PRESENTATION OF THE ACTIVITY
OF “ETAP - ADRESS” AD
the company “Etap - Adress” AD has been registered in Sofia on November 2, 1994 under company case No. 20183 and
address in Sofia, Oborishte municipality, 138 Vasil Levski blvd. the company has a registered capital of 2 332 000 bGN
allocated into 23 320 /twenty three thousand, three hundred and twenty/ registered voting share with face value of 100 bGN. the company’s main activity is domestic and
international passenger road transport. As of January 2000, the company is a member of the
National association of the bus carriers in bulgaria. ”Etap - Adress” AD is licensed for international carriage of
passengers since 1998 and from August 12.2002, has a license for a tourist agent.
Since January 14.2004, the company is quality certified after ISO 9001:2000.
the activity is carried out by a qualified staff of 250 persons. the company covers daily 25 regular bus lines
and 10 seasonal lines for carriage of passengers in bulgaria and some international bus lines. the transport services are rendered
with company owned buses equipped with audio-video technique, offering catering and providing comfort and luxury.
the high requirements for technical maintenance of the bus fleet and the professional qualification of the staff
are guarantee for the quality of the offered services. the exceptionally well-developed schedules and lines offer the
specific requirements for inter-city and international transport to the highest possible percentage of the population.
“Etap - Adress” AD has built its own repair depot situated in Sofia, 10 Lavandula Str., “Malashevtsi” residential district
authorized by tEMSA SANAYI tICArEt A.S. for technical maintenance of the following makes: tEMSA DIAMOND AND tEMSA SAFIr.
the company has more than 40 fully - equipped offices in the country.
In June 2003, “Etap - Adress” AD made an investment in the company “Central bus station” AD. It acquired 37.5%. In October 2003, the company made a deal – acquired
81 877 shares representing 100% of the capital of “Dodo beach” EOOD (with the former name
“Mt-PrOLEt” EOOD) – Kiten, district bourgas. Since November 2004, “Etap - Adress” AD has a permission from
the Ministry of Finance to implement an activity as operator of food vouchers.
From February 2005, the company has concluded a contract with Ministry of regional Development and Public works for
granting a concession over part of the sea shore – beach “Kiten - Yug” for a period of 10 years.
With decision of the Council of Ministers, “Etap - Adress” AD was granted a concession on part of the mineral water – an
exceptional state property from the well “barzia” – the village of barzia, berkovitsa municipality for a period of 15 years.
Since 2006, the company is an owner of the balneotherapy center in the village of barzia, berkovitsa municipality.
On May 8.2006, the company issued a emission of corporate shares.
As of November 29.2006, the company has a confirmed prospect for secondary public offering of corporate debentures
of the same emission and is entered as emittant in the public register of the Committee for financial surveillance.
the accumulated funds have been used for the construction of factory for producing and bottling of min-
eral water in the village of barzia, berkovitsa municipality, Montana district and for the construction of
office building in Sofia at 138 Vasil Levsky blvd. On May 16.2007, the factory for producing and bottling of mineral water in the village of barzia, berkovitsa municipality, district of Monatana was officially opened and the construction
of the office building is still in progress as atpresent the finishing works are being executed.
to the present moment, the company has no overdue obligations to taxation and other government institutions as
well as to the employed personnel. All the staff is working with labor contracts and
guaranteed social security. this proves out stable financial equilibrium and
possibility to accumulate in case of necessity additional investment funds from bank and
company /local and international/ credits.
“DODO BEACH” club is situated in
the Kiten resort complex, burgas region,
immediately adjacent to the beach strip “Kiten - Yug”.
this is the ideal choice for everyone seeking a
combination of rest beside the sea (sun, sand, sea) and
refined luxury. the complex, offers its
guests wonderful conditions for complete
rest and recreation, thanks to its attractive
interior, coziness, incorporated
establishments, and perfect service.
Your vacation can come alive with great experiences and
emotions, if you place your trust in our refined
taste and vast international experience.
Accommodationsthe two-floor hotel
section has one apart-ment, 21 double rooms, with the possibility of
installing an additional bed.
All rooms are furnished in accordance with the requirements of the
international tourism world standards. Here the Club’s guests shall discover unbelievable peace,
comfort and coziness. Each room is equipped with an independent WC and bathroom.
Additional outfitting:• TV with satellite programming;
• Telephone; • Generously stocked refrigerator
with mini bar; • Air conditioning;
• Safe; • Balcony (with a view to the
sea or the pool); • Hair drier;
• Vast assortment of toiletries; • Robes and slippers;
• Internet; Additional services:
• Fitness Center - Sauna, • Swimming pool
• Lobby bar • Restaurant
Offering the Club’s guests its great variety of seafood
delicacies, Mediterranean and Greek cuisine.
the restaurant has a large air conditioned hall and a garden
with a view to the sea.
“DODO BEACH” club
1. the natural mineral water “KOM” is obtained from water field – Exploitation well №1, village of barzia, berkovitsa municipality, District of Montana.
the village of barzia is situated in the north-west of bulgaria, district of Montana. Mineral water sprang up while splitting granite by the river, above the village. First started drilling works and then balneological resort of local
significance was built. the highest altitude above seal-level is the Kom Peak – 2016 meters. the mineral water is of atmospheric infiltration origin.
the charging area of the mineral water deposit is located along the ridge of the balkan Mountain range between the todorini Kukli and the Kom Peaks,
depending on the atmospheric rainfalls. the barzia mineral water is clear, colourless, with a temperature of 32°C at a depth of 425 m. the total min-eralization of the water is 0.260 mg/l, being characterized as hypothermal,
alkaline (pH 9.1), hydrocarbonate-sulphate-sodium, fluoric (2 mg/l) and silicon (H2SiO3 – 99 mg/l). the mineral water therapeutic and prophylactic
propertiesare established by its hypotonic activity and by the presence of hydrocarbonate, sulphate, sodium and fluoric ions.
the balneotherapy with this water has effect upon the following diseases: - renal-urological (kidney-calculus disease, chronic pyelonephritis);
- gastrointestinal (chronic gastritis, ulcer, enterocolitis); - biliary-liver (biliary-calculus disease, chronic hepatitis,
post-operative conditions, etc.) - metabolitic-endocrinal (gout, diabetes, obesity).
2. the capacity of water field Exploitation well №1, village of barzia, berkovitsa municipality, District of Montana is as follows: total annual
exploitation resource in the volume of 21 600 cub.m mineral water with daily flow rate of 1 L/sec. and peak flow rate of 2.5 L /sec. for 250 days, but not
less than 12 600 cub. m mineral water. the capacity is not influenced by the season.
3. the water quality and composition is evidenced with Certificate 17 / 26.05.2006 issued by the Ministry of Health.
WA
TER
the two-storey production-storage building for bottling of natural mineral water “KOM” in the village of barzia,
berkovitsa municipality, District of Montana is situated on unfolded built-up area of 1238,50 sq. m. the built-up area is
755,50 sq.m and the built-up volume is 5716,30 cub.m.
the building construction is of mass concrete - columns, girders and inter-story and roof slabs.
On level ±0,00 are situated the production premises, intermediate storehouse for the finished products,
compressor and electricity room, rMr and washrooms for the staff. On the second floor, level +5,28 are situated the office
rooms, microbiological laboratory and sanitary units.
As of June 2008, expanding the scope of its activity by turning in production new packing a new storehouse for
materials and ready stock was set apart with approximate built-up area of 000 кв. м.
Design solutions for meeting the sanitary-hygiene and fire-fighting regulations:
1. Safety of work
the working premises and working places
provide safe conditions of work and
health care for the employees.
2. Microclimate
In view of meeting the requirements of the
Good manufacturing practice are envisaged systems for
heating, mechanical ventilation and air-conditioning.
In order to secure the thermal efficiency of the building
an additional thermal insulation will be placed
on the facade walls and on the roof.
3. Natural illumination
the norms for illumination of the working
places and passages are satisfied by
natural and artificial lighting.
4. Noise and vibrations
the noise and vibration characteristics of
the intended equipment will not exceed
the established permitted level of 85db.
5. Sanitary service
the sanitary rooms for the staff are situated
on the first floor and are developed according
to the requirements of the Good manufacturing
practice with two locker-rooms.
6. Fire precaution
the building has a first degree fire resistance
- mass concrete load-bearing construction and
side walls of aerated concrete.In their main part
the production and service premises have categories of
fire and explosion hazards D, NPO and b, P, Pa.
the building does not have explosion hazardous area.
the necessary number of emergency exits is taken into
account as well as the respective fire-fighting equip-
ment – manual water pumps and
powder fire-extinguishers on each floor.
BU
ILD
ING
• The mineral water is treated with ozone-enriched air - Attachment № 3 Detailed design of ozone-generator with hydraulic unit OXN 40 HС.
• The production line consists of the following machines:
1. blow-moulding machine КОZМЕ KSb 3000 S1 2. Container for moulds PFA 15003. Compressor unit KAISEr 4. Cooler tAE EVO 0515. Compressor CSD 102/1160 w6. Air receiver 500 L/1660 w7. Air receirver 900 L/4460 w8. Cooling drier ТHP 146 b PEt9. booster N 753 – G10. Moulds 0,330L; 0,500L; 1,500L.11. Air conveyer Lt + control panel12. Filling machine monoblock type NH platform 24/24/613. Conveyor transporter for bottles КОZМЕ Ft + wetting system 14. Packing machine model EUrOFILM 20 transporter for packings15. Labeling machine К745-М16 from Krones 16. Packing machine model rOtOPLAt SOLLI from rObOPACK S.A. republic of San Marino
the bottling machine has a capacity of 4 500 pcs/hour. It is a fully automated process. According to the requirements of the Ministry of health the equipment is serviced every week.
• The laboratory equipment consists of:1. Laminar box – bIOAIr, providing sterile working environment2. Vacuum pump – rocker 300, providing vacuum filtration3. Funnel for vacuum filtration – for sample filtration4. Autoclave Certo Clav – sterilizes the laboratory glassware and nutrient media for microbiological analyses5. thermal cabinets tr CrOWN, for providing temperature of cultivation6. Water bath - ВБ 80, for preparation of nutrient media and microbiological control7. Photometer – NOVA 60, for performing of chemical analyses8. thermal reactor – tr 320, for pyrolytic breakdown of the analysis samples9. Distiller – Vaki Chim
the laboratory analysis of the bottled water is made every hour and secures a constant control on the microbiological and physicochemical characteristics which guarantees the product quality.
EQUIPMENT
FUtUrE INtENtIONS FOr INVEStMENtWe intend to expand the production range of mineral water „КОМ” putting on the market glass bottles of 0.33l; 0.5l and 0.75l as well.
PR
OD
UC
TS
tankard 120 ml
tankard 200 ml
bottle 0.33 l
bottle 0.5 l
bottle 1.5 l
bottle 3 l
bottle 5 l
bottle 8 l
bottle 10 l
bottle 19 l
tHE FINISHED PrODUCtS are offered in the following packing