Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood...

23
Pre-Bid Meeting December 15, 2016 BP1 – Hillside and Milwood Middle Schools Remodel BP2 – Phoenix High School and Woods Lake Magnet Remodel

Transcript of Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood...

Page 1: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Pre-Bid Meeting

December 15, 2016 BP1 – Hillside and Milwood Middle Schools Remodel

BP2 – Phoenix High School and Woods

Lake MagnetRemodel

Page 2: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

AGENDA Introductions

Scope and Schedule

Bid Categories

Bid Requirements

Questions

Tour

Page 3: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

PROJECT TEAM

Allan Tyler, Facilities Manager

Karen Jackson, Facilities Management Executive

Assistant

Jim RossMichael Galovan

The SKILLMAN CorporationMichael KounelisCourtney James [email protected]

Page 4: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

SUMMARY OF WORKBid Package 2 –Hillside Middle School• Locker replacement and exterior monument sign

Milwood Magnet School• Locker replacement

Bid Package 3 –Phoenix High School • New concrete walk • Window and entrance replacement• Soffit repair• Cast stone wall cap replacement• Toilet room remodel• Exhaust fans and convectors• Clocks and lighting

Woods Lake Magnet• Exterior monument sign• Interior door replacement and transom infill• Technology Infrastructure

Page 5: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 2BC 1.1 – General Trades – Hillside Middle

Demo lockers; relocate electrical outlet; new fire extinguishers and cabinets; concrete footings and slab, pre-cast concrete, masonry, electronic message sign, dimensional letters related to monument sign

BC 1.2 – General Trades – Milwood Magnet

Demo lockers, new fire extinguishers and cabinets

BC 2.1 – Lockers– Hillside Middle

New lockers

BC 2.2 – Lockers – Milwood Magnet

New lockers

Scope of Workby Bid Package and Category

Page 6: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 1 – Site Concrete – Phoenix High School

Demo, excavation, concrete sidewalk, pavement painting, site restoration

Scope of Workby Bid Package and

Bid Category

Page 7: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 2 – Glass and Aluminum Assemblies – Phoenix High School

Limited demolition, storefront entrances, windows and aluminum doors and hardware, fiberglass-sandwich-panels, louvers

Scope of Workby Bid Package and Category

Page 8: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 3.1 – General Trades – Phoenix High School

Demo +window AC, concrete floor patch, cast-stone, wood doors and hardware, plaster patch soffits and paint, metal stud/gyp. board walls and ceilings, interior painting, toilet partitions and accessories

Scope of Workby Bid Package and Category

Page 9: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 3.2 – General Trades – Woods Lake Magnet

Demo; concrete footings and slab, pre-cast concrete, masonry, electronic message sign, dimensional letters related to monument sign; hollow metal doors and frames; wood doors; door hardware; artistic door decal; metal stud/gyp. board door frame infill; and interior paint

Scope of Workby Bid Package and Category

Page 10: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 4 – Tiling – Phoenix High School

Page 11: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 5 – Mechanical / Plumbing – Phoenix High School

Demo (window AC); plumbing fixtures, piping, exhaust fans and balancing, convector, fin-tube and controls reinstallation

Scope of Workby Bid Package and Category

Page 12: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 6.1 – Electrical – Phoenix High School

Demo, clocks, lighting, technology infrastructure

Scope of Workby Bid Category

Page 13: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Package 3BC 6.2 – Electrical – Wood Lake Magnet

Demo, clocks, lighting, technology infrastructure

Scope of Workby Bid Category

Page 14: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

01 12 00Multiple Contract

Summary and Schedule

Summary

- Summer 2017

- Work can start after school dismisses for the day, as long as conditions are restored for education.

- Window and toilet room work may NOT start until June 19, 2017.

- Substantial Completion July - August 2017.

Page 15: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

1.01 Documents

• Construction documents are available at: www.skillmanplanroom.com

• The electronic files are available FREE.

• Bidders desiring printed documents are required to pay for cost of printing and shipping.

00 10 00 Instructions to

Bidders

Page 16: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

1.02 Bidders Examination & Representation• H. This is a construction management

project. There is no General Contractor. The Owner will award separate Contracts to each Prime Contractor.

1.04 Clarifications of Bidders Questions

• Submit questions to [email protected]

1.05 Approval Before Bidding• Substitution requests will not be accepted.

00 10 00 Instructions to

Bidders

Page 17: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

1.06 Addenda

• Addenda will be posted to www.skillmanplanroom.com

1.11 Bid Security

• Bid security in the amount of 5% must accompany each bid.

1.16 Performance and Payment Bond

• Successful Bidders will be required to furnish Performance & Payment Bonds for 100% of their Contract amount.

00 10 00 Instructions to

Bidders

Page 18: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

1.19 Wage Scale

• This is a non-prevailing wage rate project.

00 10 00 Instructions to

Bidders

Page 19: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

00 31 00Bid Form

Page 20: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Bid Documents Availablewww.skillmanplanroom.com

January 11– Final Addendum

January 17– Bid Opening

January 19 – 27 – Post-bids

February 17 – Notice to Proceed

June 19 – Construction Begins

BID SCHEDULE AND UPDATES

Page 21: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside
Page 22: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside
Page 23: Pre-Bid Meeting BP1 Hillside and December 15, 2016 Milwood ...distribution.easternengineering.com/Job_Details/Pre-Bid Meeting... · Pre-Bid Meeting December 15, 2016 BP1 –Hillside

Questions

(followed by Tour)

LOY NORRIX WINDOW

REPLACEMENT