PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES...

21
PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES BASED DISTILLERY UNIT, 130 TPD SYNTHETIC ORGANIC CHEMICAL MANUFACTURING UNIT AND 2.2 MWH CO-GENERATION POWER PLANT BY M/S. SHAKTI DISTILLERIES PVT. LTD. SURVEY NO.: 475, 476, 479/1, 479/2, 480, MOJE SUNEVKALLA, TALUKA HANSOT, DISTRICT BHARUCH, GUJARAT

Transcript of PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES...

Page 1: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

PRE - FEASIBILITY REPORT

FOR

PROPOSED 60 KLPD MOLASSES BASED DISTILLERY UNIT,

130 TPD SYNTHETIC ORGANIC CHEMICALMANUFACTURING UNIT AND

2.2 MWH CO-GENERATION POWER PLANT

BY

M/S. SHAKTI DISTILLERIES PVT. LTD.

SURVEY NO.: 475, 476, 479/1, 479/2, 480, MOJESUNEVKALLA, TALUKA HANSOT,

DISTRICT BHARUCH,GUJARAT

Page 2: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

SUMMARYM/s. Shakti Distilleries Pvt. Ltd. is located, at Survey No.: 475, 476, 479/1, 479/2, 480, Moje Sunevkalla,Taluka Hansot, District Bharuch, Gujarat and has proposed 60 KLPD Molasses Based Distillery Unit, 130TPD (Containing By-Product) Synthetic Organic Chemical Industry and 2.2 MWH Co-Generation PowerPlant.

PROJECT COSTThe total cost of the project will be around Rs. 90 crores. Total capital cost of pollution control measureswill be Rs. 32 crores & recurring cost per annum will be 9.90 crores.

DETAILS OF PRODUCTSDetails of proposed products are given in following table.

LIST OF PROPOSED PRODUCTS AND PRODUCTION CAPACITY

SR.NO.

NAME OF THE PRODUCTSTOTAL

QUANTITY1. Extra Neutral Alcohol /Rectified Spirit & Fuel Ethanol 60 KLPD2. Co-Generation Power Plant 2.2 MWH3. Sodium Methoxide 20 TPD4. Sodium Ethoxide 20 TPD5. Potassium Methoxide 20 TPD6. Potassium Ethoxide 20 TPD

BY-PRODUCT

7. Carbon Dioxide 50 TPD

REQUIREMENTS FOR THE PROJECT

RAW MATERIALSFollowing are the raw materials required for the production process.

Sr. No.

Name of the Raw MaterialREQUIREMENT PER

DAY1. Molasses - F. S 43% 245 MT

2. DAP / UREA Nutrients - 46 % w/w Nitrogen 189 kg3. Antifoam Agent 126 kg4. Magnesium Sulphate 16 kg5. Yeast (Active Dry Yeast/Distiller’s Yeast) Own Propagation

LAND Total open land area of about 66,200 m2 will be utilized for the proposed distillery unit.

WATER For the proposed project 600 KLD water will be required. Around 1,147 KLD water will be recycled. Sourceof water for the proposed distillery unit is primarily from canal, in case of non availability of surface canalwater, ground water will be utilized. Necessary approvals will be obtained.

ELECTRICAL ENERGY For proposed project power requirement will be 1,900 KWH. Entire power requirement will be fulfilled byproposed Co-Generation Power Plant (CPP). In case of emergency power will be sourced from Gujarat StateElectricity Board grid and one D. G. set of 1,500 KVA.

MANPOWER For proposed project 50 personnel will be employed who will come from local area.

FUEL

Page 3: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

Around 53 TPD Coal (Indian/ imported) and Spent Wash is required as fuel to run the boiler. Around 15lit/hr. Diesel is required from the stand by diesel Generator Set.

SOURCES OF AIR POLLUTION AND CONTROL MEASURES

EMISSIONS FROM COMBUSTION OF FOSSIL FUELS FROM STATIONARY OR MOBILESOURCES

Sr.No.

Stack Attached ToStack Height In

MeterAir Pollution

Control DevicesParameter

1.Deep Fluidized Bed- Spent Wash Incinerator Boiler (20 TPH)

45 meter ESPPM < 150 mg/nm3

SO2 < 100 ppmNO2 < 50 ppm

2.D. G. Set(1,500 KVA – Stand By)

11.0 meter --PM < 150 mg/nm3

SO2 < 100 ppmNO2 < 50 ppm

WASTE WATER GENERATION AND IT’S TREATMENT Waste water generated from the proposed distillery unit in the form of spent wash will be concentrated inmulti effective evaporator and then incinerated in the spent wash fired boiler. Condensate from MEE will berecycled back to the process, while spent less and other waste water stream will be treated in ETP and treatedwater will be reused for process and green belt development. Thus achieve the’ Zero Liquid Discharge’.

NOISE POLLUTION AND CONTROL MEASURES:From the proposed manufacturing unit noise pollution will generate which will be controlled by adoptingdifferent types of noise pollution control measures. Main sources of the noise pollution are machineries,Electric motors, etc. Following noise control measures to be adopted in the existing and proposed project,

Encasement of noise generating equipment.

Greenbelt all around the plant boundary.

In addition personnel, working near high noise level generating sources, will be provided with PPE.

Proper and suitable acoustic barrier will also be provided around, areas generating high noise.

Effective preventive maintenance and vibration measurement of all rotating equipment will help in theimprovement of plant life and also noise reduction.

SOLID WASTE GENERATION AND ITS DISPOSAL METHODThe details of solid/Hazardous waste generation and its management are given in the following table.

Sr.No.

Name of the Waste Total Method of Storage & Disposal

1. Fly ash 18800 MT/Year Will be sold to brick manufacturers or use as manure.

2. Used Oil 0.1 KL/YearCollection, Storage, transportation and disposal by sell-

ing to GPCB approved registered recyclers / reuse.

3.Discarded Container/Bar-rels/ Linear

50 Nos./YearCollection, Storage and disposal by selling to GPCB ap-

proved registered recyclers.

GREEN BELT DEVELOPMENTAround 22,157 m2 area will be developed as green belt.

Page 4: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

INDEX

CHAPTERNO.

CONTENT

1 Introduction of the Project2 Project Description3 Site Analysis4 Planning Brief5 Proposed Infrastructure6 Rehabilitation and Resettlement (R & R) Plan7 Project Schedule & Cost Estimates8 Analysis of Proposal

Page 5: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER-1INTRODUCTION OF THE PROJECT

1.1 IDENTIFICATION OF PROJECT

M/s. Shakti Distilleries Pvt. Ltd. is located at Survey No.: 475, 476, 479/1, 479/2, 480, Moje Sunevkalla,Taluka Hansot, District Bharuch, Gujarat. M/s. Shakti Distilleries Pvt. Ltd is planning to set up 60 KLPDdistillery plant using molasses as a basic raw material , Synthetic Organic Chemical Industry and 2.2 MWHCo-Generation Power Plant.

1.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT

M/s. Shakti Distilleries Pvt. Ltd. is planning for installation of the distillery unit, Synthetic OrganicChemical Industry and Co-Generation Power Plant at Survey No.: 475, 476, 479/1, 479/2, 480, MojeSunevkalla, Taluka Hansot, District Bharuch, Gujarat.

LIST OF PRODUCTS AND PRODUCTION CAPACITY

SR.NO.

NAME OF THE PRODUCTSTOTAL

QUANTITY1. Extra Neutral Alcohol /Rectified Spirit & Fuel Ethanol 60 KLPD2. Co-Generation Power Plant 2.2 MWH3. Sodium Methoxide 20 TPD4. Sodium Ethoxide 20 TPD5. Potassium Methoxide 20 TPD6. Potassium Ethoxide 20 TPD

BY-PRODUCT7. Carbon Dioxide 50 TPD

1.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND ORREGION.

1.3.1 INDUSTRY OVERVIEWMolasses is one of byproducts of sugar industry which is used to produce rectified spirit/alcohol for makingliquor and fuel. Traditionally, molasses has been used in India to produce rectified spirit and alcohol of high-er than 95% purity for producing liquor for human consumption and for producing various chemicals. How-ever, with technological developments in the recent past, molasses has been effectively used to produce bio-ethanol for blending with petrol as a fuel.

1.3.2 GLOBAL SCENARIOBrazil is the second largest producer of ethanol globally after U. S. While U.S. produces ethanol from corn,Brazil manufactures ethanol from sugarcane. Brazil has mandatory blending ratio of ethanol in gasolineranging from 18% to 25%. The blend rate was as high as 25% before September 2011 and was reduced to20% due to drop in cane output hence affecting the ethanol production. Currently, flex-fuel cars, which canuse either ethanol or blended gasoline, in Brazil account for about 53% of the total car fleet and around 90%of the new vehicles’ sales. The proportion of the flex-fuel cars are expected to cross 80% by 2020. Current -ly, the Brazilian light vehicle fleet has been increasing by 6.7% y-o-y since 2003 with currently 90% of thenew vehicles being flex-fuel cars. Thus, there exists an increasing demand in Brazil for ethanol which is en -couraging for the sugarcane industry.

1.3.3 INDIAN SCENARIOIndia has 330 distilleries, which produce over 4 billion liters of rectified spirit (alcohol) a year. Of the totaldistilleries, about 120 distilleries have the capacity to distillate 1.8 billion liters (an additional annual ethanolproduction capacity of 365 million liters was built up in the last three years) of conventional ethanol per yearwhich is sufficient to meet requirement for 7-8% ethanol blending with petrol.

Total ethanol production increased from 1,435 million liters in 2009-10 to 1,934 million liters in 2010-11 on

1

Page 6: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

account of higher sugarcane and sugar production and the estimated ethanol production in 2011-12 is peggedat 2,130 million liters. Ethanol consumption increased from 1,780 million liters in 2009-10 to 2,010 millionliters in 2010-11, owing to improved molasses supply and steady ethanol demand from competing indus-tries.

1.3.4 GOVERNMENT POLICYIn 2006, GOI mandated 5% ethanol blending with petrol (EBP) programme to directly benefit the sugarcanefarmers by assuring the sugar industry a stable and reasonable return for the molasses and then passing a sig-nificant part of the same to the farmers. But since then the programme has been struggling to take off despitethe fact that the Cabinet Committee on Economic Affairs (CCEA) in November 2009 directed that a finan -cial penalty be imposed on OMCs for their failure to reach targets.

In November 2012, the CCEA has made it mandatory for Oil marketing companies (OMCs) - Bharat Petro-leum, Hindustan Petroleum and Indian Oil Corporation - to blend 5% ethanol with petrol. This is likely toreduce the fuel import bill and lower India's dependence on fossil fuel as the ethanol prices are lower thanpetrol. OMCs have been blending ethanol with petrol for the past two years but the policy was partially im-plemented in absence of any clear directive. The Committee, headed by the Prime Minister, has also ap -proved market-based pricing of the biofuel, opening the market for ethanol producers - mostly sugar compa -nies. This shall result in an increased demand for ethanol by OMCs.

The national bio-fuel policy, approved by the Government of India, has plans for a 20% ethanol blendingprogramme by 2017 from the current mandated 5% blending & recently increased to 10%, to reduce India’sdependence on fossil fuel imports.

1.4 DEMANDS-SUPPLY GAPThe gap between the availability of alcohol and the requirement by the industry has been widening. The ex -isting requirement of alcohol by the industries is around 600 million liters annually. In 1992-93, alcohol con-sumed for industrial purpose was 450 million liters and utilization for potable purpose was 434 millionliters. The trend is expected to continue over last 9-10 years.

1.5 EMPLOYMENT GENERATIONFor the proposed project 50 personnel will be employed.

2

Page 7: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER-2PROJECT DESCRIPTION

2.1 TYPE OF PROJECT

M/s. Shakti Distilleries Pvt. Ltd. is located at Survey No.: 475, 476, 479/1, 479/2, 480, Moje Sunevkalla,Taluka Hansot, District Bharuch, Gujarat.

Molasses is produced as a by-product during manufacturing of sugar. Company is planning to set updistillery plant to manufacture 60 KLPD Extra Neutral Alcohol /Rectified Spirit & Fuel Ethanol usingmolasses as a basic raw material, Along with Synthetic organic chemical industry and Co-Generation PowerPlant.

2.2 LOCATION

M/s. Shakti Distilleries Pvt. Ltd located at Survey No.: 475, 476, 479/1, 479/2, 480, Moje Sunevkalla,Taluka Hansot, District Bharuch, Gujarat. Project is situated at 21°29'30.78" North latitude and 72°50'37.12"East longitude. A map showing location of the project is presented in following figure-1and detailed planlayout in shown in figure- 2.

FIGURE- 1 LOCATION MAP

3

Page 8: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

FIGURE-2 PLAN LAYOUT

4

Page 9: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

2.3 PROCESS DESCRIPTION

MANUFACTURING PROCESS OF DISTILLERY UNIT

The manufacturing process of rectified spirit/ anhydrous alcohol involves two major steps. Molasses is thebasic raw material. Generally sulphuric acid is not required, nutrients like yeast, anti-foam agent etc, will beused.

Following steps are required for the Ethanol Production.

1) Fermentation SectionMolasses handling: Molasses from the sugar factory will be utilized for the proposed production. Molassesis then after weighted, sent for storage or to the process diluter tank.

Yeast Propagation: Best strain of yeast is required for the production of alcohol, yeast is bought fromnearby vendor and is developed further in propagation section and maintain the viable cell population ofabout 300 million cells/ml by yeast recycling and continuous aeration of the fermenter.

Fermentation: When Yeast is added in container, yeast works on sugar present in molasses, break down thesugar into alcohol and carbon-dioxide, required temperature controlled to be 30-32°C (by circulating coolingwater). From Fermenter CO2 collected and directed to scrubber. Remaining content is “wash”.

2) Distillation SectionThe “wash” from the fermentation enters into distillation section. The hardware contains columns basicallyfor two functions, namely Stripping and Rectification. Thus, 1) Analyser column – Operated under vacuumand 2) Rectifier cum Exhaust Column – operated under pressure. (Additional columns only for refinement).

The “wash” from fermentation is first preheated in heater and fed to analyser column. Alcohol from thewash in form of vapour from the analyser column is fed to pre-rectifier column (under vaccum). The impurespirit drawn from the top of column were collected at bottom which is fed into the rectified cum exhaustcolumn (under pressure). Alcohol is enriched towards the top and drawn out as Rectified Spirit about 95%v/v concentrations. Fusel oil generated is drawn out to tank, washed with water, decanted, layers separatedand alcohol layer returned as recovery.

3) Molecular Sieve DehydrationMolecular sieve dehydration is to produce anhydrous alcohol from rectified spirit. Water molecules areadsorbed on the pore surface and the larger alcohol molecules are excluded and exit from the sieve unit. Theabsorption is a vapour phase process and hence, rectified spirit, vaporized and super heated in avaporizer/column is passed through sieve unit. Generally there are two sieve units. One is under adsorptionwhile the other is under regeneration. The cycle time for adsorption and regeneration varies from 5 to 10minutes. Thus forms Absolute Alcohol of desired 99.8% v/v purity. There is alternate Sieve Bed 2 ready fornext operation.

4) Multi-Effect EvaporationSpent wash from the process is fed into multi effect evaporator. Whole process is under vacuum and vaporgenerated are compressed and used as steam. Condensate water generated from evaporation will be recycledback into the process. While spent wash will be incinerated in the proposed spent wash fired boiler.

5

Page 10: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

MANUFACTURING PROCESS OF SYNTHETIC ORGANIC CHEMICAL

1) SODIUM METHOXIDE SOLUTION (30% TO 25%)

Sodium Hydroxide flex is charged in four times Methanol and heated to reflux to get Methoxide Caustic solution whichpresence of one equivalent molecules of water.

This water is recovered with counter current dry methanol vapor in a bubble cap tray tower, the result in sodiummethoxide solution is collected from the bottom of that column (25-30% W/W).

2) SODIUM ETHOXIDE SOLUTION (18 to 21%)

Take 1000 gm of ethanol in reactor.

Start Stirring at room temperature.

Then add Caustic Flex (135 gm) in the ethanol Solution.

Check the moisture content is not more than 9.0 %.

3) 18% ETHANOLIC KOH SOLUTION OR POTASSIUM ETHOXIDE SOLUTION

Take 790 kg of Ethanol in S.S. reactor

Start stirring at room temperature to 100-400 rpm.

During the addition of KOH to ethanol is a exothermic reaction.

Stare cooling water circulation to S.S. reactor and bring the temperature of Ethanol between 30-350C.

Start addition of 215 kg KOH (purity of KOH is 855) slowly by maintain the temperature of Ethanol shouldnot be increased more than 35-400C.

Addition time of KOH will be 0.5 to 1.0 hrs.

After completing addition, maintain the temperature of ethanolic KOH solution at 350C for 3.0 hrs with con-stant stirring.

Check the moisture content. It should not be more than 9.0%.

After 3.0 hrs, transfer the ethanolic KOH in Drum/Storage tank with constant stirring. Solid un-dissolvedKOH should not be settled at bottom during the transfer of ethanolic KOH solution

4) POTASSIUM METHOXIDE SOLUTION (30% to 25%)

Potassium Hydroxide flex is charged in four times Methanol and heated to reflux to get Methoxide Caustic solutionwhich presence of one equivalent molecules of water.

This water is recovered with counter current dry methanol vapor in a bubble cap tray tower, the result in Potassiummethoxide solution is collected from the bottom of that column (25-30% W/W).

6

Page 11: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

PROCESS FLOW DIAGRAM OF MOLASSES BASED DISTILLERY

Water Requirement and Waste Water Generation for 60 KLPD molasses distillery

TOTAL WATER INPUTS (KL) TOTAL WATER OUTPUT (KL)

Process water in fermentation 470 Steam condensate 412

DM water for RS dilution 190 Water in spent wash 577

DM water for boiler feed 504 Spent less 155

Soft water for vaccum pump& others 30 CT evaporation & drift losses 475

Soft water makeup for cooling tower 475 Domestic consumption 10

Water in molasses48

Boiler (Deaerator, Blowdown, drain) Losses

68

Other domestic usage (Provisional) 10 Vacuum pump sealing / purge 30

Miscellaneous Washing (Provisional) 20 Miscellaneous washing (Provisional) 20

TOTAL 1,747 TOTAL 1,747

RECYCLE & UTILIZATION STREAMS (KL)

Spent lees Recycle 155

Steam Condensate recycle for boiler 412

Water in spent wash recycle (Distillation+ fermenta-tion)

130

Process condensate recycle to process & CT 420

Vacuum pump water recirculation 30

Total Recycling/ re-utilization of water per day 1116

TOTAL 1,147

FRESH WATER REQUIREMENT 600

7

Rectified spirit/ Anhydrous Alcohol

Molasses Storage and Handling

Fermentation

Multi-Pressure Distillation

Spent wash

Multi-Effect Evaporator Condensate

Process/Cooling

Dried Spent wash Used as fuel in incinerator Boiler

Page 12: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

8

Page 13: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

2.4 RAW MATERIALS REQUIREMENT Details of raw material consumption are given in following table.

LIST OF RAW MATERIALS

Sr. No.

Name of the Raw Material Requirement Per Day

1. Molasses - F. S 43% 245 MT

2. DAP / UREA Nutrients - 46 % w/w Nitrogen 189 kg3. Antifoam Agent 126 kg4. Magnesium Sulphate 16 kg5. Yeast (Active Dry Yeast/Distiller’s Yeast) Own Propagation

2.5 RESOURCE OPTIMIZATION / RECYCLING AND REUSE IN THE PROJECTWater as a resource is recycled at each possible step of the process and latest technology and methodologywill be adopted to conserve and reuse the resources. Waste water generated from the process goes to ETPand treated water after pH corrections is used back again into the various processes and remaining is usedfor the horticulture purposes.

2.6 AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT ANDSOURCE

2.6.1 WATER REQUIREMENTFor the proposed project 600 KLD water will be required. Around 1147 KLD water will be recycled. Sourceof water for the proposed distillery unit is primarily from canal, in case of non availability of surface canalwater, ground water will be utilized. Necessary approvals will be obtained.

2.6.2 POWER REQUIREMENTFor proposed project power requirement will be 1,900 KWH. Entire power requirement will be fulfilled byproposed Co-Generation Power Plant (CPP). In case of emergency power will be sourced from Gujarat StateElectricity Board grid and one D. G. set of 1,500 KVA.

2.6.3 FUEL REQUIREMENT

SR.NO.

FUEL TOTAL SOURCE & MODE OFTRANSPORTATION

1. Coal (Indian/Lignite) 53 TPD From Nagpur, Indonesia, etc2. Diesel for 1,500 KVA D. G. Set 15 Lit/Hr From Nearest Petrol Pump

2.7 QUANTITY OF WASTES TO BE GENERATED (LIQUID, AIR AND SOLID) AND THEIRMANAGEMENT / DISPOSAL

2.7.1 WASTE WATER GENERATION

For the proposed project 600 KLD water will be required. Around 1147 KLD water will be recycled. Wastewater generated from the proposed distillery unit in the form of spent wash will be concentrated in multieffect evaporator and then incinerated in the spent wash fired boiler. Condensate from MEE will be recycledback to the process, while spent less and other waste water will be treated in ETP units and treated water willbe reused in process and green belt development. Thus achieve the’ Zero Liquid Discharge’.

9

Page 14: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

2.7.2 AIR POLLUTION

EMISSIONS FROM COMBUSTION OF FOSSIL FUELS FROM STATIONARY OR MOBILESOURCES

Sr.No.

Stack Attached ToStack Height

In MeterAir Pollution Control

DevicesParameter

1.Deep Fluidized Bed- Spent Wash Incinerator Boiler (20 TPH)

45 meter ESPPM < 150 mg/nm3

SO2 < 100 ppmNO2 < 50 ppm

2.D. G. Set of (1,500 KVA – Stand By)

11.0 meter --PM < 150 mg/nm3

SO2 < 100 ppmNO2 < 50 ppm

2.7.3 SOLID WASTE GENERATION AND THEIR DISPOSAL

The sources of solid wastes, generation and its management are as given in the following table.

Sr.No.

Name of theWaste

Total Method of Storage & Disposal

1. Fly ash 18800 MT/Year Will be sold to brick manufacturers or use as manure.

2. Used Oil 0.1 KL/YearCollection, Storage, transportation and disposal by selling to GPCBapproved registered recyclers / reuse.

3.Discarded Contain-er/Barrels/ Linear

50 Nos./YearCollection, Storage and disposal by selling to GPCB approved reg-istered recyclers.

KL

10

Page 15: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER-3SITE ANALYSIS

3.1 CONNECTIVITY

3.1.1 RAIL

The nearest railway station is Kosamba Railway station, which is around 11 km in East South East directionfrom the project site.

3.1.2 ROAD

The site is well connected by road network to all the key places. The major highway passing near the projectsite is NH-228 which is approximately 2.03 km West direction from the project site.

3.1.3 AIR

The nearest airport from the project site is Surat Airport. The distance of airport from project site is around42 km in South South West direction.

3.1.4 COMMUNICATION

Project Site is well connected with telephone, telefax etc. all the communications facilities are welldeveloped in the district.

3.2 TOPOGRAPHY

Topography of the land is plane.

3.3 EXISTING LAND USE PATTERN

There is no Forest, National park; Wild life sanctuary within a radius of 10 Km. For the proposed projectexisting infrastructure land will be utilized.

3.4 EXISTING SOCIAL STRUCTURE

Project site is located at a distance of around 11 km from Kosamba. All the infrastructures are availablewithin city like Schools, Hospitals & community facilities.

11

Page 16: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER – 4PLANNING BRIEF

4.1 PLANNING CONCEPT

Molasses is the by-product in processing sugar cane for production of sugar. In general the molasses produc-tion is about 4.5% on cane crushed. The Carbohydrates in Molasses are already in the form of Sugars. Hencemolasses does not need any pretreatment for production of Alcohol. Repeated evaporation and Centrifuga-tion decreases the sugar content of molasses and increases the viscosity and concentration of salts and otherimpurities. The residual syrup thus becomes thick, viscous and brown in colour and is very heavy. The con -centration of molasses is normally measured in Brix.

Molasses Scenario of India

Details of Molasses Production in India (Source-Indian Sugar Mills Association)

Season 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14MolassesProduction

6.542 8.40 10.97 11.824 11.744 10.881

4.2 LAND USE PLANNING

The plant general layout has been planned considering production facilities, auxiliary and ancillary facilitiesand plant utilities & services. Details of land use planning are presented in following table.

Break up of different land use in meter square as given below.

Sr. No. Land useTotal Area

Sq.mt1. Plant area 16,2982. Open Area 17,3693. Internal Roads 10,3764. Green Coverage 22,157

Total Area 66,200

4.3 AMENTIES / FACILITIES

Adequate storage facility for chemicals, machinery spares and consumables shall be provided. A smallmechanical and electrical/ instrument workshop facilities for repairs and maintenance shall also be provided.Time and security offices shall be provided in the plant. To avoid fire hazard, internal fire hydrants systemunit will be provided.

12

Page 17: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER – 5PROPOSED INFRASTRUCTURE

5.1 INDUSTRIAL AREA

Total land area (i.e. 66,200 m2) will be utilized for the proposed distillery unit.

5.2 RESIDENTIAL AREA

There is no provision of permanent housing for the employees at site, however worker quarters will beprovided within premises with all facilities.

5.3 GREEN BELT

The main objective of the green belt is to provide a barrier between the source of pollution and thesurrounding areas. The green belt helps to capture the fugitive emission and to attenuate the noise generatedapart from improving the aesthetics. Development of green belt and other forms of greenery shall alsoprevent soil erosion and washing away of topsoil besides helping in stabilizing the functional ecosystem andfurther to make the climate more conducive and to restore water balance. The company has green belt areawith Lawn, plants and flowers spread across about 33% of the total area. Further it will be developed at plantboundary, road side, around offices & buildings and Stretch of open land.

The selection of tree species suitable for plantation at the industry are governed by guiding factors as statedbelow:

The trees should be tolerant to air pollutants present in the area

The trees should be able to grow and thrive on soil of the area, be evergreen, inhabitant, havingminimum of leaf fall.

The trees should be tall in peripheral curtain plantation and with large and spreading canopy inprimary and secondary attenuation zone.

The trees should posses extensive foliar area to provide maximum impinging surface for continuedefficient adsorption and absorption of pollutants.

The trees should be fast growing and indigenous and should maintain ecological, land andhydrological balance of the region.

It is also recommended to plant few trees, which are sensitive to air pollution, as air pollutionindicator.

It is also recommended to carry out extensive plantation within premises.

Keeping in view the climatic conditions, status of soils and vegetation types in and around the project areathe species shall be selected for proposed green belt development.

5.4 SOCIAL INFRASTRUCTURE

Drinking water facility, proper sanitation, etc. will be provided to the workers working in plant.

5.5 CONNECTIVITY

As discussed earlier, proposed location of the plant is already well connected with the network of road &rail. So there is no need to construct any new road or rail for the transportation.

5.6 WASTE WATER MANGAMENT

Waste water generated from the proposed distillery unit in the form of spent wash will be concentrated inmulti effective evaporator and then incinerated in the spent wash fired boiler. Condensate from MEE will berecycled back to the process, while spent less and other waste water stream will be treated in ETP and

13

Page 18: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

treated water will be reused for process and green belt development. Thus achieve the’ Zero LiquidDischarge’.

5.7 INDUSTRIAL SOLID WASTE MANAGEMENT

From the proposed project activity detail for the solid/hazardous waste generation are given in below table.

DETAILS OF SOLID & HAZARDOUS WASTE GENERATION DURING OPERATION

Sr.No.

Name of the Waste Total Method of Storage & Disposal

1. Fly ash 18800 MT/Year Will be sold to brick manufacturers or use as manure.

2. Used Oil 0.1 KL/YearCollection, Storage, transportation and disposal by selling to GPCBapproved registered recyclers / reuse.

3.Discarded Contain-er/Barrels/ Linear

50 Nos./YearCollection, Storage and disposal by selling to GPCB approved reg-istered recyclers.

14

Page 19: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER – 6REHABILITATION AND RESETTLEMENT (R & R) PLAN

The project is located on private land, which is already acquired and there is no habitat. So the projectproposal does not involve any Rehabilitation & Resettlement.

15

Page 20: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER – 7PROJECT SCHEDULE & COST ESTIMATES

7.1 TIME SCHEDULE FOR THE PROJECT

The implementation of the project will involve major activities like preparation of specification / drawings,issue of tenders, receipt of quotations, scrutiny of tenders, placing of orders, civil & structural construction,delivery & erection of equipment, test trial runs of various items of equipment and commissioning of theplant & equipment and completion of the project will take about 18 months after the necessary clearancesare available, and the funding for the project has been tied up.

7.2 ESTIMATED PROJECT COST

The total cost of the project after proposed project will be around Rs. 90 crores. Total capital cost ofpollution control measures will be Rs. 32 crores.

7.3 BUDGETORY PROVISIONS FOR EMP

Adequate budgetary provisions have been made by the management for execution of environmentalmanagement plans. The details of capital and recurring (per annum) budget earmarked for pollution control /monitoring equipment; operation and maintenance of pollution control facilities, for greenbelt developmentand maintenance.

16

Page 21: PRE - FEASIBILITY REPORT FOR PROPOSED 60 KLPD MOLASSES ...environmentclearance.nic.in/writereaddata/Online/TOR/21_Apr_2016... · Co-Generation Power Plant. 1.2 BRIEF DESCRIPTION OF

CHAPTER – 8ANALYSIS OF PROPOSAL

8.1 FINANCIAL AND SOCIAL BENEFITS

The capital cost of the distillery unit is estimated about Rs. 90 Crores for the installation of plants &machinery along with required auxiliary and balancing facilities for the production.

For the coming of this project surrounding area will get developed due to this project and through theCorporate Social Responsibility (CSR) activities, socio-economic status of the region will also getdeveloped.

17