WelcomeWelcome
Introduction
• STATS ChipPAC Ltd. is a premier service provider of semiconductor packaging design, assembly, test and distribution solutions.
• To maintains efficiency, all machine for all department must be at the greatest status
• In IC Assembly FOL, Preventive Maintenance is one of the way to maintains efficiency for Gold Wire Bonding machine
Stats Chippac Malaysia
( SCM )
SCM History & MilestoneStarted Operation - 1974
Land Area - 18 acres
Floor Space - 483,000 sq. ft.
Team Members - 2300
Services - Analog, RF & Mixed Signal Testing
- LFCSP & BCC Portfolio Additions
- Discrete Power Assembly & Test
- Product Logistics & Distribution
Production Capacity - 25 Million units per week
B3 B2B1
Plant Layout
1974 1989 1999 20002004
ChipPAC
Stats ChipPAC Malaysia Organization
Pamela Tan, Exec. Secretary
CL TanDirectorPower
Operations
HS LewPresident / MD
PrembajV.P.Test
Operations
LA KhooSr. Director
IC Assembly Engg & New Product Introduction
Ronnie OngDirector
QRA
Terence ChinDirector
IT & Facilities
ST GohDirector
CS, Ind. Engg, Product Planning
& Logistics
KK WongSr. Director
IC Assembly Operations
BaharomDirector
HR
Janet WongDirector
Procurement, Matls Planning & Warehousing
FL SeowDeputy Director
Finance
IC AssemblyDie Bank
Process Flow IC FOL
Wafer Thickness (1st)
Wafer Thickness (2nd)
Wafer Detapping
Wafer Back Grind
Wafer Tapping
2nd Optical Inspection
Wafer Saw
Wafer Mount
Coverlay (QFNs)
Die Attach
Wire Bond
Pre Bond Plasma Cleaning(QFNp)
Laser Strip ID Marking
Die Attach Cure
3rd Optical Inspection
Post Bond Plasma
Cleaning(QFNs)
Customer’s requirementAccording to package
Proper Outfit To Enter Clean Room – IC Assembly
Smock/jumpsuit& Face cover Name tag
ESD wrist's strap
Finger cots
IC Assembly – Products/Services
BCC – BUMP CHIP CARRIER
LeadMOUNTING PAD
Die
EPOXY GROUND RING
TIE BAR
DIE
EPOXY
LEAD
BOND PAD
QFNp – QUAD FLAT NO LEAD PUNCH QFNs – QUAD FLAT NO LEAD SAWN
PADDLE
DIE
EPOXY
LEAD
BOND PAD
Gold Wire Bonding Machine – K&S 8028
Power Control
LCD Monitor
Microscope
MHS Input.Magazine Handler
Bond head
MHS OutputMagazine
Signal Tower
XY Table
Work Holder
Wire Container
Butang kecemasan
MMIMan Machine Interface
Numeric Keypad
Purpose/Scopefor Preventive Maintenance
OP
ER
ATO
RS
LIN
E M
AIN
TEN
AN
CE
1. CLEANING
2. EXAMINE
3. SMALL RECOVERY
4. REPAIRING
5. MAINTENANCE
6. CALIBRATING
7. BUY- OFF
8. CONTINUES EFFICIENCY
PM
TEC
HN
ICIA
NS
EN
GIN
EER
S / C
I TEA
M
PM work flowMachine on
PM due date
Stop production & clearing
workholder (MA)
Cleaning
Calibrating
Setup
Test bond
Ready for production (MA)
i. Acknowledge PMii. Switch - OFF machineiii. Opening coversiv. Cleaning machine using vacuum
cleanerv. Greasing Rails/Slidersvi. Removing stains (using Methanol
chemical)vii. Switch – ON machine
i. Configure Heat-Blockii. Removing EFO & Wireiii. Calibrating Work-Holder
i. Railsii. Clampiii. Indexeriv. X-sensorv. Jam detectvi. Tucker eject
iv. Calibrating Bond-Headi. Z-axis adjustmentii. Bond forceiii. Ultra-Sonic Generator
(USG)iv. EFO height
v. Other calibration ( if needed )
i. Attach heat-Block & Clamp insert
ii. Acknowledge SETUPiii. Download bond
programiv. Teach H/B positionv. Calibrate crosshair-
offset note: starting using dummy or production
i. Teach bond positionii. Align overlay with
die
i. Go to AUTO menuii. Run/Stop bondingiii. Correct Crosshair-offset on
pad
i. Up & Lot Startii. Check the bonding program (must
PASSED)iii. Check list and dummy is ready to
send to QC
Conclusion
• PM is important so that the machine can run longer without many serious problem and better efficiency
• The out-come from IT and UTeM’s ways of educating produce excellent chemistry to produce an excellent future engineer