    I.I. New Projec tsNew Projec ts

    Power Transmission Interc onnec tion linesPower Transmission Interc onnec tion lines

    1.1. 400 kV interconnec tion line400 kV interconnec tion line

    Albania (Tirana)Albania (Tirana)--KosovoKosovo

    ((PrishtinaPrishtina ))2.2. 400 kV Interconnec tion Line400 kV Interconnec tion Line

    FYR of Mac edoniaFYR of Macedonia AlbaniaAlbania --

    ItalyItaly

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    2/12

    IS UNDER IMPLEMENTATION THE PROJECT:IS UNDER IMPLEMENTATION THE PROJECT:

    400 KV INTERCONNECTION LINE ELBASAN400 KV INTERCONNECTION LINE ELBASANTIRANA 2 (ALBANIA)TIRANA 2 (ALBANIA)--

    --PODGORICE (MONTENEGRO)PODGORICE (MONTENEGRO)

    ELBASANELBASANTIRANA 2 (ALBANIA)TIRANA 2 (ALBANIA)--

    Financed by Ita lian Government;Financed by Ita lian Government;

    Duration of the p rojec t: 24 monthsDuration of the projec t: 24 months The total leng th is approxima tely 47 km.The total length is approxima tely 47 km.

    Overall projec t va lue (Euro): 29 million EuroOverall projec t va lue (Euro): 29 million Euro

    TIRANA 2 (ALBANIA)TIRANA 2 (ALBANIA)--PODGORICE (MONTENEGRO)PODGORICE (MONTENEGRO)

    Financed byFinanced by KfWKfW;;

    Duration of the p rojec t: 24 monthsDuration of the projec t: 24 months

    Overall projec t va lue (Euro): 42 million EuroOverall projec t va lue (Euro): 42 million Euro

    The total leng th is approxima tely 156 km.The total leng th is approxima tely 156 km.

    For the first part of the line Tirana 2 toFor the first part of the line Tirana 2 to VauVa u DejesDejes, the towers will be for, the towers will be fordoub le c ircuit (78 km), to be used also for the 400 kV interconndoub le c ircuit (78 km), to be used also for the 400 kV interconnec tion lineec tion lineAlbaniaAlbania --Kosovo.Kosovo.

    MoreeverMoreever, Alba nia would need to further inc rease its capac ities of, Albania would need to further inc rease its capac ities of

    interconnec tion linesinterconnec tion lines

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    3/12

    For this interconnec tion line CESI Ita ly c arried out one feasibility study financed byWorld Bank.

    The study took under consideration:

    For Kosova

    Development of Elec trical DemandDeve lopment of Elec trical Demand KosovaKosova 2000200020202020

    Development Peak System LoadDevelopment Peak System Loa d KosovaKosova 2000200020202020 Development of Elec tric ity generationDevelopment of Elec tric ity generation KosovaKosova 2000200020202020

    For Albania

    Development of Elec trical Demand Alba nia 2000Deve lopment of Elec trical Demand Albania 200020202020

    Development f Pea k System Loa d Albania 2000Development f Pea k System Loa d Albania 200020202020 Development of Elec tric ity generation Albania 2000Development of Elec tric ity generation Albania 200020202020

    400 KV INTERCONNECTION LINE ALBANIA400 KV INTERCONNECTION LINE ALBANIA

    (TIRANA 2)(TIRANA 2)--KOSOVO (PRISHTINA).KOSOVO (PRISHTINA).

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    4/12

    New Projec ts:New Projec ts:

    400 KV INTERCONNECTION LINE400 KV INTERCONNECTION LINEALBANIA(TIRANA 2)ALBANIA(TIRANA 2)--KOSOVO (PRISHTINA).KOSOVO (PRISHTINA).

    Origin of Found ing:KfWKfW has expressedhas expressedinterest for financ inginterest for financ ing

    the projec tthe projec t Name of Client:

    KESH/ OSTKESH/ OST Implementing c onsultancy

    agency:NoneNone

    Type of the Projec t:

    InfrastructureInfrastructure

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    5/12

    Status of the Projec t:

    Proposed Signific anc e of the

    project:Bilateral

    Duration of the Projec t:24 months

    Overall projec t va lue

    (Euro):39 Million EURO(Estimated)

    Risk ana lyze : DONE

    Environmenta l Assessment:

    DONE

    400 KV INTERCONNECTION LINE ALBANIA400 KV INTERCONNECTION LINE ALBANIA

    (TIRANA 2)(TIRANA 2)--KOSOVO (PRISHTINA).KOSOVO (PRISHTINA).

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    6/12

    400 kV bay in Kosovo B substation;

    400 kV bay in Tirana 2 ;

    400 kV single c ircuit / twin bundle Kosovo B(KS) Vau Dejes(AL) sec tion;

    400 kV double c ircuit / twin bundle (sec ond c irc uit) Vau Dejes Tirana 2section.

    The tota l line length is 239 km and the leng ths of three sec tions are:239 km and the leng ths of three sec tions are:

    1. Sec tion Kosovo B1. Sec tion Kosovo BAlbanian borderAlbanian border 85.5 km;85.5 km;

    2. Sec tion Albanian border2. Sec tion Albanian borderVauVau DejesDejes 75.5 km;75.5 km;

    3. Sec tion3. Sec tion VauVau DejesDejesTirana 2Tirana 2 78.0 km78.0 km

    The main c omponents of the Projec t are:

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    7/12

    The main benefits of the interconnec tion lineThe main benefits of the interc onnec tion line

    The new interconnec tion line:

    enhances the reliab ility of Kosovo and Albanian systems and improves to grea ter

    extend the reliab ility of the Reg ional interconnec ted system( neighb oringc ountries) rep resenting a nec essary reinforcem ent of the reg ional networks;

    rea lize important cost saving in operation through joint and c oordinating operationsof both power systems;

    allow to rea lize an short-term and med ium term generation d ispatch op timizationof the hyd rolog ic and thermal resources of Albania and Kosovo;

    guarantee up to year 2020 the reliable operation o f the interc onnec tedTransmission Systems and ensure an adeq uate transfer c apability to a llow for theec onomic Exchange of elec tric ity be tween Kosovo and Alba nia;

    mitigate some congestion prob lems on reg ional interconnec ted transmissionsystem rela ted with the Critica l North South c orridor through a dec reasing themaximum power and annual energy transits;

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    8/12

    New Projec tNew Projec t400 KV OHTL AND SUBMARINE CABLE

    INTERCONNECTION AMONG FYR OF MACEDONIA-ALBANIA-ITALY

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    9/12

    400 KV OHTL AND SUBMARINE CABLEINTERCONNECTION AMONG FYR OF MACEDONIA-

    ALBANIA-ITALY

    Feasibility study :Feasibility study : DONEDONE

    Environmental Assessment:Environmenta l Assessment: DONEDONERisk ana lyze :Risk ana lyze : DONEDONE

    Orig in of Found ingOrig in of Found ing:: NoneNone

    Name of Client:Name of Client: KESH/ OST (Alb ania )/ TERNAKESH/ OST (Albania )/ TERNAIta ly/ MEPSO (FYROM)Ita ly/ MEPSO (FYROM)

    Overa ll projec t value (Euro):Overa ll projec t value (Euro):

    First phase: 450 Million EURO (Estimated)First pha se: 450 Million EURO (Estimated)

    Type of the Projec t:Type of the Projec t: InfrastructureInfrastructure

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    10/12

    400 KV OHTL AND SUBMARINE CABLEINTERCONNECTION AMONG FYR OF MACEDONIA-

    ALBANIA-ITALY

    Tec hnic al c harac teristic :Tec hnic al c harac teristic :

    OVERHEAD TRANSMISSION LINEOVERHEAD TRANSMISSION LINE

    (MACEDONIA AND ALBANIA)(MACEDONIA AND ALBANIA)

    VOLTAGE 400 KV

    RATED CAPACITY 1,200 MVA (NTC LIMIT SET TO UP TO 1,200 MW) FORMATION WITH TWO SHIELD WIRES

    (OF WHICH AT LEAST ONEINCLUDES\ FIBER-OPTIC)

    HVDC LINK (ALBANIA ITALY) HVDC CONVERTERS UP TO 1,000 MWHVDC CONVERTERS UP TO 1,000 MW

    400 KV SUBMARINE CABLE400 KV SUBMARINE CABLE

    Significance o f the p rojec t

    Trans-regiona l

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    11/12

    THE MAIN COMPONENTS OF THE PROJECT ARE:

    400 kV overhead transmission line from 400/ 220/ 110 kV Bitola400 kV overhead transmission line from 400/ 220/ 110 kV Bitolasubstation up tosubstation up to ElbasanElbasan substation, around 128 km.substation, around 128 km.

    400 kV transmission line400 kV transmission line ElbasanElbasan -- Durres around 70 km.Durres around 70 km.

    Construc tion o f the new AC/ DC substations in DurresConstruc tion of the new AC/ DC substations in Durres

    and Foggia.and Foggia.

    Construc tion of new submarine cable from DurresConstruc tion of new submarine c able from Durressubstation to Foggia substation, approximately 330km.substation to Foggia substation, approximately 330km.

    MINISTRY OF ECONOMY, TRADE AND ENERGYMINISTRY OF ECONOMY, TRADE AND ENERGY

    SEPTEMBER, 2007SEPTEMBER, 2007

  • 7/31/2019 Power Transmission Interconnection LinesPower Lines

    12/12

    12

    The main benefits of the interc onnec tion line are:

    The newThe new 400 KV OHTL and Submarine cable interconnec tion400 KV OHTL and Submarine cable interconnec tion

    among FYR OF MACEDONIAamong FYR OF MACEDONIA--ALBANIAALBANIA-- ITALY will haveITALY will have positivepositiveeffec t on the reg iona l network p erformance.effec t on the reg iona l network p erformance.

    From an ec onomic point of view, the benefits due toFrom an ec onomic point of view, the benefits due totransmission interconnec tion Macedoniatransmission interconnec tion Mac edonia--AlbaniaAlbania -- Italy wouldItaly would

    exceed the total investment cost with a benefitexc eed the total investment cost with a b enefit-- cost ratio ofcost ratio of3.0 over the study period .3.0 over the study period.

    Also, some other benefits of this projec t are the inc rease of thAlso, some other benefits of this projec t are the inc rease of thee

    revenue from the e lec tric ity transit, the inc rease of the systemrevenue from the e lec tric ity transit, the inc rease of the systemreliability, sharing reserve capac ities, etc .reliab ility, sharing reserve capac ities, etc .