Precast Bent System for Bridges in Seismic Regions
Marc Eberhard, John Stanton Olafur Haraldsson, Todd Janes, Hung Viet Tran
University of Washington
NEES & PEER Annual MeetingSan Francisco, 8 -9 October 2010
![Page 2: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/2.jpg)
Acknowledgments
WSDOTTRANSNOWValle FoundationFHWA, Highways for Life ProgramPEER
![Page 3: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/3.jpg)
Background
Accelerate on-site bridge construction.Use precast concrete components.Connection details:
seismic-resistant construct
![Page 4: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/4.jpg)
Construction Procedure
1) Excavate footing.
![Page 5: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/5.jpg)
2) Position and brace precast column.
Construction Procedure
![Page 6: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/6.jpg)
3) Place footing reinforcement and cast.
Construction Procedure
![Page 7: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/7.jpg)
4) Set cap-beam, grout bars into ducts.
Construction Procedure
![Page 8: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/8.jpg)
5) Place girders, diaphragms and deck.
Construction Procedure
![Page 9: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/9.jpg)
Precast
Prestressed
CIP
RC (ref)
Precast
RC
Cap-Beam
to Column
Column to
Spread Footing
Column to
Drilled Shaft
Connections
![Page 10: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/10.jpg)
Column-to-Cap-BeamConnection
![Page 11: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/11.jpg)
Cap Beam Connection: Many small bars and ducts
Courtesy: BERGER/ABAM Engineers
Tight tolerances.
![Page 12: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/12.jpg)
Precast columnPrecast cap beam6 # 18 rebar8.5” corrugated steel ductsHigh strength grout
Cap-Beam Connection: Large bars
![Page 13: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/13.jpg)
Cap-Beam Connection: Conclusions
• Failure occurs in the column.
• Large-bar precast connection behaves the same as a cast-in-place connection.
![Page 14: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/14.jpg)
Column-to-FootingConnection
![Page 15: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/15.jpg)
Footing Connection: Construction
Headed bars
![Page 16: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/16.jpg)
Footing Connection: Headed Bars
Strut and Tie Model.
![Page 17: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/17.jpg)
Footing ConnectionHooked bars facing out(Conventional cip)
Load transfer is tangential to hook.
Ineffective!
![Page 18: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/18.jpg)
Footing Connection: Construction
![Page 19: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/19.jpg)
Spread Footing ConnectionVertical (gravity) load.
Lateral (seismic) load.
![Page 20: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/20.jpg)
Spread Footing Connection: Test
After seismic testing. Foundation undamaged.
![Page 21: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/21.jpg)
Spread Footing Connection – Gravity Load Test
Column crushed at: 3.5 * (1.25DL + 1.75LL).
No damage to footing. No sign of punching failure.
![Page 22: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/22.jpg)
Spread Footing Connection
Constructability:- Column has no projecting bars.- No “form-savers”.- Easy to fabricate and transport.
![Page 23: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/23.jpg)
Spread Footing Connection
Structural Performance:• Terminators provide better anchorage than
hooked bars facing outwards.• Failure in column. Footing undamaged in
lateral load and vertical load tests.• Seismic performance as good as, or better
than, conventional c.i.p. construction.
![Page 24: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/24.jpg)
Implementation
Bid Opening:
October 14th
![Page 25: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/25.jpg)
Pre-Tensioned System
![Page 26: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/26.jpg)
Pre-Tensioned System PC cap-
beamSleeved strand
Bonded strandc.i.p.
footing
Bonded rebar
Cracking plane
![Page 27: Precast Bent System for Bridges in Seismic Regions](https://reader035.fdocuments.in/reader035/viewer/2022062316/56816912550346895de02bf6/html5/thumbnails/27.jpg)
Pre-Tensioned System
1.Pre-tensioning solves corrosion problems perceived to exist in post-tensioning.
2.Pre-tension in a plant.
• Good QC.
• Special equipment and extra site time for post-tensioning are not needed.
• Can add rebars for energy dissipation.