PPT OF EMP1
-
Upload
kalpita-deepika-khurana -
Category
Documents
-
view
221 -
download
0
Transcript of PPT OF EMP1
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 1/30
BY:DEEPAK CHANDEL
DEEPIKA SACHDEVA
GAURAV KHURANA
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 2/30
`
`
We ar e deeply indebted to God almighty f or guiding us thr oughout the course of this pr oject. The success of this pr oject of ours is truly due to His grace.
` We would like to thank our HOD, Mr . Suman Nandi f or the help extended by him in pr oviding all the facilities. We ar e grateful to Mr . Gurinder Singh, Lectur er (Dept of Computer Application) f or hiscontinuous suppor t and assistance thr oughout the pr oject.
` Also, we would like to thank our friends f or always encouraging us and admiring our work, whichhelped in developing our confidence.
` This acknowledgement would not be complete if we missed out our par ents. I am ver y thankful to my par ents, which have been a constant source of inspiration f or us fr om the star ting of our lif e
`
`
`
` Student Names
` DEEPAK CHANDEL
` DEEPIKA SACHDEVA
GAURAV KHURANA
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 3/30
` This pr esentation includes a development
pr esentation of an inf or mation system f or
managing the staff data within a small company or
organization. ` The system as such as it has been developed is
called Employee Management System.
` It consists of functionally r elatedGUI (application
pr ogram) and database.` The choice of the pr ogramming tools is individual
and par ticular .
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 4/30
` This pr esentation gives a brief theor etical pr eviewupon the employee management system.
`
And goes thr ough the essence of the pr oblem that should be r esolved
` . Keywords
` Inf or mation system, Database system, DBMS,par ent table, child table, table fields,
` primar y key, f or eign key, r elationship, sql queries,objects, classes, contr ols.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 5/30
` Most of the contemporar y Inf or mation systems ar e
based on the Database technology as a collection
of logically r elated data, and DBMS as a sof twar e
system allowing the users to define, cr eate,maintain and contr ol access to the database.
` The pr ocess of constructing such kind of systems
is not so simple.
` It involves a mutual development of applicationpr ogram and database.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 6/30
` The application pr ogram is actually the bridge
between the users and the database, wher e the
data is stor ed.
` Thus, the well-developed application pr ogram anddatabase ar e ver y impor tant f or the r eliability,
f lexibility and functionality of the system.
` The so defined systems diff er entiate to each other
and their development comprises
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 7/30
` ASP.NET is a technology that allows us to build
and contr ol dynamic Web pages easily.
` It also pr ovides many enhancements to take
advantage of new technology as we can interact with databases,
` Personalize Web pages f or visitors, display page
on mobile devices (such as cell phones), and even
build an entir e e-commerce site fr om scratch.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 8/30
` Pr eviously internet works on request/response
model that is an integral par t of client/server
model.
` Although this is a mar velous way of communicate and distribute inf or mation, it's rather simple and
static.
` When the pr ocess is over, once client r eceives the
r equesting page fr om the ser ver the ser ver has no idea what the client is doing unless it makes
another r equest.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 9/30
` Ther e is another model f or communicating
between ser ver and clients, known as event-
driven model.
` ASP.NET work on this model, it detects action andr esponds to them i.e. the ser ver waits ar ound f or
something to happen on the client.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 10/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 11/30
` Connected Appr oach: impor tant classes ar e
available in Cshar p which pr ovide the database
connectivity in Sql ser ver .
` Connected Appr oach is of two types:1) SQL Connection: It is used to specif y the
connection string.
2) SQL Command: The pur pose of SQL Command
class is to specif y a SQL quer y or operationwhich we want to perf or m on database.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 12/30
` Sql connection class: used to specif y the connectionstring.
` Sql DataAdapter: This class is used f or disconnectedappr oach . While pr ogramming
database connectivity. In asp.net with Cshar p.
The pur pose of using this class is used to specif y sql quer y or r etrive the appr opriate data fr om the ser ver .DataSet class: this class also used in disconnectedappr oach with SQL DataAdapter class.
3) Whatever the data is f etched by Sql DataAdapter class, it is stor ed in DataSet.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 13/30
` This main function ar e the f ollowing f eatur es :
` Home Page
� Links to diff er ent section
Search pr ojects and employee
View pr ojects and team member
View employee inf or mation
Login Add the employee and pr ojects
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 14/30
` Employee Ar ea Manage your details
Can Add employee
Edit your employee
Search of employee Manage inf or mation
` Pr ojects Ar ea Manage your details
Can Add pr ojects
Edit your pr ojects Search of pr ojects
Manage inf or mation
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 15/30
` System design is the process of developing
specifications for a candidate system that
meet the criteria established in the system
analysis. Major step in system design is the preparation of the input forms and the output
reports in a form applicable to the user.
` The main objective of the system design is to
make the system user friendly. System designinvolves various stages as:.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 16/30
` Data Entry
` Data Correction
` Data Deletion
` Processing ` System design is the creative act of invention,
developing new inputs, a database, offline
files, procedures and output for processing
business to meet an organization objective
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 17/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 18/30
` Input Design:
` login scr een: This scr een is used f or login
.Description of this page is as f ollows:` User Name : The username is login her e
` Password : The Password is login her e
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 19/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 20/30
This page shows that how employee is add.
In this scr een we add the employee if new
employee is come.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 21/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 22/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 23/30
This page shows that how pr oject is add .In this
scr een we add the pr oject if new pr oject is come.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 24/30
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 25/30
` This page shows that how password is change .In
this scr een we change the password and confir m
it.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 26/30
` Inf or mation is transf or med as it f lows thr ough a computer basedsystem. The system accepts input in a variety of f or ms, applieshardwar e, sof twar e and human elements to transf or m input into output and pr oduces output in a variety of f or ms. Input may be contr ol signal transmitted by a transducer, a series of numberstyped by a human operator, a pack of inf or mation transmitted on
a network link, or a voluminous data file r etrieved fr om a Cd-r om.
The transf or mation may comprise a single logical comparison, a complex numerical algorithm or rule-interface appr oach of an exper t system. We can cr eate a f low model f or any computer based system, r egardless of size and complexity.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 27/30
1. Be easy to install and test on the computer .
` 2 Be implemented as a cross-platf orm solution (operates the same ondiff erent computers) thus providing machine por tability and independence f rom hardware manuf acturers.
` 3. It should also be easily accessed by all people par ticipating in projectmanagement activities (conceivably the whole company) as an integrated approach.
` 4.Be easy to lear n and use. It should be based on industry designstandards (e.g., GUI design standards, on-line help, use of operating
` system clipboard, etc.).
` 5.Per f orms reliably and productively in accordance with specifications.
` 6. Provide standard utilities f or: Monitor ing and administer ing the system.
` 7 . Secur ity - to both administer the system, and login to input data.
`
8. File Management - to pur ge obsolete data, and backup files.` 9. Provide f acilities to record and ver if y time on project assignments.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 28/30
`
CONCLUSION
The pr oject ³EMPLOYEE MANAGEMENT SYSTTEM´ helped usunderstand the intricacies of good website design. We learned the design using .NET Platf or m with SQL Ser ver . We also studied the
working of the Internet Inf or mation Ser ver . Apar t fr om the technical side, we en joyed the benefits of working
as a team and we ar e sur e it is our co-operation and team spirit that lead to the success of the pr oject.
` SCOPE FOR EXPANSION
The pr oject can include online test facility which can pr ove beneficial f or both job seekers and employers. Apar t fr om this we can implement thisin Multilanguage.
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 29/30
` Project Coordinator:
Mr. Gurinderpreet Singh
` Project Team Members:
1) DEEPIKA SACHDEVA
` 2) GAURAV KHURANA
` 3) DEEPAK CHANDEL
8/6/2019 PPT OF EMP1
http://slidepdf.com/reader/full/ppt-of-emp1 30/30