shall ha0e
minimum following requirement)
$.1 #ro$ect dentification no)
$.2 (ine no)
$.3 ate
L & T *ACOBS
-
8/12/2019 Procedure for RI
3/9
LARSEN & TOUBRO LIMITEDPAGE NO.- 3OF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
*n additional information shall be added as required)
%.0 EQUIPMENT"MATERIAL:
%.1 O"'+ ridium.192:?amma ra source as per requirement will be used)
efer Table.1
%.2 FILM
%.2.1 *TM '(. or '(. film ma be used depending upon sensiti0it requirement as
per table below) *ll films to be used for radiograph shall be in good condition
and within the period of expir date% marked on each indi0idual carton b
manufacturer)
Tpe of ource and Film to be used for adiograph6 Table.
8all
Thickness 4T5
in mm
Material hop 8elded A or
+qui0alent
?amma.ra
4riduim 1925
*?F* >A or
+qui0alent
B @ T C 19 'arbon teel
=.ra
:?amm.ra
4ridium 1925
*?F* >A:>;
or +qui0alent
=.ra :?amm.
ra 4ridium
1925
*?F* >; or
+qui0alent
L & T *ACOBS
-
8/12/2019 Procedure for RI
4/9
LARSEN & TOUBRO LIMITEDPAGE NO.- DOF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
C B
' materials
other than
177E T
?amma.ra
4ridium 1925
*?F* >D or
+qui0alent
?amma.ra
4ridium 1925
*?F*
>D:>2 or
+qui0alent
.2 t shall be ensured that the required sensiti0it is achie0ed using the abo0e films)
f the required sensiti0it is not achie0ed consistentl% fine grain films 4high
contrast5% shall be used) 4low speed films5
.3 * film o0erlap of 27mm on either side of the film shall be pro0ided to
demonstrate the continuit of the welds) The minimum width of the film shall be
3% howe0er for elliptical 4>8>5 image ;xD film shall be used)
%.3 LEAD INTENSIF!ING SCREEN
(ead intensifing screen of thickness 7)12;mm front screen and 7)2;mm back
screen are recommended for use) creen shall be free from scratch marks and
wrinkles) creen showing e0idence of phsical damage shall be discarded).0 TECNIQUE
*n one of the following technique shall be used depend upon siGe% geometr &
accessibilit) n general% attempt shall be made to do single wall technique)
.1 SINGLE +ALL
.1.1 ingle wall image)
This technique is mainl used for pipes% where the source can be safel placed
inside)
.2 ingle wall panoramic)
ingle exposure% co0ering the whole circumference of the ob$ect) This technique
is mainl used for higher diameter pipes% where the source can be safel placed
inside) * minimum of three !s shall be placed 127 deg apart)
L & T *ACOBS
-
8/12/2019 Procedure for RI
5/9
LARSEN & TOUBRO LIMITEDPAGE NO.- ;OF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
.2 DOUBLE +ALL
.1 >ouble wall single image
This technique is used where single wall technique is not practical) * minimum
three exposures b placing source at 127 deg) nter0al at outer surface% close to
the weld) F> is approximatel equal to the diameter of the pipe) Two !s shall
be placed on the film side% on both ends of the film% where0er possible)
.3 DOUBLE +ALL DOUBLE IMAGE (E,,/,"45648)
.1 +lliptical
This technique is used where the diameter is 3); and below) Minimum two
exposures at 97 deg) to each other shall be taken for the full co0erage of the weld
circumference)
.2 uperimposed
*s an alternati0e% the weld ma be radiographed with radiation beam positioned
so that the images of both walls are superimposed) 8hen complete co0erage is
required% a minimum of three exposures at 127 deg) apart shall be made for each
$oint)
7.0 IQI
7.1 8ire tpe *TM:>/ pentameter of Hole tpe pentameter shall be used)
The ! material selection shall be according to tandard practice + 172; or
+ADA% as applicable as shall be radiographcall similar to the material being
radiographed) The thickness on which the ! is based shall be the nominal singlewall thickness plus the maximum permitted reinforcement thickness as per
referencing code section) The designated hole ! or essential wire shall be as
specified in table T.2AI) *lternati0el ! design as per T.233)2 ma be
permitted)
#(*'+M+/T OF !
L & T *ACOBS
-
8/12/2019 Procedure for RI
6/9
LARSEN & TOUBRO LIMITEDPAGE NO.- IOF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
! shall be placed on source side) 8here accessibilit pre0ents hand placing !
on source side% it shall be placed on film side with lead letter JF on the ! or
ad$acent to it) Howe0er% ! identification shall not mask the area of interest
including H*K)
7.3 #O'+>"+ >+MO/T*TO/6
>emonstration of the densit and ! image requirement shall be considered
satisfactor e0idence of compliance with this procedure)
>uring establishing radiographic procedure% source side pentameters to be used)
7.$ /"M+ OF !
1 +ach radiograph ha0e at least one !s)
.2 8hen a $oint is radiographed b panoramic 0iew in one exposure% b placing
source at the centre% the entire circumference can be radiographed b placing at least three !s
kept at 127L apart)
'.0 LOCATION MARER:
(ead letters shall be used as location marker) (ocation marker shall appear as
radiograph image and shall not be at the area interest) (ocation marker shall be
kept on the $ob itself) #lacement of location marker 4film:source side5 shall be as
per *rticle of *M+ ec),)
#.0 GEOMETRIC UNSARPNESS(U9):
9)1 The source to film distance shall be maintained in such a manner that the
geometric un sharpness does not exceed the specified limits) ?eometric
"nsharpness 4"g5 is determined b the formula "gFd:> where) F6 ource siGe in mm 4Maximum pro$ected dimension of radiation source or
>iagonal distance for rectangular shape5
>6 >istance in mm from source to weld or ob$ect to be radiographed 4source side
surface5
d6 >istance in mm from source side of the weld or ob$ect being radiographed to
L & T *ACOBS
-
8/12/2019 Procedure for RI
7/9
LARSEN & TOUBRO LIMITEDPAGE NO.- AOF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
the film 4Material thickness5)
10.0 BAC SCATTER RADIATION:
* lead letter N of siGe 4min5 & 1:1I thick 4min5 should be attached at the
back of film holder to check back scatter radiation)
11.0 EPOSURE:
The required exposure time shall be calculated from exposure chart or slide rules)
+xposure calculations ma also be used if charts and rules are not a0ailable
12.0 DENSIT!:
For =.ra% adiograph densit permissible range would be 1)B to D)7 H & >)
For ?amma ra% adiograph densit permissible range would be 2)7 to D)7 H&>
The densit 0ariation o0er the area of interest shall be with minus 1;E or plus
37E of the densit measured near the required wire or o0er the T+# HO(+ tpe
!) f the shim is used under the ! densit 0ariation ma exceed more than
37E
13.0 DAR ROOM
13.1 shall be located at an en0ironment free from% dust% fume% excessi0e heat and
radiation) afe lights be checked to pre0ent fogging of films)
2 "nexposed films would be kept in 0ertical position to pre0ent pressure mark)
1$.0 FILM PROCESSING :
Film processing shall be done in air conditioned dark room)
Manual film processing shall be carried out as per the guide lines of +.9D% Film
processing chemicals shall be procured from reputed manufacturer and shall not
be used after expir date) The solutions shall be prepared as per Manufactures
recommendation) The film shall be de0eloped at 27L ' and in accordance with the
Manufactures recommendation)
1%.0 QUALIT! OF RADIOGRAPS:
L & T *ACOBS
-
8/12/2019 Procedure for RI
8/9
LARSEN & TOUBRO LIMITEDPAGE NO.- BOF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
The films submitted for e0aluation shall be free from blemishes to the extent that
the do not mask with image of an discontinuit in the area of interest of the
sub$ect being radiographed) uch blemishes include% but are not limited to6
i) Fogging
ii) #rocessing defects such as streaks% watermarks% chemical stains%
iii) cratches% finger marks% crimps% dirtiness% static marks% smudges
i0) False indications due to defecti0e screens
1.0 EVALUATION:
!ualified T (e0el personnel meeting the requirements of /T.T'.* of
*/T and authoriGed Too nspector shall e0aluate the radiographs) *fter re0iew
b Too% radiographs shall be offered to +( for their re0iew and acceptance)
17.0 ACCEPTANCE CRITERIA:
*cceptance criteria shall be s per *M+ )31)3 Table 3D1)3)2 and applicable
specifications)
1'.0 DOCUMENTS:
eports shall be maintained in Formats /o)LT"MSQ"PIPE"RGM"013 &
LT"MSQ"PIPE"RGI"01$and cop shall be forwarded to #M' on dail basis)
*ll documents required b statutor bodies are to be maintained and kept at site)
1#.0 SAFET!:
1#.1 #recautions shall be taken as per H+ requirement of the #ro$ect as well *'
requirements
1#.2 adiograph source shall be stored in a pit in an exclusi0e storage room with lock
and ke arrangement) This pit shall be appro0ed b *') ource transfer
certificate% #it room appro0al certificate form *' shall be furnished to #M')
1#.3 >uring radiograph the following precaution shall be taken)
1#.3.1 'ordoning of area
L & T *ACOBS
-
8/12/2019 Procedure for RI
9/9
LARSEN & TOUBRO LIMITEDPAGE NO.- 9OF 9
DATE:-03.11.2007
MSQ(EPCC 1) UP GRADATIONREV.NO.- 0
PROCEDURE FOR RADIOGRAP! TESTINGPROCEDURE NO.-
LT"MSQ"P" RT "00#
3.2 >ispla of radiation smbols)
3.3 >ispla of red lights)
3.$ adiations le0el check b >osimeter : adiation sur0e meter)
1#.$ #ermit for carring out radiograph% as applicable shall be obtained)
1#.% adiographers shall wear film badges appro0ed b *')
L & T *ACOBS