PRESERVATION FOR
MACHINERY
![Page 2: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/2.jpg)
OUTLINE SCOPE OF WORK PRESERVATION ACTIVITY ORGANIZATION CHART OF
PRESERVATION SCHEDULE PRESERVATION REPORT OF PRESERVATION
![Page 3: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/3.jpg)
SCOPE OF WORK
PRESERVATION FOR STATIC/VESSEL PRESERVATION FOR ROTATING/MACHINERY PRESERVATION FOR MOTOR
![Page 4: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/4.jpg)
PRESERVATION ACTIVITY PRESERVATION FOR STATIC
STATIC EQUIPMENTS WILL BE PRESERVED BY USING VAPOUR PHASE INHIBITORS (VPI) OR NITROGENT PRESSURE .
NITROGENT PRESERVATION SHALL BE APPLIED UNTIL COMPLETION OF PIPE CONNECTION.
![Page 5: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/5.jpg)
PRESERVATION ACTIVITY PRESERVATION FOR ROTATING
1. PUMP AND DRIVE SHAFTS SHALL BE HAND ROTATED ONCE A MONTH USING CORRECT TOOLS SUCH AS STREP WRENCH .
2. LUBE OIL SHALL BE CHANGED BEFORE MECHANICAL RUNNING TEST
3. GREASE SHALL BE ADDED AND DRAIN OUT DURING MECHANICAL RUNNING TEST
![Page 6: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/6.jpg)
PRESERVATION FOR MOTOR INSULATION RESISTANCE VALUES OF
EACH WINDING FOR ALL MOTORS SHALL BE MEASURED AND RECORD AT LEAST PRIOR TO INSTALLATION AND PRIOR TO SOLO RUN/MRT . THE MEASUREMENT SHALL BE RECORDED ONCE A MONTH.
MOTOR SHAFT SHALL BE HAND TURNING ONCE A MONTH
SPACE HEATER FOR MOTOR SHALL BE TURNED ON ALL THE TIME TO WARM THE MOTOR AND AVOID INCREASING HUMIDITY INSIDE THE TERMINAL BLOCK
![Page 7: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/7.jpg)
ORGANIZATION CHART
![Page 8: Preservation for Machinery](https://reader034.fdocuments.in/reader034/viewer/2022051316/5695d3c31a28ab9b029f18b7/html5/thumbnails/8.jpg)
SCHEDULE AND REPORT FOR PRESERVATION
SCHEDULE FOR PRESERVATION REPORT OF PRESERVATION
- REPORT OF PRESERVATION WILL SUBMITTED ONCE A MONTH
- PRESERVATION WILL BE RECORDED BY QC TEAM