Page 1: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Presentation on the

Salient Aspects of

STATE DATA CENTRE

Page 2: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

General Overview

SDC is identified as one of the important element of the core infrastructure for supporting e-Governance initiatives of NeGP for consolidating services, applications and infrastructure to provide efficient electronic delivery of G2G, G2C and G2B services.

SDC would act as a central repository for consolidation of the disaggregated resources.

The physical space required for the Data Centre would be the responsibility of the State. The Back-End computerization of the Departments would be the responsibility of the State.

Page 3: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

General Overview (Contd.)

The architecture of a Data Centre would be such as to provide a model environment capable of handling the typical business model of dynamic change supporting multiple G2G, G2C, G2B, B2C activities across all channels like CSCs, portals, kiosks etc.

A centralized management and monitoring system (tool) capable of doing fault management, configuration management, security management, report generation, alerting, monitoring the critical servers, log monitoring and Data Centre network and security infrastructure etc. would be part of the Data Centre.

Page 4: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

General Overview (Contd.)The high availability is one of the critical requirements of the Data Centre. As the systems are centralized at Data Centre, the State would be required to establish appropriate Disaster Recovery and Business Continuity Plan (DR and BCP) along with appropriate data backup and recovery infrastructure. Initially, State should plan for off-site Back-up mechanism for their DR strategy and depending upon mission critical requirement the BCP requirement would be met through the design architecture of the primary Data Centre itself. The objective of the Scheme is to create a secure close user group (CUG) government network for the purpose of delivering G2G and G2C services.

Page 5: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

General Overview (Contd.)

SDC scheme has been approved by Government with an outlay of Rs.

1623.20 Crores over a period of 5 years. 

The Disaster Recovery (DR) arrangement has been envisaged to be

established and provided by NIC.

Page 6: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Components of the SSDCCAPEX Components

Site Preparation Support Infrastructure (HVAC, Fire Suppression and Detection, DG sets, UPS, Electrical works, Access Control & CCTV, BMS, Water Leak Detection System etc.)IT Infrastructure Routers, Network Switches, IPS, UPS, LAN Passive Components)Computing Resources(Web Servers, Application Servers, Storage, DB Servers)

Page 7: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

OPEX ComponentsComponents in purview of the RFP

Facility Management Expenditure License and Software Cost

Components not in purview of the RFP

Administrative Costs Diesel Running Cost Electricity Running Cost Bandwidth Cost

Components of the SSDC(Contd.)

Page 8: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Salient Features of the RFP Eligibility Criteria Scope of Work Estimated Timelines Service Level Agreement Evaluation Criteria Solution Architecture Bill of Material Technical Specifications – IT Components Technical Specifications – Non IT Components Compliance Specifications

Page 9: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Salient Features of the RFP(Contd.)

Model on a Turnkey basis(Site Preparation, Operation and Maintenance)

Duration of the Project – 5 years

Submission of Pre-Qualification,Technical and Financial Bids

Selection Methodology – Quality cum cost based selection

Pre-qualification - Compliance to Eligibility Criteria ,Technical Evaluation (a minimum of 70 marks), Key evaluation parameters - Relevant past experience, solution / design & architecture proposed, solution scalability, SLA, manpower proposed etc.

Commercial bid - Quality-cum-Cost based selection

Service oriented approach SLAs for performance based monitoringPre-Qualification CriteriaTechnical Evaluation Crteria

Page 10: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

SCOPE OF WORKBasic Infrastructure ServicesManaged Services Monitoring and Management Services Help Desk Services Server Monitoring (Hardware & Operating

System), Administration & Management Services Database Administration & Management Services Storage Administration & Management Services Security Administration Services Network Monitoring Services Back Up / Restore Services Vendor Management Services

Page 11: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Scope of Work (Contd.)Roles and Responsibilities during Operation & Maintenance Phase

Project Management System Administration & Management Storage Administration Security Administration Database Administration Application Monitoring, Maintenance &

Administration Change Management Help Desk and Monitoring Team

Page 12: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Other Important Salient Points

Bill of MaterialAmendments in the

Commercial ,Technical & Bid Process Specifications

Manpower Resources Timelines

Implementation Schedule

Page 13: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Site Progress Update up to 30th Sept 2010 for the Sikkim State Data Centre

Page 14: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Work Completed

Civil

• Fire Retarded Door Installation Work• Insulation work in Server Farm area - True Ceiling

& True Floor• Granite flooring work in office area • False flooring in Server, NOC & UPS room• False ceiling in Server room and office area• Gypsum Board partition • One coat of non fire rated color completed in

office area. • DG foundation• Guard wall behind DG foundation• One coat applied on external walls

Page 15: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Electrical & BMS• Electrical Conduiting and Cabling, • LT Panel, UPS, PDU, AMF panel & battery

rack positioning.• 20 Nos. Earth Pits completed. • Lighting Fixture Installed and green • SDC Internal cabling for LT Panel, UPS & PDU• Cable tray for DG & Transformer power

cables• PAC Indoor - Outdoor units installed, copper

piping & Pressure testing Completed• CAC outdoor units installed, copper piping

Completed. • Cabling for CCTV, Access control, Smoke

detectors • VESDA and Gas suppression piping tested• Conduiting for rodent repellent system

• Electrical Conduiting and Cabling, • LT Panel, UPS, PDU, AMF panel & battery

rack positioning.• 20 Nos. Earth Pits completed. • Lighting Fixture Installed and green • SDC Internal cabling for LT Panel, UPS & PDU• Cable tray for DG & Transformer power

cables• PAC Indoor - Outdoor units installed, copper

piping & Pressure testing Completed• CAC outdoor units installed, copper piping

Completed. • Cabling for CCTV, Access control, Smoke

detectors • VESDA and Gas suppression piping tested• Conduiting for rodent repellent system

Work Completed

Page 16: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Work to be Complete / In progress

Civil

Fire rated area paint & painting of outside walls.Aluminum frame door installation for cabins.

NOC room fire rated glass installation Furniture laminated sheet work. Installation of Racks

Electrical & BMS

Transformer & DG Cabling to LT panel. LT Panel connectivity, Battery installation, UPS connectivity DG Installation BMS equipments and panel installation

Page 17: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Material Delivery Status

Material Delivered as on date

• Civil Work related materials, Doors, Furniture Items, False Floor & Ceiling.• Electrical Work related material, PAC, CAC, UPS, LT Panel, PDU, Racks,

Novec Gas Cylinder.• Licenses from Microsoft, Red Hat, SQL & Oracle• IT Hardware & networking (IBM Servers, SAN, SAN Switches, 3-Com

Network Equipments)

Material under dispatch / In Transit

• DG Sets, BMS equipment and panels• Chairs for SDC. NOC Room Fire rated vision glass.• Syslog server

Page 18: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Current Challenges

• Water seepage issue in UPS room coming from third & second floor.

• DG Foundation area road clearance for DG installation.

Currently two temporary canteens are located there.

• SDC wants to remove canteens and install DG from15th to 19th Oct 2010 being holidays.

Page 19: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Lighting Fixture and False Ceiling

Page 20: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

AMF Panel Positioning and Incomer cable Ladder Tray

Page 21: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Fire Rated Doors.

Page 22: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

Furniture

Page 23: Presentation  on the  Salient Aspects of STATE  DATA CENTRE

PAC and PDU Positioning

Page 24: Presentation  on the  Salient Aspects of STATE  DATA CENTRE