ppt
-
Upload
softwarecentral -
Category
Documents
-
view
3.985 -
download
1
Transcript of ppt
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.1
(OO) Integration Testing
What: Integration testing is a phase of software testing in which individual software modules are combined and tested as a group. It follows unit testing and precedes system testing.
Informally - a (design) point of view
Why: The purpose of integration testing is to verify functional, performance and reliability requirements placed on major design artefacts.
How: integration testing is a logical extension of unit testing. In its simplest form, two units that have already been tested are combined into a component and the interface between them is tested. But choosing the integration order is non-trivial!
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.2
(OO) Integration vs RegressionTesting – another (incremental development) point of view
Integration tests are performed when new code is added to an existing code base; for example, when a new function is added to a set of existing functions. Integration tests measure whether the new code works -- integrates -- with the existing code; these tests look for data input and output, correct handling of variables, etc.
Regression testing is the counterpart of integration testing: when new code is added to existing code, regression testing verifies that the existing code continues to work correctly, whereas integration testing verifies that the new code works as expected.
Regression testing can describes the process of testing new code to verify that this new code hasn't broken any old code.
Question: is this incremental view a good way of thinking about integration testing or is the design view better?
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.3
Integration Testing: What about OO?
•The components to be tested are object classes that are instantiated as objects
•Larger grain than individual functions so approaches to white-box testing have to be extended
•No obvious ‘top’ to the system for top-down integration and testing
•Levels of integration are less distinct in object-oriented systems
•Cluster testing is concerned with integrating and testing clusters of cooperating objects
•Identify clusters using knowledge of the operation of objects and the system features that are implemented by these clusters
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.4
Integration Testing: What Clusters?
• Use-case or scenario testing
Testing is based on a user interactions with the systemHas the advantage that it tests system features as experienced by users
• Thread testing
Tests the systems response to events as processing threads through the system
• Object interaction testing
Tests sequences of object interactions that stop when an object operation does not call on services
from another object
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.5
(OO) Integration Testing
Tests complete systems or subsystems composed of integrated components
Integration testing should be black-box testing with tests derived from the specification
Main difficulty is localising errors
Incremental integration testing reduces this problem
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.6
Component testing •Testing of individual program components•Usually the responsibility of the component developer (except sometimes for critical systems)•Tests are derived from the developer’s experience
Integration testing•Testing of groups of components integrated to create a system or sub-system•The responsibility of an independent testing team•Tests are based on a system specification
Integration of components
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.7
Integration of components
Componenttesting
Integrationtesting
Software developer Independent testing team
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.8
Integration of components: test process is the same
Design testcases
Prepare testdata
Run programwith test data
Compare resultsto test cases
Testcases
Testdata
Testresults
Testreports
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.9
• The entire system is viewed as a collection of subsystems (sets of classes) determined during the system and object design.
• The order in which the subsystems are selected for testing and integration determines the testing strategy
– Big bang integration (Nonincremental)
– Bottom up integration
– Top down integration
– Sandwich testing
– Variations of the above
• For the selection use the system decomposition from the System Design
Integration Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.10
A
B C D
GFE
Layer I
Layer II
Layer III
Example Design Structure: Three Layer Call Hierarchy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.11
Unit Test F
Unit Test E
Unit Test D
Unit Test C
Unit Test B
Unit Test A
System Test
Not recommended in all but the simplest systems!
Integration Testing: Big-Bang Approach
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.12
• The subsystem in the lowest layer of the call hierarchy are tested individually
• Then the next subsystems are tested that call the previously tested subsystems
• This is done repeatedly until all subsystems are included in the testing
• Special program needed to do the testing, Test Driver:
– A routine that calls a subsystem and passes a test case to it
Bottom-up Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.13
A
B C D
GFE
Layer I
Layer II
Layer III
Unit Test F
Unit Test E
Unit Test G
Unit Test C
Test D,G
Test B, E, F
Test A, B, C, D,
E, F, G
Bottom-up Integration
RequireDriver: B
RequiresDriver: A
RequiresDriver: G
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.14
• Bad for functionally decomposed systems:
– Tests the most important subsystem (UI) last
• Useful for integrating the following systems
– Object-oriented systems
– real-time systems
– systems with strict performance requirements
Advantages and Disadvantages of bottom-up integration testing
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.15
• Test the top layer or the controlling subsystem first
• Then combine all the subsystems that are called by the tested subsystems and test the resulting collection of subsystems
• Do this until all subsystems are incorporated into the test
• Special program is needed to do the testing, Test stub :
– A program or a method that simulates the activity of a missing subsystem by answering to the calling sequence of the calling subsystem and returning back fake data.
Top-down Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.16
A
B C D
GFE
Layer I
Layer II
Layer III
Test A
Layer I
Test A, B, C, D
Layer I + II
Test A, B, C, D,
E, F, G
All Layers
Top-down Integration Testing
Requires stubs: B C D E F G
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.17
• Test cases can be defined in terms of the functionality of the system (functional requirements)
• Writing stubs can be difficult: Stubs must allow all possible conditions to be tested.
• Possibly a very large number of stubs may be required, especially if the lowest level of the system contains many methods.
• One solution to avoid too many stubs: Modified top-down testing strategy
– Test each layer of the system decomposition individually before merging the layers
– Disadvantage of modified top-down testing: Both, stubs and drivers are needed
Advantages and Disadvantages of top-down integration testing
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.18
• Combines top-down strategy with bottom-up strategy
• The system is view as having three layers
– A target layer ‘somewhere in the middle’
– A layer above the target
– A layer below the target
– Testing converges at the target layer
• How do you select the target layer if there are more than 3 layers?
– Heuristic: Try to minimize the number of stubs and drivers
Sandwich Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.19
A
B C D
GFE
Layer I
Layer II
Layer IIITest E
Test D,G
Test B, E, F
Test A, B, C, D,
E, F, G
Test F
Test G
Test A
BottomLayerTests
TopLayerTests
Test A,B,C, D
Sandwich Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.20
• Top and Bottom Layer Tests can be done in parallel
• Does not test the individual subsystems thoroughly before integration
• Solution: modified sandwich testing strategy:
– Test in parallel:
• Middle layer with drivers and stubs
• Top layer with stubs
• Bottom layer with drivers
– Test in parallel:
• Top layer accessing middle layer (top layer replaces drivers)
• Bottom accessed by middle layer (bottom layer replaces stubs)
Advantages and Disadvantages of Sandwich Testing
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.21
A
B C D
GFE
Layer I
Layer II
Layer III
Test F
Test E
Test B
Test G
Test D
Test A
Test C
Test B, E, F
TripleTest I
TripleTest ITriple
Test I
TripleTest I
Test D,G
DoubleTest II
DoubleTest II
DoubleTest II
DoubleTest II
DoubleTest I
DoubleTest I
DoubleTest I
DoubleTest I
Test A,C
Test A, B, C, D,
E, F, G
Modified Sandwich Testing Strategy
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.22
.
1. Based on the integration strategy, select a component to be tested. Unit test all the classes in the component.
2. Put selected component together; do any preliminary fix-up necessary to make the integration test operational (drivers, stubs)
3. Do functional testing: Define test cases that exercise all uses cases with the selected component
1. Based on the integration strategy, select a component to be tested. Unit test all the classes in the component.
2. Put selected component together; do any preliminary fix-up necessary to make the integration test operational (drivers, stubs)
3. Do functional testing: Define test cases that exercise all uses cases with the selected component
4. Do structural testing: Define test cases that exercise the selected component
5. Execute performance tests
6. Keep records of the test cases and testing activities.
7. Repeat steps 1 to 7 until the full system is tested.
The primary goal of integration testing is to identify errors in the (current) component configuration.
4. Do structural testing: Define test cases that exercise the selected component
5. Execute performance tests
6. Keep records of the test cases and testing activities.
7. Repeat steps 1 to 7 until the full system is tested.
The primary goal of integration testing is to identify errors in the (current) component configuration.
Steps in Integration-Testing
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.23
• Factors to consider
– Amount of test harness (stubs &drivers)
– Location of critical parts in the system
– Availability of hardware
– Availability of components
– Scheduling concerns
• Bottom up approach
– good for object oriented design methodologies
– Test driver interfaces must match component interfaces
– ...
• Factors to consider
– Amount of test harness (stubs &drivers)
– Location of critical parts in the system
– Availability of hardware
– Availability of components
– Scheduling concerns
• Bottom up approach
– good for object oriented design methodologies
– Test driver interfaces must match component interfaces
– ...
– ...Top-level components are usually important and cannot be neglected up to the end of testing
– Detection of design errors postponed until end of testing
• Top down approach
– Test cases can be defined in terms of functions examined
– Need to maintain correctness of test stubs
– Writing stubs can be difficult
– ...Top-level components are usually important and cannot be neglected up to the end of testing
– Detection of design errors postponed until end of testing
• Top down approach
– Test cases can be defined in terms of functions examined
– Need to maintain correctness of test stubs
– Writing stubs can be difficult
Choosing an Integration Strategy?
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.24
Establish the test objectives
Design the test cases
Write the test cases
Test the test cases
Execute the tests
Evaluate the test results
Change the system
Do regression testing
Remember the Testing Life Cycle
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.25
Test
Analyst
TeamUser
Programmertoo familiarwith code
ProfessionalTester
Configuration Management
Specialist
System Designer
How to Construct a Good Test Team?
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.26
Dynamicanalyser
Programbeing tested
Testresults
Testpredictions
Filecomparator
Executionreport
Simulator
Sourcecode
Testmanager Test data Oracle
Test datagenerator
Specification
Reportgenerator
Test resultsreport
In a complex system, you will probably need a test bench to co-ordinate testing activities
2006-2007 INT-Evry (Masters IT– Soft Eng) IntegrationTesting.27
(OO) Integration Testing
Lets learn about integration testing by looking at a practical example:
Check out the Source Code at the web site
We will use the IntPairArray from the regression testing exercise:
IntPair.java, Compare.java, IntPairArray.java,
in our new system: Integration.java
It is your task to compare and contrast 2 different integration testing approaches (e.g. big bang vs bottom-up) for this System.