POWER GRID CORPORATION OF INDIA LTD
description
Transcript of POWER GRID CORPORATION OF INDIA LTD
POWER GRID CORPORATION OF INDIA LTD
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
in
139TH SREB MEETING
19TH DECEMBER 2005
HYDERABAD
GRID EVENTS AND ISSUES
ISSUES
• 7.1.1 400 KV KAIGA – GUTTUR
• 7.2.1 400 KV MADURAI – TRIVENDRUM D/C LINE
• 8.0 TALCHER – KOLAR HVDC
• 9.1 400 KV KAIGA – NARENDRA D/C LINE
• 10.0 EVACUATION SCHEMES FOR NEW CENTRAL
SECTOR GENERATING STATIONS
• 11.1 UNREQUISITIONED POWER OF NTPC
STATIONS
• 12.2 KALPAKKAM – EVACUATION SCHEME
ISSUES (Continued …)
• 13.1 TALCHER – KOLAR INTERTRIP SCHEME
• 14.1 ALTERNATE PATH FOR EVACUATION OF
TALCHER STAGE 2 POWER
• 15.1 INTER REGIONAL TRANSMISSION LINKS
BETWEEN ER/WR AND SR
• 16.1.i HIGH VOLTAGE CONDITIONS
• 16.1.ii KAIGA – GUTTUR TRIPPING DETAILS
• 16.1.iii HIGH FREQUENCY CONDITIONS
• 16.1.iv STOA – CHIKKODI – KOLHAPUR LINE
ISSUES (Continued …)
• 5 FREQUENCY LINKED PENALTY/INCENTIVE
SCHEME FOR OVER/UNDER DRAWALS OF
SHARES
• 8 REGIONAL POWER COMMITTEE
• SCHEDULE DRAWAL GRAPHS
• INTER REGIONAL EXCHANGES
• SUMMARY OF UI
400 KV KAIGA – GUTTUR• TRIPPING DETAILS
• DIFFERENT OPTIONS
– DURING TRIPPING TYPICAL FLOWS
– ALTERNATIVE 1
– ALTERNATIVE 2
– ALTERNATIVE 3
– RADIALISATION OF CHIKODI, BELGAUM AND
NARENDRA LOAD
– LOAD FLOW STUDY RESULTS FOR PROVIDING
AUTOMATIC INTER-TRIP SCHEMES AT KAIGA
DETAILS OF TRIPPING OF 400KV KAIGA-GUTTUR CIRCUIT II ON LINE FAULT
Sl. No
Date of Event
Trip Time Normalisation Date & Time
Description of Events Remarks
1 05/08/05 09:31HRS 05-08-05 16:46HRS
Tripped on Distance Protection at Guttur
end.2 10/08/05 10:02HRS 12-08-05
17:42HRSTripped on Distance Protection at Guttur
end.
De-capping of suspension insulators.
3 13-08-05 07:14HRS 13-08-05 08:14HRS
Tripped without any relay flagged.
4 13-08-05 08:15HRS 13-08-05 19:32HRS
Tripped on CB pole discrepancy at Guttur
end5 13-08-05 19:33HRS 16-08-05
12:01HRSTripped on Distance Protection at Guttur
end.
De-capping of suspension insulators.
6 16-08-05 12:39HRS 26-08-05 18:54HRS
Guttur end Breaker tripped on LBB.
7 30-08-05 20:41HRS 30-08-05 23:34HRS
Tripped on distance protection at Kaiga
end.8 06/09/05 14:45HRS 06-09-05
16:46HRSTripped at Kaiga
without any protection relay.
9 15-10-05 18:25HRS 16-10-05 19:55HRS
Tripped on Distance Protection at Guttur
end.
De-capping of suspension insulators.
10 17-10-05 20:55HRS 18-10-05 18:20HRS
Tripped on Distance Protection.
11 21-10-05 16:27HRS 23-10-05 18:30HRS
Tripped on Distance Protection.
12 24-10-05 18:32HRS 25-10-05 18:20HRS
Tripped on Distance Protection at Guttur
end.
De-capping of suspension insulators.
13 05/11/05 20:12HRS 16-11-05 16:16HRS
Tripped on Distance Protection at Guttur
end.
De-capping of suspension insulators.
PROPOSED ALTERNATIVES FOR AVERTING TRIPPING OF GENERATORS AT KAIGA & KALI COMLEX DURING TRIPPING OF 400KV KAIGA-GUTTUR FEEDER II
48(-13)
(76) 24
(-21)28
TALAGUPPA
24(76)
(OPEN) 307
163SHARAVATHI
57
(85) 115
192(304)
GUTTUR
57
GADAG
63
90 90
387(475)
101 101
(97)5252(97)
(41)11
NAGJHERI
KODASALLI
CHIKKODI
BELGAUM
NADENDRA
MAHALINGPURA
LINGAPUR
HUBLI
PONDA
150
500
130
KAIGA
KADRA
KARWAR
400
KOLHAPUR (MSEB)
28(-21)
25
1
101
ALL FIGURES IN MW
SUB-STATION
GENERATORS
220KV
400KV
AMBEWADI
4444
Note: The Figures in brackets shows the flows after tripping of 400KV Kaiga-Guttur ckt II
TYPICAL MW FLOWS:- AROUND KAIGA AND KALI COMPLEX
ALTERNATIVE – I
249 (0)
TALAGUPPA
OPEN
181
109
SHARAVATHI
OPEN
(103)148
179(293)
GUTTUR
OPEN
GADAG
43
90 90
109
395(520)
47 47
2 2
115(24)
22
NAGJHERI
KODASALLI
CHIKKODI
BELGAUM
NADENDRA
MAHALINGPURA
LINGAPUR
HUBLI
PONDA
150
500
130
KAIGA
KADRA
KARWAR
400
KOLHAPUR (MSEB)
OPEN
37
11
105
ALL FIGURES IN MW
SUB-STATION
GENERATORS
220KV
400KV
AMBEWADI
4444
Note: The Figures in brackets shows the flows after tripping of 400KV Kaiga-Guttur Feeder – II.
TYPICAL FLOWS :- AFTER RADIALISATION OF CHIKODI, BELGAUM & NARENDRA
ALTERNATIVE – 2TYPICAL FLOWS :- SPLIT BUS OPERATION AT KAIGA
KAIGA 400KV BUS - 2
20100
60
60
400
245
SECTION - 1
ALL FIGURES IN MW
GENERATOR
220KV
400KV
KAIGA 400KV BUS - 1
KAIGA220KV
GUTTUR 220KV BUS
GUTTUR 400KV BUS
~
155
~
SECTION - 2
KADRA KODASALLY
NARENDRA400KV BUS
KAIGA 2 x 220 MW
ICT
BUS 1
KAIGA220KV
BUS 2
Continue …
ALTERNATIVE – 2 (Continued …)TYPICAL FLOWS :- SPLIT BUS OPERATION AT KAIGA
245
6
191
60
SHARAVATHI
52
100
155
GUTTUR
52
GADAG
15
88 88
60
430
98 98
70 70
20
24
NAGJHERI
KODASALLI
CHIKKODI
BELGAUM
NADENDRA
MAHALINGPURA
LINGAPUR
TALAGUPPA
HUBLI
PONDA
150
500
130
KAIGA
KADRA
KARWAR
400
KOLHAPUR (MSEB)
6
38
16
103
ALL FIGURES IN MW
SUB-STATION
GENERATORS
220KV
400KV
AMBEWADI
4343
ALTERNATIVE – 3
TYPICAL FLOWS :- AFTER TRIPPING OF 400KV KAIGA-GUTTUR CIRCUIT II
(10)21
TALAGUPPA
76(54)
OPEN(OPEN)
217SHARAVATHI
54(64)
(OPEN) 85
304(275)
GUTTUR
54(64)
GADAG
15
90 90
(54)76
475(521)
(112)101101(112)
(131)9797(131)
13(OPEN)
(125)41
NAGJHERI
KODASALLI
CHIKKODI
BELGAUM
NADENDRA
MAHALINGPURA
LINGAPUR
HUBLI
PONDA
150
500
130
KAIGA
KADRA
KARWAR
400
KOLHAPUR (MSEB)
21(10)
60
34
113
ALL FIGURES IN MW
SUB-STATION
GENERATORS
220KV
400KV
AMBEWADI
4444
Note: The Figures in brackets shows the flows after tripping of 220kV Kaiga-Kaidra & Kaiga-Kodasalli.
LINE FLOWS:-
NAME OF THE LINES Base Case
Base Case & Tripping of
400KV Kaiga-Guttur ckt-II
Case 1 : Radialisation of
Chikodi, Belgaum & Narendra
Case 1 & Tripping of 400KV Kaiga-Guttur
ckt-II400KV KAIGA-GUTTUR 307 OPEN 249 OPEN220KV KAIGA-GUTTUR 192 304 179 293400KV KAIGA-NARENDRA I 24 76 109 108400KV KAIGA-NARENDRA II 24 76 109 108220KV HUBLI-NARENDRA I 28 -21 OPEN OPEN220KV HUBLI-NARENDRA II 28 -21 OPEN OPEN220KV NARENDRA-AMBEWADI I -57 -54 OPEN OPEN220KV NARENDRA-AMBEWADI II -57 -54 OPEN OPEN220KV NAGJHERI-AMBEWADI I 101 101 47 51220KV NAGJHERI-AMBEWADI II 101 101 47 51220KV KADRA-KAIGA 115 85 148 103220KV KODASALLY-KAIGA 48 -13 115 24220KV NAGJHERI-HUBLI I TO IV 387 475 395 520
220KV VOLTAGES:-
NAME OF THE S/S Base Case
Base Case & Tripping of
400KV Kaiga-Guttur ckt-II
Case 1 : Radialisation of
Chikodi, Belgaum & Narendra
Case 1 & Tripping of 400KV Kaiga-Guttur
ckt-IIBELGAUM 216 215 210 198NARENDRA 220 219 214 203CHIKODI 212 211 206 193
LOAD ASSUMED:- MW/MVARCHIKODI 101/42BELGAUM 78/48
GENERATION ASSUMED:-
RAICHUR 1400MWSHARAVATHI 900MWNAGJHERI 500MW
KADRA 130MWKODASALLY 150MW
RADIALISATION OF CHIKODI, BELGAUM AND NARENDRA LOAD
LOAD FLOW STUDY RESULTS FOR PROVIDING AUTOMATIC INTER-TRIP SCHEMES AT KAIGAGenerations assumed for studiesStation Generation in MWRaichur 1400MWSharavathy 900MWNagjheri 500MWKadra 130MWKodasahalli 150MWKaiga 440MW
Line Flows in MWName of the Line Base case Case 1 Case II400KV Kaiga Guttur II 307 OPEN OPEN220KV Kaiga Guttur I 192 304 275400KV Kaiga Narendra I 24 76 54400KV Kaiga Narendra II 24 76 54220KV Hubli-Narendra I 28 -21 -10220KV Hubli-Narendra II 28 -21 -10220KV Ambewadi-Narendra I 57 54 64220KV Ambewadi-Narendra II 57 54 64220KV Kadra-Kaiga 115 85 OPEN220KV Kodasahalli -Kaiga 48 -13 OPEN220KV Nagjheri- Ambewadi I &II 202 202 225220KV Nagjheri- Hubli I toIV 387 475 521220KV Nagjheri- Kodasahalli I&II -104 -194 -262220KV Kadra-Kodasahalli 11 41 125
Case I : Opening of 400KV Kaiga guttur 400KV line II
Case II : Case I and Opening of 220KV Kadra-Kaiga and Kodasahalli -Kaiga feeders at Kaiga.
TRIVANDRUM
COCHIN
THRISSUR
MADURAI
UDUMALPET
ARASUR NLY-EXP
NEYVELI
BAHOOR
PUGALUR
TRICHY
SALEM
HOSUR
MYSORE
SP-BUDUR
MELKOTTAIYUR
ALMATHI
CHITOOR
KOLAR
S’HALLI
NLMNG
HOODY
JAYAMKONDAM
KARAIKUDI
MULTI-CIRCUIT
TOWER ON 220 KV
EDAMON-KAYATHAR CORRIDOR
HASSAN
KOZHIKODE
400 KV MAURAI – TRIVENDRUMD/C LINE
ADVANTAGES OF MADURAI-TRIVANDRUM LINE
• ALTERNATE SUPPLY PATH TO TRIVANDRUM
AREA
• INCREASED STABILITY OF S.KERALA SYSTEM
• DECREASED LOSSES
• IMPROVED TRANSFER MARGIN –
FACILITATING BETTER MERIT ORDER
OPERATION AND ECONOMY
Cont..
THE ISSUES OF CONCERN
• HIGH VOLTAGE AT TRIVANDRUM
– TRIPPING OF ICT ON V/F AT NIGHT
– RISK OF TRIPPING OF LINE
• CONTINUED HIGH LOADING ON 220 KV
EDAMON-KAYATHAR PREVENTING
FURTHER DECREASE IN GENERATION
IN KSEB SYSTEM
Cont..
THE MAXIMUM AND MINIMUM VOLTAGES OF EACH DAY DURING NOV 2005AT TRIVENDRUM 400 KV BUS
380
385
390
395
400
405
410
415
420
425
430
435
440
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DAYS
VO
LT
IN
KV
ADVANTAGES OF COMMISSIONING 400 KV KAIGA NARENDRA
D/C LINE
PONDA
(Goa)
KOLHAPUR
(MAHARASHTRA)
CHIKKODI
KARNATAKA
BELGAUM
NARENDRA 220
KADRA
KAIGA
AMBEWADI
XELDEM(GOA)
NAGJHARI
KODASALLI
HUBLI
GUTTUR
M.L.PURA
NOT TO SCALE
DISTANCES EXAGERATED FOR CONVENIENCE
MAPUSA
ADVANTAGES OF COMMISSIONING 400 KV KAIGA-NARENDRA D/C LINE
• PROVIDES ALTERNATE PATH FOR EVACUATION OF KAIGA GENERATION IN CASE OF CONTINGENCY
• LINE IS ON DIFFERENT ROUTE FROM THAT OF KAIGA-GUTTUR
• ENHANCED REDUNDANCY AND RELIABILITY
FREQUENCY DURATION CURVE OCT-05, OCT-04 & SEP-05
48.50
49.00
49.50
50.00
50.50
51.00
1 1117 2233 3349 4465 5581 6697 7813 8929 10045 11161 12277 13393 14509 15625 16741 17857 18973 20089 21205
% OF TIME --->
FR
EQ
UE
NC
Y I
N H
Z -
-->
0 10 20 30 40 50 60 70 80 90 100
OCT-05
SEP-05
OCT-04
<49 <49.5 49-50.5 >50.0 >50.5 Avg Freq
Oct-05 0.00 0.03 97.47 96.04 2.53 50.22
Oct-04 0.00 1.94 99.37 22.43 0.63 49.89
Sep-05
0.00 0.12 94.38 94.22 5.62 50.25
In HZ
Continue …
FREQUENCY DURATION CURVE NOV-05, NOV-04 & OCT-05
48.50
49.00
49.50
50.00
50.50
51.00
1 1081 2161 3241 4321 5401 6481 7561 8641 9721 10801 11881 12961 14041 15121 16201 17281 18361 19441 20521
% OF TIME --->
FR
EQ
UE
NC
Y I
N H
Z -
-->
0 10 20 30 40 50 60 70 80 90 100
NOV-05
OCT-05
NOV-04
<49 <49.5 49-50.5 >50.0 >50.5 Avg Freq
Nov-05
0.12 1.58 98.24 78.60 1.64 50.11
Nov-04
0.33 8.04 99.63 17.76 0.04 49.80
Oct-05 0.00 0.03 97.47 96.04 2.53 50.22
In HZ
Continue …
To Arrest High Frequency:
• Reservoir based hydro backing/closing
• Liquid Fuel Stations backing/closing down
• IR export
• Thermal Stations backing down/Closing down
• Hydro backing down – even on overflowing
stations
Continue …
To Arrest High Frequency: (Con .. )
• With frequency > 50.5 Hz
– back down even at overflowing hydro
stations
• No sudden injection in the grid at freq > 50.2 Hz.
Continue …
KADAMPARAI GENERATION/PUMP ENERGY FROM JAN - 2003
2003 2004 2005
GENERATOR MODE
PUMP MODE
GENERATOR MODE
PUMP MODE
GENERATOR MODE
PUMP MODE
JAN 39 38 44 58 0 0
FEB 39 46 21 21 0 0
MAR 32 51 6 18 0 0
APR 35 40 26 35 0 3
MAY 37 43 41 48 30 46
JUN 29 45 55 35 45 51
JUL 47 49 50 49 79 62
AUG 54 55 55 41 50 25
SEP 36 48 30 25 41 15
OCT 26 15 0 0 47 45
NOV 23 24 0 0 64 59
DEC 49 53 0 0
TOTAL 446 507 328 330 356 306
REALISATION OF OPEN ACCESS CHARGES FOR SRLDC (Figures are in Rs. Lakhs)
SRLDC (Nodal)
from other RLDCs
1 May-04 3 1.86 1.41 2.13 0.15 5.55
2 Jun-04 1 0.24 3.48 0.18 0.05 3.95
3 Jul-04 0 0 0.99 0 0 0.99
4 Aug-04 0 0 3.48 0 0 3.48
5 Sep-04 0 0 6.12 0 0 6.12
6 Oct-04 0 0 14.64 0 0 14.64
7 Nov-04 0 0 15.51 0 0 15.51
8 Dec-04 0 0 11.52 0 0 11.52
9 Jan-05 3 1.02 6.48 1.49 0.20 9.19
10 Feb-05 8 3.54 7.56 4.05 0.40 15.55
11 Mar-05 6 3.18 0 3.84 0.25 7.27
21 9.84 71.19 11.69 1.05 93.77
1 Apr-05 2 1.90 1.2 0 0.10 3.20
2 May-05 10 1.59 2.76 0 0.45 4.80
3 Jun-05 1 0.80 5.01 0 0.05 5.86
4 Jul-05 1 0.05 3.75 0 0.05 3.85
5 Aug-05 0 0 10.86 0 0 10.86
6 Sep-05 0 0 15.1 0 0 15.10
7 Oct-05 0 0 21.8 0 0 21.80
14 4.34 60.48 0 0.65 65.47
35 14.18 131.67 11.69 1.70 159.24
No.of applications processed (as Nodal
RLDC)
Month & Year
Sl.no
GRAND TOTAL
Total for the year 2004-05
Total for the year 2005-06
Year 2005-06
Year 2004-05
Handling Charges as Nodal RLDC
Processing Charges
Total
Scheduling /System Operation Charges
STEPS TAKEN TO CONTAIN OVER VOLTAGE• TRANSFORMER TAP CHANGES
– MANY ICT TAPS WERE CHANGED ON 400/220 ICT’s
• GT TAP CHANGES
• GENERATORS ON SYNCH CONDENSOR MODE
• NETWORK MANIPULATION
– UPTO 40 LINES KEPT OUT TO CONTROL HV DURING LEAN SEASON
– EVEN DURING PEAK, SRISAILAM LINES ARE KEPT OPEN TO CONTROL HIGH VOLTAGE
– TAKING OUT THE LINE AND CONVERTING LINE REACTOR TO BUS REACTOR
• UTILISATION OF HYBRID AC/DC NETWORK
DIVERSION OF TALCHER STAGE 2 POWER THROUGH GAJUWAKA
KHAMMAM
VIJAYAWADAN’SAGAR
GAZUWAKA (POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
GUTTUR
KAIGA
RSTPP
BHADRAVATI
BANGALORE
MUNIRABAD
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
TALCHER
JEYPORE
HOSUR
P
SSLMM
MMDP
THIRUVANANTHAPURAM
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI NTPC
HIRIYUR
TALGUPPA
SIRSI
CUDDAPAH1000 MW HVDC BACK TO BACK LINK
2000 MW HVDC BIPOLE
500 KV HVDC LINE
400 KV LINE POWERGRID
400 KV LINE APTRANSCO
400 KV LINE KPTCL
400 KV LINE OPERATED AT 220 KV
THERMAL GENERATING STATION
NEYVELI TPS – 1 (EXP) EXP
400KV SUB-STATION
NARENDRA
MAHABOOB NAGAR
Name of the 400 kv line
1 Khammam-Kalpakka I 364 63 YES 632 Khammam-Kalpakka II 364 63 YES 633 Vijayawada-Nellore I 341 50 YES 504 Vijayawada-Nellore II 341 50 YES 505 Vijayawada-Gazuwaka I 317 63 YES 636 Vijayawada-Gazuwaka II 315 50 YES 637 Vijayawada-Gazuwaka III 315 63 YES 638 N'sagar-Gooty 308 50 YES 509 Gooty-Hoody 305 63 YES 5010 Talaguppa-Neelamangala I 348 50 YES 5011 Talaguppa-Neelamangala II 348 50 YES 5012 Jeypore-Gazuwaka I 220 NIL 8013 Jeypore-Gazuwaka II 220 NIL 8014 Ramagundam-Hyderabad II 195 NIL 5015 Ramagundam-Khammam 189 NIL 5016 Ramagundam-Chandrapur-I 178 NIL 5017 Ramagundam-Chandrapur-II 178 NIL 5018 Hiriyur-Nelamangala I 145 NIL 5019 Hiriyur-Nelamangala II 145 NIL 5020 Nelamangala-Bangalore 73 NIL 63
LIST OF 400K V LINES WHERE LINE REACTOR CAN BE CONVERTED INTO BUS
REACTOR IN SR
S.NO.SENDING END LINE REACTOR
CAPACITY(MAVR)
LENGTH (KMS)
RECEIVING END LINE REACTOR
CAPACITY(MAVR)YES / NO
SYNCHRONOUS CONDENSOR OPERATION: IN OPERATION
S. NoName of the Generator
Unit NoInstalled capacity
(In MW)Remarks
1 N'Sagar 2 100 Running
2 N'Sagar 3 100 Running
3 N'Sagar 4 100 Running
4 N'Sagar 5 100 Running
5 N'Sagar 6 100 Running
6 N'Sagar 7 100 Running
7 SriSailam LBPH 1 150 Tested
8 SriSailam LBPH 2 150 Tested
9 SriSailam LBPH 3 150 Tested
10 SriSailam LBPH 4 150 Running
11 SriSailam LBPH 5 150 Running
12 Iddukki 1 130 Running
13 Iddukki 2 130 Running
14 Iddukki 3 130 Running Cont..
NO UNITS X MW TOTAL MW
1 SHARAVATHI 10x103.5 1035 S V.PELTON
2 JOG 4x18+4x12 120 S V.PELTON
3 VARAHI 2x115 230 S V.PELTON
4 KUTTIADI 3x25 75 S PELTON
5 KUTTIADI EXTENTION 1x50 50 PELTON
6 PALLIVASAL 3x7.5+3x4 37.5 S PELTON
7 SENGULAM 4x12 48 R PELTON
8 SABARIGIRI 6x50 300 S PELTON
9 IDUKKI 3x130+3x130 780 S PELTON
10 PEPPARA 3 3 S PELTON
11 PYKARA 3x6.65+2x11+2x14 70 S H.PELTON12 MOYAR 3x12 36 S V.PELTON13 KUNDAH - I 3x20 60 S V.PELTON14 KUNDAH - II 5x35 175 S V.PELTON15 KUNDAH - III 3x60 180 S V.PELTON16 SURULIYAR 1x35 35 S PELTON17 KODAYAR 1x60 60 S V.PELTON
TAMIL NADU
KERALA
KARNATAKA
SL.NO.TYPE OF SCHEME
TYPE OF TURBINE
POWER STATIONINSTALLED CAPACITY
LIST OF GENERATORS WITH PELTON TURBINE
Cont..
IDUKKI UNIT 1 RUNNING IN CONDENSER MODE ON 27-MAR-03
-60
-40
-20
0
20
40
60
80
100
120
140
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00
TIME IN HR ---->
MW
/MV
AR
->
MW
MVAR
3 QUADRANT OPERATION
Cont..
IDUKKI UNIT 2 RUNNING IN CONDENSER MODE ON 14-MAR-03
-60
-40
-20
0
20
40
60
80
100
120
140
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00
TIME IN HR ---->
MW
/MV
AR
->
MW
MVAR
Cont..
GENERATORS ON SYNCH CONDENSOR MODE: ADVANTAGES
• IMPROVED SHORT CIRCUIT LEVELS
• CAN BE CONVERTED TO GENERATOR MODE IN SHORT NOTICE
• EXCELLENT REACTIVE SOURCE
• REDUCED LOSSES
• CONTROL VOLTAGE FLUCTUATIONS
UNREQUISITIONED POWER OF NTPC STATIONS
• RSTPS UNIT 7– SEP 05 1.12 MU ( 05 Transactions)– OCT 05 7.65 MU (15 Transactions) – NOV 05 4.37 MU (11 Transactions)
• TALCHER STAGE 2– NOV 05 6.06 MU (08 Transactions)
Cont..
Month Export Import Wheeling Export Import WheelingApril'05 1 2 1 10 44 May'05 9 7 3 80 63 5June'05 19 1 3 128 38 6July'05 2 0 4 20 0 22
August'05 92 0 0 194 0 7September'05 103 0 0 356 0 32
October'05 135 0 0 564November '05 139 0 0 382
Total 500 10 11 1734.13 144.47 71.59
Number of Transactions. ENERGY SCHEDULED(REA) IN Mus
DETAILS OF STOA TRANSACTIONS
Cont..
REALISATION OF OPEN ACCESS CHARGES FOR SRLDC (Figures are in Rs. Lakhs)
SRLDC (Nodal)
from other RLDCs
1 May-04 3 1.86 1.41 2.13 0.15 5.55
2 Jun-04 1 0.24 3.48 0.18 0.05 3.95
3 Jul-04 0 0 0.99 0 0 0.99
4 Aug-04 0 0 3.48 0 0 3.48
5 Sep-04 0 0 6.12 0 0 6.12
6 Oct-04 0 0 14.64 0 0 14.64
7 Nov-04 0 0 15.51 0 0 15.51
8 Dec-04 0 0 11.52 0 0 11.52
9 Jan-05 3 1.02 6.48 1.49 0.20 9.19
10 Feb-05 8 3.54 7.56 4.05 0.40 15.55
11 Mar-05 6 3.18 0 3.84 0.25 7.27
21 9.84 71.19 11.69 1.05 93.77
1 Apr-05 2 1.90 1.2 0 0.10 3.20
2 May-05 10 1.59 2.76 0 0.45 4.80
3 Jun-05 1 0.80 5.01 0 0.05 5.86
4 Jul-05 1 0.05 3.75 0 0.05 3.85
5 Aug-05 0 0 10.86 0 0 10.86
6 Sep-05 0 0 15.1 0 0 15.10
7 Oct-05 0 0 21.8 0 0 21.80
14 4.34 60.48 0 0.65 65.47
35 14.18 131.67 11.69 1.70 159.24
No.of applications processed (as Nodal
RLDC)
Month & Year
Sl.no
GRAND TOTAL
Total for the year 2004-05
Total for the year 2005-06
Year 2005-06
Year 2004-05
Handling Charges as Nodal RLDC
Processing Charges
Total
Scheduling /System Operation Charges
EVACUATION SCHEMES FOR NEW CENTRAL SECTOR GENERATING STATIONS
• KOODANKULAM APP
• NEYVELI TS-II EXPANSION
• KAIGA STAGE -II
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORESLINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES
KUDANKULAM-TIRUNELVELI KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.)QUAD (108 & 83 Km.)
TIRUNELVELI-UDUMALPET TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km)MOOSE (300Km) LILO OF BOTH CIRCUITS OF LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km)AT TIRUNELVELI ( 2 X 55 Km) EDAMON-EDAMON-MUVATTUPUZHA MUVATTUPUZHA D/C LINE QUAD (150Km)D/C LINE QUAD (150Km) TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).
MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD QUAD CONDUCTORS (90Km)CONDUCTORS (90Km)
T N
KARNATAKA
KERALA
Contd..
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
SUB-STATIONSSUB-STATIONS
NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHAMUVATTUPUZHA
AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/STRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S
SUPPLEMENTARY TRANSMISSION SYSTEMSUPPLEMENTARY TRANSMISSION SYSTEM
LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION ATAT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU)KARAIKUDI (TAMILNADU)
LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA)HASSAN.(KARNATAKA)
KAIGA 3 & 4 TRANSMISSION SYSTEMKAIGA 3 & 4 TRANSMISSION SYSTEM
LINES : 413 KmsLINES : 413 Kms
MYSORE-KOZHIKODE D/C LINEMYSORE-KOZHIKODE D/C LINE
LILO OF KOLAR-SRIPERUMBADUR LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM)AT MELAKOTTAIYUR (40KM)
NARENDRA-DAVANGERE D/C LINE NARENDRA-DAVANGERE D/C LINE
SUB-STATION : 2 Nos. NewSUB-STATION : 2 Nos. New
NEW 400/220KV SUBSTATION ATNEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYURKOZHIKODE & MELAKOTTAIYUR
22NDND 315MVA TRANSFORMER 315MVA TRANSFORMER AT AT HIRIYUR S/S. HIRIYUR S/S. BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) &
HIRIYUR.HIRIYUR.
COST ESTIMATE : 512 CRORESCOST ESTIMATE : 512 CRORES
KERALA
NLC-TS-II EXPANSION TRANSMISSION SYSTEMNLC-TS-II EXPANSION TRANSMISSION SYSTEM
LINES : 467 Km.LINES : 467 Km.
2 NOS. 400KV S/C LINES FROM 2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM).TO NLC TS-II (EXPAN) (8 KM).
NEYVELI-PUGALUR D/C LINENEYVELI-PUGALUR D/C LINE
PUGALUR-MADURAI D/C LINEPUGALUR-MADURAI D/C LINE
UDUMALPET-ARASUR D/C LINEUDUMALPET-ARASUR D/C LINE
LILO OF NEYVELI-SRIPERUMBU-LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY.DUR LINE AT PONDY.
SUB-STATIONSUB-STATION
NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY.PONDICHERRY.
COST ESTIMATE : 721 CRORESCOST ESTIMATE : 721 CRORES
T N
KERALA
KARNATAKA
INTER REGIONAL EXCHANGES
265
221
150 138
0
50
100
150
200
250
300
350
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
IMPORT BY SR FROM WR (668 MU)
IMPORT BY SR FROM ER (805 MU)
INTER REGIONAL EXCHANGES
146 139
286 295
0
50
100
150
200
250
300
350
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
EXPORT BY SR TO WR (610 MU)
EXPORT BY SR TO ER (311 MU)
INTER-REGIONAL EXCHANGES DETAILS UPTO 151 WKS (Till 20.11.05)
WR ER
Net Energy Transaction
57.5 MU
IMPORT BY SR
493.9MU
IMPORT BY SR
Amount Due to
SR Constituents
Rs. 79.7 Cr. Rs. 24.5 Cr.*
Amount Credited TO SR
Constituents
Rs. 76.2 Cr. Rs. 24.5 Cr.
*from 06.09.04 (when ER exchanges computed @ respective frequencies)
UI IN SR (FROM 01/01/03 TO 04/12/05)
• TOTAL UI TURNOVER :- 10141 MU
• TOTAL UI AMOUNT DISBURSED:- 1933 CR
• AVG WEEKLY TRANSACTION:- 66 MU
• AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR
Contd..
AP KAR KER TN PONDY
Total UI exported(-) /
Imported(+) in MUs
-4688 4734 679 1702 -199
Total amount paid in Crores
Rs.-899 862 117 448 -36
Average rate of UI in paise/unit 192 182 173 263 183
SUMMARY OF UI – 153WKS(FROM 01/JAN/03 TO 04/DEC/05)
Contd..
OD UD AND UI RATES OF CONSTITUENTS
182 179
234
200184
149
379
185
0
50
100
150
200
250
300
350
400
AP KAR KER TN
RA
TE
(P
AIS
E/U
NIT
)
OVER DRAWAL (PURCHASE) UNDER DRAWAL (SOLD)
226MU
4914MU
4766MU
31MU
1315MU
2281MU
579MU
636MU
IMPLEMENTED SCHEME TO ENSURE GRID STABILITY
a) BOTH POLES WERE HEALTHY AND ONE POLE GOES OUT
• INSTANT TRIPPING OF UNIT #6, (ONE OF THE FOUR STAGE-II UNITS) IF EX BUS GENERATION IS MORE THAN 1700MW
b) BOTH POLES WERE HEALTHY AND BOTH POLES GO OUT
• IF EX BUS GENERATION IS MORE THAN 1100 MW
– UNITS #5 & #6 TRIPPED INSTANTANEOUSLY– UNIT #4 TRIPPED AFTER 250 m sec
• IF EX BUS GENERATION IS MORE THAN 550 MW
UNIT # 5 TRIPPED INSTANTANEOUSLY UNIT # 4 TRIPPED AFTER 250 m sec UNIT # 6 TRIPPED AFTER 500 m sec
NOTE: STAGGERED TRIPPING IS ADOPTED TO ALLOW THE POWER
SUMMATED SIGNAL RESETTINGContinue ……
Inter Trip Scheme
Continue ……
CONDITIONS BEING CONSIDERED FOR TRIPPING OF 220 KV LINES ON CONDITIONS BEING CONSIDERED FOR TRIPPING OF 220 KV LINES ON
TRIPPING OF TALCHER-KOLAR HVDC POLE(S)TRIPPING OF TALCHER-KOLAR HVDC POLE(S)
MONOPOLAR OPERATION:If the pole power one second prior to trip was more than 400 MW, we extend the inter-trip.
BIPOLAR OPERATION:
(2A) If both poles were carrying power in excess of 200 MW and both poles trip within a time span of 2 sec, we extend inter-trip.(2B) If both poles were carrying power in excess of 800 MW and any one of the poles trips, we extend inter-trip irrespective of power compensation by the surviving pole.(2C) If each pole was carrying power in the range of 400 MW to 800MW and one pole trips, no trip is extended if after a delay of 2 sec the power of surviving pole is more than 600 MW.
COMMISSIONED ON 18.04.2003
PRESENT KOLAR INTER TRIP LOGIC
Continue ……
HIGH SPEED INTER-TRIP SCHEME AT KOLAR
GOOTY
HOODY
SALEM
TRICHUR
MADURAI
TRICHY
SPBDR
NLC II
CUDDAPAH
PONDICHERY
SOMANHALLI KOLAR
HOSUR
NLC -1 EXP.
UDUMALPET
BAHOOR
KURNOOLSOMYAZULA PALLI
TO TALCHER
Continue ……
PRESENT INTER-TRIP POINTS
1) Chinakampally 4) Hosur
2) Kolar ICT 5)Sriperumbudur
3) Hoody 6) Salem
Continue ……
SUGGESTED SCHEME: TRIP SIGNAL 1
• Trip Signal 1 would be initiated under any one of the following two conditions:
• If loss of power flow on the HVDC link at any instant compared with the power flow 2 seconds prior to current instant is more than 500 MW but less than or equal to 1000 MW.
• If one of the HVDC pole block on a line fault and the power flow on the HVDC link just prior to that instant was more than 1000 MW but less than or equal to 1500 MW.
Continue ……
SUGGESTED SCHEME: TRIP SIGNAL 2
• Trip Signal 2 would be initiated to obtain an additional relief of around 800 MW (in addition to 700 MW from Trip Signal 1) :
• If loss of power flow on the HVDC link at any instant compared with the power flow 2 seconds prior to current instant is more than 1000 MW.
• If one of the HVDC pole block on a line fault and the power flow on the HVDC link just prior to that instant was more than 1500 MW.
• Note: In the event of occurrence of Trip signal 2, the total relief would be of the order of around 1500 MW.
Continue ……
STATE SUBSTATIONS RELIEF (MW)
REMARKS
A.P CHINAKAMPALLI 150 EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND.
KARNATAKA KOLAR ICT 250 THROUGH LOCAL PILOT WIRING
HOODY THROUGH PLCC
TAMIL NADU HOSUR 300 THROUGH PLCC
SRIPERUMBUDUR EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND.
SALEM EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND.
TRIP SIGNAL 1: POINTS
Continue ……
STATE SUBSTATIONS RELIEF (MW)
REMARKS
A.P GOOTY SWITCHING STATION
200 SIGNAL WILL BE SENT THROUGH WIDE BAND
ANANTHAPUR -DO-
SOMAYAJULAPALLI
-DO-
KURNOOL -DO-
KARNATAKA SOMANAHALLI 200 EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND.
KERALA TRICHUR NORTH 200 SIGNAL WILL BE SENT THROUGH WIDE BAND
KOZHIKODE -DO-
TAMIL NADU MADURAI 200 -DO-
KARAIKUDI -DO-
THIRUVARUR -DO-
TRICHY 230 -DO-
INGUR -DO-
TRIP SIGNAL 2: POINTS
Continue ……
LOCATIONSIN DIFFERENT STATES
LOGIC DIAGRAM FOR PROPOSED GENERATION OF GRADED SIGNAL AT KOLAR FOR COMPENSATING DIFFERENT LOSS OF POWER FLOW IN HVDC TALCHER-KOLAR LINK
AND TRANSMISSION OF TRIP SIGNAL TO DIFFERENT LOCATIONS
DC LINE FAULT WITH ANTECEDENT POWER FLOW ( ONE SEC PRIOR ) > 1000
MW AND ≤ 1500 MW
DC LINE FAULT WITH ANTECEDENT POWER FLOW (ONE SEC PRIOR) >
1500 MW
TALCHER – KOLAR HVDC
• DETAILS OF IMPORT OF ENERGY
• TRIPPING DETAILS
TALCHER-KOLAR IMPORT OF 23850MUs FROM ER THROUGH TALCHER-KOLAR UPTO NOV - 05
YEAR ---> 2002 2003 2004 2005
MONTHSTOTAL
ENERGY (IN MU)
MAX FLOW
(IN MW)
TOTAL ENERGY (IN MU)
MAX FLOW (IN MW)
TOTAL ENERGY (IN
MU)
MAX FLOW (IN MW)
TOTAL ENERGY (IN MU)
MAX FLOW (IN
MW)
JAN --- --- 311 850 805 1528 852 1583
FEB --- --- 273 1010 701 1508 775 1865
MAR --- --- 491 1316 837 1600 884 1507
APR --- --- 473 1183 923 1500 878 1600
MAY --- --- 172 1026 652 1385 704 1500
JUN --- --- 277 994 688 1416 691 1605
JUL --- --- 319 1075 759 1490 1254 1880
AUG --- --- 346 1088 628 1341 857 1600
SEP 6 200 512 1533 742 1552 732 1881
OCT 58 500 508 1458 829 1550 895 1834
NOV 77 500 470 1048 719 1600 999 1880
DEC 241 750 630 1383 882 1615
TOTAL 382 4782 9165 9521
AVERAGE 96 399 764 866
MAX FLOW
750 1533 1615 1881
1. AT 16:18HRS, HUBLI BUS BECAME DEAD DUE TO INSULATOR BURST AT
HUBLI ON 220KV HUBLI-LINGAPUR.
KPTCL DETAILS
2. 400KV KAIGA-GUTTUR WAS ALREADY OUT.
3. NAGJHERI & KAIGA GENERATION WAS AROUND 800MW.
4. CHIKKODI, BELGAUM, NARENDRA, AMBEWADI & GOA LOADS ARE
AROUND 250-300MW.
5. POWER RUSHED TO GUTTUR THROUGH 220KV KAIGA-GUTTUR LINE.
6. AT 16:21HRS, 220KV KAIGA-GUTTUR LINE ALONG WITH KAIGA UNITS
TRIPPED.
7. KAIGA & NAGJHERI COMPLEX FREQUENCY SHOOT UP TO 52.6HZ.
8. SUBSEQUENTLY ALL UNITS @ NAGJHERI WERE TRIPPED AT 16:33HRS.
KAIGA TRIPPING ON 07th NOV 05
Inter Regional Links
Present IR CapacityPresent IR Capacity= 9,500 MW= 9,500 MW
700 MW700 MW
1200MW1200MW
2000MW2000MW
1200 MW1200 MW
900 MW900 MW30,500 MW
16,000
32,700 MW
34,500 MW
2300
1850 MW1850 MW
1650 MW1650 MW
Contd..
DEVELOPMENT OF NATIONAL GRID
NER
ER
NR
WR
SR
EXISTING
500MW
MW1000
MW500
GAZUWAKA
CHANDRAPUR
VINDHYACHAL
SASARAM
UNDERCONST.
EXISTING
400 kV
220 kV
BONGAIGAONBIRPARA
MALDA
KORBA BUDHIPADAR
KOLHAPUR
BELGAUM
U.SILERU
BALIMELA
DEHRISAHUPURI
MALANPUR
AURAIYA
PHASE-I(By 2002)
HVDC STATION
KOLAR
(KARNATAKA)
TALCHER
ORISSA)
TALCHER KOLAR HVDC LINE
LENGTH:100 KMS
INTER REGIONAL LINKS
CHIKKODI
KOLHAPUR
DETAILS
KALPAKKAM FAST BREEDER REACTOR(500 MW)
EVACUATION
ARANI
VILLUPURAM
ACHARAPAKKAM
KALPAKKAM
SPKOIL
KPFBR EVACUATION SCHEME
SIRUCHERIKANCHEEPURAM
TO SRIPERUMBUDUR
MAPS – KPFBR LINK IS THROUGH A 230 KV D/C CABLE WITH SPARE PHASE.
KPFBR
Contd..
KPFBR EVACUATION SCHEME
• KANCHEEPURAM AND SIRUCHERI ARE CONNECTED TO THE GRID THROUGH 220 KV NETWORK.
• POSSIBILITY OF CONNECTING THEM THROUGH LILO OF ARANI-SRIPERUMBUDUR MAY BE EXAMINED
• TWIN-MOOSE CAN BE CONSIDERED FOR ARANI LINE
• CHENNAI CITY ISLANDING SCHEME COULD BE EVOLVED AT 220 KV LEVEL WITH MAPS, NCTPS,ETS AND GMR
Contd..
CHENNAI RING MAIN
KOLAR
MELKOTTAIYUR
ALMATHI
FROM
NELLORE
SRIPERUMBUDUR
TO NEYVELI
TO CHITTOOR
BACKUP TRANSMISSION SYSTEM TO CATER TO OUTAGE
OF TALCHER KOLAROPERATIONAL STUDIES
OPERATIONAL STUDY FOR BACKUP TRANSMISSION SYSTEM FOR TALCHER-KOLAR OUTAGE
400 KV SYSTEM
GENERATION PATTERN ASSUMED•SIMHADRI 1000 MW
•IMPORT AT GAZUWAKA 1495 MW•GENERATION AT VEMAGIRI 1500 MW
•GENERATION AT VEMAGIRI INCLUDES VEMAGIRI CCGT +KONASEEMA+GOUTHAMI•LINES TO VEMAGIRI COMPLEX STATIONS
NOT MODELLED
GAZUWAKA
KALPAKA
SIMHADRI
VEMAGIRINUNNA
364 MW EACH 112 MW
EACH
620 MW EACH
1495 MW FROM ERTO
KHAMMAM384 MW EACH
NELLORE595 MW EACH
145 MWEACH
Contd..
OPERATIONAL STUDY FOR BACKUP TRANSMISSION SYSTEM FOR TALCHER-KOLAR OUTAGE
220 KV SYSTEMANNEXURE-1
PAGE 2 OF 2
FROMKALPAKA
VEMAGIRINUNNA
10 MWEACH
BOMMUR
VJS(N)
123 MWEACH
102 MWEACH
TO VTS
128 MW
BHIMADOLU
141 MWEACH
PEDDAPURAM
135 MW
BHIMAVARAM
NIDADAVOLU
302
400 KV BUS
142 MW
96 MW EACH
Contd..
SUMMARY OF STUDY • THE 400 KV EVACUATION LINES FROM NUNNA , ESPECIALLY,
NUNNA-NELLORE-CHENNAI MAY FACE INCREASED LOADINGS DEPENDING ON THE LOAD PROFILE IN N.COASTAL AP AND TN + KERALA SYSTEMS.
• HOWEVER, WITH THE CHANGE IN LOAD PATTERN IN AP SYSTEM, AS WELL AS IN DIFFERENT ZONES IN AP, THE LINE LOADING PATTERN SHALL CHANGE AND IN ORDER TO ARRIVE AT A CORRECT DECISION AS FAR AS PLANNING OF TRANSMISSION NETWORK IS CONCERNED, THE STUDIES NEEDED TO BE CARRIED OUT.
• MORE GAS/CCGT GENERATION IS LIKELY TO COME IN THE BASIN AREA , WHEREAS THERE MAY NOT BE SUBSTANTIAL LOAD INCREASE.
• VIJAYAWADA WOULD BECOME A POOLING POINT– PROTECTION ISSUES– SC LEVELS
• SPS SYSTEM TO BE WIRED FROM TALCHER TO SENSE POLE OUTAGE AND RAMP POWER AT GAZUWAKA
RAICHUR-PARLE LINE
OPERATIONAL ASPECTS
PARLE(WR)-RAICHUR(SR)
N’SAGAR
MEHBOOBNAGAR
PARLE
RAICHUR
GUTTUR
GOOTY
HIRIYUR
NELMANGALA
MBD
HOODY
TO MYS/KOZHI
KURNOOL
S’HALLI
FROM KAIGA
FROM STRP
Contd..
OPERATIONAL ISSUES• SYNCHRONOUS OPERATION OF SR WITH CENTRAL GRID
– EXPERIENCE FROM OPERATING THE INTERCONNECTED GRID YET TO BE GAINED
– SINGLE LINK MAY CAUSE PROBLEMS ESPECIALLY ON TRIPPING OF TALCHER-KOLAR
– EVACUATION FROM RAICHUR MAY ALSO CAUSE PROBLEMS – NEED FOR EXTENSIVE STRENGTHENING
• BLACK START RESTORATION– IS SR IS CONNECTED ASYNCHROUNOUSLY, STARTUP POWER
FOR RESTORATION OF CENTRAL GRID COULD BE SOURCED FROM SR
• OPERATION OF HYBRID NETWORK UNDER CONTINGENCY INVOLVES GOOD PERCEPTION AND FAST SET POINT CHANGES IF DONE MANUALLY
• NETWORK SHOULD BE SUFFICIENTLY MATURE WITH PROPER PROTECTION SYSTEM IN PLACE
• COST-RELIABILITY TRADE-OFF
REGIONAL POWER COMMITTEE
• RESOLUTION
• MINUTES OF MEETING HELD ON 06th SEPT 2005 REGARDING ESTABLISHMENT OF RPC