DATA ROOMDATA ROOM Bucharest Municipality decided to found an Bucharest Municipality decided to found an

information center, called DATA ROOM, with the information center, called DATA ROOM, with the end of identifying potential investors, who might end of identifying potential investors, who might become partners of the Public Authority.become partners of the Public Authority.

The DATA ROOM vision is based on the concept of The DATA ROOM vision is based on the concept of communication, securing through attitude, communication, securing through attitude, knowledge and information a transparent and knowledge and information a transparent and credible climate for all those interested in credible climate for all those interested in contributing, together with Bucharest contributing, together with Bucharest Municipality, to the improvement of the services Municipality, to the improvement of the services offered to the citizens of the city. offered to the citizens of the city.

Projects proposed by Bucharest Projects proposed by Bucharest

MunicipalityMunicipality Underground Parking in Underground Parking in

BucharestBucharest

Walter Maracineanu Square, Presei Walter Maracineanu Square, Presei Libere Square, Dorobanti Square, Libere Square, Dorobanti Square, Alba Iulia Square, Edgar Quinet Alba Iulia Square, Edgar Quinet Street, Baneasa Railway Station Street, Baneasa Railway Station

Esplanade, Charles de Gaulle Square, Esplanade, Charles de Gaulle Square, Revolutiei Square – Romanian Revolutiei Square – Romanian

Athenaeum Athenaeum

Present Situation in BucharestPresent Situation in Bucharest

Increasing number of vehicles;Increasing number of vehicles; Explosive development of urban Explosive development of urban

traffic in Bucharest;traffic in Bucharest; Small number of parking lots as Small number of parking lots as

compared to present needs;compared to present needs; Vehicles standing on the first traffic Vehicles standing on the first traffic

lane;lane; Vehicles standing in inappropriate Vehicles standing in inappropriate

places and on green spaces.places and on green spaces.

The objectives of Bucharest The objectives of Bucharest Municipality in order to improve the Municipality in order to improve the

present situationpresent situation The construction of underground parking lots in The construction of underground parking lots in

the main functional macro-areas of the city;the main functional macro-areas of the city;

After analyzing the present situation, eight After analyzing the present situation, eight locations have been selected for the construction locations have been selected for the construction of underground parking lots in the following of underground parking lots in the following areas: Walter Maracineanu Square, Presei Libere areas: Walter Maracineanu Square, Presei Libere Square, Dorobanti Square, Alba Iulia Square, Square, Dorobanti Square, Alba Iulia Square, Edgar Quinet Street, Baneasa Railway Station Edgar Quinet Street, Baneasa Railway Station Esplanade, Charles de Gaulle Square, Revolutiei Esplanade, Charles de Gaulle Square, Revolutiei Square – Romanian Athenaeum.Square – Romanian Athenaeum.

Benefits brought to the community Benefits brought to the community by achieving the set objectivesby achieving the set objectives

The achievement of civilized parking The achievement of civilized parking conditions;conditions;

The providing of safety conditions for The providing of safety conditions for parked vehicles;parked vehicles;

The fluidization and optimization of the The fluidization and optimization of the traffic in Bucharest;traffic in Bucharest;

The increase in the safety degree of The increase in the safety degree of the participants in the public road the participants in the public road traffic;traffic;

The improvement of the urban aspect.The improvement of the urban aspect.

“Walter Maracineanu” Underground Parking

Walter Maracineanu Underground ParkingWalter Maracineanu Underground Parking

LocationLocation

The ground of the parking is located in the The ground of the parking is located in the nearby area of Cismigiu Park, Brezoianu nearby area of Cismigiu Park, Brezoianu Street and Aristide Demetriade Street, Street and Aristide Demetriade Street, forming the Walter Maracineanu Square forming the Walter Maracineanu Square from the 1from the 1stst district. district.

Walter Maracineanu Underground ParkingWalter Maracineanu Underground Parking

Main Technical Characteristics:Main Technical Characteristics: Number of levels: 2;Number of levels: 2; Number of parking lots: 276 places;Number of parking lots: 276 places; Level 1 - 134 places;Level 1 - 134 places; Level 2 - 142 places;Level 2 - 142 places; Constructed area:Constructed area: Underground level 1 - 4.775,00 sqm;Underground level 1 - 4.775,00 sqm; Underground level 2 – 4.775,00 sqm;Underground level 2 – 4.775,00 sqm; Developed area – 9.550,00 sqm;Developed area – 9.550,00 sqm; Height of level – 3.25 m;Height of level – 3.25 m; Constructed volume inside the precinct walls – 26.740 mConstructed volume inside the precinct walls – 26.740 m33;;

Structure:Structure: Steel concrete molded walls;Steel concrete molded walls; Steel concrete pillars and crossbars;Steel concrete pillars and crossbars; General grating - 7,60 m x 7,60 m;General grating - 7,60 m x 7,60 m; Foot passenger access – 3 pieces;Foot passenger access – 3 pieces; Car access – 1 piece;Car access – 1 piece;

Presei Libere Underground Parking

Presei Libere Underground ParkingPresei Libere Underground Parking

LocationLocation

The “Presei Libere” underground parking will The “Presei Libere” underground parking will be located in the area of the Presei Libere be located in the area of the Presei Libere Square.Square.

Presei Libere Underground ParkingPresei Libere Underground Parking

Main technical characteristics:Main technical characteristics: Number of levels: 3;Number of levels: 3; Number of parking lots: 1.633 places;Number of parking lots: 1.633 places; Level 1 – 541 places;Level 1 – 541 places; Level 2 – 541 places;Level 2 – 541 places; Level 3 – 551 places;Level 3 – 551 places; Constructed area:Constructed area: underground level 1: 19.980 sqm;underground level 1: 19.980 sqm; underground level 2: 19.980 sqm;underground level 2: 19.980 sqm; underground level 3: 19.980 sqm;underground level 3: 19.980 sqm; Developed area: 59.940 sqm;Developed area: 59.940 sqm; Height of level=3,25m.Height of level=3,25m.

Structure:Structure: steel concrete molded walls;steel concrete molded walls; steel concrete pillars and crossbars;steel concrete pillars and crossbars; general grating: 7,90 m x 8,00 m;general grating: 7,90 m x 8,00 m;

Dorobanti Underground ParkingDorobanti Underground Parking

Dorobanti Underground ParkingDorobanti Underground Parking

LocationLocation 1 1stst variant variant

The project proposes two variants for the The project proposes two variants for the construction of the Dorobanti underground construction of the Dorobanti underground parking, as it follows: parking, as it follows:

11stst variant variant –– The “Dorobanti” The “Dorobanti” underground parking will be located under underground parking will be located under the existent park and the Dorobanti Blvd.the existent park and the Dorobanti Blvd.

Dorobanti Underground Parking Dorobanti Underground Parking

Main technical characteristics Main technical characteristics 11stst variant variant

Number of levels: 2;Number of levels: 2; Number of parking lots - 360 places;Number of parking lots - 360 places; Level 1 – 180 places;Level 1 – 180 places; Level 2 – 180 places.Level 2 – 180 places. Constructed area: Constructed area: Level 1 - 6.686,00 sqm;Level 1 - 6.686,00 sqm; Level 2 - 6.686,00 sqm;Level 2 - 6.686,00 sqm; Developed area: 13.372,00 sqm;Developed area: 13.372,00 sqm; Height of level=3,00m.Height of level=3,00m.

Structure:Structure: steel concrete monolith frames system;steel concrete monolith frames system; steel concrete walls.steel concrete walls.

The entrance and exit is done through 3 platforms, 2 of them (entrance and The entrance and exit is done through 3 platforms, 2 of them (entrance and exit) are placed on Dorobantilor Square Street and the third one is from exit) are placed on Dorobantilor Square Street and the third one is from Dorobanti Blvd. on the route towards Charles de Gaulle Square.Dorobanti Blvd. on the route towards Charles de Gaulle Square.

Dorobanti Underground ParkingDorobanti Underground Parking

LocationLocation 22ndnd variant variant

22ndnd variant variant – – The Dorobanti underground The Dorobanti underground parking will be located under Dorobanti parking will be located under Dorobanti Blvd. Blvd.

Dorobanti Underground Parking Dorobanti Underground Parking

Main technical characteristics – Main technical characteristics – 2nd variant2nd variant

Number of levels: 2;Number of levels: 2; Number of parking lots: 246 places;Number of parking lots: 246 places; Level 1 – 115 places;Level 1 – 115 places; Level 2 – 131 places.Level 2 – 131 places. Constructed area: Constructed area: Level 1 – 4.910,00 sqm;Level 1 – 4.910,00 sqm; Level 2 – 4.480,00 sqm;Level 2 – 4.480,00 sqm; Developed area: 9.390,00 sqm;Developed area: 9.390,00 sqm; Height of level: 3,00 m.Height of level: 3,00 m.

Structure: Structure: steel concrete monolith frames system;steel concrete monolith frames system; steel concrete walls.steel concrete walls.

Alba Iulia Underground ParkingAlba Iulia Underground Parking

Alba Iulia Underground ParkingAlba Iulia Underground Parking

LocationLocation

The “Alba Iulia” underground parking will The “Alba Iulia” underground parking will be located in the area of Alba Iulia Square, be located in the area of Alba Iulia Square, under the present traffic circle.under the present traffic circle.

Alba Iulia Underground ParkingAlba Iulia Underground Parking

Main technical characteristicsMain technical characteristics Number of levels: 3;Number of levels: 3; Number of parking lots: 2.190 places;Number of parking lots: 2.190 places; Level 1 – 730 places;Level 1 – 730 places; Level 2 – 730 places;Level 2 – 730 places; Level 3 – 730 places.Level 3 – 730 places. Constructed area:Constructed area: underground level 1: 21.900 sqm;underground level 1: 21.900 sqm; underground level 2: 21.900 sqm;underground level 2: 21.900 sqm; underground level 3: 21.900 sqm.underground level 3: 21.900 sqm. Developed area: 65.700 sqm;Developed area: 65.700 sqm; Height of level: 2.20 m.Height of level: 2.20 m.

Structure:Structure: pillars and broad crossbars executed in monolith steel concrete;pillars and broad crossbars executed in monolith steel concrete; steel concrete walls;steel concrete walls; barrets and molded walls;barrets and molded walls; steel concrete floors.steel concrete floors.

Edgar Quinet Underground ParkingEdgar Quinet Underground Parking

Edgar Quinet Underground ParkingEdgar Quinet Underground Parking

LocationLocation

The The „Edgar Quinet”„Edgar Quinet” underground parking underground parking will be located under Edgar Quinet and will be located under Edgar Quinet and Biserica Enei streets.Biserica Enei streets.

Edgar Quinet Underground Parking Edgar Quinet Underground Parking

Main technical characteristicsMain technical characteristics Number of levels: Number of levels:

• 2 levels under Edgar Quinet Street;2 levels under Edgar Quinet Street;• 3 levels under Biserica Enei Street.3 levels under Biserica Enei Street.

Number of parking lots: Number of parking lots: • 380 places for cars;380 places for cars;• 25 places for motorcycles.25 places for motorcycles.

Constructed area: 6.147 sqm;Constructed area: 6.147 sqm; Developed area: 14.521 sqm;Developed area: 14.521 sqm; Height of level: 2.40 m.Height of level: 2.40 m.

Structure:Structure: exterior and interior monolith steel concrete walls;exterior and interior monolith steel concrete walls; intermediary walls and steel concrete pillars;intermediary walls and steel concrete pillars; steel concrete floors.steel concrete floors.

The entrance in the underground parking will be made from Balcescu Blvd. The entrance in the underground parking will be made from Balcescu Blvd. and the exits will be placed on Academiei Street and Biserica Enei Street.and the exits will be placed on Academiei Street and Biserica Enei Street.

Baneasa Railway Station Esplanade Underground ParkingBaneasa Railway Station Esplanade Underground Parking

Baneasa Railway Station Esplanade Baneasa Railway Station Esplanade Underground ParkingUnderground Parking

LocationLocation

““Baneasa Railway Station Esplanade” Baneasa Railway Station Esplanade” underground parking will be located in underground parking will be located in front of the Baneasa Railway Station, front of the Baneasa Railway Station, on the present esplanade.on the present esplanade.

Baneasa Railway Station Esplanade Baneasa Railway Station Esplanade Underground Parking Underground Parking

Main technical characteristicsMain technical characteristics Number of levels: 2Number of levels: 2 Number of parking lots: 100 places;Number of parking lots: 100 places; Level 1 – 50 places;Level 1 – 50 places; Level 2 – 50 places;Level 2 – 50 places; Constructed area: 2.675 sqm;Constructed area: 2.675 sqm; Developed area: 5.351 sqm;Developed area: 5.351 sqm; Height of level: 2.20 m.Height of level: 2.20 m.

Structure:Structure: pillars and broad crossbars executed in monolith steel concrete;pillars and broad crossbars executed in monolith steel concrete; steel concrete walls;steel concrete walls; steel concrete floors.steel concrete floors. For the access of vehicles, the project proposes the execution of one-way For the access of vehicles, the project proposes the execution of one-way

circulation platforms, with one or two traffic lanes. circulation platforms, with one or two traffic lanes. For the exit of vehicles, the project proposes the execution of some For the exit of vehicles, the project proposes the execution of some

platforms, as it follows:platforms, as it follows: right side – one way;right side – one way; one way curve.one way curve.

Charles de Gaulle Underground ParkingCharles de Gaulle Underground Parking

Charles de Gaulle Underground ParkingCharles de Gaulle Underground Parking

LocationLocation

The “Charles de Gaulle” underground parking will be located in the area of The “Charles de Gaulle” underground parking will be located in the area of the Charles de Gaulle Square.the Charles de Gaulle Square.

The construction of the “Charles de Gaulle” parking implies the execution The construction of the “Charles de Gaulle” parking implies the execution of 2 separate sections (the Eastern Section and the Western Section) on 3 of 2 separate sections (the Eastern Section and the Western Section) on 3 levels: 1levels: 1stst level-commercial area, 2 level-commercial area, 2ndnd and 3 and 3rdrd levels – parking area. levels – parking area.

Eastern SectionEastern Section The construction will be situated at the crossroads of Calea Dorobantilor The construction will be situated at the crossroads of Calea Dorobantilor

Blvd., Aviatorilor Blvd. and Primaverii Blvd. It has 2 entrances, fully Blvd., Aviatorilor Blvd. and Primaverii Blvd. It has 2 entrances, fully equipped, and technical spaces. equipped, and technical spaces.

Western SectionWestern Section The construction will be located at the crossroads of C-tin Prezan Blvd. and The construction will be located at the crossroads of C-tin Prezan Blvd. and

Aviatorilor Blvd. It has 2 entrances, fully equipped, and technical spaces.Aviatorilor Blvd. It has 2 entrances, fully equipped, and technical spaces.

Charles de Gaulle Underground Parking Charles de Gaulle Underground Parking Main technical characteristicsMain technical characteristics

Number of parking lots: 831 vehicles;Number of parking lots: 831 vehicles; Developed area on 2 levels: 25.752 sqm;Developed area on 2 levels: 25.752 sqm; Constructed volume inside the precinct walls: 80.000 mConstructed volume inside the precinct walls: 80.000 m33;; EASTERN SECTION: 2 levels - 363 places;EASTERN SECTION: 2 levels - 363 places; WESTERN SECTION: 2 levels - 468 places.WESTERN SECTION: 2 levels - 468 places. Area of foot passenger access covered at the surface: Western Section-373 sqm(6 Area of foot passenger access covered at the surface: Western Section-373 sqm(6

pieces) / Eastern Section-301 sqm(4 pieces);pieces) / Eastern Section-301 sqm(4 pieces); Area of over-ground access covered at the surface: Western Section-493 sqm / Eastern Area of over-ground access covered at the surface: Western Section-493 sqm / Eastern

Section–301 sqm;Section–301 sqm; Area of foot passenger access in the underground: 4.061 sqm;Area of foot passenger access in the underground: 4.061 sqm; Area of commercial spaces (Level 1 underground): 14.295 sqm , of which 1.613 sqm/ Area of commercial spaces (Level 1 underground): 14.295 sqm , of which 1.613 sqm/

residual closed spaces;residual closed spaces; Parking area - Level 2: Western Section - 7.330 sqm / Eastern Section – 5.546 sqm;Parking area - Level 2: Western Section - 7.330 sqm / Eastern Section – 5.546 sqm;  Parking area – Level 3: Western Section - 7.330 sqm / Eastern Section – 5.546 sqm;Parking area – Level 3: Western Section - 7.330 sqm / Eastern Section – 5.546 sqm; Total area of the parking: Western Section–14.660 sqm / Eastern Section–11.092 sqm;Total area of the parking: Western Section–14.660 sqm / Eastern Section–11.092 sqm;  Parking lots Level 2: Western Section – 234 places / Eastern Section – 182 places;Parking lots Level 2: Western Section – 234 places / Eastern Section – 182 places;  Parking lots Level 3: Western Section – 234 places / Eastern Section – 181 places;Parking lots Level 3: Western Section – 234 places / Eastern Section – 181 places;  Total number of parking lots: 831 places.Total number of parking lots: 831 places.Structure:Structure: pillars and broad crossbars executed in monolith steel concrete;pillars and broad crossbars executed in monolith steel concrete; steel concrete walls;steel concrete walls; steel concrete floors. steel concrete floors.

Revolutiei Square – Romanian Athenaeum Underground Revolutiei Square – Romanian Athenaeum Underground ParkingParking

Revolutiei Square – Romanian Athenaeum Revolutiei Square – Romanian Athenaeum Underground ParkingUnderground Parking

Location Location 11stst variant variant

The “Revolutiei Square – Romanian Athenaeum” underground parking will be located in The “Revolutiei Square – Romanian Athenaeum” underground parking will be located in the area of the Revolutiei Square and the Romanian Athenaeum, 1the area of the Revolutiei Square and the Romanian Athenaeum, 1stst district. district.

The project has in view 2 variants of developing the parkingThe project has in view 2 variants of developing the parking::

11stst variant variant –– The “Revolutiei Square – Romanian Athenaeum” underground parking will The “Revolutiei Square – Romanian Athenaeum” underground parking will have 2 levels;have 2 levels;

The underground construction of the entire parking is formed of 3 main sectionsThe underground construction of the entire parking is formed of 3 main sections (P1 (P1 SectionSection, P2, P2 Section Section andand P3 P3 Section Section)), functionally connected at the 1, functionally connected at the 1stst and 3 and 3rdrd levels and levels and segmented by the main collector at the 2segmented by the main collector at the 2ndnd level underground level underground..

P1P1 Section Section – – the construction will be delimited by Episcopiei Street, the Romanian the construction will be delimited by Episcopiei Street, the Romanian Athenaeum, Cina Terrace and C.A. Rosetti Street. The Southern side will be adjacent to Athenaeum, Cina Terrace and C.A. Rosetti Street. The Southern side will be adjacent to Victoriei Blvd.Victoriei Blvd.

P2P2 Section Section – – the construction will be delimited by C.A. Rosetti Street, the University the construction will be delimited by C.A. Rosetti Street, the University Library, Dem. I. Dobrescu Street and adjacent to Victoria Blvd.Library, Dem. I. Dobrescu Street and adjacent to Victoria Blvd.

From the functional point of view, the access to this section will be done from the other From the functional point of view, the access to this section will be done from the other sections.sections.

P3P3 Section Section – – the construction will be delimited by Dem. I. Dobrescu Street, Victoriei Blvd., the construction will be delimited by Dem. I. Dobrescu Street, Victoriei Blvd., the artery adjacent to the Senate. the artery adjacent to the Senate.

Revolutiei Square – Romanian Athenaeum Revolutiei Square – Romanian Athenaeum Underground Parking Underground Parking

Main technical characteristics Main technical characteristics 11stst variant variant

Number of levels: 2;Number of levels: 2; Number of parking lots: 1342 places;Number of parking lots: 1342 places; Constructed area: 20.250 sqm;Constructed area: 20.250 sqm; Developed area (2 levels): 40.500 sqm;Developed area (2 levels): 40.500 sqm; The volume inside the precinct walls: 287.550 mThe volume inside the precinct walls: 287.550 m33;; Height of level – 2.20 m.Height of level – 2.20 m.

Structure:Structure: monolith steel concrete pillars and crossbars;monolith steel concrete pillars and crossbars; steel concrete walls;steel concrete walls; steel concrete floors.steel concrete floors.

Revolutiei Square – Romanian Athenaeum Revolutiei Square – Romanian Athenaeum Underground ParkingUnderground Parking

Location Location 22ndnd variant variant 22ndnd variant variant – – InIn this variant, the project has in view the preservation of the this variant, the project has in view the preservation of the

Romanian Athenaeum Park and the providing of general traffic on Victoriei Blvd. on Romanian Athenaeum Park and the providing of general traffic on Victoriei Blvd. on at least two ways.at least two ways.

The “Piata Revolutiei – Romanian Athenaeum” underground parking will have 3 The “Piata Revolutiei – Romanian Athenaeum” underground parking will have 3 levels (without the Athenaeum Park and Victoriei Blvd., which is opened for the levels (without the Athenaeum Park and Victoriei Blvd., which is opened for the general traffic). general traffic).

The underground construction of the entire parking is formed of 3 main sections, The underground construction of the entire parking is formed of 3 main sections, functionally connected at the 1functionally connected at the 1stst and 3 and 3rdrd levels and segmented by the main collector levels and segmented by the main collector at the 2at the 2ndnd level underground. level underground.

P1P1 Section Section – – the construction will be delimited by Episcopiei Street, Romanian the construction will be delimited by Episcopiei Street, Romanian Athenaeum Park, Cina Terrace and C.A. Rosetti Street. The Southern wing is Athenaeum Park, Cina Terrace and C.A. Rosetti Street. The Southern wing is adjacent to Victoriei Blvd. adjacent to Victoriei Blvd.

P2P2 Section Section – – the construction will be delimited by C.A. Rosetti Street, the University the construction will be delimited by C.A. Rosetti Street, the University Library, Dem. I. Dobrescu Street and adjacent to Victoriei Blvd. (used for the Library, Dem. I. Dobrescu Street and adjacent to Victoriei Blvd. (used for the general traffic in this 2general traffic in this 2ndnd variant). variant).

From the functional point of view, the access will be done from the other sections.From the functional point of view, the access will be done from the other sections. P3P3 Sections Sections – – the construction will be delimited by Dem. I. Dobrescu Street, Victoriei the construction will be delimited by Dem. I. Dobrescu Street, Victoriei

Blvd. and the artery adjacent to the Senate. Blvd. and the artery adjacent to the Senate.

Revolutiei Square – Romanian Revolutiei Square – Romanian Athenaeum Underground ParkingAthenaeum Underground Parking

Main technical characteristics Main technical characteristics 22ndnd variant variant Number of levels: 3 (without the Athenaeum Park and Victoriei Blvd. used Number of levels: 3 (without the Athenaeum Park and Victoriei Blvd. used

for the general traffic);for the general traffic); Number of parking lots: 1.650 places;Number of parking lots: 1.650 places; Constructed area: 17.200 sqm;Constructed area: 17.200 sqm; Developed area (3 levels): 49.000 sqm;Developed area (3 levels): 49.000 sqm; Volume inside the precinct walls: 484.590 mVolume inside the precinct walls: 484.590 m33;; Height of level: 2.20 m;Height of level: 2.20 m; The underground construction of the entire parking is formed of 3 main The underground construction of the entire parking is formed of 3 main

sections, functionally connected at the 1sections, functionally connected at the 1stst and 3 and 3rdrd levels and segmented by levels and segmented by the main collector at the 2the main collector at the 2ndnd level underground. level underground.

Structure:Structure: monolith steel concrete pillars and broad crossbars;monolith steel concrete pillars and broad crossbars; steel concrete walls;steel concrete walls; steel concrete floors.steel concrete floors.

Through this DATA ROOM, Bucharest Through this DATA ROOM, Bucharest Municipality had the pleasure to present Municipality had the pleasure to present the projects regarding the construction of the projects regarding the construction of some high capacity underground parking some high capacity underground parking lots that meet international standards. lots that meet international standards.

Parking facilities will be thus created in the Parking facilities will be thus created in the crowded areas of the city, leading to the crowded areas of the city, leading to the decongestion of the cars and passengers decongestion of the cars and passengers traffic, providing comfort and safety to traffic, providing comfort and safety to those who live or pass by the respective those who live or pass by the respective areas. areas.

Thanking you for your attention and interest, please Thanking you for your attention and interest, please accept the expression of our highest consideration.accept the expression of our highest consideration.