PPS 25.03.12

download PPS 25.03.12

of 59

Transcript of PPS 25.03.12

  • 8/2/2019 PPS 25.03.12

    1/59

    Architectural Professional Studies

    ARCT 1053

    Laura Edwards

    Unit 15

  • 8/2/2019 PPS 25.03.12

    2/59

    3

    CONTENTS

    PART 1: Introduction .....1

    Site & Project Brief .....2

    Existing & Proposed .....3

    Building Processes .....4

    Automated Border Control .....5

    Clients .....6

    PART 2: Architectural Management .....7

    TheArchitectsRole&Responsi bili ti es .....8

    Issues to Consider Pre-Contract .....9

    Procurement Method ....10

    Project Timeline ....11

    Avoidi ng& ManagingRi ski nCo nstructi on

    Logistics ....12

    Site Delivery & Storage ....13

    Access:NeighbouringBuildings ....14

    Noise&WorkingHours ....15

    RightstoLight ....16

    CDMRegulations .....17

    RiskAssessment ....18

    Issues to Consider Post-Completion

    Building Management ....21

    Building Performance Indicators ....22

    PART 3: Building Economics ....23

    Procurement Method Design Impact ....24

    ProjectBrieng:Programme ....25

    Cost Planning

    Sustainability ....26

    Modern Methods of Construction ....27

    Princip lePro jectDrivers& Objectives ....28

    PART 4: Legal Issues ....29

    Planning Legislation

    RightsofWay ....30

    Conservation Areas & Listed Buildings ....31

    Property Law ....33

    Adjoining Owners and Boundaries

    Party Wall etc Act 1996 ....34

    Planning Applications

    Process ....35

    Previous Applications ....36

    Appeals and Enforcement ....37

    T he A rc hi te ct s L eg al D uti es & Re sp on si bi li ti es ....38

    PART 5: Appendix ....39

    AppendixA:RIBAOutlinePlanofWork2007 ....40

    Appendix B: Conservation Area Planning

    Consent Application Form ....41

    Appendix C: Party Structure Notice ....42

    Appendix D: 3/6 Metre Notice ....43

    Appendix E: Planning Application Form ....44

    Appendix F: Proposed Planning Drawings ....50

  • 8/2/2019 PPS 25.03.12

    3/59

    1

    PART 1: Introduction

    This section of the Design Realisation Reportdetails the architects professional responsibilitiesfrom the design inception through to completion.

    Areas of consideration include: Architectural

    Management, Building Economics, and Legal

    Issues

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    4/59

    2

    Site & Project Brief

    Required Project Outcomes

    Quickerectionofdevelopment(social-political

    responce);

    Lowenergyperformancebuilding;

    Efcientautomatedbordercontrolsystem(elimination

    of discrimination);

    CreationofnewpublicSpace;

    Highqualitydesign;

    Low Life-time and Maintenance Costs;

    Spitalelds & Banglatown Ward

    Population: 8,383

    ThisareawithintheLondonBoroughofTowerHamletsformspartofthecouncilwardofSpitaleldsandBanglatown.Itsnamerepresents

    the modern association of the Bangladeshi community with this areaandneighbouringBrickLane.

    MybuildingdesignrespondstoahypotheticaldissectionoftheSpitaleldsandBanglatownwardintotwopartsoneofwhichisastateinitsownrightandrespondstorecentextremistmovementscallingfortheBanglatownandBrickLaneareatobeunderitsown

    jurisdiction.

    Assuch,mydesignactsasabordercontrolcentreandtemporarilyhousesselectimmigrantswhoarelookingtoinvestinthenewstate.

    Key Items

    Bangla State

    Spitalelds & BanglatownWard boundary

    Site

    The Project Brief

    Thedesignanderectionofabordercontrolstation

    andhighqualityresidentialunitswithassociatedfacilitiesandparking,includingthecreationofnewpublic,landscapedspace,withina6monthtime-frame,withminimaldisturbancetoneighbouring

    buildingsandinfrastructure.

    N

    Spitalelds&BanglatownWardAerialView,Source:GoogleMaps

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    5/59

    3

    Existing & Proposed

    After Completiton

    Existing Site

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    6/59

    4

    Building Processes

    3D Diagram Showing Movement Across Borders Within the Building

    Key

    Car Border Control Station

    Inter-State Access Platforms

    Automated Border Control

    Thepublicspacetotheraisedgroundoorplazalevelispunctuatedwithbrightlycolouredplatforms,whichdirecttheusertotheirdestination,whetherthatbeacrosstheborderorintotheInter-Stateresidency.

    Aspartofthebuildingproject,theexistingaccessesoneithersideofthesitewillbeconnectedviaabordercontrolstationforthemovementofcars.However,astheBangla-Statewillbealargelypedestrianarea,thiswillbereservedmainlyforVIPuse.

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    7/59

    5

    Automated Border Control

    Conceptual Image Showing the Automated

    Border Control Process

    FingerprintRecognitionSystem

    MovingWa

    lkway

    CulturalMedia

    CulturalModifcations

    Toeliminatediscriminationwithinbordercontrolsystems,andtomaketheprocessmoreefcientintransportingcommuters,thebordercontrolsystemutilisedwithinthebuildingwillbeautomated.Thesystem will educate travellors on the State culturaldifferences on a moving platform after granting themaccessthroughangerprintscan.

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    8/59

    6

    ThesiteiscurrentlyownedbyTrumanBrewery,whohavenointentionofsellingduetotheirlandbankingstrategies.

    In the case of this project, Turman Brewery will long-lease the land to the clients in return for payment of therevenue created from the new residential units withintheInter-State.

    TowerHamletsCouncilandIndianCompanyRelianceIndustriesLtd.willcollaborateintoaPartnershipforthisproject.

    ReliancewillprovidethemajorityofthefundingandTowerHamletsCouncilwillmanagethebuildingpost-completion.

    Clients

    Tower Hamlets Council Prole:

    TheLondonBoroughofTowerHamletsistheLocalAuthorityfortheSpitaleldsandBanglatownWard,andwillbetheofcialsforbordercontrolduringandaftertheWarddivision.

    TheywillpartnerwithRelianceforthisdevelopmentandwillmanagethebuildingaftercompletion.

    Project Drivers:

    Thedevelopmentwillfullltheneedforauser-friendlyautomatedbordercontrolsystem,whichseekstoeliminatediscriminationandeducateusersonculturaldifferences.

    Theprojectalsoseekstotreattheborderasatransparent,integratedareainordertocreateafeelingof

    unitybetweenthetwosideswithoutphysicallybeingassuch.

    Objectives:

    EfcientBorderControl QuickErection Low Life-time and Maintenance Costs BuildInter-StateRelations RespondtoUnitaryDevelopmentPlanObjectives

    Reliance Industries Ltd. Prole:

    TheRelianceGroup,foundedbyDhirubhaiH.Ambani(1932-2002),isIndiaslargestprivatesectorenterprise,withbusinessesintheenergyandmaterialsvaluechain.GroupsannualrevenuesareinexcessofUS$58billion.Theagshipcompany,RelianceIndustriesLimited,isaFortuneGlobal500companyandisthelargestprivatesectorcompanyinIndia.

    Relianceenjoysgloballeadershipinitsbusinesses,beingthelargestpolyesteryarnandbreproducer

    intheworldandamongthetopvetotenproducersintheworldinmajorpetrochemicalproducts.

    Project Drivers:

    ThisprojectisagreatopportunityforReliancetoshowtheirsupporttooverseasBengaleeCommunitiesandadvertisetheirbrandpriortoestablishinganinternationalmarket,whilepromotingsustainable,energyefcientlivingcounteractingbadpressagainsttheiroilenergyproducts.

    Objectives:

    PromoteInternationalRelationships Create Positive Press Support Overseas Bengalee Community Promote Investment in Bengalee Community Low Life-time Costs

    PART 1: Introduction

  • 8/2/2019 PPS 25.03.12

    9/59

    7

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    10/59

    8

    The Architects Role & Responsibilities

    The architects responsibility is to interpret and develop the clients brief during the v arious

    stages of the project.

    FirstthearchitectwilldenetheClientsrequirementsinaDesignBriefwhichwillassistthedesignteam

    intheirwork.Thearchitect,withassistancefromthedesignteam,willthen:

    Identify constraints;

    AdvisetheClientintermsoffeasibilitystudiesandoptionappraisals;

    Arrange site investigations and surveys;

    Establishthepreferredsolution;

    Adviseonsustainability;

    Manage initial health and safety issues;

    Develop the design;

    ObtainClientsignoffofthedesignatappropriatestages;

    Advise on materials selection;

    Prepareconstructiondrawingsandspecicationsetc.;and

    Prepareadesignwhichmeetsalltheclientsrequirements,includingbudgetandtimescale.

    The architect acts as the leader of the rest of the design team and consultants, and co-ordinates their

    specialistinputwiththeirown.

    AtStageDthearchitectwillprepareandsubmitthePlanningApplicationinco-ordinationwiththerestof

    theTeam.

    Duringtheworksonsite,thearchitectwillassisttheClerkofWorksinmonitoringqualityonsite.At

    handovertheArchitectwillassistinensuringthattheworksarecompleteandthattheclientsneedshave

    beenmet,andwillcontinuetheirinvolvementthroughtheDefectsLiabilityperiod,andthenalresolution

    ofdefects.

    Afternovation(inthecaseofaDesign&BuildContract),theArchitectwillworkforthecontractorandwill

    nolongerbeinthedirectemploymentorcontroloftheclient.

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    11/59

    9

    Issues to Consider Pre-Contract

    Before a contract is made between all partiesconcerned, several areas require considerationto enable the architect to select (and revise ifappropriate) the right contratual document to enablethe project to be procured effectively. The key areasare as follows:

    1. Required project outcomes.

    2. The project brief.

    3. Selection of consultants, advisers and contractors.

    4. The construction procurement process.

    Required Project Outcomes

    Quickerectionofdevelopment(social-politicalresponce);

    Lowenergyperformancebuilding;

    Efcientautomatedbordercontrolsystem(eliminationofdiscrimination);

    CreationofnewpublicSpace;

    Highqualitydesign;

    Low Life-time and Maintenance Costs;

    The Project Brief

    Thedesignanderectionofabordercontrolstationandhighqualityresidentialunitswithassociatedfacilitiesandparking,includingthecreationofnewpublic,landscapedspace,withina6monthtime-frame,withminimal

    disturbancetoneighbouringbuildingsandinfrastructure.

    Selection of Consultants, Advisers and Contractors

    AstheclientisnotfamiliarwithUKpropertyandplanninglaw,andwillnothaveaworkingrelationshipwithanyparticular contractor or consultants, it is the duty of the architect to recommend the consulants, advisors andcontractorsdeemedsuitablefortheproject.

    Thefollowingisalistofthekeyteammemberstobeappointedforthisproject:

    Main Contractor

    CDM Co-ordinator

    EmployersAgent

    Quantity Surveyor

    Civil Engineer

    Planning Consultant

    Fire Consultant

    Landscape Architect

    EnglishHeritage

    SecurebyDesignConsultant

    BREEAMConsultant

    The Construction Procurement Method

    Inordertoselectthemostappropriateconstructionprocurementmethodtheclientmustbemadeawareofthepotentialrisksinvoledwithineacharea,includinghowthedifferingmethodsarelikelytoaffectdesignqualityandnancialriskstotheclient.Theprocurementmethodmustalsobedeterminedonthedesiredlevelofclientinvolvement.

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    12/59

    10

    Procurement Method

    Clients

    Consultants

    Engineer

    Suppliers

    Contractor

    Architect

    CDMCo-ordinator

    EmployersAgent

    QuantitySurveyor

    Land Owner

    TowerHamletsCouncilandIndianCompanyRelianceIndustries

    Ltd.willcollaborateintoaPartnershipforthisproject.

    ReliancewillprovidethemajorityofthefundingandTower

    HamletsCouncilwillmanagethebuildingpost-completion.

    TheArchitectwillworkuptostageEtoachieveplanning

    permissionbeforebeingnovatedbytheclientontothe

    contractorsconsultantteamviaatripartiteagreementbetween

    client,consultantandcontractor.

    Mace have provided contractor services to many

    award winning developments, and are veryexperiencedinallbuildingsectors.

    During the Design & Build contractperiodtheleaseonthesitewillbetransferredtothecontractorforsitesecurityresponsibilitypurposes.

    ThesiteiscurrentlyownedbyTrumanBrewery,whohavenointentionofsellingduetotheirlandbankingstrategies.

    In the case of this project, Turman Brewery will long-leasethe land to the clients in return for payment of the revenue

    createdfromthenewresidentialunitswithintheInter-State.

    TheCDMCo-Ordinatorwillbeappointedbytheclientto oversee health & saftey on the project, inform theclientoftheirresponsibilitiesandreportbacktoHSE

    TheselectprocurementmethodisDesignandBuild.Thishasbeenselectedonthefollowingmerits:

    1. Itisproventobeoneofthefastestmethodsof procurement.

    2. Theclientsandarchitecthavelessliability Oneclientis largelyoverseasandwillnotbe abletooverseetheworkseffectively,and

    the other is a Council who, it is assumed willfeelmorecomfortablewith lessr isk involved.3. Highlevelofnancialsecuritytotheclientas cost isnalisedbeforeworkscommence.

    However,Design&Buildisnotwithoutitsrisks:Duetothedesignelementbeingcontrolledbythecontractor,costsareprioritisedanddesignqualitycansuffer.Toreducethisriskheinitialworks,uptostageE,willbecarriedoutbythearchitectandthenthearchitectwillbenovatedbytheclientontothesub-contractorteam,asitisintheclientsinteresttomaintaindesignquality.

    PART 2: Architectural Management

    Design&BuildProcurementRelationshipsDiagram

  • 8/2/2019 PPS 25.03.12

    13/59

    11

    Project Timeline

    Duetotimeconstraintswithinthebrief,theprojectis

    requiredtobecompleted12monthsfrominception.

    Asillustratedinthetimelineabove,themajorityofthe

    designandpre-constructionworkoccursfor5months

    beforeconstructionandproductioninformationis

    continuouslydevelopedalongsidetheconstructionworks

    forthreemonths,allowingaspeedierprocess.

    Afterpracticalcompletionthebuildingishandedover

    totheclientandthebuildingisinspected,usersare

    assisted during the inital occupation period, and the project

    performanceinuseisreviewed.

    FormoredetailedinfomationseeAppendixA:RIBA

    OutlinePlanofWork2007

    A

    A

    C

    C

    J

    D

    D

    K

    G

    G

    E

    E

    L

    H

    F

    F

    J K L1+2

    L3

    B

    B

    H

    Planning Design Review

    December 2012 March 2013 June 2013September 2012June 2012

    Appointment of Consultants Appraisal

    Design Concept

    Mobilisation

    Processes Technical Design

    Post Practical Completion

    Preperation Design Brief

    Tender Action

    ProjectTimeline:RIBAStagesofWork

    Pre-Construction Design Development

    Construction to Practical Completion

    Construction Production Information

    Use Tender Documentation

    Key

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    14/59

    12

    Logistics

    Avoiding & Managing Risk In Construction

    During the design process it is important to considerthe impacts of the design upon the construction and/oruseofthebuilding.

    Onesuchelementofthisschemeistheabilitytotransportanderectthe24Glulammembers,assomeof them reach up to 13 meters long and just as wideduetotheirshape.

    Toovercomeissuesoftransportationthememberswillbeconstructedintwoparts:Oneconsistsofthestructural column and the other curves round to formthegroundoorlightingstrategy,whichissuspendedfromtheceiling.Thecoloumnswillbettedbeforethegroundoorplateiscast,andthesecondwillbeliftedfromthegroundoorandttedinplacebeforethestxelectricworkscommence.

    Theadjacentimageshowshowthememberscannowbeeasilytransportedtositeusingthismethod.

    AerialViewofConstructedGlulamMembers SideViewofConstructedGlulamMembers

    GlulamTransportationMethod

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    15/59

    13

    Site Delivery & Storage

    Avoiding & Managing Risk In Construction

    There are two access points to the site: One offOsbornStreettotheEast,andtheotheroffGunthorpeStreettotheWest.GunthorpeStreet,however,isonlyasmallroadwithadeadend,thereforeOsbornStreetwillbetheprimaryaccessfordeliveries.

    During Phase 1 of the project, the intention is thatvehicleswillenterOsbornStreetfromWhitechapelHighStreet,andreverseontothesiteviatheexistingaccessbeforeoff-loadingitscontentsintothestorageareashownonthediagram.

    Deliverieswillneedtobetakenoutsideofofcehourssothattheneighbouringcommercialbuildingsaccessesarenotaffected,andtrafcshouldbelow.

    AHighwaysofcerwillneedtodeterminewhetherthisisasuitablearrangementbeforeworkcommences.

    DuringPhase2apermitwillberequiredforthedeliveryvehiclestoparkonOsbornStreet,asthisiswhenlandscapingwillbecarriedout.Thecontractorwill also need to arrange delieveries of materials insuchawaythattheneedforstorageisreduced.

    3DImageShowingPartyWalltoNo.27OsbornStreet(NTS)

    Key

    SiteOfces

    Storage Area

    Site Boundary

    DeliveryVehicleMovement

    N

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    16/59

    14

    Access: Neighbouring Buildings

    Avoiding & Managing Risk In Construction

    3DImageShowingPossibleAccessAreastoNeighbouringBuildings(NTS)

    Key

    PossibleAccessAreas

    Site Boundary

    TheneighbouringbuildingstotheSouthoftheSiteareamixtureofcommercialandpublicbuildings,whicharelikelytorequirerearaccessfordeliveriesandreescaperoutes.

    Astheproposeddevelopmentconsistsofbothbuildingandlandscapingworks,thetwowillhavetobephasedsothatthehoardingcanbeinapositiontoenableaccesstothenecessaryareasduringthebuilding

    works,andthendismantledwhenthebuildingissecuretoallowlandscapingandinfrastructureworkstobecarriedout.

    Itispossiblethatcertainareasoflandscapingworkswillneedtobecarriedoutonsaturdayswhentheyshouldhaveaminimumaffectontheneighbouringbusinesses.

    Inanycasethataccessswillbeaffected,consentwillneedtobesoughtfromthebuildingowners.

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    17/59

    15

    Noise & Working Hours

    Avoiding & Managing Risk In Construction

    UndertheControlofPollutionAct1974EnvironmentalProtectionAct1990,noisepollutionfromconstructionworksmustbeforcastedandcontrolledwhereverpossible.

    Beforeconstructioncommencesanoisesurveywillbecarried out in order to determine the maximum levelsenforcedduringconstructionworks.Thiswillhaveaneffectonhowtheconstructionisundertakeincertainareas.

    ThecontractorwillberequiredtosubmitdocumentationtoTowerHamletsCouncilincluding:

    Manufacturersliteraturerelatingtonoiseemissionsfromplantmachinery.

    Aprogrammeofworkstobecarriedoutonsiteandtheassociatednoiselevels.

    Amethodstatementdetailingthemeasurestakentocontrolthenoisepollutionfromplantmachinery.

    ConstructionNoiseDistributionDiagram

    InadditionallconstructionworksmustbecarriedoutwithintheTowerHamletsLocalAuthorityenforcedworkinghoursforconstructionsites:

    M on da y - Fr id ay : 0 80 0 - 18 00

    Saturday: 08001300

    WorkisnotpermittedonSundaysorBankHolidays.

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    18/59

    16

    Commonlawstatesthatallbuildingownershavealegal right to maintain levels of daylight from windowswithintheirbuilding.

    Any new development must not adversely affect thelevelsofdaylighttoanyneighbouringbuildignbymorethan20percent.

    AlthoughRightsofLightarenotwithinplanninglegislation, impacts of the proposed developmentondaylightandsunlightlevelswillbetakenintoconsiderationduringtheplanningprocess.

    ItislikelythataDaylight/SunlightStudywillberequiredfortheproject.

    TheexisitngbuildingthatwillbemostadvereslyaffectedintermsofsunlightistheEDFEnergysub-stationatNo.27OsbornStreet,whichislocatedalongtheNorthboundaryofthesite.TherearecurrentlyseveralwindowsalongthisSouthelevation.However,thereisapprovedplanningconsentforthisbuilding,whichincludestheremovaloftheseopenings(seedrawingsopposite).

    EDFEnergySub-stationSouthElevationDrawings,AdrianSaltandPangLtd.

    Rights to Light

    Shadows at 21st June, 05:00 PM

    Avoiding & Managing Risk In Construction

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    19/59

    17

    CDM Regulations

    As the construction will take longer than 30days, the project will be notiable to the Healthand Safety Executive (HSE). Therefore the clientwill need to employ a Construction (Design andMangement) (CDM) Co-ordinator who will advisethe client on their health and safety obligationsand oversee constructon works. The CDM Co-ordinator will report to HSE regularly.

    The adjacent table details the key roles andduties of each profession.

    Source:HealthandSafetyExecutivehttp://www.hse.gov.uk/construction/cdm/

    responsibilities.htm

    CLIENT

    Checkcompetenceand

    resources of all appointees Ensuretherearesuitable

    management arrangements

    for the project welfare

    facilities

    Allowsufcienttimeand

    resources for all stages

    Provide pre-construction

    information to designers and

    contractors

    Appoint CDM co-ordinator*

    Appoint principal contractor*

    Makesurethatthe

    construction phase does

    not start unless there aresuitablewelfarefacilitiesand

    a construction phase plan is

    inplace.

    Provide information relating

    tothehealthandsafetyle

    to the CDM co-ordinator

    Retainandprovideaccess

    tothehealthandsafetyle

    DESIGNER

    Eliminatehazardsand

    reducerisksduringdesign

    Provideinformationaboutremainingrisks

    Checkclientisawareof

    duties and CDM co-ordinator

    hasbeenappointed

    Provide any information

    needed for the health and

    safetyle

    PRINCIPALCONTRACTOR

    Plan, manage and monitor

    construction phase in liaison

    with contractor Prepare, develop and

    implement a written plan

    andsiterules(Initialplan

    completedbeforethe

    constructionphasebegins)

    Givecontractorsrelevant

    parts of the plan

    Makesuresuitablewelfare

    facilities are provided from

    the start and maintained

    throughout the construction

    phase

    Checkcompetenceofall

    appointees

    Ensureallworkershavesite

    inductions and any further

    information and training

    neededforthework

    Consultwiththeworkers

    Liaise with CDM co-ordinator

    regarding ongoing design

    Secure the site

    CDMCO-ORDINATOR

    Advise and assist the client

    with his/her duties N ot if y HSE

    co-ordinate health and safety

    aspectsofdesignwork

    and co-operate with others

    involved with the project

    Facilitate good

    communicationbetween

    client, designers and

    contractors

    Liaise with principal

    contractor regarding ongoing

    design

    Identify, collect and pass on

    pre-construction information Prepare/update health and

    safetyle

    CONTRACTOR

    Plan, manage and monitor

    ownworkandthatofworkers

    Checkcompetenceofalltheirappointeesandworkers

    Train own employees

    Provide information to their

    workers

    Complywiththespecic

    requirementsinPart4ofthe

    Regulations

    Ensurethereareadequate

    welfare facilities for their

    workers

    Checkclientisawareofduties

    and a CDM co-ordinator has

    beenappointedandHSE

    notiedbeforestartingwork Co-operate with principal

    contractor in planning and

    managingwork,including

    reasonabledirectionsandsite

    rules

    Provide details to the principal

    contractor of any contractor

    whom he engages in

    connection with carrying out

    thework

    Provide any information

    needed for the health and

    safetyle

    Inform principal contractor of

    problemswiththeplan

    Inform principal contractor of

    reportableaccidents,diseases

    and dangerous occurrences

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    20/59

    18

    CDM Regulations

    Before work commences on site we must considerseveral issues relating to the construction and use ofthe building in order to reduce possible risks.

    Working alongside other core consultants through acentral co-ordinator, risk can be managed effectively,identied early and dealt with by the most suitableconsultant in the team.

    The adjacent table identies potential Health andSafety risks and ways to reduce them.

    NB:Alegendtothevariouscodeswithinthetablecanbefoundonpage19.

    JOB TITLE: 19-25 Osborn Street, Tower Hamlets

    Construction (Design & Management) Regulations 2007HS2-Hazard Identification & Risk Assessment

    Ref. Item Type ofHazard

    (1)

    Population

    (2)

    Risk Assessment Comments, Actions:

    Likelihood(3)

    Severity(4)

    Score(5)

    1 Site clearance & excavation 1,3,4,9,10,11 &

    14

    C, V M M 4 A soil investigation should be carried out to find out if thereis any contamination. If there is isolation of work areas

    necessary and suitable staging to be agreed. Method

    statement to be provided by specialist sub-contractor and

    approved prior to commencement on site.

    To reduce the amount of excavated soil to be removed

    from the site, some will be reused in the construction of

    the raised ground floor plaza level to either end of the

    building.

    Care should be taken to make sure all other existing

    materials, foundations, etc. are completely removed.

    Special consideration should be given to the existing

    foundations of neighbouring properties, which are in very

    close adjacency to site.

    2 Neighbouring properties and

    public highways

    1, 2, 3,

    4, 5, 9

    C, V, P M L 2 Suitable scaffolding and heavy machinery to be provided

    in prevention of falling onto all surrounding roads and

    neighbouring properties.

    Osborn Street is a public road therefore care should

    be taken working on and around this road and public

    pavement in line with Tower Hamlets Code of

    Construction Practice. In particular, sufficient

    headroom (usually 2.5m) should be provided from the

    pavement and a width of at least 1.25m between

    pavement structures and the scaffolding above to

    prevent objects falling onto the highway.

    The adjacent EDF Energy Substation is in close proximity

    to the proposed scheme. Party wall agreement will be

    required.

    3 Demolition work 1, 3, 4,

    5, 6, 9,

    14, 15

    C, V M H 6 All buildings on site are to be demolished. An inspection of

    the existing buildings should be carried out before work

    commences to identify any hazardous substances, suchas asbestos. Any hazardous materials will require removal

    by a specialist.

    Disturbance to neighbouring buildings and residences to

    be kept at minimum.

    4 Foundations 2,4,9 C L M 2 All hazards and risks to be identified in association with

    the contractor. Method statement to be provided by

    contractor in association with the Structural Engineer and

    approved prior to commencement.

    Risk Assessment

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    21/59

    19

    Ref. Item Type ofHazard

    (1)

    Population

    (2)

    Risk Assessment Comments, Actions:

    Likelihood

    (3)Severity

    (4)Score

    (5)

    5 External Walls 1,2,3,4,

    9

    C,V,P M L 2 Suitable scaffolding and access for operatives and

    materials to be provided. M ethod statement to be

    provided by contractor, and approved prior to

    commencement.

    Consideration should be given to the different materials

    and different construction methods between each floor,

    which will be employed at different areas of the

    building.

    Extra protection, safety measures maybe required

    when working next to Osborn Street.

    6 Floors 1,2,3,5,

    9

    C M L 1 Method statement to be provided by specialist sub-

    contractor and approved prior to commencement

    7 Roof 1,3,9 C M H 6 Suitable scaffolding and access for operatives and

    materials. Method statement to produced by

    contractor, and approved prior to commencement.

    Allowances should be made on site as to extra space

    required at ground level by specialist sub-contractors

    during construction period. Roof manufacturer to

    advise.

    Post-construction maintenance safety features for

    cleaning and repair to be fitted during construction

    period. Manufacturer to advise.

    To minimise maintenance rodding access points to rain

    water pipes and weir overflows to gutters should be

    considered. Mansafe system maybe required to non-

    terraced roof areas for roof and PV panel maintenance.

    Special consideration should be given to protection of

    persons from falling, after completion of works. All

    railings and parapet walls to be agreed with BC Officer,

    including balustrades to podium.

    8 Working at height 1,2,3,9 C L H 3 Contractor to ensure provision of adequate and

    suitable safety rails etc. to all work areas above ground

    level. Isolation of work area necessary, and suitable

    access for operatives and materials. Met hod

    statement to be produced by contractor, and approved

    prior to commencement.

    9 External works - hard and soft

    landscaping

    1,4,9 C L M 2 Method statement to be provided by specialist sub-

    contractor, and approved prior to commencement.

    Additional safety requirements for working at high level,

    podium & terraces, landscaping.

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    22/59

    20

    Ref. Item Type ofHazard

    (1)

    Population

    (2)

    Risk Assessment Comments, Actions:

    Likelihood

    (3)

    Severity

    (4)

    Score

    (5)

    10 Windows (cleaning) 1 P L H 3All windows first floor and above capable of being

    cleaned from the inside, or from balconies.

    All windows will be operated from the inside. Opening

    angle of windows will be restricted to preventoccupants from falling, or access to non-terraced roof

    areas. Tilt & turn or easy clean windows to be

    considered.

    Separate method statement to be provided for the

    maintenance of windows in common areas, windows to

    be utilised as AOVs and glass block openings.

    11 Safe access for maintenance 1 C,V M H 6All accessible external areas above the height of 2

    metres will be enclosed with parapet wall or railings.

    Mansafe system to be considered for non-terraced roof

    areas.

    Roof maintenance to be carried out by an experienced

    contractor and a layman would not be permitted access

    non-terraced to roof top areas. Appropriate anchors

    and fixings to be incorporated at the detailed design

    stage.Careful consideration to be given to the installation and

    maintenance of Solar Panels.

    All railings and enclosures to terraces and podium to

    be approved by BC Officer.

    (1) Identify Hazard from the following list or write in other:1. Falling of personnel (>2m)2. Falling of personnel (

  • 8/2/2019 PPS 25.03.12

    23/59

    21

    Issues to Consider Post-Completion

    Afterpracticalcompletionofthebuildingworksthebuildingwillbehandedovertotheclient.Atthisstagetheclientwillbeassistedinthevariousmanagementaspects including:

    Automatedbordercontrolsystem Electrical systems Plant management MaterialandPVpanelmaintenance Intelligentbuildingsystemsie.climatecontrol

    system

    TheresidentialInter-Statewillbemanagedbyanindipendantcompany.

    Building Management

    PART 2: Architectural Management

    Perspective Section Through Proposed Building

  • 8/2/2019 PPS 25.03.12

    24/59

    22

    Issues to Consider Post-Completion

    Building Performance Indicators

    Afterthebuildinghasbeenhandedovertotheclientandisbeingused,keyperformanceindicatorswillbeusedtoassessthesuccessoftheproject.Thesemayinclude the following:

    AmountofrenewableenergycreatedbyPVpanels; Thermalperformanceofthebuilding(ie.

    temperature levels measured at regular intervals

    throughout the day); Userfeedback; Bordercontroleffciency(ie.waitingtimeinlineand

    numberofissues);and Daylightlevelswithindifferentareasofthebuilding. Thestructuralintegrityofthebuilding(ie.

    movement)

    InternalViewofPublicPlaza

    PART 2: Architectural Management

  • 8/2/2019 PPS 25.03.12

    25/59

    23

    PART 3: Building Economics

  • 8/2/2019 PPS 25.03.12

    26/59

    24

    Design&BuildProcurementRelationshipsDiagram

    Procurement Method Design Impact

    Design & Build

    The Design & Build procurement method allowscostcertaintyfortheclientandtransfersrisktothecontractor.

    Thearchitectwillcreateadesignpackageincludingall stage D drawings, room data sheets and anaccommodation schedule to allow for the pricing of theworksbythecontractorinwhatisknownasaSingleStageTender.Thecontractorthenpricestheworkasaxedfeetotheclient,withinwhichareallanticipated

    sub-contractorandconsultantsfees.

    For the client to maintain a degree of control over thedesignqualityisitadvisabletonovatethearchitectontothecontractorsconsultantssothatconstructiondrawingscanbeperformedbythearchitect.

    It is also recommended for the Quantity Surveyor toworkalongsidethecontractorandarchitecttoworkoutanycostissuesinsuchawaythatdesignqualityisnotadverselyaffected.

    Clients

    Consultants

    Engineer

    Suppliers

    Contractor

    Architect

    CDMCo-ordinator

    Employers

    Agent

    QuantitySurveyor

    Land Owner

  • 8/2/2019 PPS 25.03.12

    27/59

    25

    Project Brieng: Programme

    Service/Plant Rooms (550m2)

    Asthebuildingwillbemanagedbytwoseperate parties on either side of theborder,theplantroomissplitintotwoandoperatedseperately.Thiswillhaveasignicantimpactoncostsastwosetsofmachinerywillberequired.However,itisunavoidable.

    Automated Border Control (40m2)

    Situatedonthebasementoor,thesewillbeself-contained,automatedspaceswith entrances and exits at either end viaaplatformtothegroundoorlevel.Theareas will include a specialised electronicsystem,whichwillneedtobedesignedbyanM&EConsultant.

    Inter-State Accommodation (500m2)

    The two levels of residential units areconstructed from cross-laminatedtimberpanels,costsarereducedinconstruction(seepg.27).

    Stair Cores

    Due to the divided nature of the siteacrosstheborder,fourstaircoresarerequired,twoofwhichwillneedlifts.However,theyareconstructedof in-situ concrete and form the mainelement of the primary structure,reducingadditionalstructuralcosts.

    Amenity Spaces (660m2)

    The two ares of amenity spacearelocatedonthegroundoorplazalevel,whichwillbenisedinhard landscaping, and on the roofterrace, which serves the residentialunits.

    State Ofces (570m2)

    Locatedonthelowergroundoorin a fully insulated space, this areaofthebuildingisconstructedfromin-situconcreteandglulamcolumns.

    Exploded Massing Model

    RaisedGroundFloor

    LowerGroundFloor

    Basement

    FirstFloor

    SecondFloor

    Massing Model

    PART 3: Building Economics

  • 8/2/2019 PPS 25.03.12

    28/59

    26

    SustainabilityCost Planning

    Income generated from PV Panels

    Residential Area: 483m2

    Average Electricity:

    483m2x0.082kWh= 40kWh

    Average Space heating:

    83m2x0.219kWh= 106kWh AverageCooking:

    483m2x0.019kWh= 9kWh

    Ofce: 811m2

    AveragePower:572m2x233kWh= 133,276kWh

    Total Usage (Residential & Commercial): 40+106+9+133=288kWh

    Average daily Energy Created by PV Panels: 4.53kWhx168m2=761kWh

    Surplus Daily Energy: 761-335=426kWh

    EDF Energy purcase rates: 7 p pe r kW h 7 p x 42 6 = 2 9. 82 29.82x365=10.884.30p/a

    ROCs:761x365=277,765 277,765/1000=277.77Mwh

    277.77Mwhx40=11,110.80p/a

    Total Annual Income from PV Panels = 21.995.10

    Average cost of PV Panels = 20,000 each88 x 20,000 = 176,000

    Average Energy Cost per kWh = 10p

    10p x 288 x 365 = 10,512

    Pay back period =176,000/(10,512+21.995) = 5.4 years

    PV Panels

    The88Photovoltaic(PV)panelstobeinstalledon the roof of the residential area are proposed topowerthemajority,ifnotall,ofthebuilding.Thiswillsignicantlydiminishtherunningcostsofthebuildingonce completed and earn additional income for theowner.UnusedenergyisproposedtobefeddirectlytotheneighbouringEDFEnergySub-Station,whichporovideselectricityforthewholeoftheTowerHamletsBorough.

    TheadjacentguresforresidentialandcommercialenergyusearebasedoncalculationsofaverageenergyconsumpitonincentralLondonasof2005.

    However,itislikelythattheenergyconsumptionwillbelessintheproposedbuildingduetosustainablemethodsofconstructionwithinthedesign.

    ViewofPVPanels

    Source:PVGISEuropeanCommunities,2001-2010

    PART 3: Building Economics

  • 8/2/2019 PPS 25.03.12

    29/59

    27

    Modern Methods of Construction

    Cost Planning

    TypicalOne-BedroomedatExternalView

    Cross-LaminatedTimberWalltoFloorJoint

    Cross-Laminated Timber

    Thismethodofconstructionsignicantlyreducesconstructiontimeandmaterialwaste,bothofwhichhaveadirectimpactonthebuildcost.

    Asthecross-laminatedtimberpanelsareconstructedoff-sitefromthearchitectsdrawings,whicharepreparedinconsultationwiththesupplier,qualitycontrol is high and the inital construction of the panelsisnotaffectedbyweatherconditions,orimpeededby

    otherfactorsonsite.

    After the panels are transported to site, they are cranedontotheconcretestructureandxedinplacebyadedicatedandexperiencedteam.Thisprocesshasbeenknowntotakeaslittleasaweekperooronresidential projects such as the Stadthaus apartmentsinLondonbyWaughThistletonArchitects.

    Thereforeconstructioncostswillbesignicantlyreducedintermsoflabourandcranehire.

    PART 3: Building Economics

  • 8/2/2019 PPS 25.03.12

    30/59

    28

    Principle Project Drivers & Objectives

    Oneoftheprincipleprojectobjectivesaffectingcostistocreateasustainablebuildingthatcostsverylittletorunandmaintain.Thiswillbeachievedthroughthe selection of low maintenance materials with highthermalmass,renewableenergycreation(PVpanels),andpassiveventilationsystems.

    Theprogrammeofthebuildingmeansthatthegroundoorandbasementwillnotrequireclimatecontrol,whichwillsignicantlyreducetherunningcostsofthe

    building.

    PART 3: Building Economics

    Perspective Section Through Proposed BuildingKey

    HighClimateControl

    Medium Climate Control

    Cold Air InNo climate control

    Warm Air Out

    Photovoltaic(PV)Panels

  • 8/2/2019 PPS 25.03.12

    31/59

    29

    PART 4: Legal Issues

    PART 3: Building Economics

  • 8/2/2019 PPS 25.03.12

    32/59

    30

    Rights of WayPlanning Legislation

    Highway...a way over which the public have theright to pass and repass. UK Common Law

    TheHighwaysAct1980setsouttherequirementsrelatingtoconstructionworkonornearahighway.thekeyrequirementsoftheactinclude:

    Permissionbyformalagreementfromthe

    HighwaysAuthorityforanyworkstohighways;

    Licencesarerequiredforpermissiontoplacetemporaryobstructionsonthehighway;

    Deposition of mud or other such materials on thehighwayisprohibited;

    Surface drainage from a construction site mustnotbeallowedtorunacrossthefootwaypartofapublichighway.

    In the last phase of the construction, hard landscapingworkswillbecarriedoutonsitewhichbuttsuptothehighway.Inorderfortheseworkstobecarriedout,asmallareaofthepavementwillneedtobeclosed.ItisalsoapossibilitythataSection106aggreementwillrequireanewpavementtobeconstructedtodealwiththehigherfootfalllevels.

    The contractor will need to consult with the LondonBoroughofTowerHamletsattheinitialprojectstagesto assess the adverse affects of closing this area ofpavementandalternatemethodsofconstruction.

    Licencesforthisclosureorpartclosurewillberequiredpriortocommencementoftheworks.Alldiversionwillneedtobedenedbyclearsigning,andanyclosed

    routesblockedoffbyacontinuousbarrier.

    AerialImageShowingRightofWayandDiversions

    Key

    AreaofPavementtobeClosed

    Site Boundary

    Pedestrian Diversion

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    33/59

    31PART 4: Legal Issues

    Listed Buildings

    GradeIIListed

    Conservation Area

    GradeII*Listed

    BrickLane&FornierStreet:LondonBoroughofTowerHamlets

    ExtractPlan1:2000

    Key

    Site

    Site

    WhitechapelArtGallery

    ToynbeeHall

    NewWhitechapelArtGallery(formerlyWhitechapelLibrary)

    85WhitechapelHighStreet&Angel Alley

    ThesiteresidesintheBrickLane&FourierStreetConservationAreaofTowerHamlets.

    PlanninglegislationstatesthatconsentisrequiredforthedemolishofanybuildingwithinaConservationAreathatismorethan115m3 in volume or a gate or fencethatismorethan1mhighwhereabuttingahighway,ormorethan2melsewhere.ConservationAreaPlanningConsent Application Form is attached as Appendix B

    TheproposalwillneedtobeinaccordancewithPlanningPolicyStatement5:PlanningfortheHistoricEnvironment.

    DiscussionswithaPlanningConsultantwouldbenetthecaseandwillgivedirectiontoenableabettingdevelopmentproposal.

    However,inthecaseofthisproject,itwillbeinTowerHamletCouncilsbestinteresttoapprovethedemolitionoftheexisting,disusedbuildingsonsiteastheyareareriskduetovandalism.Theywillalsobekeenforthebordercontroltobemovedthroughquickly.

    Conservation Areas & Listed BuildingsPlanning Legislation

  • 8/2/2019 PPS 25.03.12

    34/59

    32

    Important Views:

    The site is in close proximity to Listed BuildingsWhitechapelGalleryandThePassmoreLibrary(listedbuildings),shownabjacentinyellow.Thereforeitsimportantthattheproposedbuildingdoesnotimposeonviewtothesetwobuildings.TheimagesaboveshowthattheproposedbuildingcanjustbeglimpsedfromtheviewWesttothelistedbuildings,andnotseenatall

    fromtheEastviewalongWhitechapelHighStreet.

    ViewfromWhitechapelHighStreetWesttoListedBuildings

    Listed Buildings:WhitechapelGallery&ThePassmoreLibrary

    Key

    ViewfromWhitechapelHighStreetEasttoListedBuildings

    Conservation Areas & Listed BuildingsPlanning Legislation

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    35/59

    33

    Property Law

    Long-Lease

    ThesiteiscurrentlyownedbyTrumansBreweryandwillbelong-leasedtotheLondonBoroughofTowerHamlets(LBTH)forasetperiodoftimewhichwouldbearound50years,oraslongasthebuildingisanticipatedtoexist.Thisisacontractualagreementbetweentheownerandthelease-holderandcanberenewedafterthestatedperiodifbothpartiesagree.

    During the Design and Build contract period theproperty lease is typically transfered to the contractor,themainreasonbeingtotransferlegalresponsibilitiesofsecurity.Meaningthatthecontractorwillbeheld

    responsibleforanytrespassingonsiteduringtheconstructionandconsequentialinjuries.Thereforeitisin the interest of the contractor to carry out his duties intermsofrepairinganydamagetohoardingetc.

    WhenthebuildingishandedovertoLBTH,theleasewillalsobetransfered.

    RatherthanpayingTrumansBrewerygroundrent,itispossiblethatthetwopartieswillagreetoatransferofresidentialincomefromthedevelopment.

    McAule

    y

    Hous

    e

    25lAlley

    GUNTHORPE

    STREET

    3

    1to9

    26

    12 to 20

    OSBORNSTREET

    22

    2to 10

    37

    11

    1317

    915

    EE

    OSBORNSTREET

    3 t 3

    Ele

    ctricitySub

    Station

    27

    Garage

    19 to 23

    c

    t

    19

    23

    to

    rt Gallery

    Library

    hit ch l

    17

    77

    N

    ExistingSiteplan(NTS)

    Existing Site 3D Image

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    36/59

    34

    Adjoining Owners & Boundaries

    Theproposedbuildingworkswillinvolvetheconstructionofaconcretesub-structureagainstpartofawallbelongingtoEDFEnergyatNo.27OsbornStreet(showninblue).UnderthePartyWalletc.Act1996TowerHamletsCouncilwillneedtosubmitaPartyStructureNotice(seeappendixC) to EDFEnergyatleast2monthsbeforetheywishtostart

    theworks.Ifagreed,theagreementisvalidfor1year.

    InaccordancewiththePartyWallActworkscanbestartednoearlierthan2monthsfromthesubmissionof the notice with written consent from the adjoiningowner.IfEDFEnergydoesnotagreetotheworksanagreedsurveyorwillbeappointedbyTowerHamletsCouncilwiththeagreementoftheadjoiningowner(otherwise2surveyorscanbeemployedtodrawthepartywallagreementuptogether).

    Theagreedsurveyormustbeanimpartialpartyandconsidertheimplicationsforbothowners.TheywilldrawupaPartyWallAward,whichconsistsofanoutlineoftheworkstobecarriedout,andhowandwhentheywillbecarriedout.ThePartyWallAwardisnal.

    ARightofSupportwillalsoberequiredbetweenNo.27OsbornStreetandtheproposedbuilding.The contractor will have to provide support tothe party wall during and after the proposedconstructionworks.Thiswillprobablybeincludedinthebasementtankingstructure,butwillrequireastructuralengineertoassess.

    3DImageShowingPartyWalltoNo.27OsbornStreet

    Key

    Party Wall

    If you plan to excavate,or excavate and construct

    foundationsforanewbuildingorstructure,within3metresofaneighbouringownersbuildingorstructure,wherethatworkwillgodeeperthantheneighboursfoundationsyoumustinformtheadjoiningownerorownersbyservinganotice

    ThePartyWallEtc.Act1996:ExplanatoryBookletCommunitiesandLocalGovernment

    Thisalsoincludesbasementstructureswhicharewithin6mofaneighbouringbuildingwhentakinga45degreelinefromthefoundations.However,thisdoesnotapplytoanyofthebuildingsinthevacinityotherthanNo.27.

    Aspreviouslystated,theproposedworksincludeexcavationofjustover5m.ThiswillbedirectlyagainstNo.27OsbornStreetforupto10malongthePartyWall.

    ThePartyWalletcActalsoincludesbasementstructureswhicharewithin6mofaneighbouring

    buildingwhentakinga45degreelinefromthefoundations.However,thisdoesnotapplytoanyofthebuildingsinthevacinityotherthanNo.27.

    In addition to the Party Structure Notice, EDFEnergywillneedtobeservedwitha3/6MetreNotice(seeappendixD),whichmustastatethestructural intentions of the proposal with regards tosupportingthepartywall.

    Party Wall etc Act 1996

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    37/59

    35

    Planning Applications

    Adapted from Planning Portal Application Process Flow Chart Diagram

    An application for Full Planning Permission involvessubmissionofthefollowinginformationtotheLocalPlanning Authority:

    PlanningApplicationForm(AttachedasappendixE) Conservation Area Demolition Consent Application

    Form(attachedasappendixF) Exisitng Plans and Elevations Proposed Plans and Elevations Design & Access Statement Consevation Area Statement

    OncetheplanningapplicationissubmittedtoTowerHamletsPlanningAuthorityitwillbeassesedbyPlanningOfcersinlinewithTowerHamletsDevelopmentPlan.

    Ifplanningpermissionisapproved,itislikelythatconditionswillbeattachedtoadevelopmentsuchasthisproject.ThisisamethodusedbytheLocalPlanningAuthoritytocontrolspecicelementsofthedevelopmenttoensureitmeetstheirrequirements.Theconditionswillneedtobedischarged(mostlythroughissuingadditionalinformation)beforetheconstructioniscompleted.

    Obtain Pre-Planning Advice fromPlanning Consultant

    Submit Planning Application Online orin Paper Format to Local Authority (LA)

    Submit Application with Correct FeeAnd Supporting Documents

    LA Validates Application and Requestsany Additional Information

    LA Acknowledges Valid Application

    LA Publicises and Consults onApplication

    Application is Considered by PlanningOfcer or Planning Committee

    Outline Application

    PermissionRefused

    PermissionGranted

    Permission

    Refused

    ChangeProposal andSubmit NewApplication

    Right of Appealto the Secretary

    of State

    Start WorkWithin the

    Time Limit andComply withConditions

    Application

    notDecided

    in8Weeks

    Permission

    Grantedwith

    Conditions

    Permission

    Granted

    Full Application

    The adjacent diagram illustrates how theplanningprocessiscarriedout.

    PART 4: Legal Issues

    Process

  • 8/2/2019 PPS 25.03.12

    38/59

    36

    Previous Applications

    Planning Applications

    25thSeptember2001

    PA/00/00639

    DemolitionofmainbuildingsanddevelopmentofasixstoreybuildingfacingOsbornStreetprovidingretail,

    showroom,lightindustrialandofcewithatsabove.

    Withdrawn

    All previous planning applications forproposalsonthesiteinthelast10yearshavebeenwithdrawnbytheapplicant.Thismaybeduetoseveralreasons,butthemostlikelycauseofapplicationwithdrawalsisadversefeedbackfromplanningofcersand/oroppositionfromlocals.Howeveritcouldbetodowithnewinformationarising,whichresults in necessary changes to the proposal,

    orfundingissues.

    Unfortunatelytheplanningdatabasedoesnot hold any drawings for these applications,thereforeanin-depthanalysiscannotbecarried out with the sole use of the adjacentinformation.

    7thDecember2009

    PA/09/01402

    Demolitionofallbuildingsonsiteandachangeofusetoacarpark.

    Withdrawn

    29thOctober2003

    PA/02/01542

    Useofgroundoorandpartrstoorasentertainmentvenueincluding function / performance

    hall,restaurantandfourbarswithancillaryofces.

    Withdrawn

    2ndMarch2011

    PA/10/02748

    Demolitionofallbuildingsonsite(exceptthebuildingat17OsbornStreet)anderectionofabrickwall

    andplantingontheeastboundaryplusametalpalisadefence.

    Withdrawn

    Decision Date:

    PlanningReference:

    Proposal:

    Decision:

    Existing Site in Context

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    39/59

    37

    Appeals

    Planning Applications

    Ifaplanningapplicationhasbeenrefusedortakenmorethan8weeks,theapplicantcanmakeanappealagainst the Local Authority to the Secretary of Statewithin6monthsofthedateofdecision.Appealscanalsobemadeagainstconditionsattachedtoanapprovedplanningpermissioniftheyaredeemedtobeunreasonable.

    In the case of an appeal it is often good practice

    torevisitthedesigninlightofPlanningOfcerscommentsand/orreasonsforrefusalbeforemakinganappeal.Otherwiseitisveryunlikelythatagoodcasecanbemadeandapproved.

    Mostappealsaredecidedonthebasisofwrittenrepresentations,plansandavisittositebytheplanninginspector.

    Therearetwowaysinwhichthedecisioncanbemade:

    1.PublicInquiry

    ApublicinquiryiscarriedoutwhenrequestedbytheLocal Authority, the applicant or the Inspectorate a ndrequirestheInspectoratesagreement.

    Witnessesandrespresentativesarequestionedor

    cross-examined and anyone involved may use a layertoputtheircase.Forthisreasonapublicenquiryisalotmoreexpensivethanahearing.

    2.Hearings

    Hearingsarelessformal,andthereforelessexpensivethanapublicinquiry.However,thismethodisnotsuitablewherethereishighpublicinterestinacase.

    AdecisionisthenmadebytheInspectorateandsenttotheapplicantandLocalPlanningAuthority.

    AnappealsagainsttheInspectoratesdecisionmustbemadewithin6weekstotheHighCourtifitisdeemed that the INspectorate has not followed properproceduresorhasexceededtheirpowers.Ifthisappealsucceedsthecasewillhavetobeheardagain

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    40/59

    38

    The Architects LegalDuties & Responsibilities

    ThefollowingthreekeyareasarelegallyrequiredforanarchitecttopracticeintheUK:

    1.AllarchitectsaretoholdProfessional IndemnityInsurancewhencarryingoutarchitecturalworks.

    2.AllarchitectsmustpracticeinaccordancewiththeRIBACodeofProfessionalConduct(seeopposite).

    3.CDM2007legislationplaceslegaldutiesonthearchitectasadutyholderofhealth&safety.

    RIBAMembersareexpectedtoconducttheirpracticeof architecture in accordance with all relevant legal

    requirements(suchasbusiness,tax,discrimination,disabilityandemploymentlaw),withoutitbeingnecessarytomentionspeciclegislationineithertheCodeorguidancenotes.Abreachofthelaw,asevidencedbyandingbyarecognisedcourtortribunal,maybeconsideredasevidenceagainstamember,shouldacomplaintabouthisorherprofessionalconductbemade.

    RIBA,Explaininganarchitectsservices

    Honesty, integrity and competency, as well as concern forothers and for the environment, are the foundations of the RoyalInstitutes three principles of professional conduct set ou t below.

    All members of the Roy al Institute are required to comply.

    THE THREE PRINCIPLES:

    PRINCIPLE 1: INTEGRITY

    Membersshallactwithhonestyandintegrityatalltimes.

    PRINCIPLE 2: COPETENCE

    IntheperformanceoftheirworkMembersshallactcompetently,conscientiouslyandresponsibly.Membersmustbeabletoprovidetheknowledge,theabilityandthenancialandtechnicalresourcesappropriatefortheirwork.

    PRINCIPLE 3: RELATIONSHIPS

    Membersshallrespecttherelevantrightsandinterestsofothers.

    PART 4: Legal Issues

  • 8/2/2019 PPS 25.03.12

    41/59

    39

    PART 5: Appendix

  • 8/2/2019 PPS 25.03.12

    42/59

    40

    RIBA Outline Plan of Work 2007

    Appendix A

    Amended November 2008

    Outline Plan of Work 2007

    Royal Institute of British Architects

    RIBA Work Stages Description of key tasks OGC Gateways

    Prepara

    tion

    A Appraisal

    Identication o clients needs and objectives, business case and possible constraints on

    development.

    Preparation o easibility studies and assessment o options to enable the client to decide

    whether to proceed.

    B D es ig n B ri ef

    Development o initial statement o requirements into the Design Brie by or on behal o the

    client conrming key requirements and constraints. Id entication o procurement method,

    procedures, organisational structure and range o consultants and others to be engaged or

    the project.

    Design

    C Concept

    Implementation o Design Brie and preparation o additional data.

    Preparation o Concept Design including outline proposals or structural and building

    services systems, outline specications and preliminary cost plan.

    Review o procurement route.

    DDesign

    Development

    Development o concept design to include structural and building services systems,

    updated outline specications and cost plan.

    Completion o Project Brie.

    Application or detailed planning permission.

    ETechnical

    Design

    Preparation o technical design(s) and specications, sufcient to co-ordinate components

    and elements o the project and inormation or statutory standards and construction saety.

    Pre-Construction F

    Production

    Information

    F1

    F2

    Preparation o production inormation in sufcient detail to enable a tender or tenders to be

    obtained.

    Application or statutory approvals.

    Preparation o urther inormation or construction required under the building contract.

    GTender

    Documentation

    Preparation and/or collation o tender documentation in sucient detail to enable a tender or

    tenders to be obtained or the project.

    H T en d er A ct i onIdentifcation and evaluation o potential contractors and/or specialists or the project.

    Obtaining and appraising tenders; submission o recommendations to the client.

    Construction J M ob il is at io n

    Letting the building contract, appointing the contractor.

    Issuing o inormation to the contractor.

    Arranging site hand over to the contractor.

    K

    Construction

    to Practical

    Completion

    Administration o the building contract to Practical Completion.

    Provision to the contractor o urther Inormation as and when reasonably required.

    Review o inormation provided by contractors and specialists.

    Us

    e

    LPost Practical

    Completion

    L1

    L2

    L3

    Administration o the building contract ater Practical Completion and making nal

    inspections.

    Assisting building user during initial occupation period.

    Review o project perormance in use.

    The activities in italics may be moved to suit project requirements, ie:D Application or detailed planning approval;

    E Statutory standards and construction saety;

    F1 Application or statutory approvals ; andF2 Further inormation or construction.

    G+H Invitation and appraisal o tenders

    1Business

    justication

    3ADesign Brie and

    ConceptApproval

    2Procurement

    strategy

    4Readinessor

    Service

    5Benets

    evaluation

    RIBA 2007

    The Outline Plan o Work organises the process o managing, and designing building projects and administering building contracts into a number

    o key Work Stages. The sequence or content o Work Stages may vary or they may overlap to suit the procurement met hod (see pages 2 and 3).

    Page 1 of 3

    3BDetailedDesign

    Approval

    3CInvestment

    decision

  • 8/2/2019 PPS 25.03.12

    43/59

    41

    $Date::2010-09-10 #$ $Revision:2999 $

    Application for conservation area consent for demolition in a conservation area.Planning (Listed Buildings and Conservation Areas) Act 1990

    You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply

    Publication of applications on planning authority websites

    Please note that the information provided on this application form and in supporting documents may be published on theAuthoritys website. If you require any further clarification, please contact the Authoritys planning department.

    Please complete using block capitals and black ink.

    It is important that you read the accompanying guidance notes as incorrect completion will d elay the processing of your application.

    1. Applicant Name and Address

    Title: First name:

    Last name:

    Address 1:

    Address 2:

    Town:

    Address 3:

    County:

    Country:

    Postcode:

    Company(optional):

    Housenumber:

    Housename:

    Housesuffix:

    Unit:

    2. Agent Name and Address

    Title:

    Housename:

    Housesuffix:

    Housenumber:

    Unit:

    Company(optional):

    First name:

    Last name:

    Address 1:

    Address 2:

    Town:

    Address 3:

    County:

    Country:

    Postcode:

    3. Description of the Proposal

    Please describe the proposed works:

    Conservation Area DemolitionPlanning Application Form

    Appendix B

  • 8/2/2019 PPS 25.03.12

    44/59

    42

    Party Structure Notice

    Appendix C

    Party Structure Notice

    Party Wall etc Act 1996 Section 3

    To: (Adjoining Owner)of

    *I/We (Building Owner)of

    as owner(s) of

    which adjoins your premises known as

    HEREBY SERVE YOU WITH NOTICE THAT, IN ACCORDANCE WITH *MY/OUR RIGHTS:under Section 2 (2), and with reference to the *party structure/party fence wall separating theabove premises, it is intended to carry out the works detailed below after the expiration of twomonths from service of this notice.

    The proposed works are:

    It is intended to commence works *as soon as notice has run/on theor earlier by agreement.

    Under Section 5, if you do not consent to the works within 14 days you are deemed to havedissented and a difference is deemed to have arisen. In such case Section 10 of the Actrequires that both parties should concur in the appointment of a surveyor or should eachappoint one surveyor and in those circumstances *I/we would appointof

    Signed (Date)*Authorised to signon behalf of (Building Owner)

    *Delete as appropriate std\party structure notice

  • 8/2/2019 PPS 25.03.12

    45/59

    43

    3/6 Metre Notice

    Appendix D

    Example letter 8 - 3/6 Metre Notice.

    ToAdjoining Owner[See note 4]

    OfAdjoining Owner's main address [See note 5]

    Date [See note 7]

    Dear [See note 8]

    The Party Wall etc. Act 1996

    Notice of proposed works - excavation and construction.

    As the owner/s ofBuilding Owner's building[See note 3] which is adjacent to your

    premises atAdjoining Owner's building[See note 6] I/weBuilding Owner[See note1] ofBuilding Owner's main address [See note 2] notify you that in accordance with

    our rights under

    Add either[Section 6(1) of the Party Wall etc. Act 1996 that I/we intend to build

    within 3 metres of your building and to a lower level than the bottom of your

    foundations by carrying out the building works detailed below.]

    Or add[Section 6(2) of the Party Wall etc. Act 1996 that I intend to build within 6metres of your building and to a lower level than the bottom of your foundations

    (measured by a 45 line) by carrying out the works detailed below.]

    [Only if applicable add- The enclosed explanatory booklet provides more

    information about the Act.] [See note 9]

    The proposed works are: description of the excavation and works [See note 17]

    The accompanying plans and sections show the site of the proposed building and the

    excavation depth proposed. [See note 17]

    I/we do* / do not* propose to underpin or otherwise strengthen in order to safeguard

    the foundations of your property. [See note 17]

    I/we intend to start works on date of works [See note 10] [if you want to start withinthe 1 month notice period add- or on the earlier date of [date] with your written

    agreement - see note 11]

    If you are content for the works to go ahead as proposed please complete, sign and

    return the attached letter [See note 12] within 14 days of receiving this letter.

    If you do not confirm in writing that you are content for the work to go ahead as

    proposed we will be 'in dispute' under the Act.

    In the event of any dispute between us under the Act, would you be willing to agree to

    the appointment of an 'Agreed Surveyor'?

    If yes I suggest usingAgreed Surveyor's name [See note 13] but would be happy toreceive your alternative proposal.

    If no, please let me know whom you would appoint as your surveyor.

    Yours sincerely

    Building Owner's/s'signature/s [See note 14]

  • 8/2/2019 PPS 25.03.12

    46/59

    44

    Planning Application Form

    Appendix E

    $Date::2010-09-10 #$ $Revision:2999 $

    Application for Planning Permission.

    Town and Country Planning Act 1990You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply

    Publication of applications on planning authority websites

    Please note that the information provided on this application form and in supporting documents may be published on the

    Authoritys website. If you require any further clarification, please contact the Authoritys planning department.

    Please complete using block capitals and black ink.

    It is important that you read the accompanying guidance notes as incorrect completion will delay the processing of your application.

    1. Applicant Name and Address

    Title: First name:

    Last name:

    Address 1:

    Address 2:

    Town:

    Address 3:

    County:

    Country:

    Postcode:

    Company(optional):

    Housenumber:

    Housename:

    Housesuffix:

    Unit:

    2. Agent Name and Address

    Title:

    Housename:

    Housesuffix:

    Housenumber:

    Unit:

    Company(optional):

    First name:

    Last name:

    Address 1:

    Address 2:

    Town:

    Address 3:

    County:

    Country:

    Postcode:

    3. Description of the Proposal

    Please describe the proposed development, including any change of use:

    Has the building, work or change of use already started? NoYes

    If Yes, please state the date when building,

    work or use were started (DD/MM/YYYY): (date must be pre-application submission)

    Has the building, work or change of use been completed? NoYes

    If Yes, please state the date when the building, workor change of use was completed: (DD/MM/YYYY): (date must be pre-application submission)

  • 8/2/2019 PPS 25.03.12

    47/59

    45

  • 8/2/2019 PPS 25.03.12

    48/59

    46

  • 8/2/2019 PPS 25.03.12

    49/59

    47

  • 8/2/2019 PPS 25.03.12

    50/59

    48

  • 8/2/2019 PPS 25.03.12

    51/59

    49

  • 8/2/2019 PPS 25.03.12

    52/59

    50

    Proposed Planning Drawings

    Appendix F

    N

    E u r o

    1 2 8 0

    ltrs

    E u

    r o

    1 2

    8 0

    ltrs

    E u

    r o

    1 2

    8 0

    ltrs

    E u

    r o

    1 2

    8 0

    ltrs

    E u

    r o

    1 2

    8 0

    ltrs

    N

    Proposed Site Plan1:500

    GunthorpeStre

    et

    Osbo

    rnS

    tree

    t

    Whitechape

    lHighStree

    t

    1

    1

    3

    2

    2

    2

    3

    3

    Key

    Site Boundary

    RetainedAccess

    NewRoad

    HardLandscaping

  • 8/2/2019 PPS 25.03.12

    53/59

    51

    N

    Proposed-1FloorPlan1:150

    1

    1

    1

    4

    4

    4

    4

    4

    5

    5

    6

    6

    2

    2 2

    223

    3

    3

    Key

    Bangla-StatePlantRoom

    CommercialDistrictPlantRoom

    State Transition Passage

    Lift

    Media&RoboticsServiceRoom

    Stair Core

    A

    A

    A

  • 8/2/2019 PPS 25.03.12

    54/59

    52

    ProposedLowerGroundFloorPlan1:150

    1

    11

    114

    4

    3

    3

    6

    7

    7

    76

    6

    2

    2

    25

    5

    5

    Key

    CommercialStateOfces

    Lift

    Bangla-StateOfces

    Male WC

    Store

    Stair Core

    Female WC

    N

    A

    ro 80ltrs

    ur

    ur

    A

  • 8/2/2019 PPS 25.03.12

    55/59

    53

    Eur

    128

    N

    ProposedGroundFloorPlan1:150

    1

    1

    1

    1

    1

    4

    4

    3

    3

    2

    2

    2

    55

    6

    6

    6

    7

    7 7

    77

    8

    8

    8

    8

    8

    Key

    PublicCommercialStatePlaza

    Lift

    PublicBangla-StatePlaza

    Stair Core

    BorderControlRoom

    HoldingRoom

    Inter-State Platform

    Border-Crossing Platform

    A

    A

  • 8/2/2019 PPS 25.03.12

    56/59

    54

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    Communal Amenity Space

    Private Amenity Space

    N

    Proposed First Floor Plan1:150

    1

    1

    4

    5

    5

    5

    5

    5

    5

    5

    44

    4 4

    4 4

    3

    3

    3

    3

    3

    3

    3

    2

    2

    6

    6

    Key

    1Bedroom2personFlat

    Service Lift

    Fire Stair

    RefuseDrop

    7

    7

    7 7

    7 7

    7 7

    7

    WaterStorageTanks

    A

    A

  • 8/2/2019 PPS 25.03.12

    57/59

    55

    DB

    CD

    DB

    CD

    DB

    Desk

    CD

    SB

    Desk

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    CD

    DB

    Desk

    CD

    SBDesk

    CD

    DB

    CD

    DB

    CD

    N

    Proposed Second Floor Plan1:150

    3

    3

    3

    2Bedroom3personFlat

    Communal Amenity Space

    Private Amenity Space

    1

    1

    1

    4

    5

    5

    5

    5 5

    5 5

    5 5

    5

    5

    5

    5

    2

    2

    2

    2

    2

    2

    2

    2 2

    2 2

    Key

    1Bedroom2personFlat

    Stair

    A

    A

  • 8/2/2019 PPS 25.03.12

    58/59

    56

    N

    ProposedRoofPlan1:150

    PositionofPVPanels

    A

  • 8/2/2019 PPS 25.03.12

    59/59

    ss

    JAN-082BEAUTIFUL

    BRITISHCOLUMBI A

    N

    LGF

    -1F

    GF

    1F

    2F

    KeyPlan1:1250

    OsbornStreet

    GunthorpeStreet

    ProposedSectionA-A1:150