    Ultrasonic Machining for

    Nuclear Fabrication and PWSCCMitigation

    Matt Short - EWI

    Technology Leader

    [email protected]

    ATI CSC11

    Paper 8H 09/29/2011

    Steve Levesque

    Project Manager

    [email protected]

  • 7/24/2019 Presentation 8h Levesque

    2/26

    High Frequency Ultrasonics

    ! High-frequency ultrasonics convey information

  • 7/24/2019 Presentation 8h Levesque

    3/26

    High-Power Ultrasonics (HPU)

    ! HPU - application of intense, high-frequencyacoustic energy to changematerials,processes

    Ultrasonic energycauses change inMaterial or Process

    UltrasonicTransducer

    Transmission

    Material/Process

    Power supply

    60 ~

  • 7/24/2019 Presentation 8h Levesque

    4/26

    Ultrasonic MachiningTechnical Background

    ! What is Ultrasonic Machining (UM)! It is application of ultrasonic (US) vibrations to traditional

    machining processes (drilling, turning, milling ") to improveperformance (e.g., faster drilling, drilling of hard materials, bettertool life, increased accuracy, ")

    Concepts of adding USvibrations to

    various machining

    processes

  • 7/24/2019 Presentation 8h Levesque

    5/26

    Prior Work

    Cincinnati Milacron US

    turning, 1960s

    Grumman US Drilling,

    1970s

    OSU, US Cutting

    1970s

    Sonobond Drilling,

    Turning 1970s

  • 7/24/2019 Presentation 8h Levesque

    6/26

    Progression of Ultrasonic Machining

    ! EWI approach to US Machining

    ! Utilization of higher US power than previously used (starting at 4.5 kW)

    ! Take advantage of better control technology of modern US systems

    ! Apply modern FEA analysis to tool development

    ! Initial Application

    ! Jointly sponsored NASA, NCDMM program on US Twist Drilling

    4.5- vs. 2.5-kWTransducer

    Dukane 5-kW GeneratorsVibrational Analysis

    of Twist Drill

  • 7/24/2019 Presentation 8h Levesque

    7/26

    NCDMM Testing

    ! Focused on 6061-T6; 1/8

    and ! drills

    ! Used dynamometer to evaluate drilling forces, torques

    ! Showed significant reductions in normal force and torque when drillingaluminum

    ! Optimum vibration amplitude

    ! For 4340 steel, system torque and rpm insufficient for tools >1/2-in

    1/2

    Drill in 6061 Al

    Amplitude Mz Fz Mz Reduction Fz Reduction

    0 27.74 1263.3

    37 12.41 389.9 55.26% 69.14%

    45 9.195 431.1 66.85% 65.88%

    55 16.67 763.1 39.91% 39.59%

  • 7/24/2019 Presentation 8h Levesque

    8/26

    Progression of Ultrasonic Machining

    Lath Test Bed EWI Drill #1

  • 7/24/2019 Presentation 8h Levesque

    9/26

    Drilling Tests

    ! ! drill bit into " steel plate! without sonics: 45s! with sonics: 15s

    ! Power draw up to 2kW

    ! 1/8

    drill bit into #

    steel plate! without sonics: 15s

    ! with sonics: 1.2s! Power draw up to 600W

    ! " drill in development

    holes in

    steel plate

  • 7/24/2019 Presentation 8h Levesque

    10/26

    Tool Life Assessment

    ! Tool Performance With and W/O US! Trials conducted on Inconel, no lubricant

    ! Cutting edge wear indicated W/O US

    ! Third pass showed significant wear

    Wearindicated

    Severe wear

    Hole 1 Hole 2 Hole 3

    Materialtransfer

    No USEnergy

    With USEnergy

  • 7/24/2019 Presentation 8h Levesque

    11/26

    Tool Life Assessment

    ! Loads increase as wear increases

    Hole 1 W/out US

    ~40-N

    ~70-N

    Hole 2 W/out US

    ~65-N

    ~85-N

    Hole 3 W/out US

    ~90-N~150-N

    Hole 1 with US

    ~55-N ~65-N

    Hole 2 with US

    ~55-N~65-N

    Hole 3 with US

    ~70-N ~70-N

  • 7/24/2019 Presentation 8h Levesque

    12/26

    Extending Technology to NuclearApplications

    ! Is it possible to integrate an US transmission line toportable equipment such as AREVAs drillinghardware

  • 7/24/2019 Presentation 8h Levesque

    13/26

    Challenges

    ! Climax Drill Design!

    Improve overall process efficiency

    ! Process speed

    ! Tool wear

    !

    Surface finish! Dimensional stability

    ! Clearance of transducer on platform

    ! Stack-up length

    ! Ease of use and adaptability

    !

    Use of internal mandrel acting as collet!Ability to revert to standard practice

    with minimal effort

  • 7/24/2019 Presentation 8h Levesque

    14/26

    Transducer Overview

    ! Off-the-shelf transducer designed to operate at 20-kHz

    ! If the components are not tuned properly, it will notwork

    Transducer end

    28-32 #m

  • 7/24/2019 Presentation 8h Levesque

    15/26

    20242 Hz

    ! Shank modified by reducing length of Morse taper tooverall length of 10.87! This does not take into account shrink fit portion of shank due to

    tuning

    Finite Element Analysis

  • 7/24/2019 Presentation 8h Levesque

    16/26

    The Transmission Line

    ! Design each component as half or full wavelength, thencombine components into a multi-wave assembly

    $ $/2 $/2

  • 7/24/2019 Presentation 8h Levesque

    17/26

    AREVA Design Concept

    ! Successfully isolated all vibrations from surroundingequipment

    ! Continues to drive longitudinal vibrations

  • 7/24/2019 Presentation 8h Levesque

    18/26

    AREVA System Overview

    ! Transmission Line Components! Rigid, interchangeable shrink-fit collet

    ! Half wave extension

    ! Transducer

    ! Assembly!

    Each component makes up $/2

    !

    Accomplished with single bolt at interface

    Transducer

    Mandrel/Shrink-FitCollet

    Half WaveExtension

    PatentPending

  • 7/24/2019 Presentation 8h Levesque

    19/26

    AREVA System Overview

    ! Climax Drill Assembly! Install Collet/Mandrel into drill bore engaging drive key

    ! Transmission lines transmits torque while transmitting acousticalvibrations to cutting faces

    ! Protective boot covers $/2 extension and provides easy removal

    !

    Transducer attaches to back side of extension

  • 7/24/2019 Presentation 8h Levesque

    20/26

    AREVA Drilling Results

    ! Capable of performing operationin 36-sec. Not desirable due tosurface finish

    ! Successfully met surfacerequirements at ~5-min operationtime

    ! Improved true position of hole

    ! Maintained ability to revert toMorse taper tooling

    !

    Completely isolated vibrationsfrom drill head

    ! Capable of performing severaloperations with same drill bit

  • 7/24/2019 Presentation 8h Levesque

    21/26

    Ongoing Developments

    ! Development of a machining center compatible US machiningunits (e.g. drilling tools and/or milling tools) will be a next step inexpanding US machining technology

    Haas 5-axis MC

  • 7/24/2019 Presentation 8h Levesque

    22/26

    Design Details

    ! Concept to incorporate 20-kHztransducer into live spindlecase! Must consider the following:

    !

    Electrical contacts! Various mounting provisions acceptingdifferent size tool holders

    ! HSK/CAT 40, 60, etc.

    ! Repairable/serviceable

    ! Use of shrink-fit tooling

    !

    Isolate vibrations from spindle

  • 7/24/2019 Presentation 8h Levesque

    23/26

    Vibration Analysis

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    0

    35.00% 45.00% 55.00% 65.00% 75.00% 85.00% 95.00% 105.00%

    Long. Node Amp Displacement Radial Amp at Nodal Position

    Bore Face Amp Displacement Tool Tip Displacement

    Back Mass Long. Amp Displacement Radial Amp at Back MassLong. Amp. @ Tool Holder Interface Rad. Amp. @ Back End of Case

    Rad. Amp. @ Node Position with Case

  • 7/24/2019 Presentation 8h Levesque

    24/26

    Results

  • 7/24/2019 Presentation 8h Levesque

    25/26

    For technical questions or to requestmore information, contact:

    Gary R. Poling, P.E.

    Special Projects

    AREVA NP, Inc. - CR&R

    434.832.2962

    [email protected]

    Matt Short

    Technology Leader Ultrasonics

    EWI

    614.688.5137

    [email protected]