PRELIMINARY STORMWATER CONTROL PLAN
AND HYDROLOGY CALCULATIONS FOR DEIKEL MADRONA AVE RESIDENCE
CAB CONSULTING ENGINEERS CARL BUTTS
APRIL 6, 2018
September 1, 2017 Page 1 of 7 BASMAA
Stormwater Control Plan
for Small Projects/Single-Family Homes
Deikel Residence 1545 Madrona Ave. Introduction
The California State Water Resources Control Board reissued the Phase II NPDES Permit for Small Municipal Storm Sewer Systems (MS4s) in February 2013. As of June 30, 2015, development projects that create or replace 2,500 square feet* or more of impervious surface (roofs or pavement) must incorporate specified measures to reduce runoff. This requirement is part of municipalities’ comprehensive effort to reduce runoff pollution.
This purpose of this plan is to address St. Helena City Public Works anticipated comments whereby:
• Drainage needs to be routed to prevent inundation of neighboring properties. Grading and/or site improvement plans shall show how 2-year and 10-year storm flows shall be infiltrated on site and/or diverted at the property lines to prevent inundation of neighboring properties, and
• Prepare and implement a Stormwater Control Plan as required by the Bay Area Stormwater Management Agencies Association (BASMAA) Post-Construction Manual, dated July 14, 2014.
The following design strategies have been incorporated into this project:
• Limit disturbance of creeks and natural drainage features
• Minimize compaction of highly permeable soils
• Limit clearing and grading of native vegetation at the site to the minimum area needed to build the project, allow access, and provide fire protection
• Minimize impervious surfaces by concentrating development on the least-sensitive portions of the site, while leaving the remaining land in a natural undisturbed state
*Projects that create or replace 5,000 square feet or more of impervious surface, except for detached single-family homes, require a comprehensive Stormwater Control Plan for Regulated Projects.
Step-by-Step Instructions
The steps are:
1. Fill out the Project Data Form (below) and select one or more runoff reduction measures. 2. Prepare a site plan or sketch. Specify and design the runoff reduction measures you will use to meet
the stated minimum requirements. 3. Complete your submittal, which will include:
• Project Data Form
• Site Plan or Sketch
September 1, 2017 Page 2 of 7 BASMAA
• Completed checklist for each Runoff Reduction Measure selected Step 1: Project Data Form and Runoff Reduction Measure Selection
Complete all fields.
Project Name/Number Deikel Residence
Application Submittal Date
[to be verified by municipal staff] TBD
Project Location
[Street Address if available, or intersection and/or APN] 1545 Madrona Ave.
Name of Owner or Developer Ted and Pamala Deikel
Project Type and Description
[Examples: “Single Family Residence,” “Parking Lot Addition,” “Retail and Parking”]
Single Family Residence with Garage.
Total Project Site Area (sf) 6,965 (sf)
Total New or Replaced Impervious Surface Area (square feet) [Sum of impervious area that will be constructed as part of the project]
2,200 (sf)
Total Pre-Project Impervious Surface Area 2,654 (sf)
Total Post-Project Impervious Surface Area 2,200 (sf)
Runoff Reduction Measures Selected
(Check one or more)
X - 1. Disperse runoff to vegetated area
2. Pervious pavement
3. Cisterns or Rain Barrels
X - 4. Subsurface Infiltration Units
Step 2: Delineate impervious areas and locations of runoff reduction measures
The pre-project conditions and shed are shown in Exhibit A – Pre Project Conditions.
September 1, 2017 Page 3 of 7 BASMAA
The post-project conditions and sheds with designated impervious areas are shown in Exhibit B - Deikel Residence Storm Water Control Plan.
The location and options for runoff reduction are annotated on Exhibit B.
Option 4 has been selected as the primary runoff reduction option for this project for the following reasons:
1. Provides an efficient and compact collection system for infiltration into native soils given the very compact space the project is afforded.
2. Rain Cisterns are not desired due to the architectural character of the residence.
Rainwater leaders tied to a small on-site storm drain system will collect impervious surface and roof runoff. This runoff will be directed to several subsurface NDS Flo Well infiltration units for reduction in runoff.
Option 1, modified to field conditions, has also been selected as an additional runoff reduction measure. This option is targeted to landscape and vegetated areas that will eventually drain to the northeastern corner of the property.
The site is mapped by the National Resources Conservation Service as Cortina very gravelly loam which has a Hydrologic Soils classification of “A”. The NRCS data is provided in Appendix C.
A percolation test was is proposed following design review. A percolation rate of 15” per hour is assumed based on previous soils infiltration testing on nearby sites for this soils complex.
The hydrologic methodology used to substantiate the city’s requirements is TR-20 using Soils Conservation Service (SCS) rainfall data for the 2 and 10-year storm events. SCS rainfall data is provided by the National Oceanic and Atmospheric Administration (NOAA) Precipitation Data Frequency Server for the project site. Values of 3.88 in/day and 5.66 in/day for the 2 and 10-year events are used in calculating runoff rates in TR-20. NOAA precipitation data is provided in Appendix C.
Pre and Post Developed curve numbers (CN) are calculated as 56 and 63, respectively, for the 0.16-acre site. A time of concentration of 10-minutes is assumed for the pre and post developed condition. The storm distribution for St. Helena is Type 1A taken from Figure B-2 of the NRCS “Urban Hydrology for Small Watersheds – Technical Release 55.” Composite CN values are provided on each hydrograph report in Appendix C.
Autodesk Autocad Civil 3D Hydraflow Hydragraphs Extension is used in calculating TR-20 runoff data for the pre and post-developed condition. The pre-developed condition shows a runoff rate for the 2 and 10-year storm as 0.006 and 0.035 cfs.
The post-developed condition shows a runoff rate for the 2 and 10-year storm as 0.000 and 0.013 cfs. The 2-year runoff is completely captured on-site. The 10-year post developed condition lessens the rate of runoff by roughly 8%. The proposed NDS Flo Well dry cisterns therefore meet runoff requirements for the 2-year storm. An infiltration sump and pump system
September 1, 2017 Page 4 of 7 BASMAA
using a 15 gallon per minute submersible pump and discharge to the street is proposed for excess flow (0.013 cfs, or 6.24 gallons per minute) of the 10-year event. Pre and post-developed calculations are provided in Appendix C.
September 1, 2017 Page 5 of 7 BASMAA
Appendix A – Pre Developed Conditions
CAB
CON
SULT
ING
ENGI
NEE
RS
851
NAP
A VA
LLEY
CORP
ORA
TE W
AYSU
ITE
DN
APA,
CA
9455
8V
707.
252.
2011
C 70
7.69
4.64
7920
18.0
4.06
DEIK
EL M
ARDO
NA
RESI
DEN
CEEX
ISTI
NG
SHED
CO
NDI
TIO
NS
1" =
20'
ST. H
ELEN
ACA
LIFO
RNIA
2018
.04
2017
.09.
01 E
X SH
ED
September 1, 2017 Page 6 of 7 BASMAA
Appendix B – Post Developed Storm Water Control
Plan
CAB
CON
SULT
ING
ENGI
NEE
RS
851
NAP
A VA
LLEY
CORP
ORA
TE W
AYSU
ITE
DN
APA,
CA
9455
8V
707.
252.
2011
C 70
7.69
4.64
7920
18.0
4.06
DEIK
EL M
ADRO
NA
RESI
DEN
CEST
ORM
WAT
ER C
ON
TRO
L PL
AN
1" =
20'
ST. H
ELEN
ACA
LIFO
RNIA
2018
.04
2018
.04.
06 S
CP
September 1, 2017 Page 7 of 7 BASMAA
Appendix C – Hydrology Supporting Data and
Calculations
Soil Map—Napa County, California
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
4/6/2018Page 1 of 3
4261
740
4261
770
4261
800
4261
830
4261
860
4261
890
4261
920
4261
740
4261
770
4261
800
4261
830
4261
860
4261
890
4261
920
545620 545650 545680 545710 545740 545770 545800 545830 545860 545890 545920
545650 545680 545710 545740 545770 545800 545830 545860 545890 545920
38° 30' 16'' N12
2° 2
8' 3
6'' W
38° 30' 16'' N
122°
28'
23'
' W
38° 30' 9'' N
122°
28'
36'
' W
38° 30' 9'' N
122°
28'
23'
' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS840 50 100 200 300
Feet0 20 40 80 120
MetersMap Scale: 1:1,410 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)Area of Interest (AOI)
SoilsSoil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point FeaturesBlowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water FeaturesStreams and Canals
TransportationRails
Interstate Highways
US Routes
Major Roads
Local Roads
BackgroundAerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map measurements.
Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Napa County, CaliforniaSurvey Area Data: Version 10, Sep 25, 2017
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Dec 31, 2009—Nov 22, 2016
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Napa County, California
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
4/6/2018Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
124 Cortina very gravelly loam, 0 to 5 percent slopes, moist, MLRA 14
9.1 100.0%
Totals for Area of Interest 9.1 100.0%
Soil Map—Napa County, California
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
4/6/2018Page 3 of 3
9/9/2016 Precipitation Frequency Data Server
http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=38.5023&lon=122.4667&data=depth&units=english&series=pds 1/4
NOAA Atlas 14, Volume 6, Version 2 Location name: Saint Helena, California, US* Latitude: 38.5023°, Longitude: 122.4667°
Elevation: 237 ft** source: Google Maps
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, SandraPavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey
Bonnin, Daniel Brewer, LiChuan Chen, Tye Parzybok, John Yarchoan
NOAA, National Weather Service, Silver Spring, Maryland
PF_tabular | PF_graphical | Maps_&_aerials
PF tabularPDSbased point precipitation frequency estimates with 90% confidence intervals (in inches)1
DurationAverage recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5min 0.133(0.119‑0.151)
0.163(0.145‑0.186)
0.203(0.180‑0.231)
0.235(0.206‑0.271)
0.280(0.236‑0.335)
0.314(0.259‑0.385)
0.350(0.280‑0.441)
0.386(0.300‑0.503)
0.436(0.323‑0.595)
0.476(0.339‑0.675)
10min 0.191(0.170‑0.217)
0.234(0.208‑0.266)
0.291(0.257‑0.331)
0.337(0.296‑0.388)
0.401(0.338‑0.480)
0.450(0.371‑0.552)
0.501(0.401‑0.632)
0.554(0.430‑0.720)
0.626(0.463‑0.853)
0.682(0.486‑0.967)
15min 0.231(0.206‑0.263)
0.283(0.251‑0.322)
0.351(0.311‑0.401)
0.408(0.358‑0.469)
0.485(0.409‑0.580)
0.545(0.449‑0.667)
0.606(0.486‑0.764)
0.670(0.520‑0.871)
0.757(0.560‑1.03)
0.825(0.587‑1.17)
30min 0.349(0.311‑0.396)
0.427(0.380‑0.486)
0.531(0.470‑0.605)
0.616(0.540‑0.709)
0.732(0.618‑0.876)
0.822(0.678‑1.01)
0.915(0.733‑1.15)
1.01(0.785‑1.32)
1.14(0.846‑1.56)
1.25(0.887‑1.77)
60min 0.517(0.460‑0.587)
0.633(0.562‑0.720)
0.786(0.696‑0.896)
0.912(0.800‑1.05)
1.08(0.915‑1.30)
1.22(1.00‑1.49)
1.35(1.09‑1.71)
1.50(1.16‑1.95)
1.69(1.25‑2.31)
1.84(1.31‑2.62)
2hr 0.793(0.705‑0.900)
0.962(0.855‑1.09)
1.18(1.04‑1.35)
1.35(1.19‑1.56)
1.58(1.34‑1.90)
1.76(1.45‑2.16)
1.93(1.55‑2.44)
2.11(1.64‑2.74)
2.34(1.73‑3.19)
2.52(1.79‑3.57)
3hr 1.02(0.908‑1.16)
1.23(1.10‑1.40)
1.51(1.33‑1.72)
1.72(1.51‑1.98)
2.00(1.69‑2.40)
2.21(1.83‑2.71)
2.42(1.94‑3.06)
2.63(2.04‑3.43)
2.91(2.15‑3.96)
3.11(2.22‑4.41)
6hr 1.55(1.38‑1.76)
1.87(1.66‑2.13)
2.28(2.02‑2.60)
2.60(2.28‑2.99)
3.02(2.55‑3.61)
3.32(2.74‑4.07)
3.62(2.90‑4.57)
3.92(3.04‑5.10)
4.31(3.19‑5.87)
4.59(3.27‑6.51)
12hr 2.21(1.97‑2.51)
2.71(2.41‑3.08)
3.34(2.96‑3.81)
3.84(3.37‑4.42)
4.49(3.79‑5.37)
4.97(4.10‑6.09)
5.45(4.36‑6.86)
5.92(4.59‑7.70)
6.54(4.84‑8.91)
7.00(4.98‑9.92)
24hr 3.11(2.79‑3.53)
3.88(3.48‑4.41)
4.87(4.36‑5.54)
5.66(5.04‑6.48)
6.70(5.80‑7.89)
7.47(6.36‑8.96)
8.25(6.88‑10.1)
9.03(7.36‑11.3)
10.1(7.92‑13.0)
10.8(8.29‑14.5)
2day 4.08(3.66‑4.63)
5.22(4.69‑5.93)
6.67(5.98‑7.60)
7.82(6.96‑8.97)
9.33(8.08‑11.0)
10.4(8.90‑12.5)
11.6(9.64‑14.1)
12.7(10.3‑15.9)
14.1(11.1‑18.3)
15.2(11.6‑20.3)
3day 4.69(4.21‑5.32)
6.08(5.46‑6.91)
7.84(7.03‑8.93)
9.23(8.22‑10.6)
11.0(9.57‑13.0)
12.4(10.5‑14.8)
13.7(11.4‑16.8)
15.0(12.2‑18.8)
16.7(13.2‑21.7)
18.0(13.8‑24.1)
4day 5.19(4.67‑5.89)
6.76(6.07‑7.68)
8.73(7.83‑9.95)
10.3(9.16‑11.8)
12.3(10.7‑14.5)
13.8(11.8‑16.6)
15.3(12.8‑18.7)
16.8(13.7‑21.0)
18.7(14.8‑24.3)
20.2(15.4‑26.9)
7day 6.49(5.84‑7.37)
8.34(7.49‑9.48)
10.7(9.59‑12.2)
12.6(11.2‑14.4)
15.0(13.0‑17.7)
16.9(14.4‑20.3)
18.7(15.6‑22.9)
20.6(16.8‑25.8)
23.0(18.1‑29.9)
24.9(19.0‑33.2)
10day 7.42(6.67‑8.43)
9.46(8.50‑10.7)
12.1(10.8‑13.7)
14.1(12.6‑16.2)
16.9(14.6‑19.9)
19.0(16.2‑22.7)
21.0(17.5‑25.7)
23.1(18.8‑28.9)
25.9(20.4‑33.5)
28.0(21.4‑37.3)
20day 9.84(8.84‑11.2)
12.5(11.2‑14.2)
15.9(14.2‑18.1)
18.6(16.5‑21.3)
22.1(19.1‑26.0)
24.7(21.0‑29.6)
27.2(22.7‑33.3)
29.8(24.3‑37.3)
33.2(26.1‑43.0)
35.7(27.3‑47.6)
30day 11.7(10.5‑13.2)
14.8(13.3‑16.9)
18.8(16.8‑21.4)
21.9(19.5‑25.1)
25.9(22.4‑30.5)
28.8(24.5‑34.6)
31.7(26.4‑38.8)
34.5(28.1‑43.2)
38.2(30.1‑49.5)
40.9(31.3‑54.6)
45day 14.2(12.7‑16.1)
18.0(16.2‑20.4)
22.7(20.3‑25.8)
26.3(23.4‑30.2)
30.9(26.8‑36.4)
34.2(29.1‑41.0)
37.4(31.2‑45.8)
40.5(33.0‑50.7)
44.5(35.0‑57.6)
47.4(36.2‑63.2)
60day 16.7(15.0‑19.0)
21.2(19.1‑24.1)
26.6(23.9‑30.3)
30.7(27.4‑35.2)
35.9(31.1‑42.3)
39.6(33.7‑47.4)
43.0(35.9‑52.6)
46.4(37.8‑58.1)
50.6(39.8‑65.5)
53.6(41.0‑71.5)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for agiven duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are notchecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.Please refer to NOAA Atlas 14 document for more information.
Back to Top
Hydraflow Table of ContentsC:\Users\Carl Butts\Dropbox\CAB Consulting\2018\2018.04 Deikel Madrona\Reports & Calcs\SCP\Appendix C - Hydrology\Deikel Madrona.gpw
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Watershed Model Schematic...................................................................................... 1
Hydrograph Return Period Recap............................................................................. 2
2 - YearSummary Report......................................................................................................................... 3Hydrograph Reports................................................................................................................... 4
Hydrograph No. 1, SCS Runoff, Pre-Developed...................................................................... 4Hydrograph No. 2, SCS Runoff, Post Developed..................................................................... 5Hydrograph No. 3, Reservoir, Routed Post Developed............................................................ 6
Pond Report - Flo Well........................................................................................................ 7
10 - YearSummary Report......................................................................................................................... 9Hydrograph Reports................................................................................................................. 10
Hydrograph No. 1, SCS Runoff, Pre-Developed.................................................................... 10Hydrograph No. 2, SCS Runoff, Post Developed................................................................... 11Hydrograph No. 3, Reservoir, Routed Post Developed.......................................................... 12
IDF Report.................................................................................................................. 13
1
2
3
1
Watershed Model SchematicHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Project: C:\Users\Carl Butts\Dropbox\CAB Consulting\2018\2018.04 Deikel Madrona\Reports & Calcs\SCP\Appendix C - Hydrology\DFriday, 04 / 6 / 2018
Hyd. Origin Description
Legend
1 SCS Runoff Pre-Developed
2 SCS Runoff Post Developed
3 Reservoir Routed Post Developed
Hydrograph Return Period Recap2
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ ------- 0.012 ------- ------- 0.053 ------- ------- ------- Pre-Developed
2 SCS Runoff ------ ------- 0.008 ------- ------- 0.045 ------- ------- ------- Post Developed
3 Reservoir 2 ------- 0.000 ------- ------- 0.013 ------- ------- ------- Routed Post Developed
Proj. file: C:\Users\Carl Butts\Dropbox\CAB Consulting\2018\2018.04 Deikel Madrona\Reports & Calcs\SCP\Appendix C - Hydrology\Friday, 04 / 6 / 2018
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Summary Report3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 0.012 1 484 437 ------ ------ ------ Pre-Developed
2 SCS Runoff 0.008 1 485 382 ------ ------ ------ Post Developed
3 Reservoir 0.000 1 n/a 0 2 251.54 0.419 Routed Post Developed
C:\Users\Carl Butts\Dropbox\CAB Consulting\2018\2018.04 Deikel Madrona\Reports & Calcs\SCP\Appendix C - Hydrology\Deikel MaReturn Period: 2 Year Friday, 04 / 6 / 2018
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 1
Pre-Developed
Hydrograph type = SCS Runoff Peak discharge = 0.012 cfsStorm frequency = 2 yrs Time to peak = 8.07 hrsTime interval = 1 min Hyd. volume = 437 cuftDrainage area = 0.160 ac Curve number = 61*Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 10.00 minTotal precip. = 3.88 in Distribution = Type IAStorm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.060 x 98) + (0.100 x 39)] / 0.160
4
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Pre-DevelopedHyd. No. 1 -- 2 Year
Hyd No. 1
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 2
Post Developed
Hydrograph type = SCS Runoff Peak discharge = 0.008 cfsStorm frequency = 2 yrs Time to peak = 8.08 hrsTime interval = 1 min Hyd. volume = 382 cuftDrainage area = 0.160 ac Curve number = 59*Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 10.00 minTotal precip. = 3.88 in Distribution = Type IAStorm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.110 x 39)] / 0.160
5
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Post DevelopedHyd. No. 2 -- 2 Year
Hyd No. 2
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 3
Routed Post Developed
Hydrograph type = Reservoir Peak discharge = 0.000 cfsStorm frequency = 2 yrs Time to peak = n/aTime interval = 1 min Hyd. volume = 0 cuftInflow hyd. No. = 2 - Post Developed Max. Elevation = 251.54 ftReservoir name = Flo Well Max. Storage = 0 cuft
Storage Indication method used. Exfiltration extracted from Outflow.
6
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Routed Post DevelopedHyd. No. 3 -- 2 Year
Hyd No. 3 Hyd No. 2 Total storage used = 0 cuft
Pond Report 7
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Pond No. 1 - Flo Well
Pond DataUG Chambers -Invert elev. = 252.00 ft, Rise x Span = 2.33 x 1.58 ft, Barrel Len = 1.58 ft, No. Barrels = 5, Slope = 0.00%, Headers = NoEncasement -Invert elev. = 251.50 ft, Width = 2.58 ft, Height = 2.83 ft, Voids = 50.00%
Stage / Storage TableStage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 251.50 n/a 0 00.28 251.78 n/a 3 30.57 252.07 n/a 3 60.85 252.35 n/a 5 111.13 252.63 n/a 5 151.42 252.92 n/a 5 201.70 253.20 n/a 5 251.98 253.48 n/a 5 292.26 253.76 n/a 5 342.55 254.05 n/a 5 392.83 254.33 n/a 5 43
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in) = 2.00 0.00 0.00 0.00
Span (in) = 2.00 0.00 0.00 0.00
No. Barrels = 1 0 0 0
Invert El. (ft) = 254.00 0.00 0.00 0.00
Length (ft) = 10.00 0.00 0.00 0.00
Slope (%) = 0.50 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff. = 0.60 0.60 0.60 0.60
Multi-Stage = n/a No No No
Crest Len (ft) = 0.00 0.00 0.00 0.00
Crest El. (ft) = 0.00 0.00 0.00 0.00
Weir Coeff. = 3.33 3.33 3.33 3.33
Weir Type = --- --- --- ---
Multi-Stage = No No No No
Exfil.(in/hr) = 15.000 (by Wet area)
TW Elev. (ft) = 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge TableStage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Totalft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0 251.50 0.00 --- --- --- --- --- --- --- 0.000 --- 0.0000.03 0 251.53 0.00 --- --- --- --- --- --- --- 0.007 --- 0.0070.06 1 251.56 0.00 --- --- --- --- --- --- --- 0.007 --- 0.0070.08 1 251.58 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.11 1 251.61 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.14 1 251.64 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.17 2 251.67 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.20 2 251.70 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.23 2 251.73 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.25 3 251.75 0.00 --- --- --- --- --- --- --- 0.008 --- 0.0080.28 3 251.78 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.31 3 251.81 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.34 4 251.84 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.37 4 251.87 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.40 4 251.90 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.42 5 251.92 0.00 --- --- --- --- --- --- --- 0.009 --- 0.0090.45 5 251.95 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.48 5 251.98 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.51 6 252.01 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.54 6 252.04 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.57 6 252.07 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.59 7 252.09 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.62 7 252.12 0.00 --- --- --- --- --- --- --- 0.010 --- 0.0100.65 8 252.15 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.68 8 252.18 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.71 9 252.21 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.74 9 252.24 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.76 9 252.26 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.79 10 252.29 0.00 --- --- --- --- --- --- --- 0.011 --- 0.0110.82 10 252.32 0.00 --- --- --- --- --- --- --- 0.012 --- 0.0120.85 11 252.35 0.00 --- --- --- --- --- --- --- 0.012 --- 0.0120.88 11 252.38 0.00 --- --- --- --- --- --- --- 0.012 --- 0.012
Continues on next page...
8
Flo Well
Stage / Storage / Discharge TableStage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Totalft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.91 12 252.41 0.00 --- --- --- --- --- --- --- 0.012 --- 0.0120.93 12 252.43 0.00 --- --- --- --- --- --- --- 0.012 --- 0.0120.96 13 252.46 0.00 --- --- --- --- --- --- --- 0.012 --- 0.0120.99 13 252.49 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.02 14 252.52 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.05 14 252.55 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.08 15 252.58 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.10 15 252.60 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.13 15 252.63 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.16 16 252.66 0.00 --- --- --- --- --- --- --- 0.013 --- 0.0131.19 16 252.69 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.22 17 252.72 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.25 17 252.75 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.27 18 252.77 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.30 18 252.80 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.33 19 252.83 0.00 --- --- --- --- --- --- --- 0.014 --- 0.0141.36 19 252.86 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.39 20 252.89 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.42 20 252.92 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.44 21 252.94 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.47 21 252.97 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.50 22 253.00 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.53 22 253.03 0.00 --- --- --- --- --- --- --- 0.015 --- 0.0151.56 22 253.06 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.58 23 253.08 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.61 23 253.11 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.64 24 253.14 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.67 24 253.17 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.70 25 253.20 0.00 --- --- --- --- --- --- --- 0.016 --- 0.0161.73 25 253.23 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.75 26 253.25 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.78 26 253.28 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.81 27 253.31 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.84 27 253.34 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.87 28 253.37 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.90 28 253.40 0.00 --- --- --- --- --- --- --- 0.017 --- 0.0171.92 29 253.42 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0181.95 29 253.45 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0181.98 29 253.48 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0182.01 30 253.51 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0182.04 30 253.54 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0182.07 31 253.57 0.00 --- --- --- --- --- --- --- 0.018 --- 0.0182.09 31 253.59 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.12 32 253.62 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.15 32 253.65 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.18 33 253.68 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.21 33 253.71 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.24 34 253.74 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.26 34 253.76 0.00 --- --- --- --- --- --- --- 0.019 --- 0.0192.29 35 253.79 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.32 35 253.82 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.35 35 253.85 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.38 36 253.88 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.41 36 253.91 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.43 37 253.93 0.00 --- --- --- --- --- --- --- 0.020 --- 0.0202.46 37 253.96 0.00 --- --- --- --- --- --- --- 0.021 --- 0.0212.49 38 253.99 0.00 --- --- --- --- --- --- --- 0.021 --- 0.0212.52 38 254.02 0.00 oc --- --- --- --- --- --- --- 0.021 --- 0.0212.55 39 254.05 0.00 oc --- --- --- --- --- --- --- 0.021 --- 0.0242.58 39 254.08 0.01 oc --- --- --- --- --- --- --- 0.021 --- 0.0292.60 40 254.10 0.01 oc --- --- --- --- --- --- --- 0.021 --- 0.0342.63 40 254.13 0.02 oc --- --- --- --- --- --- --- 0.022 --- 0.0382.66 41 254.16 0.02 oc --- --- --- --- --- --- --- 0.022 --- 0.0402.69 41 254.19 0.02 oc --- --- --- --- --- --- --- 0.022 --- 0.0432.72 42 254.22 0.03 oc --- --- --- --- --- --- --- 0.022 --- 0.0472.75 42 254.25 0.03 oc --- --- --- --- --- --- --- 0.022 --- 0.0512.77 42 254.27 0.03 oc --- --- --- --- --- --- --- 0.022 --- 0.0542.80 43 254.30 0.03 oc --- --- --- --- --- --- --- 0.022 --- 0.0572.83 43 254.33 0.04 oc --- --- --- --- --- --- --- 0.023 --- 0.059
...End
Hydrograph Summary Report9
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 0.053 1 481 1,035 ------ ------ ------ Pre-Developed
2 SCS Runoff 0.045 1 481 944 ------ ------ ------ Post Developed
3 Reservoir 0.013 1 490 16 2 254.11 39.7 Routed Post Developed
C:\Users\Carl Butts\Dropbox\CAB Consulting\2018\2018.04 Deikel Madrona\Reports & Calcs\SCP\Appendix C - Hydrology\Deikel MaReturn Period: 10 Year Friday, 04 / 6 / 2018
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 1
Pre-Developed
Hydrograph type = SCS Runoff Peak discharge = 0.053 cfsStorm frequency = 10 yrs Time to peak = 8.02 hrsTime interval = 1 min Hyd. volume = 1,035 cuftDrainage area = 0.160 ac Curve number = 61*Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 10.00 minTotal precip. = 5.66 in Distribution = Type IAStorm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.060 x 98) + (0.100 x 39)] / 0.160
10
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Pre-DevelopedHyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 2
Post Developed
Hydrograph type = SCS Runoff Peak discharge = 0.045 cfsStorm frequency = 10 yrs Time to peak = 8.02 hrsTime interval = 1 min Hyd. volume = 944 cuftDrainage area = 0.160 ac Curve number = 59*Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 10.00 minTotal precip. = 5.66 in Distribution = Type IAStorm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.110 x 39)] / 0.160
11
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Post DevelopedHyd. No. 2 -- 10 Year
Hyd No. 2
Hydrograph ReportHydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Hyd. No. 3
Routed Post Developed
Hydrograph type = Reservoir Peak discharge = 0.013 cfsStorm frequency = 10 yrs Time to peak = 8.17 hrsTime interval = 1 min Hyd. volume = 16 cuftInflow hyd. No. = 2 - Post Developed Max. Elevation = 254.11 ftReservoir name = Flo Well Max. Storage = 40 cuft
Storage Indication method used. Exfiltration extracted from Outflow.
12
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (hrs)
Routed Post DevelopedHyd. No. 3 -- 10 Year
Hyd No. 3 Hyd No. 2 Total storage used = 40 cuft
Hydraflow Rainfall Report13
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 04 / 6 / 2018
Return Intensity-Duration-Frequency Equation Coefficients (FHA)Period
(Yrs) B D E (N/A)
1 0.0000 0.0000 0.0000 --------
2 0.0000 0.0000 0.0000 --------
3 0.0000 0.0000 0.0000 --------
5 0.0000 0.0000 0.0000 --------
10 13.4094 0.1000 0.5679 --------
25 0.0000 0.0000 0.0000 --------
50 0.0000 0.0000 0.0000 --------
100 0.0000 0.0000 0.0000 --------
File name: RHR.IDF
Intensity = B / (Tc + D)^E
Return Intensity Values (in/hr)Period
(Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 5.32 3.61 2.87 2.44 2.15 1.94 1.78 1.65 1.54 1.45 1.38 1.31
25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tc = time in minutes. Values may exceed 60.
Rainfall Precipitation Table (in)
Butts\Dropbox\CAB Consulting\2016\2016.05 Deikel Allyn\Reports & Calcs\SCP\Appendix C - Hydrology\St Helena.pcp
StormDistribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
SCS 24-hour 0.00 3.88 0.00 0.00 5.66 0.00 0.00 0.00
SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00