Practical delivery of COBie Contractors view - BRE Events/BIM...exchange ( COBie) standard. VINCI...
Transcript of Practical delivery of COBie Contractors view - BRE Events/BIM...exchange ( COBie) standard. VINCI...
1
Practical delivery of COBie Contractors view 4th June 2014 The Building Centre, London
Jeff Stephens, BIM Strategy Manager [email protected]
Traditional O&M information delivery
2
To successfully use BIM all parties need to agree to rely on the 3D model (as opposed to 2D drawings)
Re-usability - One input, many outputs
Checkability - One input, many checks
Interoperability - One format, many paths
3
4
Where is VINCI Construction on the BIM journey?
BIM Maturity
5
Level 2 BIM documents
The following seven documents are being delivered by the Cabinet Office BIM Task Group and are expected to be utilised on a project: PAS 1192-2:2013 Capital Delivery PAS 1192-3:2014 Operational Delivery BS 1192-4:2014 COBie CIC BIM Protocol Government Soft Landings Uniclass 2 Classification Digital Plan of Works (requirements for the level of graphical detail and level of
information in a 3D model)
The VCUK Projects teams will need to be fully conversant with the Level 2 BIM package of documents and clearly understand how they must be utilised on a project.
6
BIM Maturity – Related Documents
Level 0 Level 1 Level 2 Government Construction Strategy Requirement Data 2D Drawings (PDF) Discipline Specific 3D (native) Non Graphical Data (COBie-UK-2012) Single Common Data Environment (CDE) Documents PAS 91:2013 Construction Prequalification Questionnaires (Table 8) BIM Employer’s Information Requirements Pre-Contract BIM Execution Plan Post-Contract BIM Execution Plan BIM Protocol Collaboration BS1192:2007 Collaborative Information Production File-Based Collaboration & Library Management Model Federation Information Management Role PAS 1192-2:2013 Specification for information management for the capital/delivery phase of construction projects using Building Information Modelling
PAS 1192-3:2014 Specification for information management for the operational phase of construction projects using Building Information Modelling
Government Soft Landings In Development BS 1192-4:2014 Collaborative production of architectural, engineering and construction information – Client information requirements
Digital Plan of Works Classification System (UNICLASS2)
7
8
What will BIM mean for a project?
What will BIM means to the VINCI business?
Early contractor involvement. Avoidance of poor quality BIM data. Processes based on 3D model information, rather than 2D drawings. No/less single stage tenders. Design for manufacture and Offsite fabrication.
9
10
Asset Management Information delivery
The Common Data Environment
11
Ensuring information governance and assurance
12
13
VINCI Construction uses - COBie – Vessel Inspections
Power Station Longitudinal Section
14
Reactor Sections
15
Metrics
2 Power Stations - Hartlepool - Heysham 1
4 Pressure Vessels, each with ~: - 17 Levels - 385 Spaces - 17 Types - 5,625 components - 695 systems (wires) - 7,750 URL search query links - 24,500 attributes
Inspection Data: - 25,000 photos, 75 Gbytes - 7,500 inspection records
16
COBie model with annotation
17
4Projects- 4BIM
18
Viewing Anchor Pegs
19
IFC model geometry substitution
20
Inspection model
21
DDS CAD Viewer
22
Anchor Peg data
23
Inspection Photo
24
IFC model embedded into a PDF report
25
26
xBIM Xplorer and COBie
Xbim Xplorer IFC Model Federation
27
Exported federated COBie spreadsheet
28
29
4Projects BIM on your desktop – 4BIM
4Projects – BIM in a Browser
30
4BIM project – COBie made easy
31
32
P21+ Repeatable Rooms 4Projects – 4BIM
33
Fixtures and fittings
34
Repeatable rooms
35
4 bed room
36
Basin properties
37
COBie data for Basin
38
Room data sheet
39
Basin - occurences
40
41
P21+ Wrightington Hospital
BIM Task Group – Trial Project P21+ Wrightington Phase 1
42
P21+ Wrightington Hospital BIM Task Group, Cabinet Office Trial Projects programme
43
Delivering asset data at handover using the Construction Operations Building information exchange (COBie) standard.
VINCI Constuction UK is a partner in the £1.1m 4BIM UK Government funded R&D project with 4Projects, Northumbria University, AEC3 UK and Kingspan.
Demonstrates the use of COBie and IFC building information models to support construction and manufacturing supply chains.
Trialling in the P21+ Wrightington Hospital project, under the UK Government BIM Task Group, Cabinet Office Trial Projects programme.
P21+ Wrightington
Integrated Health Partnership (IHP) and their BIM core team have lead the implementation of BIM including P21+team engaged with BIM process Adapt Design Team Appointments to capture BIM requirements Establish teams ICT infrastructure and capabilities – CPIx Agree Project Specific Standard Method and Procedure information –
SMP Implement the Common Data Environment BS1192 & PAS1192-
2:2013 and a common numbering convention and project extranet Agree BIM Execution Plan:
- Defines the use of BIM in the project and throughout the project lifecycle - Defines the Construction Operation Building information exchange
(COBie) requirements Design Issue of models as Industry Foundation Classes (IFC) to
capture the assess data for formulation of the COBie data sheet.
44
The information delivery cycle
45
COBie information exchange stages
46
VINCI Procedures
47
Design Management Plan
48
Wrightington Phase 1 BIM Execution Plan
49
Project Goal BIM Goal Measurable objective Achieved if Projected Timeframe
Demonstrate that the design for building structure, the building fabric and components, and all building engineering services installations are fully co-ordinated
Create a virtual 3D model of the project design based on the various discipline models created by the design consultants and sub-contractors.
The project team all use 4Projects 3G Extranet to share model information. Design coordination is improved.
3D models are used for coordination rather than 2D drawings.
From January 2013, and then throughout the project.
Clash Detection To eliminate clashes between building elements and systems and ensure the design is fully co-ordinated prior to construction.
Number of requests for information. Number of clashes encountered during the construction stage.
Compared with projects not using BIM: - Reduction of RFI’s. - Reduction of clashes found during construction.
On-going throughout the project.
Create COBie Data Drop 3 information based on BIM models
Use the various discipline and sub-contractor BIM models as the starting point for creating COBie information.
RIBA Stage F1 / F2
Enhance the COBie data to Data Drop 4, with installation and commissioning information.
Use the 4Projects 3D xBIM system to manage the COBie data that is added by the supply chain team.
O&M Asset Management information is created 4 weeks before practical completion.
Compliant COBie Data Drop 4 Spreadsheet is created.
RIBA Stage K
Proposed major plant item requirements
50
Major Items of plant identified by the WWL Trust.
Items not in this project
CO
Bie
dat
a at
(S
tage
6)
Item
in M
EP
Des
igne
r
(Sta
ge 4
)
O&
M a
dded
by
MEP
C
ontr
acto
r
(Sta
ge 6
)
Comments
LV Distribution Switchgear
✓ ✓ ✓
Energy Meters ✓ X ✓ Meter data to be attributed to item that is being metered
Generators X UPS Installations ✓ ✓ ✓ IPS Installations ✓ ✓ ✓ Auto Transfer Switches
✓ ✓ ✓
Lifts X X X Who will model the lifts?
Lighting and Emergency Lighting
✓ ✓ ✓
Boilers ✓ ✓ ✓ Clorifiers ✓ ✓ ✓ Ventilation & Air Conditioning Systems
a. AHU ✓ ✓ ✓ b. Fan Coil Units ✓ ✓ ✓ c. Fan Convectors X d. Split Systems X e. Variable Refrigerant Flow Systems (VRF)
X
f. Chillers ✓ ✓ ✓ g. Heat Recovery Units
X
h. Out Door Units X Medical Gas Installations
✓ ✓ ✓ Need to check what MEP model plant items are modelled.
Employers Information Requirements for COBie Asset Data at Stage 6
51
Stage 6: Handover and Closeout
O&M Information
Major Items of plant Description C
OB
ie U
K-2
012
IFC
Mod
el
NG
L A
rch
RV
T m
odel
AJP
Stru
ct R
VT
mod
el
RP
S M
EP
RV
T m
odel
NG
B to
add
tag
info
to
RV
T m
odel
2D D
WG
Dra
win
g
2D P
DF
Dra
win
g
Doc
umen
tatio
n
Level of Detail
COBie information requirements Spaces Arch Room,
MEP spaces
✓ ✓ ✓ ✓ Revit Arch Rooms and MEP Spaces defined
HV Distribution: Sub Station X Transformer X RMU X
LV Distribution: LV Switch Boards X LV Panel Boards ✓ ✓ ✓ ✓ ✓ ✓ ✓ LV Distribution Boards ✓ ✓ ✓ ✓ ✓ ✓ ✓
Metering: Meters ✓ ✓ ✓ ✓ ✓ ✓ ✓ Meter data to be attributed to item
that is being metered Earthing & Bonding:
Main Earth Terminal (MET) ✓ ✓ ✓ ✓ ✓ ✓ ✓ Earth Reference Terminal (ERT)
✓ ✓ ✓ ✓ ✓ ✓ ✓
Defining COBie data requirements
52
53
P21+ Wrightington Hospital model checking - Solibri
Coordinated model
54
Coordinated model
55
Structural
56
MEP and Structural
57
MEP and Structural
58
Model review
59
Model checking
60
61
P21+ Wrightington Hospital 4Projects – 4BIM and COBie
4Projects 3G Extranet Common Data Environment
62
Architectural
63
Structural
64
4Projects 4BIM – Model Federation
65
Federate COBie
66
Federation of COBie data
67
COBie Spreadsheet
68
Contacts
69
Facility
70
FLoors
71
Spaces
72
Types
73
Components
74
Assembly
75
Systems
76
77
New Covent Garden Market
In site context
78
Coordination
79
Structural models
80