PRECINCT C - STAGE G PRECINCT A (Q2 2021) (2024)
Transcript of PRECINCT C - STAGE G PRECINCT A (Q2 2021) (2024)
KE
NN
A S
TR
EE
T E
XT
EN
SIO
N
PROPOSED
PUBLIC OPEN
SPACE
PRECINCT A
PRECINCT B
THOMASPRECINCT FPRECINCT DPRECINCT C
HOARDING TO BE USED TO MANAGE THE INTERFACES BETWEEN
NEW RESIDENTIAL DEVELOPMENT, EXISTING RESIDENTIAL
DEVELOPMENT AND THE RACECOURSE DASHED IN BLUE
TOTE BUILDING
PROPOSED
FUTURE LINK
PROPOSED
FUTURE LINK
CO
AT
S S
TR
EE
T
AL
EX
AN
DR
A A
VE
NU
E
KE
NN
A S
TR
EE
T
TH
OM
AS
ST
RE
ET
DE
AN
ST
RE
ET
KE
NN
A S
TR
EE
T
PROPOSED
PUBLICLY
ACCESSIBLE
PARK
INDICTAIVE AREA DASHED
PROPOSED PUBLICLY ACCESSIBLE PARK PRECINCT B
B1&B2
FUTURE DEVELOPMENT
(POST GRANDSTAND DEMOLITION)FUTURE DEVELOPMENT
(POST GRANDSTAND DEMOLITION)
FUTURE DEVELOPMENT
PRECINCT C - STAGE G
FUTURE DEVELOPMENT (Q2 2021)
(Q1 2022)(2024)(2032)
PRECINCT E
FUTURE DEVELOPMENT
(POST GRANDSTAND DEMOLITION)
(2030)(2026)(2028)
(2024)
MCNAE STREET
Brisbane, Melbourne, Sydneywww.rothelowman.com.au
Revisions
Disclaimer: Rothe Lowman Property Pty. Ltd. retains all common law, statutory law and other rights including copyright and intellectual property rights in respect of this
document.The recipient indemnifies Rothe Lowman Property Pty. Ltd. against all claims resulting from use of this document for any purpose other than its intended use, unauthorized changes or reuse of the document on other projects without the permission of Rothe Lowman Property Pty. Ltd. Under no circumstance shall transfer of this document be deemed a sale or constitute a transfer of the license to use this document. ABN 76 005 783 997
Drawing No.Author Scale: @ A1Project NoProject Drawing Date
30/08/2019 3:37:44 PM
1 : 600 ATP05.20TD217158MVRC Redevelopment Staging Plan
Stage B (Buildings 1&2)
10/19/18- 23.05.19 Town Planning Submission TD
A 20.08.19 RFI Submission TD
Page 2 of 2
ACZ Staging Plan – Stage B (Buildings 1 and 2) – Page 2 of 2 – Explanatory Table – 28 May 2019
NOTE: To be read in conjunction with TP05.20: ACZ Staging Plan – Stage B (Buildings 1 and 2) (page 1).
*Letter acronyms which identify Precincts and Stages do not represent the sequence of development of future Precincts and/or Stages.
PRECINCT Precinct A Precinct B Precinct B – Current Precinct C* - Future Precinct C* – Future Precinct D* – Future Precinct E* – Future Precinct F* – Future Totals
STAGE Stage A Stage B (Thomas St) Stage B (1 & 2) Stage G TBC TBC TBC TBC Approx. year of Completion (Dependent on market conditions) Q2 – 2021 2022 2024 2024 2028 2026 2030 2032
Approx. No. of Dwellings 67 76 313 TBC (deducted from balance of Stage C* -
Future) 524 240 250 530 2000
Approx. % of Total Dwellings 3% 4% 16% TBC (deducted from balance of Stage C* -
Future) 26% 12% 13% 27% 100%
Approx. Percentage of Financial Contributions payable upon Statement of Compliance 3% 4% 16%
TBC (deducted from balance of Stage C* -
Future) 26% 12.5% 12.5% 27% 100%
Public Open Space Contributions (and accompanying Landscaping Works)
Approximately 5,000sqm park land to be made accessible but not formally transferred to Council.
No Public Open Space to be delivered in this stage.
Approximately 1800sqm park land to be made accessible but not formally transferred to Council.
Potential Public Open Space to be delivered in this Stage.
Potential Public Open Space to be delivered in this Stage.
5,000sqm publicly accessible park land constructed in Stage A to be formally transferred to Council as Public Open Space.
Potential Public Open Space to be delivered in this Stage.
Potential Public Open Space to be delivered in this Stage.
Up to 7000sqm
Traffic Mitigation Works (to be a cash contribution and applied by Council within 12 months for the purpose which they are collected following receipt of payment)
Not as part of this stage. Not as part of this stage.
PT Signal Priority Study. General Bus stop improvements. Ascot Vale Road - remove car parks. Mt Alexander Rd - Corridor study contribution.
Dawson/Melville - Line Marking. Victoria/Melville - Intro turn phase.
N/A
Traffic Mitigation Works (to be constructed) Kenna St Intersection
Dean St Signal Intersection. Dean St - MVRC Land. Alexandra Ave - Roundabout. Alexandra - Pedestrian / Bike Upgrade. Dean Street - Shared Path (incl. McRae Street and Stuart Street - minor LATM works.).
Thomas St Upgrade. Junction - Signal optimisation. Junction - Line marking alts. Wilson St - Signal Intersection.
N/A
Non-Residential Development (GFA) Does not include non-residential uses Does not include non-residential uses Includes non-residential uses; offices and retail spaces.
Retail, commercial non-residential development located in these Precincts
Retail, commercial non-residential development located in these Precincts
Retail, commercial non-residential development located in these Precincts
Retail, commercial non-residential development located in these Precincts
Minor non-residential development only (TBC)
TBC
Interfaces/Management of Racecourse Operations
Prior to the commencement of construction associated with this stage of development, car parking for Racecourse Members will be relocated to the existing car park located within the infield. Land not contained within Stage A will remain under the management of Moonee Valley Racing Club for racecourse purposes. Hoarding / temporary fencing will be erected at the stage boundary to delineate public, private and racecourse land. Hoarding / temporary fencing to be visually treated to promote interest. Stage A includes four dwellings that present to the temporary Coats St extension. Management of construction impacts with existing and future residential interfaces will be addressed through Construction Management Plans under permit.
Prior to the commencement of construction associated with this stage of development, car parking for the Legends Facility (except for disabled parking) will be relocated to the infield. Land not contained within Stage B will remain under the management of Moonee Valley Racing Club for racecourse purposes. Hoarding / temporary fencing will be erected at the stage boundary to delineate public, private and racecourse land. Hoarding / temporary fencing to be visually treated to promote interest. Management of construction impacts with existing and future residential interfaces will be addressed through Construction Management Plans under permit.
Majority of interface / management of Racecourse Operations works to be completed as part of Stage B (Thomas St).
MVRC Float Park Car Park to be relocated
Main MVRC Grandstand to be demolished. New underpass to be delivered.
MVRC Float Park & Stalls to be relocated TBC TBC
Affordable Housing Affordable Housing research to be undertaken and strategy to be prepared
Affordable Housing research to be undertaken and strategy to be prepared
Affordable Housing (Key Worker) to be delivered as 5% of Building 1 Apartments (8 apartments total)
Affordable Housing to be implemented % of 5% total allowance TBC
Affordable Housing to be implemented % of 5% total allowance TBC
Affordable Housing to be implemented % of 5% total allowance TBC
Affordable Housing to be implemented % of 5% total allowance TBC
Affordable Housing to be implemented % of 5% total allowance TBC
5%
Infrastructure / Site Servicing
Gas: Existing gas on McPherson St, new connection in Kenna St extension Electrical: New pillar substation installed on Kenna St. Sewer: New trunk sewer installed and tapped into for Stage A. Water: Water main upgrade provided for Stage A. Telecoms: NBN provisioned for.
Gas: Connection to existing gas on Thomas Street. Electrical: New basement substation. Sewer: Connection to trunk sewer. Water: Connection to existing water main. Telecoms: NBN provisioned for.
Extension of Kenna St (interim design) to form part of Stage B (1 & 2) as per town planning submission
North-South Road as per ITP Pedestrian Link & Underpass to Infield
Coats St