COBIE Overview

13
COBIE: Providing Benefits of BIM to Owners, A/Es and Contractors Igor Starkov President www.tokmo.com President Tokmo Solutions, Inc.

Transcript of COBIE Overview

Page 1: COBIE Overview

COBIE: Providing Benefits of BIMto Owners, A/Es and Contractors

Igor Starkov President

www.tokmo.com

President

Tokmo Solutions, Inc.

Page 2: COBIE Overview

Business Drivers for Using COBIE

How COBIE Information is Organized

Results & Guides

1

2

3

COBIE and LEAN4

www.tokmo.comwww.tokmo.com

COBIE and LEAN4

COBIE Challenge5

Page 3: COBIE Overview

www.tokmo.comwww.tokmo.com

US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

Page 4: COBIE Overview

Construction-Operations Building Information Exchange (COBIE)

www.tokmo.com

US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

Page 5: COBIE Overview

Why Owners Need COBIE?

• Plan, design, build data loss

• Recreation transcription errors

• Delivered and stored as paper

• Delivered after occupancy (sometimes years later)

www.tokmo.com

US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

(sometimes years later)

• Preemptive job plans missing

• Additional transcriptions costs ($40K NAVFAC’s OMSI file)

• Impossible to maintain

Page 6: COBIE Overview

Why Contractors Need COBIE?

• Materials/products submittals and purchasing difficult to coordinate with trade partners

• High cost of providing as-built information, “job crawl” ($25K for a medium size project)

• Tracking installed products and

www.tokmo.com

• Tracking installed products and equipment

• Data quality degrades over time

• COBIE is required by owners on a growing number of new projects

Page 7: COBIE Overview

Why A/Es Need COBIE?

• Ability to establish QC for created models reduces risk

• Owners prefer vendors who help them cut costs

• COBIE is required on a growing number of new projects

Co

mp

on

en

tID

Sp

ac

eID

Reg

iste

rID

Exte

rna

lSyste

mN

am

e

Exte

rnalN

am

eID

Co

mp

on

en

tNam

e

1 2,100A 15,Hardware items 100A2 3,100B 15,Hardware items 100F

3 2,100A 15,Hardware items 100G

4 4,101 15,Hardware items 101A5 5,102 15,Hardware items 102A6 6,103 15,Hardware items 103A

7 7,104 15,Hardware items 104A

www.tokmo.com

number of new projects7 7,104 15,Hardware items 104A

8 8,105 15,Hardware items 105A

9 2,100A 6,Overhead Coiling Doors Assembly 100C10 2,100A 6,Overhead Coiling Doors Assembly 100D11 3,100B 6,Overhead Coiling Doors Assembly 100E

12 2,100A 6,Overhead Coiling Doors Assembly 100B17 10,RF 54,HVAC System Components and Equipment HP-1

18 2,100A 54,HVAC System Components and Equipment RH-1

19 2,100A 54,HVAC System Components and Equipment RH-220 2,100A 54,HVAC System Components and Equipment RH-321 2,100A 54,HVAC System Components and Equipment RH-4

22 2,100A 54,HVAC System Components and Equipment RH-5

23 2,100A 54,HVAC System Components and Equipment RH-6

Page 8: COBIE Overview

How Information Is Organized

logical organization(how does information link?)

process organization(who does what when?)

open standard definition(Industry Foundation Classes)

www.tokmo.comwww.tokmo.com

many formats/same datao ifco ifcXMLo Excel XML

US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

Page 9: COBIE Overview

Sample ViewsS

pac

eID

Flo

orI

D

Sp

ac

eF

un

cti

on

Spa

ce

Refe

ren

ceID

Exte

rna

lSyste

mN

am

e

Exte

rna

lNam

eID

Sp

ace

Nu

mb

er

Spa

ceN

am

e

Sp

ace

De

scrip

tion

Sp

aceU

sa

ble

He

igh

t

Sp

ace

Usa

ble

Heig

htU

nits

2 1,First Floor 13-15 21 17 Maintenance Spaces SpaceIDPick 100A Locomotive Shop LinearUnit3 1,First Floor 13-15 21 17 Maintenance Spaces SpaceIDPick 100B Recessed Maintenance Area LinearUnit

4 1,First Floor 13-75 00 00 Storage Spaces SpaceIDPick 101 Tools/Janitor LinearUnit

5 1,First Floor 13-81 21 24 Telecommunications Room SpaceIDPick 102 Communication room LinearUnit6 1,First Floor 13-81 21 21 Electrical Room SpaceIDPick 103 Electrical Room LinearUnit

Spaces Worksheet

www.tokmo.comwww.tokmo.com

6 1,First Floor 13-81 21 21 Electrical Room SpaceIDPick 103 Electrical Room LinearUnit

Ins

talla

tio

nID

Reg

iste

rID

Com

po

ne

ntI

D

Tra

nsm

itta

lID

Spa

ceID

Lis

t

Docu

me

ntI

DLis

t

Ins

talla

tio

nN

am

e

Insta

lla

tion

Mn

ufa

ctu

rer

Ins

talla

tio

nM

od

el

Insta

llati

on

Seri

alN

um

be

r

1 15,Hardware items 1,100A TransmittalIDPick 1 100A Securall Doors HD36x84 000-01-1

2 15,Hardware items 2,100F TransmittalIDPick 1 100F Securall Doors HD36x84 000-01-2

3 15,Hardware items 3,100G TransmittalIDPick 1 100G Securall Doors HD36x84 000-01-3

4 15,Hardware items 4,101A TransmittalIDPick 1 101A Securall Doors HD36x84 000-01-4

Installation Worksheet

Page 10: COBIE Overview

Published Results & Guides

Whole Building Design Guide:

www.wbdg.org/resources/cobie.php

Or Google for COBIE BIM

www.tokmo.comwww.tokmo.comPage 10

US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

Page 11: COBIE Overview

LEAN and COBIE

• LEAN - Minimize waste of all resources (materials, time, effort, money, …)

• Reduce variability / improve predictability through implementation of:

– 3D/4D/nD/BIM

– Optimized, Just-in-Time detailed scheduling (Last Planner™)

www.tokmo.comwww.tokmo.com

– Optimized, Just-in-Time detailed scheduling (Last Planner™)

– Networks of reliable commitments (improve reliability through

better tracking of products/equipment)

– Sound task assignments (include products/materials from

COBIE as resources for activities)

Page 12: COBIE Overview

COBIE Challenge

www.tokmo.comwww.tokmo.com

Page 13: COBIE Overview

Igor Starkov

Phone: 571-277-6617

Email: [email protected]

Website: www.tokmo.com

www.tokmo.com