Pradeep Jain-Resume-9-Dec-2014

6

Click here to load reader

Transcript of Pradeep Jain-Resume-9-Dec-2014

Page 1: Pradeep Jain-Resume-9-Dec-2014

PRADEEP JAIN

Email: [email protected],[email protected] No: +27-848340327, +27-746353888

CAREER OBJECTIVE:

Intend to build a career in Telecom with leading corporate of high tech environment with Committed and dedicated people, which will help me to explore myself fully and realize my potential is willing to work as a key player in challenging and creating Environment.

WORK EXPERIENCE : GSM (2G) & WCDMA (3G) & LTE (4G) – RF Optimization Engineer

TOTAL EXPERIENCE : 5 Year

PRESENT EMPLOYER:

Working in METRO TELWORKS (South Africa) as a RF planning & Optimization From March 2012 to (till date) Worked in METRO TELWORKS India as RF Engineer from November 2009 to March2012.

CURRENT PROJECT:

1. MTN -(Client Site: Huawei : 2G/3G/4G project )

Location: Pretoria & JohannesburgDuration: August 2014 to till nowCompany: Metro Teleworks (South Africa)

Job profile: RF planning & Optimization Maintaining main 8 KPIs for R99 and HS to meet Service Level Agreement (SLA) Points. Tuning/Suggesting RF Parameters for RNC Level Degradation. Making data& providing solutions/reasons for Exclusion of Sites/Cells for days/hours from SLA Points in case of

breach with the help of Prove from RF reports and RF parameters from M2000/Naster. We monitor SE cells with help of M2000 and PRS, and Change at parameter level for the Live optimization of

traffic, KPI and Customer Experience. Pre/Post Event Health Check Report : Pre/Post Event KPI analysis (Accessibility/Retain ability KPI) Main target in times of Event monitoring is to give the user better experience on 4G /3G up to the extent it’s

possible, and then move traffic to 2G Cells. RNC Performance Monitoring Trouble Ticket Resolution, M2000/PRS Initial system planning for GSM cellular network, site identification and

evaluation, RF coverage planning, power budgeting, frequency planning using RF planning tools like Asset (ILSA).

Traffic monitors and analysis of various counters (Call success, Drop, Congestion, Handover etc.) for capacity planning and traffic planning. Also to identify any problem related with quality parameters in the network.

verification of network performance, detection of any interference present due to low C/I or C/A and to check the speech quality in the network.

Identification of weak coverage areas and implementation of solutions such as Boosters, Repeaters etc.

Page 2: Pradeep Jain-Resume-9-Dec-2014

OTHER PROJECT

1. Cell C-(Client Site: Huawei Project) Company: Metro Teleworks (South Africa) Cell C: Pretoria (South Africa)

Job profile: RF planning & Optimization Project: 2G & 3G Duration: June2014 to August 2014

JOB RESPONSIBILITIES:- Responsible for PLO site report submission. Monitoring the Coverage and KPI for 2100 layer Upgrade site Making the report for monthly drive and give the recommendation for improving the coverage. Handling the Customer complaint. Work on Multi radio Site GSM900, DCS1800, and UMTS 900 UMTS 2100. Involved in analyzing Coverage, Quality, and Handovers of the network and Height reduction of GSM Antenna

and UMTS FDD Antenna. Parameter Tuning and Optimization of Network as per design requirements. Analysis of Call Drops, Blocked Calls, Handover Failures, Excessive Handovers, Congestion, Swapping,

Interferences, Poor quality and Poor C/I in 2G. Analysis of Video Call Drops, Video Blocked Calls, Handover Failures 3G-2G and 2G-3G ,3G-3G,Cell reselection

3G-2G and 2G-3G Congestion, Swapping, Poor Ec/No and Poor RSCP in 3G. Daily worst cell Analysis for TCH assignment, completion rate & recommended best possible solutions for the same.

Daily worst cell analysis for SDCCH assignment, completion rate & recommended for best possible solution for the same.

Neighbor tuning & deletion & addition of neighbors as required for maintaining Handovers success rate.

Frequency retune, checking of faulty hardware (trx, dvga, feeder cable BOI card) to optimize best possible Uplink & Downlink Rx qual.

Frequency & Handover, Inter & Intra MSC Handover planning, LAC Planning.

To find out & rectify the major causes of call drops.

Have full command on HOC.POC & other parameter at BSC & BTS system level for fine tuning of the Network.

Daily monitoring of Data KPI, Analysis of data traffic & TBF success rate.

Planning for data network, Data equipment & network dimensioning.

Traffic monitors and analysis of various counters (Call success, Drop, Congestion, Handover etc.) for capacity planning and traffic planning. Also to identify any problem related with quality parameters in the network.

Verification of network performance, detection of any interference present due to low C/I or C/A and to check the speech quality in the network through the drive test plots.

Identification of weak coverage areas and implementation of solutions such as Boosters, Repeaters etc. Maintenance of all main KPI for 8Major BSc’s. Leading a team of engineers for in-depth analysis of different reports for hard as well as soft optimization of

sites. Daily BSC wise as well as Cell-Sector wise analysis for correction of major faults as Transcoder drops, Abis

Drops, Significant increase in CP load at MSC & Increase in Transcoder utilization in the system.

2. Vodacom-(Client Site: Huawei : LTE project ) Location: Pretoria & JohannesburgDuration: March 2014 to May 2014Company: Metro Teleworks (South Africa)

Job profile: Report Analyzer and Report maker

Page 3: Pradeep Jain-Resume-9-Dec-2014

Rollout of 20 sites for launching LTE-Vodacom in Durban & 500 sites for launching LTE-Vodacom in Johannesburg & Pretoria, SA.

Analysing SINR Degradations with respect to PCI Planning Analysing the performance of different UE’s with respect to Throughput Drive (DL+UL) in terms of Throughput

and UE Tax Power. Analysed and achieved CS fall back. Preparing Reports for SSV and submitting it to the Customer for acceptance. Analysis of Layer 3 Messages Optimization includes tuning of handover parameters like a3offset, a3time to trigger, a5offset, a5time to trigger, Timer T304 etc Initially Performed Drive test & Co-ordinating the teams for newly integrated RL 25 sites and optimising in cluster

with RL 15 sites with respect to SCTP port number’s configuration and Handover Definitions. Tool Used Nemo outdoor & Analyser/ Genex probe & Genex Assistant 5 Analysis of Call Drops, Blocked Calls, Handover Failures, Excessive Handovers, Congestion, Swapping,

Interferences, Poor quality and Poor C/I in 2G/3G.

3. Vodacom-(Client Site: NSN: Main Month Project) Company: Metro Telworks (South Africa) Vodacom -Durban (South Africa)

Job profile: Report analyzer Duration: March 2012 to Responsible for PLO site report submission. Monitoring the Coverage and KPI for 2100 layer Upgrade site Making the report for monthly drive and give the recommendation for improving the coverage. Handling the Customer complaint. Work on Multi radio Site GSM900, DCS1800, UMTS 900 UMTS 2100. Involved in analysing Coverage, Quality, and Handovers of the network and Height reduction of GSM Antenna and

UMTS FDD Antenna. Parameter Tuning and Optimization of Network as per design requirements. Analysis of Call Drops, Blocked Calls, Handover Failures, Excessive Handovers, Congestion, Swapping,

Interferences, Poor quality and Poor C/I in 2G/3G. Analysis of Video Call Drops, Video Blocked Calls, Handover Failures 3G-2G and 2G-3G ,3G-3G,Cell reselection 3G-2G

and 2G-3G Congestion, Swapping, Poor Ec/No and Poor RSCP in 3G.

4: IDEA - (Client Site: Main Month –Nasik Shusravan KPI Project -Nasik) Company: Metro Telworks (India) Job Profile: RF Engineer (Drive test & Data Analyzer) Duration: December 2011 to February 2012. Location: Maharashtra

Perform SCFT and Cluster Drive & Single BTS town. Analyze/generate KPI reports and co-ordinate with zonal team members to improve network KPI performance. Benchmarking with Other Competitor operator. Solve Customer Complain and give solution to Customer. IBS drive in metro City.

5: BSNL 3G (Client Site: ALCATEL LUCENT, PUNE) Company: Metro Telworks (India) Job Profile: RF Engineer (Drive test & Data Analyzer) Duration: October 2010 to December 2011. Location: Maharashtra

Work Profile: 3G optimization for BSNL N/W. 3G Call Drops, Handoff failures. 3G power optimization and pilot pollution control. Drive test analysis using Post Analysis of App Throughput, download and upload rates in kbps.. Verifying Lat, Long, Tilt, Antenna height and Orientation, according to the Planning Database. Network Coverage and Quality Responsible for overall BSC& RNC performance and improving upon the existing

KPI’s Processing Tools using MapInfo and MCOM. Site Audit (2.5G & 3G) of existing sites and recommend changes in site design for network improvement.

Page 4: Pradeep Jain-Resume-9-Dec-2014

6. UNINOR - (Client Site: NSN, Gujarat Circle) Company: Metro Telworks (India) Designation: Data Analyzer & Coordination Duration: March 2010 to September 2010

Reporting making (PPT) of Cluster drive & SCFT. Coordination of team on Project. Maintaining Audit tracker, Kit tracker. Resolve Kit issue.

7. TATA DOCOMO -(Client Site: HUAWEI, Gujrât Circle) Company: Metro Telworks (India) Designation: Drive test engineer Duration: November 2009 to March 2010

Perform SCFT and Cluster Drive & Single BTS town. Benchmarking with Other Competitor operator. Solve Customer Complain and give solution to Customer. IBS drive in metro City.

TELECOM TOOLS: Actix , Nemo Analyzer , Huawei Genex probes 1.53 Assistant 1.52. ,Tems discovery Nemo analyzer Agilent 14.2, 15,16 version, MapInfo Professional, MCOM, Gladiator, 10 .MIPT 2G, MAP GRID. Nemo Analyzer, Gladiator, Analyzing tool M2000 ,PRS

ACADEMIC QUALIFICATION: B.TECH from R.I.E.T Affiliated to Rajasthan University, in Year 2008 with 63.7%.  H.S.C from Vidhya Bahwan Sr.SEC SCHOOL in year 2003 with 63.15% . S.C from Vidhya Bahwan Sr.SEC SCHOOL in year 2001 with 67.5 %.

PERSONAL PROFILE:

Date of Birth : 25 February,1985Gender : MaleMarital Status : SingleNationality : IndianLanguages Known : English & Hindi, Hobbies : Playing cricket, Reading Books, Net surfing Strengths : Self confidence, Quality of Leading & Positive ThinkingPassport Details : J8166506Visa Detail : Valid Quota work Visa(South Africa) for 5 year

DECLARATION :

I hereby declare that the information furnished above is true to the best of my knowledge and belief hoping for favorable attitude.

Pradeep Jain