PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

32
PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITYDURING WORK OVER OPERATIONS & WELL COMPLETION IN OIL INDIA LIMITED Sanjay Verma Binay Chetri

Transcript of PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Page 1: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

PRACTICES FOLLOWED TO ENSURE“WELL INTEGRITY” DURING

WORK OVER OPERATIONS&

WELL COMPLETION INOIL INDIA LIMITED

Sanjay Verma Binay Chetri

Page 2: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

PRESENTATION COVERS

Basic concept on Well Integrity, Barriers & types of Failures in wells.

A road map to ensure well integrity in OIL.

A Case study.

Page 3: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WHAT IS WELL INTEGRITY?

“Well Integrity is the design, installation, operation and

maintenance of all the well equipment to a standard that ensures safe containment of well fluids (produced or injected) over the

entire life of the well”

Keep the hydrocarbons in the pipe!

Page 4: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WELL INTEGRITY –INFLUENCING FACTORS

• CompositionNature of production and injection fluids.Suspended Solid Produced with well fluids.Water Cut

• EnvironmentNature of formation fluid behind casing.Pressures and temperatures.Flow rate & Regimes

• PhysicalWell Life.Cumulative oil/water production.Completion types.

Page 5: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WELL BARRIERS

For Well integrity we need barriers which needs to be defined.Well barriers are envelopes which prevents fluids or gases from flowing unintentionally, from the formation into another formation or to surface.

Primary Barrier Secondary Barrier

BARRIERS CLASSIFICATIONS

Page 6: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

SECONDARY BARRIER

PRIMARY BARRIER

Casing & Casing Cement

Packer

Lower MV

Cement

Casing

Upper MV

Annulus Valves

TRSSSV

Tubing Hanger

Top & Side Valve

Tubing

Lower MV

BARRIER DESIGN IN OIL INDIA LTD

SIGNIFICANCE OF WELL BARRIERS

Two independent & tested barriers.If one of the barrier fails then all the activities in the well shall be directedtowards restoring the barrier.

Page 7: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Surface Failure X Mass Tree & Annulus Valves, Tubing & Casing Hanger Seals, etc

Sub Surface Failure Completion String, Casing, Cement behind Casing, etc

Combine Surface and Sub Surface Failure

FAILURE OF WELL BARRIERS

Page 8: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

POSSIBLE LEAK PATHS-IN COMPLETIONSTRING (SUB SURFACE FAILURE)

Tubing Hanger Seal

Tubing & Connections

TR SSSV Control Line

Gas Lift Valves

Prod Packer

SSD

Page 9: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

POSSIBLE LEAK PATH FROM CASING(SUB SURFACE FAILURE)

Casing Hanger Seal – Leak to B Annulus Casing Leak – Leak to/from B Annulus

Casing Leak – leak to/from FormationCement Bond failure – resulting communication with other formation

Page 10: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

ROAD MAP TO WELL INTEGRITYMANAGEMENT

Well Data

Inspection and Record Generations

Risk Assessment & Planning

Work over

Page 11: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Well DataWell Development NoteCompletions reportsOther Reports(BHP, Hole Probing, fish details if any etc)

Inspection and Record GenerationsVisual InspectionPressure Monitoring

ROAD MAP TO WELL INTEGRITYMANAGEMENT

Page 12: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Risk Assessment & Planning

No Risk Well : No Failures.Medium Risk Well: Needs to repair on scheduled work over. High Risk Well: Require immediate action .

ROAD MAP TO WELL INTEGRITYMANAGEMENT

Page 13: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WORK OVER OPERATION

Subside the well with kill fluid POOH Production stringCasing scrapper tripRecord LogsRestore integrity

Page 14: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Primary Barrier

Secondary Barrier

Fluid Column

CasingCasing CementWell Head SealsAnnulus VavesDrilling BOP

BARRIERS DURING WORK OVER OPERATION

A Annulus

B Annulus

Page 15: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

BARRIER TEST / REPAIR

Testing primary / secondary Seals Casing Test & RepairIsolation RepairA Annulus

B Annulus

Page 16: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

TESTING PRIMARY SEALS

B A

Page 17: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

TESTING PRIMARY SEALS

B A

Page 18: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

CASING & ISOLATION REPAIR

• Casing Repair USIT Log Casing Damage HuntingCement Squeeze /Casing Patch

• Isolation repairCVL-VDL LogsCement Squeeze

A Annulus

B Annulus

Page 19: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WELL COMPLETIONS

Oil India Limited has three basic types of well completions based on flow, namely:

Gas well Self Flowing Oil WellArtificial Lift Well

Page 20: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WELL COMPLETION

• Gas Well Premium Thread Tubing'sRetainer Packer with extended Seal BoreTwo Master ValveTR-SSSV (Tubing Retrieval Sub Surface Safety Valve).

• Self Flowing Oil WellCombination of P-110 & N/L-80 tubing.Hydraulic Packer or Mechanical Packers.

• Artificial Lift Well (Gas Lift Well) N-80 or L-80 tubing's.Completed with GLV & Packer.

Page 21: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

COMPLETION EQUIPMENTS CHECKS/TESTS ATWORKSHOP

• Gas Lift Valve & MandrelsConventional GLM minimises chances of leak.Gas lift Valves and Mandrels hydro test.

• Hydraulic PackersThe ball, seat & shear pins checked.Hydro test up to 200 Psi.

• Hook Wall PackersFunction test of the HW Packers.

• X Mass Tree Function test of valves & Hydro test.

Page 22: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

GAS LIFT VALVE & MANDREL HYDRO TEST ONWORKSHOP

Page 23: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

HYDRAULIC PACKER HYDRO TEST ONWORKSHOP

Page 24: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Packer with or without GLV’sX Mass Tree is Rig up Packer is set and hydro tested

TESTING OF COMPLETION EQUIPMENTS

Page 25: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

CASE STUDYINTEGRITY REPAIR

BRIEF HISTORY Development Oil Well Completed on March 2000.Initial Production, oil 92 klpd, Bean- 5 mm, FTHP - 3000 Psi, GOR - 122 scum/kls.April’ 2010, sharp decline with a high water cut was observed. The tubing punctured at 1200 m in to facilitate gas lifting.December’2011, existing perforations sand was plugged back using through tubing bridge plug (MPBT) & Perforated.During Testing the higher up sand the SITP-SICP-2300 Psi & Pressure Built was observed on 9 5/8” X 5 ½” B-Annulus of 1150 Psi. Decided for urgent workover.

A B

Page 26: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

CASE STUDY -INTEGRITY REPAIR

The USIT log showed suspected casing damage in the range 1681-1685m, 1855-1860m, 2314-2315 m.

1855-1860 m

1681-1685 m

2314-2315 m

• Cement Plug placed 2390 – 2470 m.

• Hi-Vis pill placed 2800 - 2470 m.

• Using Hook Wall Packer Leak detected 1190 - 1247 m.

A Annulus

B Annulus

• Recorded CBL-VDL

Page 27: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

Casing Damaged in between 1190 -1247 m.

1190-1247 m

• Cement squeezed into B Annulus Top Plug displaced up to 1165 at Max 1000 Psi on surface.

• Cement is cleaned up to 2317 m.

• Hi-Vis pill placed 1255 -1655 m.

• A Positive at 1000 Psi is carried out and found OK

CASE STUDY -INTEGRITY REPAIR

A Annulus

B Annulus

• Decided for Cement Squeezed Job

Page 28: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

WELL COMPLETION – AFTER REPAIR

AFTER INTEGRITY REPAIR THE WELL PRODUCED@35 KLPD WITH FTHP-1900 PSI.

$$$

A B

Page 29: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

THANK YOU

Page 30: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

LOG’s OF THE WELL

Page 31: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

LOG’s OF THE WELL

Page 32: PRACTICES FOLLOWED TO ENSURE “WELL INTEGRITY DURING …

LOG’s OF THE WELL