LIST OF NEW TRANSMISSION CAPACITIES AND INTERCONNECION LINES (2009-2015) February 2009 Prishtina

Transcript of List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission...

Page 1: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

LIST OF NEW TRANSMISSION CAPACITIES AND

INTERCONNECION LINES (2009-2015)

February 2009

Prishtina

Page 2: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 2-28

Content Introduction......................................................................................................................... 3 1. Transmission Network of Republic of Kosovo ....................................................... 3

1.1 History of transmission network................................................................................. 3 2 Actual transmission network capacities (2008) ....................................................... 5

2.1 Actual capacity of transmission lines ..................................................................... 6 2.2 Actual transformation capacities ........................................................................... 6

3 Development of new transmission capacities ....................................................... 10 3.1 New transmission network capacities of Kosovo until year 2015.................. 12 3.2 Capacity of Transmission Lines – 2015 configuration ................................... 13 3.3 Transformation capacities in year 2015 ........................................................... 14 3.4 Capacities of interconnection lines ................................................................. 15

4 Regional developments of transmission systems ................................................. 20 4.1 Maximal load of Power Systems of Southeast Europe countries .......................... 20 4.2 Actual list of Interconnection Lines of countries in Southeast Europe........ 21 4.3 List of important regional projects of transmission networks............................... 24

4.3.1 Status of investments which have been approved......................................... 24 4.3.2 Status of projects under discussion or candidate........................................... 25

ANNEX A – 2015 configuration ..................................................................................... 27 ANNEX B- Technical data of lines and autotransformers .......................................... 28

Page 3: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 3-28

Introduction Transmission network is one the there main pillars of Kosovo Power system. Generation, transmission and distribution are three main components of modern power systems. Duty of the transmission network is bulk transmission of electricity generated by generators of the system or cross border lines, at long distanced up to distribution nodes with high reliability, quality and efficiency at 400, 220 and 110kV voltage level. Based on TSO license Article 10.2 and based on Article 13.1 (k) of the Law on Electricity, Transmission System Operator every two years should prepare list of new transmission capacities of the region and interconnection according to needs of Kosovo. This document includes time horizont 2009-2016 based on 7 year Development Plan for Transmission Network of Republic of Kosovo. Document contains list of actual transmission network capacities, network limitations, vision for development of new transmission capacities and interconnection capacities. Document also contains data about actual capacities of interconnection lines of Transmission Systems of Southeast Europe countries as well and long term plans for development of new interconnection capacities.

1. Transmission Network of Republic of Kosovo

1.1 History of transmission network

Transmission network of Republic of Kosovo during the past years has been

developed in several stages of expansion, reinforcement and consolidation.

Between years 1953 and 1958, first 110kV line in Kosovo has been built, from Novi Pazar (in Serbia) to Butel (in Macedonia) connections Substations (SS): SS Vallaç, SS Trepça, SS Vushtrria, SS Kosovo A, SS Prishtina 1 and SS Prishtina 4, SS Ferizaji and SS Sharri. At the same period has been built the second 110kV line between SS Kosovo A and SS Prishtina 1 and radial line from Vallaç in Peja connected to Burim. In 1959 second 110kV line from SS Vallaç to Kosovo A has been built to reinforce connection if Power Plant (PP) Kosovo A which was being built at that time. In 1960 first 200kV line in Kosovo was built, from Krushevc (Serbia) to SS Kosovo A. in 1963 another 220kV line was built, and from SS Kosovo A to Skopje (Macedonia), and another interconnection was added between these two substations in year 1971.

In 1967 the 110kV line in northwest was expanded from Peja to connect Decani and Gjakova 1 to west part of the region. In 1969 this was further expaned towards SS Prizreni 2 in south connecting it with SS Gjakova 2. In 1972 second radial 110kV line from Ferizaj to Theranda was constructed, and then in 1973 in SS Prizreni 3, Prizreni 1 and SS Prizreni 2 completing an 110kV ring around the region. Also in 1973 second 110kV line from SS

Page 4: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 4-28

Prishtina 1 was built which later in the year 1988 was connected to SS Prishtina 4 and was expanded to SS Gjilani, in eastern part of Kosovo. In 1977 second 110kV line from SS Kosovo A to SS Prishtina 1 was built reinforcing supply for the city and by this connecting SS Prishtina 2 and SS Prishtina 3 (1986). Also on 1977 double 220kV lines were built connecting SS Kosovo A and SS Kosovo B. In year 1978 first 400kV line in Kosovo was built connecting Nish (Serbia) with Skopje (Macedonia) through SS Kosovo B. In 1980 the 110kV line towards Gjilani was expanded to Bujanovc (Serbia). In 1981 the 110kV line for connection of HPP Ujmani with SS Vallaç was built. In 1983 second 400kV interconnection line from Ribarevina (Montenegro) to SS Kosovo B was built, both 400kV lines so connecting PP Kosovo B to SS Kosovo B, and 220kV lines for self supply of SS Kosovo B. At the same year 220kV line from SS Kosovo B to SS Prizreni 2 was built, through switchyard in Drenas. Also in the same year second 220kV line to Drenas was built, followed by second line for supply of industrial objects of Feronikel. At the same time radial 110kV line from SS Kosovo A to SS Bardhi was built.

In the year 1984 line from SS Gjilani to SS Sharr through SS Vitia was built, by this completing southeast circle of 110kV of Kosovo network. In 1988 the 220kV line from SS Prizreni 1 to hydro power plant (HPP) Fierza (Albania) was built, also at the same year double 220kV line from SS Kosovo B to SS Prishtina 4 was built. At the same year 110kV line from SS Gjakova 2 to SS Klina and line from SS Prizreni 2 to SS Prizreni 3 were built, so reinforcing supply of Prizreni.

In 1990 second 110kV line from SS Prizreni 2 to SS Gjakova 2 was built. In 1991

Lipjani substation was built interconnecting with SS Prishtina 4 through 110kV line constructed at the same year. This year represents end of investment in transmission network for a period of 10 years until year 2001 that represents a long pause of 10 years in reinforcement and development of the transmission network. This can be seen in fig.1.

Page 5: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 5-28

Fig.1. Time period and number of installations of SS and lines per year

Such a long pause of non development of transmission network, improper

maintenance and old equipment are main factors that have brought Kosovo transmission system to a very difficult situation. Due to lack of financial funds even after the war there were no investments which would improve performance of the network. Below in tab.1 is provided a list of projects of category of increase of transmission network capacities realized from year 200 until 2008.

Tab.1 Projects realized 2000-2008

Name Characteristics YearAT3 in SS Kosovo B 400/220kV Third autotransformer 400MVA 2003 AT3 in SS Kosovo A, 220/110kV AT3 replacement, 150MVA 2003 Replacement of conductor in line 110kV, no 164/1 SS Gjakova 1- SS Gjakova 2

Replacement of conductor from 150mm2 to 240mm2, 4.9km

Double line 110kV from SS Kosovo A to SS Prishtina 5

ASCR 240mm2, 5.5km 2005

Replacement of conductor in line 110kV, no 125, SS Kosovo A- SS Vushtrria1& 2

“Hot Wire” 150mm2, 24km 2007

Replacement of conductor in line 110kV, no 164/3, SS Prizreni 1- SS Prizreni 2

“Hot Wire” 150mm2, 3.2km 2007

Line 110kV SS Prizreni 2- SS Rahoveci ASCR 240mm2, 17.25km 2008

2 Actual transmission network capacities (2008)

Kosovo transmission network operates with three voltage levels 400kV, 220kV, and 110kV. Transmission system of Republic of Kosovo is interconnected through cross border lines with four neighboring countries: Serbia, Macedonia, Montenegro and Albania. In the regional aspect Kosovo transmission system has an important role in transactions of electricity trades developed in the region. Powerful horizontal network 400kV, strong interconnection with neighboring countries determines the important role in our system in the energy aspect. Actually through horizontal network very high volume of electricity is transferred, this is around 62% of annual consumption of Kosovo.

Page 6: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 6-28

2.1 Actual capacity of transmission lines In Tab. 2 and Fig. 2 can be seen length and transmission capacities for length of existing lines of Kosovo transmission network, based on situation in the end of year 2008. Tab.2 Length of transmission lines and its transmission capacity. Overhead lines

2008 Total length in Kosovo

[km] Transmission capacity Ct=Sn*L

[MVA km] 400kV 181.4 238846

220kV 231.821 77506 110kV 645 65845

While data from tab.2 presented in diagram look as in fig.2

0

50000

100000

150000

200000

250000

400kV 220kV 110kV

Kap

acite

ti tra

nsm

etue

s M

VA*k

m

0

100

200

300

400

500

600

700

Gja

tesi

a e

linja

ve k

m

Kapaciteti [MVA*km]Gjatesia e linjave [km]

Fig.2 Graphical presentation of data from table 2

Also from this diagram can bee seen that previous concept of Kosovo transmission

network is developed in increase of exporting capacities, while no due care was given to increase of transmission capacities for internal consumption. From the diagram it can be seen that capacities of horizontal network are satisfactory, while capacities of 110kV are insufficient for transmission of power to distribution loads.

2.2 Actual transformation capacities Actual transformation capacities of the transmission network managed by KOSTT are mainly concentrated in 400/220kV and 220/110kV substations. 1 Two damaged lines Kosovo A – Skopje are not taken into account 2*65=130km

Page 7: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 7-28

Highest transformation capacity in installed in SS Kosovo B 400/220kV. In this substation are installed three transformers on nominal power 400MVA. Total transformation capacity of this substation is 3*400 = 1200MVA. SS Kosovo A actually has three autotransformers AT1=100MVA, AT2 = 150MVA and AT3 = 150MVA with total transformation capacity of 400MVA. SS Prishtina 4, actually has two autotransformers AT1=150MVA and AT2 = 150MVA , with total transformation capacity of 300MVA.

SS Prizreni 2, actually has two autotransformers AT1=150MVA and AT2 = 150MVA , with total transformation capacity of 300MVA. Table.3 Actual transformation capacities in Transmission Network

AUTOTRANSFORM. Number of Autotransform.

Total transformation capacity (MVA)

400/220kV -SS Kosovo B

3

1200MVA

220/110kV - SS Kosovo A -SS Prishtina 4 - SS Prizreni 2

3 2 2

1000MVA 400MVA

300MVA 300MVA

2.3 Actual limitations in the network Actual condition of the Kosovo transmission system capacities is not satisfactory as consequence of factors presented below:

• Enormous growth of electricity consumption in distribution level from year 2000 until now.

• Lack of investments in transmission network reinforcement from year 1990 until 2000.

• Insufficient investment from year 2000 until now.

Actual capacity of the network is about 930MW 2 with all elements in operation (N-Criteria) taking into account consumption of Feronikeli industry which is connected at 220kV level with sufficient transmission capacity. Capacity of 930MW can be higher or lower depending on configuration of the network and environment temperatures. Highest influence in variations of network capacity have 110kV 2 From Energy Balance 2009

Page 8: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 8-28

interconnection lines and 220kV line Fierza-Prizren as well and injection of generation from HPP Ujmani. More than 85 of the indigenous consumption is transmitted or transformed through 220/110kV transformers installed in three substations at 220/110kV voltage level. Limitations or bottlenecks which transmission network actually faces are:

• Limitations in transformation in all 220/110kV substations

- SS Kosovo A - SS Prishtina 4 - SS Prizreni 2

In all three substations there is lack of transformation capacities, especially during peak load there are dangerous overloads of autotransformers. While criteria N-1 in these substations can be fulfilled only during low consumption during summer season, for load lower than 650MW.

• Limitations in 110kV lines - Line no 118/5, SS Prishtina 4 – SS Bibaj,

While criteria N-1 during load over 930MW in condition of 2008 configuration do not fulfill:

- One 220kV line (no. 293/2) - Eight 110kV lines Eventual opening of abovementioned elements during heavy consumption can cause

dangerous overloads in other elements of the power system which can open one after other, with consequence of forced de-energize of large parts of transmission network. Most critical case is tripping of the 220kV line SW Drenasi 1 - SS Prizreni 2, no. 293/2, in which case system faces drastically loss of transmission capacities and collapse of voltage in big part of the transmission network.

Computed analyzes (simulations with PSS/E in System model) show that transmission network can fulfill N-1 criteria for loads lower than 650MW. In fig. 3 detailed single line diagram of Power System of Republic of Kosovo can be seen, as per condition of year 2008. .

Page 9: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 9-28

Fig.3 Single line diagram of PS of the Republic of Kosovo actual configuration 2008

Page 10: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 10-28

3 Development of new transmission capacities After establishment of Kosovo Transmission, System and Market Operator (KOSTT)

significant activities were developed in regards to long term planning of the transmission network. During this process state of the transmission network has been analyzed in detail and best options for reinforcement of network have been provided, with aim of improving reliability and security of supply of consumers. Based on the Grid Code and legal obligations, KOSTT has prepared long term Transmission Network Development Plan (7 years) which is revised every year. This plan contains list of projects and reinforcements in the transmission network for time period 2007-2013.

In tab. 4 are presented projects that are expected to be put in operation until end of year 2009 Tab. 4 Projects in progress that are expected to be completed by end of the year 2009

Name

Characteristics

Year

PEJA 3 PROJECT - AT1 400/110kV - Connection to interconnection line L437 - New line 110kV Peja 3- Klina - Replacement of conductor of L126/4 - Connection of SS Skenderaj to L163 - Replacement of conductor of line

Skenderaj-Peja 3

Autotransformer 300MVA Double line 2x490mm2,ASCR, 0.6km Line 110kV,ASCR 240mm2, 18km “Hot Wire” 150mm2, 23km Double line 110kV, 240mm2, 5km “Hot Wire” 150mm2, 17.9km

2009

Adoption of line L212 as 110kV SS Kosovo A-SS Bibaj

Repair of the line with previous parameters from SS Kosovo A to SS Bibaj 31km

2009

Replacement of conductor in line 110kV, no 126/1, SS Deçan – SS Gjakova 1

Replacement of conductor from 150mm2 to 240mm2, 20.2km

2009

All these three projects are extraordinary important for increase of reliability and security of Transmission System Operation. These will directly increase transmission capacities of the System. Peja 3 project represents biggest reinforcement of the transmission network since ’80. Project has very high benefit will increase transmission capacities, will enable reduction of losses in the network, will relief many 110kV lines, autotransformers in SS Kosovo A and SS Prizreni 2, and will increase quality of consumer supply with electricity, especially in Dukagjini Valley. Also, the second project of adaption of 220kV line (L212) as 110kV and its connection to SS Ferizaji 1 represents a very important plan for transmission network. This represents an emergency plan due to emergent needs of transmission network in Southeast part of Kosovo. Effects of this project will enable elimination of bottleneck of 110kV supply line that connects SS Prishtina 4 – SS Ferizaj 1, increase quality of supply of distribution points: (Ferizaj, Viti, Theranda and Sharr).

Page 11: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 11-28

Also and project for replacement of conductor 150mm2 of the line that connects SS Gjakova 1 – SS Deçan with conductor 240mm2 will influence increase of network transmission capacities. In table 5 is presented of projects of category of reinforcements in Transmission extracted from development plan. Table contains five categories of reinforcements:

- Reinforcement in transformation - Creation of powerful Transmission nodes – new substations - New interconnection lines - New internal lines

Tab. 5 List of the projects from Transmission Network Development Plan

Name

Characteristics

Year

AUTOTRANSFORMER – RINFORCMENT IN TRANSFORMATION Autotransformer AT1 in Kosovo A Replacement of existing AT1 with AT1

150MVA 2009

Autotransformer AT3 in Prishtina 4 Autotransformer 150MVA, 220/110kV 2011Autotransformer AT3 in Prizreni 2 Autotransformer 150MVA, 220/110kV 2011NEW SUBSTATION – CREATION OF POWERFULL NODE FERIZAJ 2 PROJECT

- AT1 400/110kV - Connection to interconnection line

L420 - New line 110kV SS Gjilani 1- SS

Ferizaj 2 - Double line 110kV SS Bibaj – SS

Ferizaj 2 Connection of L212 in Ferizaj 2

Autotransformer 300MVA Double line 2x490mm2,ASCR, 3.5km Line 110kV,ASCR 240mm2, 30km “Hot Wire” 150mm2, 5.5km Continuation – line 110kV, 240mm2, 4km

2011

PROJECT DRENASI 1 (ÇIKATOVE) - AT1 220/110kV completed

Transformation of Switchyard Drenasi 1 in substation 220/110kV by installation of autotransformer AT1 150MVA

2012

NEW INTERCONNECTION LINES 400kV Line 400kV SS Kosovo B – SS Kashar (KS – AL)

Line 400kV, 2x490/65mm2 ACSR, 85 km in territory of Kosovo

2012

Line 400kV SS Kosovo B – SS Skopje 5 (KS – MK)3

Line 400kV, 2x490/65mm2 ACSR, 65 km in territory of Kosovo

2015

NEW INTERNAL LINES 110kV _ SUPPORT OF DISTRIBUTION CONSUME Connection of SS Bardhi to line L163 Double line 110kV ,240mm2,1.2km 2009Connection of SS Fushë Kosovo in line L1801 Double line 110kV ,240mm2, 5km 2010Cross border line 110kV SS Prizreni 2- Kukës Line 110kV ,240mm2, 20km 2010Double line 110kV SS Drenasi 1- SS Drenasi 3

(Industrial Zone) Double line 110kV ,240mm2, 10km 2012

Double cable line SS Prishtina 4- SS Prishtina 6 Double cable line 110kV ,1000/95mm2, 5.3km 2010Double cable line SS Prishtina 4- Prishtina 7 Double cable line 110kV, 240mm2, 0.2km 2010

3 It is still in the pre-feasibility stage. Project is Candidate Project in SECI

Page 12: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 12-28

Connection of SS Mitrovica 2 to L125/3 Double line 110kV, 240mm2, 4km 2010Connection of SS Gjilani 5 to L184/1 Double line 110kV,240mm2, 0.8km 2010Connection of 110kV SS Drenasi 1- SS Drenasi

2 Line 110kV, 240mm2, 6.28km 2011

Line 110kV Malishevë - Rahovec Line 110kV, 240mm2, 19km 2011Line 110kV Malishevë – SS Drenas 2 Line 110kV, 240mm2, 24km 2011Connection of SS Shtime to L179/2 Double line110kV,240mm2, 2km 2012Double line SS Dragash – SS Prizreni 2 Double line 110kV,240mm2, 23km 2012

REINFORCMENTS OF LINES 110kV (increase of transmission capacity) Adaption of line 35kV Lipjan – Shtime to

110kV line Conductor 110kV “Hot Wire” TASCR 150mm2, 14.8km

2012

Replacement of conductor in line 110kV, no 179/1, SS Prizreni 1- SS Prizreni 3

Conductor 110kV,ASCR 240mm2 4.69km 2012

Replacement of conductor in line 110kV, no 126/5, SS Peja 1- SS Peja 2

Conductor 110kV ASCR 240mm22, 4.6km

2012

Replacement of conductor in line 110kV, no 125/2, SS Vallaç 1- SS Trepça

Conductor 110kV ASCR 240mm2, 11.4km

2011

Replacement of conductor in line 110kV, no 125/2, SS Vushtrria 1- SS Trepça

Conductor 110kV ASCR 240mm2, 9.6km

2011

3.1 New transmission network capacities of Kosovo until year 2015

Network capacities projected in Transmission Network Development Plan will be sufficient for accommodation of power flows in relation to forecasted consumption and expected growth of generation capacities, until the time period included in long term development plan. Projected network according to Transmission Network Development Plan will not have bottlenecks, while its electric parameters will be in allowed limits in accordance with Grid Code. Network capacities will have sufficient security margin in facing the maximal load forecasted for future years and in almost all elements N-1 criteria will be meet. Quality of transmitted power will be in allowed limits according to Grid Code.

Computer simulations show that transmission network developed with planed time frame according to Transmission Network Development Plan 2007-2013 will have transmission capacity in range of 1500MW up to 1600MW. Increase of transmission capacity for 70% from actual capacity will be an extraordinary support for power system, especially for economic development of country. In table 6 development of transmission network capacities through years can be seen:

Tab.6. Development of transmission capacities through the years

Transmission capacity of the network

2008 2009 2010 2011 2012 2013 2014 2015

Max cap.(MW) (N Criteria)

930 1250 1250 1530 1600 1600 1600 1600

Max cap. (MW) (N-1 Criteria)

650 850 850 1050 1100 1100 1100 1100

Page 13: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 13-28

Peak forecast (MW) 967 1023 1081 1112 1157 1188 1217 1235

Most influential projects in increase of internal transmission network capacities are creation of two powerful nodes:

- SS PEJA 3 400/110kV and - SS FERIZAJI 2 400/110kV

And increase of transformation capacities in substations 220/110KV by installation of additional autotransformers with power of 150MVA. - SS Kosovo A, SS Prishtina 4, SS Prizreni 2 and SS Drenasi 1 From point of view of increase of interconnection capacities it is of very high importance for Kosovo power system, countries to which these lines are interconnected and Transmission Systems of the region are two 400kV interconnection lines.

- SS Kosovo B – SS Kashar (Kosovo – Albania) - SS Kosovo B – SS Skopje 5 (Kosovo – Macedonia)

These two lines enable accommodation of new generation capacities especially will enable Kosovo exports after construction of new generation capacities. These will also increase stability and security of operation of the power systems in region, will enable reduction of bottlenecks in horizontal networks of the region, optimization of operation of Kosovo, Albania and Macedonia power systems by supporting electricity trade transactions in region.

3.2 Capacity of Transmission Lines – 2015 configuration Tab. 7 shows the length and transmission capacities of existing lines of Kosovo transmission network, based on Transmission Network Development Plan 2007-2013. While fig. 4 shows comparison of line lengths and their capacity for both configurations 2008 and 2015. Tab.7 Length of the lines of transmission network and their transmission capacity for network configuration in 2015.

Overhead lines 2015

Total length of the lines in Kosovo [km]

Transmission capacity Ct=Sn*L [MVA km]

400kV 346 238846

220kV 232 65845 110kV 956 103731

Page 14: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 14-28

645km

181km

956km

346km

232km

0

50000

100000

150000

200000

250000

300000

350000

400000

450000

500000

400kV 220kV 110kV

Kap

acite

ti Tr

ansm

etue

s M

VA k

m

0

200

400

600

800

1000

1200

Gja

tesi

a e

linja

ve k

m

Kapaciteti [MVA*km] 2008 Kapaciteti [MVA*km] 2015Gjatesia e linjave [km] 2008 Gjatesia e linjave [km] 2015

Figure.4 Comparison of line lengths and capacity per length between transmission network of 2008 and 2015

From the figure 4 it can be noted that:

- Capacity of 400kV lines per length will increase for 90% from year 2008 until year 2015, while

- Capacity of 220kV lines per length will remain same since there will be no investments in new 220kV lines, and

- Capacity of 110kV lines for length will increase for 57%

Up to load of 1100 MW all lines of the transmission network in 2015 network configuration will fulfill N-1 criteria, while for forecasted peak of 1235MW for year 2015 lines 110kV connecting SS Gjakova 1 – SS Gjakova 2 and SS Peja 3 – SS Peja 1 will not fulfill N-1 criteria.

3.3 Transformation capacities in year 2015

Transmission network will have increase of transformation capacities in existing 220/110kV substations, also these capacities will increase due to construction of two substations 400/110kV, SS Peja 3 and SS Ferizaj 2, in which initially one autotransformer of nominal power of 300MVA will be installed in each. Tab. 8 shows transformation capacities which will be achieved in transmission network until year 2015.

Page 15: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 15-28

Tab. 8 Installed transformation powers in transmission network until year 2015

AUTOTRANSFORM. 2015

Number of AT

Total transformation

capacity 400/220kV

- SS Kosovo B 3

1200MVA 3x400MVA

400/110kV - SS Peja 3

- SS Ferizaj 2

1 1

600 MVA 1x300MVA 1x300MVA

220/110kV - SS Kosovo A - SS Prishtina 4 - SS Prizreni 2 - SS Drenasi 1

3 2 2 1

1500MVA 3x150=450MVA 3x150=450MVA 3x150=450MVA 1x150=150MVA

By comparing tables 3 and 8 it can be noted that:

- Transformation capacity up to 110kV level has increased for 210%, which means that capacity of 1500+600=2100MVA (that corresponds to approximately 1900MW) represents sufficient margin reserve taking into account that in year 2015 peak will be 1235MW 4

- Transformation capacities 400/220kV will remain same since it is not necessary to increase such capacities taking into account effect of two new substations 400/110kV (SS Peja 3 and SS Ferizaj 2) in unloading of power flows of autotransformers in SS Kosovo B.

Out of all autotransformers installed in the transmission network until year 2015 only the autotransformer in SS Peja 3 will not fulfill N-1 criteria, if it trips for loads higher than 1100MW. Whilst tripping of single autotransformer in SS Ferizaj 2 will be compensated by 110kV line connecting SS Kosovo A – SS Bibaj (L212 converted to 110kV line). Figure 7 shows geographic layout of Kosovo power system in year 2015 while figure 8 shows long term vision for development of 400kV network.

3.4 Capacities of interconnection lines

Maximal capacity of energy exchanges (with natural power of lines) with high voltage transmission lines is 2200MW. In 400kV lines existing cross border transmission capacity is about 1800MW (3x600), while in 220kV it reaches up to 400MW ( 200MW line with Albania and 200MW line with Krushevc – Serbia). Future plans for improvement, respectively increase transmission capacity of interconnection lines includes construction on one 400kV

4 Base scenario (medium) from Long Term Power Balance 2009-2018

Page 16: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 16-28

line that would connect Kosovo and Albania with a capacity of 600MW, as well and another 400kV line with Macedonia with capacity of 600MW. Net Transfer Capacity (NTC) of Kosovo interconnection lines smaller than their natural power and it depends from regional power balance in different neighboring countries as well and from limitations in transmission lines that can occur in 400kV interconnection lines. In the fig.5 are shown actual capacities of interconnection according to their natural power (case when power systems of the region have balanced systems and average NTC values).

P =200MWNTC= 100MW

P =600MWNTC= 350MW

Pnat =600MW

NTC= 400MW

P =600MW

NTC= 440MW

KapacitetetKapacitetet aktualeaktuale tete interkoneksionitinterkoneksionit

PRIZRENI

Leposavic

Lipjan

2

AB

MAQEDONIA

SHQIPËRIA

MALI I ZI

SERBIA

TOTALI

P = 2000MW

NTC = 1290MW

Fig.5. Actual interconnection capacities – NTC and capacities as per natural power of lines

Whilst figure 6 shows values of interconnection line capacities after start of operation of 400kV line SS Kosovo B – SS Kashar (Albania) and second 400kV line SS Kosovo B – SS Skopje 5. NTC values can be lower or higher depending on development of horizontal network of transmission network of countries in Southeast Europe, as well and energy exchange and power balance of each system. Increase of exchanges especially from north to south can limit NTC values. After installation of new generation capacities in our country, direction and volume of power flows will

Page 17: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 17-28

change significantly. Construction of two new 400 lines is necessary since energy exchange transactions in the region will increase and these two lines will enable safe transfer of power surpluses which will occur after installation of new generation capacities.

P =600MW

NTC= 500MW

KapacitetetKapacitetet interkoneksionitinterkoneksionit pas pas operimitoperimit tete linjeslinjes 400kV 400kV KosovKosovëë –– ShqipShqipëëriri dhedhe LinjLinjëëss se se dytdytëë 400kV 400kV KosovKosovëë -- MaqedoniMaqedoni

PRIZRENI

Leposavic

Lipjan

2

AB

MAQEDONIA

SHQIPËRIA

MALI I ZI

SERBIA

TOTALI

P = 3200MW

NTC = 2290MW

P =600MW

NTC= 500MW

Fig.6. Increase of interconnection transmission capacities and NTC values after start of operation of

two new 400kV lines

Page 18: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 18-28

Fig.7 View of power system of Republic of Kosovo based on Transmission Network Development Plan 2007-2013

Page 19: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 19-28

Figure.8 Possible vision of development of 400kV network and new generation capacities

Page 20: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 20-28

4 Regional developments of transmission systems

Process of transmission network panning of each country in region is determined

from electricity demand forecast and development of generation capacities. All countries of Southeast Europe do not have generation capacities to meet consumption; therefore large number of them is dependent on electricity imports. Actually highest demand for imported electricity has Greece, Italy, Croatia, Hungary, Albania, Kosovo and Montenegro. But all these countries have their plans for construction of generation capacities of different types, depending on primary energy sources which they have.

Kosovo is potentially expected to be electricity exporter, always based on large

quantities of primary energy sources based on lignite. Actual infrastructure of transmission in Southeast Europe will not meet technical criteria in next time period for 10 years, if new capacities are not created (lines, substations).

Project of planning regional transmission network “SECI 5” financed by USAID has

created working groups among which Kosovo takes place, respectively KOSTT. This project includes long term development plan of each country in a single model with aim of identification of necessary reinforcements of interconnection capacities, based on various development scenarios of consumption and new generation capacities. Below we will present important data from SECI initiative for long term development of Transmission System of Southeast Europe.

4.1 Maximal load of Power Systems of Southeast Europe countries Maximal forecasted loads of Southeast Europe countries which correspond to winter and summer season in time horizon 2012, 2015 and 2020 are presented in table 9.

The above mentioned table shows maximal loads for individual power systems of countries in region: Albania, Kosovo, Bosnia and Herzegovina, Bulgaria, Croatia, Greece, Macedonia, Montenegro, Rumania and Serbia.

5 SECI-The Southeast European Cooperative Initiative-Project Group on “Development of Interconnections of Electric Power Systems of SECI countries for better integration to European System”

Page 21: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 21-28

Table.9 Maximal forecasted loads in countries of Southeast Europe

2012 2015 2020

Countries Winter Summer Winter Summer Winter Summer MW MW MW MW MW MW Albania (Al) 1445 1123 1614 1380 2.645 2.246 Kosovo (KS) 1157 685 1235 750 1390 969 Bosnia (BA) 2245 1352 2410 1451 2855 1719 Bulgaria (BG) 6810 5651 7025 5752 7340 6176 Croatia (HR) 3290 2010 3838 2119 4448 2354 Greece (GR) 11102 12134 12705 13849 14027 15290 Macedonia (MK) 1485 900 1607 997 1946 1171 Montenegro (MG) 725 610 737 637 787 679 Rumania (RO) 8352 5133 9.056 5675 11418 7017 Serbia (SR) 6120 4080 6393 4242 6745 4472

4.2 Actual list of Interconnection Lines of countries in Southeast Europe

Region of Southeast Europe is undergoing process of changes in electricity sector: in

generation, transmission and distribution. These changes in each country have resulted with reorganization of vertically integrated companies, result of which is unbundling of transmission from generation and distribution. Changes in electricity sector also have influenced planning philosophy of generation and transmission since most of the countries in region are countries in transition.

All development plans of generation and transmission are described and analyzed in

GIS “Generation Investment Study” of year 2004. Purpose of this study is determination of list of projects of new generation units and their method of connection in regional network and needs for network reinforcements in order for system to sustainably accommodate new generation capacities. Below we will present list of actual capacity of interconnections lines of interconnected transmission systems of countries of Southeast Europe, as well and of those planed in time frame of 2009-2015. Tab.10 shows list of interconnection lines of transmission systems of Southeast Europe at 400kV and 220kV level. List contains also list of interconnections lines of our system (see yellow rows). Fig. 9 shows electric map of the region which contains actual interconnection lines.

Page 22: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 22-28

Tab. 10 List of interconnection lines Conductor Length(km)

Interconnection Lines

Interconnected countries

Voltage level (kV)

Type Dim. No. of phases

Trans. Capac. (MVA) I I Tota

Varna -Isaccea BG -RO 750 ACSR 300 5 2390 150 85 235 Albertirsa -Zapadoukrainska HU -UA 750 ACSR 400 5 5360 268 254 522 Isaccea -Pivdenoukrainska RO -UA 750 ACSR 400 5 5360 5 395 400 God -Levice HU -SK 400 ACSR 500/350 2/3 1440 88 36 124 Gyor -Gabcikovo HU -SK 400 ACSR 500/450 2/3 1440 29 15 44 Zemlak -Kardia AL -GR 400 ACSR 500 2 1309 21 80 101 Mostar4 -Konjsko BA -HR 400 ACSR 490 2 1318 41 69 110 Ugljevik -Ernestinovo BA -HR 400 ACSR 490 2 1318 39 53 92 Blagoevgrad -Thessaloniki BG -GR 400 ACSR 500 2 1309 72 102 174 Dobrudja -Isaccea BG -RO 400 ACSR 400 3 1715 81 150 231 Maritsa Istok -Hamitabat BG -TR 400 ACSR 400 3 1715 59 90 149 Isaccea -Vulcanesti RO -MOLD 400 ACSR 400 3 1715 5 54 59 Kozloduy -Tantareni (double) BG -RO 400 ACSR 500/300 2/3 2490 14 102 116 Sofia West -Nis BG -RS 400 ACSR 500 2 1330 37 86 123 Maritsa Istok -Babaeski BG -TR 400 ACSR 500 2 1309 50 77 127 Zerjavinec -Heviz (double) HR -HU 400 ACSR 490 2 1318 99 69 168 Chervena Mogila - Stip6 BG- MK 400 ACSR 490 2 1330 80 70 150Dubrovo -Thessaloniki MK -GR 400 ACSR 490 2 1330 55 60 115 Nish – Kosovo B SR- KS 400 ACSR 490 2 1330 84 40 124Skopje 5 - Kosovo B MK -KS 400 ACSR 490 2 1330 22.5 68 90.5Arachtos -Galatina HVDC GR -IT 400 HVDC 1250 / 500 / / 313 Gyor -Wien Sud (double) HU -AT 400 ACSR 500 2 2563 59 63 122 Podgorica -Trebinje ME -BA 400 ACSR 490 2 1330 60 21 81 Arad -Sandorfalva RO -HU 400 ACSR 450/500 2 1212 5 52 57 Portile De Fier -Djerdap RS -RO 400 ACSR 967 2 1330 1 2 3 Rosiori -Mukacevo RO -UA 400 ACSR 450 2 1212 39 36 75 Ernestinovo -S. Mitrovica HR -RS 400 ACSR 490 2 1330 52 41 93 Subotica -Sandorfalva RS -HU 400 ACSR 490 2 1330 27 21 48 Maribor -Keinachtal (double) SI -AT 400 ACSR 490 2 1330 26 37 63 Melina -Divaca HR -SI 400 ACSR 490 2 1318 26 41 67 Tumbri -Krsko (double) HR -SI 400 ACSR 490 2 1318 32 16 48 Divaca -Redipuglia SI -IT 400 ACSR 490 2 1330 39 10 49 Mukachevo -Sajoszeged UA -HU 400 ACSR 400 2 1386 8 142 150 Bitola -Florina MK -GR 400 ACSR 490 2 1312 20 13 33 Ribarevine -Kosovo B KS -ME 400 ACSR 490 2 2000 50 73 123 Ugljevik -S. Mitrovica BA -RS 400 ACSR 490 2 1920 46 34 80 Vau Dejes -Podgorica AL -ME 220 ACSR 360 1 301 47 21 68 Fierzë -Prizren AL -KS 220 ACSR 360 1 301 26 45 71 Krusevc- Podujeva RS - KS 220 ACSR 360 1 301 70.5 14. 85Pljevlja -Bajina Basta ME -RS 220 ACSR 360 1 720 15 82 97 Pljevlja -Pozega ME -RS 220 ACSR 360 1 1000 14 78 92 Gradacac -Djakovo BA -HR 220 ACSR 360 1 300 19 27 46 Prijedor -Mraclin BA -HR 220 ACSR 360 1 300 66 66 Mostar4 -Zakucac BA -HR 220 ACSR 360 1 300 49 50 99 Prijedor2 -Medjuric BA -HR 220 ACSR 360 1 300 34 32 66 TE Tuzla -Djakovo BA -HR 220 ACSR 360 1 300 65 27 92 Trebinje -HE Dubrovnik (Plat) BA -HR 220 ACSR 240 2 491 7 5 12 Trebinje -HE Dubrovnik (Plat) BA -HR 220 ACSR 240 2 491 7 5 12 Trebinje -HE Perucica BA -ME 220 ACSR 360 1 301 20 42 62 Sarajevo20 -Piva BA -ME 220 ACSR 490 2/1 366 61 23 84 Visegrad -Pozega BA -RS 220 ACSR 360 1 301 18 51 69 Zerjavinec -Cirkovce HR -SI 220 ACSR 360 1 300 19 51 70 Skopje -Kosovo A (out of MK -KS 220 ACSR 360 1 301 18 65 83 Skopje -Kosovo A (out of MK -KS 220 ACSR 360 1 301 18 65 83 Gyor -Wien Sud HU -AT 220 ACSR 360 1 305 59 63 122 Gyor -Neusiedl HU -AT 220 ACSR 360 1 305 55 27 82 Podlog -Obersielach SI -AT 220 ACSR 490 1 366 46 20 66 Pehlin -Divaca HR -SI 220 ACSR 490 1 350 6 47 53 Divaca -Padricano SI -IT 220 ACSR 490 1 366 10 2 12 Mukachevo -Kisvarda UA -HU 220 ACSR 400 1 308 54 10 64 Mukachevo -Tiszalok UA -HU 220 ACSR 400 1 308 97 35 132

Abbreviations of countries from Table 10 are shown in Fig. 9.

6 This 400kV line (Macedonia - Bullgary) is put in operacion on16.12.2008

Page 23: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 23-28

Fig. 9 Existing interconnection lines 2008 in interconnected Transmission Systems of Southeast Europe

Page 24: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 24-28

4.3 List of important regional projects of transmission networks

Based on GIS study and UCTE development plans of year 2007, actual situation of

planned projects of transmission systems with regional influence for countries of Southeast Europe are presented below:

4.3.1 Status of investments which have been approved

Tab. 11 - List of interconnection that are considered to be in operation until year 2015

Conductor Transmission

capacity

Voltage level Type Dim

Total lengthInterconnection line

Interconnected countries

(kV) (mm2) (MVA) km Kashar - Podgorica AL - MN 400 ACSR 2x490 1330 146 Maritsa Istok – N.Santa BG - GR 400 ACSR 3x400 1715 180 Nis-Leskovc-Vranje-Stip SR - MK 400 ACSR 2x490 1330 95 Okroglo – Udine (double)

SI - IT 400 ACSR 2x400 1163 113

Kashar – Kosovo B AL - KS 400 ACSR 2x490 1330 238 Bekescaba - Nadab (Oradea)

HU - RO 400 ACSR 2x490 1211 54

N.Santa - Babaeski GR - TR 400 ACSR 3x400 1500 180 Tab. 12 Internal lines planned until year 2015

Conductors Transmission

capacity

Voltage level Type Dim

Total length Internal lines Place

(kV) (mm2) (MVA) (kV) Line Subotica 3 - Sombor 3 Serbia 400 ACSR 2x490 1330 56 Line Tirana - Elbasan Albania 400 ACSR 2x490 1330 45 Line Fier - Vlore Albania 220 ACSR 360 301 26 Line Karlovo - Plovdiv Bulgaria 400 ACSR 3x490 1330 60 Line Arad - Nadab Romania 400 ACSR 2x490 1330 35 Line Lagada - Fillippi Greece 400 ACSR 3x400 1178 110 Tab. 13 –Planned substations 2010-2015

Project name Place Implementation SS PEJA 3 400/110 kV Kosovo 2009 SS FERIZAJ 2 400/110 kV Kosovo 2012

Page 25: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 25-28

SS BEOGRADI 20 400/110 kV Serbia 2008 SS TIRANA 2 400/110 kV Albania 2009 SS VLORA 220/110kV Albania 2009 SY VADAP 400kV Rumania 2008

4.3.2 Status of projects under discussion or candidate

Tab. 14 –Candidate interconnection lines of countries of Southeast Europe 2015

Conductor Transmission Voltage

level Type Dim capacity

Total length

Interconnection Lines Interconnected

countries (kV) (mm2) (MVA) km

Visegrad - Pljevlja BA - MN 400 ACSR 2x490 1330 60 Pécs - Ernestinovo (double) HU - HR 400 ACSR 2x490 2x1330 87

Tumbri - Banja Luka HR - BA 400 ACSR 2x490 1330 200 Pecs - Sombor HU - SER 400 ACSR 2x490 1330 115Kosovo B – Skopje 5 KS - MK 400 ACSR 2x490 1330 83Novi Sad - Timisioara SR - RO 400 ACSR 2x490 1330 128Bitola 2 - Elbasan AL - MK 400 ACSR 2x490 1330 125Maritsa East - Nea Santa BU - GR 400 ACSR 3x400 1715 180Durres - Foggia Al - IT 400 DC 1250 500 250Konjsko - Candia HR - IT 400 DC 1250 500 200 Cirkovce - Héviz SLO- HU 400 ACSR 2x490 1330 162Žerjavinec - Cirkovce HR - SLO 400 ACSR 2x490 1330 140 In fig.10 are shown approved interconnection lines and candidate lines in interconnected transmission system of Southeast Europe until year 2015.

Page 26: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 26-28

Fig. 10 Planned approved lines and candidate lines until year 2015

Page 27: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 27-28

ANNEX A – 2015 configuration

Fig. 11 Single line diagram of Kosovo power system – year 2015

Page 28: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 28-28

ANNEX B- Technical data of lines and autotransformers

LIST OF 400kV, 220kV and 110kV LINES - 2015 CONFIGURATION

Tab. 15 Lines 400kV and 220kV

L. No. Line Kosovo Length (km)

Total Length (km)

No. of towers

in Kosovo

Un (KV)

L. Section (mm2) In

[A

]

Sn [MVA]

Construction year

Ct=Sn*L MVAkm

XX NS KOSOVË B - SS TIRANË 89.50 239.0 400 3x2x490/65 1901 1317 2012 117872

408 SS KOSOVË B - SS NISH 3 40.05 124.4 106 400 3x2x490/65 1901 1317 1977 52745

XX SS KOSOVË B - SS SHKUP 5 68.16 90.4 400 3x2x490/65 1901 1317 2015 89761 420/1 SS KOSOVË B - SS FERIZAJ 2 43.50 116+10 400 3x2x490/65 1901 1317 2011 57290 420 SS FERIZAJ 2 - SS SHKUP 5 31.66 53.9 73+10 400 3x2x490/65 1901 1317 1978 41691

437/1 SS KOSOVË B - SS PEJË 3 42.70 111+2 400 3x2x490/65 1901 1317 2009 56237 437 SS PEJË 3 - SSH RIBAREVINË 28.70 80.8 82+2 400 3x2x490/65 1901 1317 1983 37801

445/1 SS KOSOVË B - TC KOSOVË B 1.10 6 400 3x2x490/65 1901 1317 1983 1449 445/2 SS KOSOVË B - TC KOSOVË B 1.10 6 400 3x2x490/65 1901 1317 1983 1449 205/1 SS KOSOVË B - SS BESIANË 35.81 82 220 3x360/57 779 297 1960/2003 10635 205/2 SS BESIANË - SS KRYESHEVC 14.65 84.8 28 220 3x360/57 779 297 1960/2003 4350

267 SS KOSOVË B - SS KOSOVË A 3.47 12 220 3x490/65 950 362 1977 1255 290 SS KOSOVË B - TC KOSOVË B 0.80 4 220 3x490/65 950 362 1983 290

293/1 SS KOSOVË B - SSH DRENAS 15.55 46 220 3x490/65 950 362 1983 5629 293/2 SSH DRENAS -SS PRIZREN 2 56.26 161 220 3x490/65 950 362 1983 20367 2298 SS KOSOVË B - SSH DRENAS 15.36 45 220 3x490/65 950 362 1983 5559 2299 SSH DRENAS -SS FERONIKEL 2.28 8 220 3x360/57 779 297 1983 677 2300 SSH DRENAS -SS FERONIKEL 2.33 8 220 3x360/57 779 297 1983 692 2303 SS PRIZREN 2 - HC FIERZË 45.05 71.4 136 220 3x360/57 779 297 1988 13380 2304 SS KOSOVË B -SS PRISHTINË 4 18.26 58 220 3x490/65 950 362 1988 6608 2305 SS KOSOVË B -SS PRISHTINË 4 18.40 58 220 3x490/65 950 362 1988 6662 2306 SS KOSOVË B -SS KOSOVË A 3.67 12 220 3x490/65 950 362 1988 1329

Page 29: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 29-28

Tab.16 Lines 110kV

L No. Line Kosovo Length (km)

Total Length (km)

No. of Towers in

Kosovo

Un (KV)

Line section (mm2) In

[A

]

Sn [MVA]

Construction year

Ct=Sn*L MVAkm

118/1 SS KOSOVË A -SS PRISHTINË 1 7.26 30 110 3x150/25 436 83 1959/62 602

118/2 SS PRISHTINË 4 -SS PRISHTINË 1 8.10 33 110 3x150/25 436 83 53/75/88 672 118/3 SS FERIZAJ -SS SHARR 28.66 122 110 3x150/25 436 83 1953 2379 118/4 SS SHARR -SS BUTEL 1.00 17.7 5 110 3x150/50 436 83 1959/78 83 118/5 SS PRISHTINË 4 -SS FERIZAJ 30.41 117 110 3x150/25 436 83 53/75/88 2524 125/1 SS KOSOVË A -SS VUSHTRRI 2 23.38 79 110 3x173/25 HW 735 140 1959/2008 3274 125/4 SS VUSHTRRI 2 -SS VUSHTRRI 1 1.75 7 110 3x173/25 HW 735 140 1959/2008 244 125/2 SS VUSHTRRI 1 -SS TREPÇË 9.60 39 110 3x150/25 436 83 1959/67 797 125/3 SS TREPÇË - SS MITROVICË 2 6.00 110 3x150/25 436 83 1959/71 498

x SS MITROVICË 2 - SS TREPÇË 11.54 110 3x150/25 436 83 2010 958 x SS MITROVICË 2 - SS SKENDERAJ 21.85 110 3x173/25 HW 735 140 2009 3059

126/1 SS GJAKOVË 1 -SS DEÇAN 20.24 60 110 3x240/40 604 115 1967/88/2008 2328 126/2 SS DEÇAN -SS PEJË 2 14.57 46 110 3x150/50 436 83 1966/88/2006 1209 126/5 SS PEJË 2 - SS PEJË 1 4.60 18 110 3x150/25 436 83 1966/88/2006 382

x SS PEJË 3 - SS BURIM 4.96 110 3x150/25 436 83 1958/70/89 412 x SS PEJË 3 - SS BURIM 4.90 110 3x150/25 436 83 2009 406 x SS PEJË 3 - SS PEJË 1 23.50 110 3x240/40 604 115 2009 2703 x SS PEJË 3 - SS SKENDERAJ 22.90 110 3x173/25 HW 735 140 2009 3206

XX SS PEJË 3 - SS KLINË 23.10 110 3x240/40 604 115 2009 2657 155/2 SS VALLAÇ -SS NOVI PAZAR 18.78 35.8 60 110 3x150/25 436 83 66/68/89 1559 X 163 SS BARDHI - SS MITROVICË 2 32.00 110 3x150/25 436 83 1958/71 2656

x SS MITROVICË 2 - SS VALLAÇ 6.00 110 3x150/25 436 83 2010 498 164/1 SS GJAKOVË 1 -SS GJAKOVË 2 4.99 22 110 3x240/40 604 115 2005 574 164/2 SS PRIZREN 2 -SS GJAKOVË 2 29.04 103 110 3x150/25 436 83 1969/79 2410 164/3 SS PRIZREN 2 -SS PRIZREN 1 3.20 12 110 3x173/25 HW 735 140 1981/2008 448 179/1 SS PRIZREN 1 -SS PRIZRENI 3 4.69 18 110 3x150/25 436 83 73/78/88 389 179/2 SS THERANDË -SS FERIZAJ 39.42 141 110 3x150/25 436 83 1973/78 3272 XX SS SHTIME -SS LYPJAN 14.80 110 3x240/40 604 115 2012 1702

179/3 SS PRIZREN 3 -SS THERANDË 18.85 66 110 3x150/25 436 83 1973/88 1565 184/1 SS PRISHTINË 4 -SS GJILAN 5 32.00 110 3x240/40 604 115 2010 3680

X 184/3 SS GJILAN 5 -SS GJILAN 4.80 110 3x240/40 604 115 1973/88 552 184/2 SS PRISHTINË 4 -SS PRISHTINË 1 6.11 22 110 3x240/40 604 115 1973/88 703

x SS PRISHTINË 4 -SS PRISHTINË 6 5.30 110 1000 kab. 803 153 2010 811 x SS PRISHTINË 4 -SS PRISHTINË 6 5.30 110 1000 kab. 803 153 2010 811 x SS PRISHTINË 4 -SS PRISHTINË 7 0.20 110 1000 kab. 803 153 2010 31 x SS PRISHTINË 4 -SS PRISHTINË 7 0.20 110 1000 kab. 803 153 2010 31 x SS FERIZAJ 2 - SS GJILAN 30.00 110 3x240/40 604 115 2011 3450 x SS FERIZAJ 2 - SS FERIZAJ 5.50 110 3x240/40 604 115 2011 633 x SS FERIZAJ 2 - SS FERIZAJ 5.50 110 3x240/40 604 115 2011 633

112/1 SS KOSOVË A - SS FERIZAJ 38.00 110 3x360/57 803 153 2009 5814 x SS KOSOVË A - SS F.KOSOVË 5.20 110 3x240/40 604 115 2010 598 x SS F.KOSOVË - SS BARDH 8.60 110 3x240/40 604 115 2009 989

1114 SS KOSOVË A - SS PRISHTINË 1 7.10 26 110 3x240/40 604 115 1978 817 1139/1 SS KOSOVË A - SS PRISHTINË 3 6.58 25 110 3x240/40 604 115 1977/86 756 1139/2 SS PRISHTINË 2 - SS PRISHTINAË 3 10.87 56 110 3x240/40 604 115 1977/86 1250

x SH.DREN.110 - SS P.INDUSTRIAL 10.00 110 3x240/40 604 115 2011 1150 x SH.DREN.110 - SS P.INDUSTRIAL 10.00 110 3x240/40 604 115 2011 1150 x SH.DREN.110 - SS DRENAS 6.28 110 3x240/40 604 115 2011 722 x SS DRENAS - SS MALISHEVË 24.00 110 3x240/40 604 115 2011 2760

1140/1 SS GJILAN -SS BERIVOJCË 18.61 67 110 3x150/25 436 83 1980/83;87,03 1545 1140/2 SS BERIVOJCË -SS BUJANOVC 10.81 18.4 21 110 3x150/26 436 83 1980/83; 87,03 898 1202 SS PRISHTINË 4 -SS PRISHTINË 2 6.51 26 110 3x240/40 604 115 1988 748 1213 SS PRISHTINË 4 -SS LYPJAN 13.52 49 110 3x240/40 604 115 1991 1554 1800 SS VALLAÇ - HC UJMAN 14.36 46 110 3x240/40 604 115 1981 1652 1801 SS KOSOVË A -SS BARDH 5.00 110 3x240/40 604 115 2009 575 1802 SS GJILAN -SS VITI 23.41 78 110 3x240/40 604 115 1984/'86 2692 1803 SS VITI -SS SHARR 25.81 95 110 3x240/40 604 115 1984/'86 2969 1804 SS PRIZREN 2 -SS PRIZREN 3 8.79 34 110 3x240/40 604 115 1988 1011

Page 30: List of New Transmission Capacities and Interconnection ... of New... · List of New Transmission Capacities and Interconnection Lines ... List of New Transmission Capacities and

List of New Transmission Capacities and Interconnection Lines (2009-2015) 30-28

1805 SS PRIZREN 2 -SS GJAKOVË 2 24.32 78 110 3x240/40 604 115 1990 2796

x SS RAHAVEC - MALISHEVË 19.00 110 3x240/40 604 115 2011 2185 x SS PRIZREN 2 -SS DRAGASH 23.00 110 3x240/40 604 115 2012 2645 x SS PRIZREN 2 -SS DRAGASH 23.00 110 3x240/40 604 115 2012 2645

1806 SS GJAKOVË 2 -SS KLINË 32.88 102 110 3x240/40 604 115 1988 3781 1807 SS KOSOVË A -SS PRISHTINË 5 5.50 20 110 3x240/40 604 115 2003 633 1808 SS KOSOVË A -SS PRISHTINË 5 5.50 20 110 3x240/40 604 115 2003 633 1809 SS PRIZREN 2 - SS RAHOVEC 17.24 / 110 3x240/40 604 115 2008 1983

Table 14. Transformation capacities (autotransformers) year 2015

SUBSTATION ID Power Sn

[MVA] Transformation % Un [kV]

Unp [kV]

Uns [kV]

uk1-2 [%]

dPcu1-2 [kW]

Io [%]

dPo [kW]

KOSOVO A ATR1 150 220±12X1.25%/115 15 220 220 115 10.48 585 0.5 144 KOSOVO A ATR2 150 220±12X1.25%/115 15 220 220 115 11.21 585 0.5 144 KOSOVO A ATR3 150 220±12X1.25%/115 15 220 220 115 10.48 585 0.5 144

PRISHTINA IV ATR1 150 220±12x1.25/115 12 220 220 115 11 375 0.4 100.5 PRISHTINA IV ATR2 150 220±12x1.25/115 12 220 220 115 11 375 0.4 100.5 PRISHTINA IV ATR3 150 220±12x1.25/115 12 220 220 115 11 375 0.4 100.5

PRIZREN ATR1 150 220±12x1.25/115 12 220 220 115 10.64 375 0.4 100.5 PRIZREN ATR2 150 220±12x1.25/115 12 220 220 115 10.64 375 0.4 100.5 PRIZREN ATR3 150 220±12x1.25/115 12 220 220 115 10.64 375 0.4 100.5

DRENAS 1 ATR1 150 220±12x1.25/115 12 220 220 115 10.64 375 0.4 100.5

KOSOVO B ATR1 400 400±5%/231 5 400 400 231 11.8 586 0.13 132.4 KOSOVO B ATR2 400 400±5%/231 5 400 400 231 11.8 586 0.13 132.4 KOSOVO B ATR3 400 400±5%/231 5 400 400 231 11.8 586 0.13 132.4

PEJË 3 ATR 300 400±12x1.25/115 12 400 110 115 11 550 0.15 123 FERIZAJ 2 ATR 300 400±12x1.25/115 12 400 110 115 11 550 0.15 123