Presentation on Summer training at BHEL Haridwar, Production Block-1, HEEP Presented By: - Utkarsh Tripathi EE-7 th sem

Transcript of Ppt 123

Page 1: Ppt 123

A Presentation on

Summer training at

BHEL Haridwar, Production Block-1, HEEP

Presented By: -

Utkarsh Tripathi

EE-7th sem

Page 2: Ppt 123

Overview - B.H.E.L

BHEL is the largest engineering &manufacturing enterprise in India.

Established 40 years ago.

Earns profits continuously since 1971-72,& paying dividends since 1976-77

Page 3: Ppt 123

BHEL DELIVERS

Installed equipment for over 90,000MW of power generation.

Supplied over 225000MVA Transformer capacity.

Supplied 25000 motors with drive control system.

Supplied traction electrics & A.C./D.C. locos to power over 12000 kms railway networks.

Page 4: Ppt 123

History of development in BHEL

• In 1950s: At Bhopal with British collaboration 30 MW & 120 MW

Hydrogen cooled.

•In 1960s: At Haridwar with Russian collaboration 100MW & 200 MW Hydrogen cooled.

•In 1970s: At Hyderabad with Germany Collaboration 60MW Air Cooled & 110MW Hydrogen cooled.

Page 5: Ppt 123

Vision, Mission & Values

Vision• A world class engineering enterprise

committed to enhancing stakeholder values.

Mission• To be an Indian multinational engineering

enterprise providing total business solution through quality products.

Values

• Meeting commitments made to external & internal customers.

• Respect for dignity & potential of individuals.

• Integrity and fairness in all matters.

Page 6: Ppt 123

BHEL Haridwar Complex

Area

HEEP

0.845 sq. Km

CFFP

1.0 sq. Km

Location:-

Complex is situated in the foot hills of shivalik range in Haridwar district of Uttaranchal state.

Page 7: Ppt 123

HEEP Classification

HEEP

Block-1

(Electrical

Machines)

Block-2

(Fabrication

Block)

Block-3

(Turbine and Auxilia

ry block)

Block-4

(Feeder

Block)

Block -5

Block-6

(Machining)

Block – 7

(Stamping and

dia. manufacturin

g)

Page 8: Ppt 123

Block- 1 HEEP

Products

Turbo generators Brushless Exciter

Page 9: Ppt 123

Turbo Generators

Stator

•Stator Frame•Stator core•Stator Winding & Core assembly

Rotor

•Rotor Shaft•Rotor winding

Page 10: Ppt 123

Turbo Generator - Stator

Stator Frame:- Flexible core suspensions

components, core and stator winding.

Consist of cylindrical frame housing to flanged rings and ribs.

The outer casing is of gastight and pressure resistant welded construction.

Housing and ribs made up of non-magnetic steel to prevent eddy current losses.

Page 11: Ppt 123

Stator Core:-

The stator core is stacked with insulated electrical sheet steel laminations with a low loss

index.

To remove the heat, a large number of spacer segments, placed at intervals along the bore length.

The stator core and winding assembly is mounted in the

outer casing by means of welded springs.