by :Power Grid Corporation of India LtdAPTRANSCO,VIDYUTH SOUDHA,HYDERABAD 01st JULY 2005
-
ContentsABT at Regional LevelNeed for Intra-State ABTSimilarities at State LevelOptions for Market ModelsOptions for UIFeatures of Special Energy MetersAllocations from PPAsRegulatory IssuesAchievement of Intra-State ABTImplementation Plan
-
POWERGRID co-ordinated and provided all infrastructure for ABT implementation.
01.11.200301.01.200301.07.200201.04.200301.12.2002ABT implemented in All Five Regions.Pool Accounts Operated by RLDCs.
-
AVAILABILITY BASED TARIFF (ABT)Spearheaded by POWERGRID Features:Unique commercial mechanism linked with frequency.
Fixed Charges i.e. Capacity charges As per Plant Availability.
Variable Charges i.e. Energy charges As per Schedule.
Unscheduled Interchange (UI) Price as per prevailing system frequency
-
ABT implementation activities involved
Scheduling (Pre Despatch Activities)
Real time operation
Settlement System (Post Despatch Activities)
-
Scheduling (Pre Despatch Activities)
-
SRLDCNLC STAGE2/1NLC TS1 EXPTALCHER ST2RSTPSNLC STAGE2/2ISGSMAPSKGSDESPATCH SCHEDULE TO ISGSAVAILABILITY DECLARATION BY ISGSAPTRANSCOKPTCLKSEBTNEBPONDYGOANLCMINESBENEFICIARIESENTITLEMENTS FROM ISGSsREQUISITION FROM ISGSs and STOAsDRAWAL SCHEDULE TO BENFICIARIESSCHEDULING AT SRLDCLegend
-
ABT implementation - Pre-Despatch ActivitiesDay- Ahead Scheduling
Demand forecasting
Availability Declaration ISGS
Scheduling of ISGSGeneration and Bilaterals
In Southern Region - 5 ISGS stations- 10 Notional control areas - 5 bilateral and inter State open access transactions per day
-
Real time operation
-
Settlement System (Post Despatch Activities)
-
ABT in SR-----Settlement system Monthly Accounts for Fixed Charge and Energy Charge payments to ISGS
Weekly Account for UI and Reactive Energy (Monday-Sunday)
Operation of Pool Account by SRLDC (UItransactions)
-
METERING LOCATIONS IN SRTotal No Of SEMS in SR USED FOR REA 350 No.sTotal No Of SEMS in APTRANSCO USED FOR REA127 No.sSR METERING DIAGRAM
-
INTER STATE LINES METERING LOCATIONS
-
IntraState ABT
-
IntraState ABT : Power Grid Expertise - Implementation of Intra-State ABT in Gujarat and Punjab
- Preparation of Roadmap for Intra-State ABT in Maharastra
- Consultancy Proposals under consideration for other states
-
Need for intra-State ABTTo empower the utilities to take decisions in their interest. Management of UI To identify agencies responsible for Overdrawal / Underdrawal, Overgeneration / Undergeneration resulting in UI payment to regional pool.Proper Demand forecast and management by DISCOMsGeneration Availability of GENCOsTo establish a framework for bilateral trading at intra-State levelTo achieve overall merit order operation.
-
Issues need to be addressed forintra-State ABT
Identification of entities for intra-State ABTMetering ArrangementsScheduling Principles & ProceduresCommercial PrincipleTreatment of existing AgreementsOrganisational DevelopmentRegulatory Issues
-
ISGS: Inter State Generating StationsSGS: State Generating StationsCTU: Central Transmission UtilitySTU: State Transmission UtilityInter-State ABTIntra-State ABTDistribution Control Centre One for each Discom
-
Market ModelsOption 1 Single Buyer ModelAll the generation including IPPs to be pooled /purchased by residual Electricity Board & all power sale / purchase from other agencies through residual Electricity BoardOption 2 Multi Buyer ModelAll the generation including IPPs to be sold/purchased by DISCOMs directly & all power sale / purchase from other agencies also directly by DISCOMs
-
STATE POWER POOL : Single Buyer Model- Option 1 GEN 1 GEN 2 GEN 3 IPP 1 IPP 2
APCPDCL s APGENCO THROUGH TRANSCO SYSTEM RESIDUAL EB/TRADECO/HOLDING CO. TO POOL ALL GENERATION Power Purchases/Sales
-
STATE POWER POOL : Multiple Buyer Model Option2 GEN 1 GEN 2 GEN 3 IPP 1 IPP 2 TRANSMISSION SYSTEM OF APTRANSCO APGENCO
APCPDCL External PurchasesTRADE CO / HOLDING CO.
-
Options for UIUI Rate CurveSame as inter-state UI-Rate CurveHigher inter-state UI-Rate CurveLower inter-state UI-Rate CurveDifferential Rate Curve ( for injection and drawal of UI)Different curves for CPPs and other bulk power licenseeFrequency UI rate curveSingle-slope Curve Multi-slope Curve
-
Options for different market participants CPPs/Co-gens
Case- ICPP embedded in same DISCOMNo intra-State ABT(in future, can be in intra-DISCOMABT)Case- IICPP located in One DISCOM, self use in the host DISCOM and in other DISCOM alsoIntra-State ABT
Case- IIICPP located in one DISCOM, self use in other DISCOM Intra-State ABT
-
Special Energy Meters&Metering philosophy
-
Special Energy Meters0.2s class of IEC static type.Works in 3-phase, 4 wire principleVoltage from 110V secondary side VT and current from CT's of ratio 1A or 5 AmpIn Model-A with 1Amp CT, model-B with 5 Amp CT.Meter will store the data in the memory for 10 days.Meter is having a optical port for tapping the stored data by using a hand held unit called DCD (data collection device)
-
SEM stores the followingNet active energy (wh) in each 15 minute time-block with +/- sign.
Cumulative Wh reading at each mid night.
Average frequency of each 15 minute block with a 2 digit code. Integrate the reactive energy (VARh) algebrically into two separate registers, one for Vave RMS 103% and other for Vave RMS 97%, at each midnight.
-
SEM displays followingProcessor's identification code and modelDate (year month day)Time (hour min sec)Cumulative Wh readingAverage frequency of the previous blockNet Wh transmittal during the previous blockAverage per unit voltageReactive power (VAR)Voltage high VARh register readingVoltage low VARh register reading
-
Local data collection through Optical Port as backup Meter 31DCDDCD
-
AMR System : Through RS485 connectionRS 232 port PSTN ModemPSTNRS 485 / RS 232 Conv.Meter 31Local Data CollectionRemote Data Collection
-
A CASE STUDY CONDUCTED FOR GUJARATMetering Location Philosphy
-
Metering Location PhilosphyAlternatives:
Metering at actual boundary points (66/11kV Xers)
Metering at 132/66 or 220/66kV Xers
Metering at 220/132 or 220/66kV substations
Metering at notional boundarires
-
Assessment of Meters/DCDs - AlternativesAlternative 1 :Discom boundary at 11 kV feeder from 66/11 kV XersMetering at 11 kV side of 66/11 kV Xers.More meters and data recording at lower voltage level would add to inaccuracies.Data collection would be exhaustive and unnecessary. Since 66kV network is owned by GETCO, proportionate losses would be borne by all Discoms.Lot of bulk customers are connected above 11kV and are consumers of Discoms. Metering requirement would be high.No. of meters exceed 3600 Nos. (incl 20% spares)No. of DCDs/MTEs would be high
-
No of meters>3600
-
Assessment of Meters/DCDs - AlternativesAlternative 2 :Metering at 66kV side of Xers of 220/66kV, 132/66kV.Losses in 66kV transmission network included in actual drawal. Inter-discom lines 66kV and below to be metered.Customers connected at 132kV and above to be metered .?No. of meters 1195 (incl 20% spares)No. of DCDs 203 ( incl 20% spares)
-
No of meters = 1195
-
Assessment of Meters/DCDs - AlternativesAlternative 3 :Metering at 220kV side of 220/66kV, 220/132kV Xers .Inter-Discom lines at 132kV and below to be metered.Bulk customers connected at 220kV to be metered.Losses below 132kV and 66kV network included in the drawal No. of meters 772 (incl 20% spares)No. of DCDs 133 (incl 20% spares)
-
No of meters = 772
-
Assessment of Meters/DCDs - AlternativesAlternative 4 : RECOMMENDED ALTERNATIVEMetering at Discoms boundaries (the network dedicated to Discom)Metering at GETCO (Dedicated to Discom) GETCO (dedicated to other discom) Metering at inter-Discom, Discom-to-Genco, Discom-to-IPP, Discom-to-CPP feedersAdvantagesCost of metering and infrastructure for data communication would reduce drastically.Losses of dedicated overlayed GETCO network included in Discom drawal, which anyway has to be apportioned. Losses of common GETCO network shall be pooled.As such differences between estimated and actual losses becomes negligible.No. of meters reduces to 614 (incl 20% spares)No. of DCDs 114 (131 with 20% spares 131)
-
No of meters = 614
-
Comparison with 4 Alternatives
Alternative 1Alternative 2Alternative 3Alternative 4
No. Of Meters>36001195772614No. Of DCDsVery High203133114
-
Metering Location PhilosphyRecommended option : Option 4
Logical, cost-effectiveeasy-to-administer
-
List
List of 132 and 220kV Substations in DISCOMS
Sr. No.
NAME OF SUBSTATIONKVRatioInstalledDISCOM
DAKSHIN GVCL
1VAPI220220/663X100+1X50NAVSARI/VAPI
2BHILAD220220/662X100+1X50NAVSARI/VAPI
3NAVSARI220220/661X100+2X50NAVSARI/NAVSARI
4AMBHETA(CHIKHLI)220200/661X100NAVSARI/NAVSARI
5ICHHAPORE (I)220220/661X100+1X50NAVSARI/ICHHAPUR
6TALANGPUR(SACHIN)220220/662X100NAVSARI/ICHHAPUR
7VAV (VALTHAN)220220/665X100NAVSARI/VAV
8JAGADIA220220/661X100BHARUCH/KIM
9ACHHALIA220220/661X25BHARUCH/ACHHALIA
132/661X40
10HALDARVA220220/662X50BHARUCH/HALDERVA
11KIM (LINDIAT)220220/662X100BHARUCH/KIM
12MOTA2202NAVSARI/VAV
13UKAI (H)220220/66?
14ATUL132132/661X50+1X20
15BHESTAN132132/664X50
16BHARUCH132132/663X20BHARUCH/BHARUCH
17ANKLESHWAR132132/663X50
18VALIA132132/662X50
19ATUL132132/112X12.5
MADHYA GVCL
1ASOJ400400/2202x500JAMBUVA/
220220/1322x50JAMBUVA/
2WAGHODIA220220/662X50JAMBUVA
3GAVASAD(MOBHA)220220/662X50JAMBUVA/
4GODHRA220220/662X50JAMBUVA/
220/1323x50JAMBUVA/
5CHANDRAPURA220220/662X50JAMBUVA/GODHRA
6KAPADVANJ220220/662X50NADIAD/NADIAD
7SALEJADA220220/661X100+1X50NADIAD
8KARAMSAD (220)220220/662x100JAMBUVA
132/664X50
9JAMBUVA220132/662X50JAMBUVA
10GOTRI132132/664X40+1X50
11KARJAN132132/663X50JAMBUVA/GOTRI
12FERTILIZERNAGAR132132/661X50+1X40KOYALI
13NANDESARI(DHANNORA)132132/662X50
14DAHOD132132/661X40
15TILAKWADA132132/661X50+1X40JAMBUVA/
16CHHOTAUDEPUR VASED132132/661X50+1X40
17ODE132132/663X20
18UNDEL132132/662X50
19NADIAD(DABHAN)132132/661X50+2X20NADIAD/NADIAD
20MEHMDABAD132132/662X50NADIAD/NADIAD
21VATVA(NAROL)132132/663X40+1X50NADIAD/NADIAD
22JAWAHAR NAGAR132132/333X50
23NANDESARI(DHANORA)132132/333X50KOYALI*
24DAHOD132132/332X20
25GOTRI132132/112X12.5KOYALI
26MANJUSAR132132/1112/1/05KOYALI
27ODE132132/112X12.5
28CHILODA132132/111X25+2X12.5NADIAD/RANASAN
UTTAR GVCL
1KHANPUR(DEHGAM)220220/662X100NADIAD/NADIAD
2AGIOL(HIMATNAGAR)220220/1321X100Mehsana
220220/662X50Mehsana
3SOJA400400/2202x500MEHSANA
4CHHATRAL220220/663X100+1X50MEHSANA
5DEODAR220220/662X100+1X50PALANPUR
6DHANSURA220220/662X50MEHSANA
7DHRANGADHRA220220/662X100+1X50NADIAD/DHRANGADHRA
8JAMLA220220/662X100MEHSANA
9JANGRAL220220/661X100
10KANSARI220220/662X100PALANPUR
11KHERALU220220/662X100MEHSANA
12LIMBDI220220/1322ASSUMED
132/663X50NADIAD/LIMBDI
13MEHSANA220220/661x100MEHSANA
220220/1324x100MEHSANA
132132/661X50MEHSANA
14MITHA220220/661X100MEHSANA
15PALANPUR220220/662X100PALANPUR
16RANASAN220220/1322(ASSUMED)
220220/662(ASSUMED)
220132/661X50NADIAD/LIMBDI
17SANKHARI220220/661X100+1X50PALANPUR
18THARAD220220/662X100PALANPUR
19VIJAPUR220220/1321X100Mehsana
220220/661X50-DO-
20HALVAD220220/66NADIAD
20VIRAMGAM220220/661X100+2X50NADIAD/VIRAMGAM
21CHILODA132132/661X50INUG OR MG
22DEESA132132/662X50+1X40PPALANPUR
23DHANDHUKA132132/112X12.5NADIAD
24IDAR132132/662X50MEHSANA
25PATAN132132/661X50+2X40PALANPUR
26SABARMATI132132/661X40+1X20NADIAD/RANASAN
27SIDHPUR132132/662X50+1X40PALANPUR
28TALOD132132/662X50+1X40MEHSANA
29VISNAGAR132132/662X50PALANPUR
PASHCHIM GVCL
1JETPUR400400/2203x315GONDAL
220220/662x100
2RAJKOT(NAYARA)220220/1321x100GONDAL/RAJKOT
220220/662x100GONDAL/RAJKOT
3ANJAR220220/661X50ANJAR/ANJAR
ANJAR220132/662X50+2X40ANJAR/ANJAR
4AMRELI-A400400/220AMRELI/AMRELI
AMRELI-B220220/66
5DHASA220220/662X50AMRELI/DHASA
DHASA220132/661X50 ??AMRELI/DHASA
6DHOKADVA(KANSARI)220220/661X100+1X50AMRELI/KODINAR
7AKRI MOTA
7GONDAL220220/1322x100+1x50GONDAL/GONDAL
132/663X30GONDAL/GONDAL
8JAMNAGAR220220/1322X100GONDAL/JAMNAGAR
220/662X100
9KESHOD220220/661X100+2X50AMRELI/KESHOD
10KODINAR(TIMBDI)220220/1322ASSUMED
220/662X50AMRELI/KODIAR
11MORBI(PIPALIA)220220/662X100ANJAR/MORBI
12MOTIPANELI220220/661X100+1X50GONDA/GONDAL
13NAKHATRANA220220/662X50ANJAR/NAKHATRANA
14NANIKHAKHAR220220/661X100+1X50ANJAR/ANJAR
15OTHA(MAHYVA)220220/661X100AMRELI/SAVARKUNDALA
16RANAVAV220220/1322x100GONDAL/RANAVAV
132/663X50GONDAL/RANAVAV
17SAGAPARA220220/661X100AMRELI/VARTEJ
18SARDARGADH220220/661X100+1X50GONDAL/GONDAL
19SAVARKUNDALA220220/661X100+2X50AMRELI/SAVARKUNDLA
20VARTEJ220220/663X100AMRELI/VARTEJ
21VISAVADAR220220/662X50GONDAL/JUNEGADH
22BARVALA132132/112X12.5AMRELI/DHASA
23BHATIA132132/661X50+1X20GONDAL/JAMNAGAR
24BHAYAVADAR132132/661X50+1X20GONDAL/GONDAL
25BHUJ132132/663X50ANJAR/BHUJ
26DHORAJI132132/112X12.5GONDAL/GONDAL
27DHROL132132/661X50GONDAL/JAMNAGAR
28HARIPUR132132/111X12.5AMRELI/KESHOD
29JAMNAGAR(NAGHEDI)132132/662X50GONDAL/JAMNAGAR
30JAMNAGAR(NAGHEDI)132132/111X25+2X12.5GONDAL/JAMNAGAR
31JASDAN132132/662X50GONDAL/GONDAL
32JUNAGADH132132/661X50GONAL/JUNAGADH
33JUNAGADH132132/112X12.5GONDAL/JUNAGADH
34KHAMBHALIA132132/111X20+1X12.5GONDAL/JAMNAGAR
35LALPAR132132/112X12.5ANJAR/MARBI
36PALIYAD132132/662X50AMRELI/DHASA
37PALIYAD132132/111X12.5AMRELI/DHASA
38RAJKOT C-VIKRAM132132/663X50GONDAL/RAJKOT
39SAMAKHIIYALI132132/661X50+2X20ANJAR/ANJAR
40SITAGADH132132/111X25+1X12.5DHRANGADHRA/NADIA
41TALALA132132/664X20AMRELI/KESHOD
42VAJADI132132/662X20
43VALLABHIPUR132132/112X12.5AMRELI/DHASA
44WANKANER132132/663X50ANJAR/MARBI
Genco
GENCO Generating Stations
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersCheck metersTotal metersNo. of LocationsMeters at Cons end
GENCO
Pashchim VGCL
1Panandro KLTPSGT-ST side (3GTs/2STs)2205510
50MVAXer220220/66111
Panandro-Anjar D/C22022
Panandro-Nakhatrana D/C22022
Panandro-Akrimota D/C22011
Sub-total565161
2SikkaGT-ST side (2GTs/2STs)132448
50MVA Xers132132/66111
Sikka-Naghedi S/C13211
Sikka-jamnagar T/C13233
Sikka-Bhatia S/c13211
Sikka-Ranavav S/C13211
Sub-total474151
SUB-TOTAL (PVGCL)9139312
Uttar VGCL
1Gandhinagar TPSGT-ST side(5GTs/4STs)2209918
G'nagar-Ranasan D/C22022
G'nagar-Jamla D/C22022
G'nagar-Mehsana D/C22022
G'nagar-Chhatral D/C22022
G'nagar-Soja D/C22022
Sub-total9109281
SUB-TOTAL (UVGCL)9109281
Madhya GVCL
1Kadana HydroGT-ST side (4GTs/1ST)5510
Xers2200
Kadana-Godhra D/C22022
Kadana-Dhansura D/C22022
Sub-total545141
2Wanakbori TPS
220kV BusGT-ST side (4GTs)448
W'bori-Asoj S/C40011
W'bori-Soja D/C40022
500MVA ICT400400/220111
400kV BusGT-ST side (3GTs/4STs)7714
500MVA ICT400400/22011
W'bori-Ranasan(UG) S/C22011
W'bori-Kapadvanj (MG)S/C22011
W'bori-Asoj (MG)D/C22022
W'bori-Dhansura (UG)D/C22022
W'bori-Godhra (MG)S/C22011
ICT220220/6611To check from SLD
Sub-total111311351
3Dhuvaran TPSGT-ST side(6GTs/3STs)9918ST-3 donot have CT on HV side
Dhuvaran-Gotri (MG)D/C13222
Dhuvaran-Karamsad(MG) D/C13222
Dhuvaran-Dhanduka(UG) D/C13222
Dhuvaran-Undel(MG) S/C13211
Dhuvaran-GSECL D/C13222
Dhuvaran-Vatwa(MG) D/C13222
12.5MVAICT132132/1111
Bus Ties (2)13222
Sub-total9149321
Dhuvaran GSECLGT-ST side(2GTs)224To check GT+ST ??
Dhuvaran-Limbdi (UG)D/C13222
Dhuvaran-Dhuvaran D/C13222
Sub-total24281
Total Dhuvaran111811402
4PanamPanam-Shehra1111131
SUB-TOTAL (MVGCL)283628925
Dakshin GVCL
1Utran GBPPGT-ST side(4GTs/1ST)5510
100MVA Xers220220/6611
220KV Utran Kim D/C22022
Utran-SECo-G D/C6622I-Discom feeder
Utran-Kribhco660CPP/Consumer
Utran-Velanja660Discom-GENCO
Utran-SECo-B16611I-Discom feeder
Utran-SECo-B26611I-Discom feeder
Sub-total575171
2Ukai TPSGT-ST side(5GTs/3STs)88
Ukai-Mota S/C2201
Ukai-Achhalia T/C2203
Ukai-Ukai(H) D/C2202
Ukai-Vav (tap at KAPS)2201
315MVA Xers220400/2201
Sub-total888241
3Ukai (H)GT-ST side(4GTs)44
Ukai-Achhalia D/C2202Gen at 220kV
Ukai(H)-Ukai D/C2202
50MVA Xers220220/6622
Ukai LBPH-Ukai(H)66To Check
Ukai(H)-Nizar S/C66To Check
Ukai(H)-Songadh D/C66To Check
Ukai(H)-Sagbara S/C66To Check
Sub-total464141
4Ukai LBPH33Directly feeding to DISCOM
Ukai LBPH-Ukai(H)66
Ukai-Dam feeder111
Ukai-Colony feeder111
Sub-total32381
SUB-TOTAL (DVGCL)202320634
GRAND-TOTAL66826621412
&L&F&C&D &T&RPage &P of &N
UG-2
ALTERNATIVE -2
Uttar GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of LocationsMeters at Cons EndType C Meters
APalanpur Transmission Circle
1Palanpur220220/662x10022241
2Deodar220220/662x100+1x5033361
3Tharad220220/662x10022241
4Kansari220220/662x10022241
5Sankhari220220/661x100+1x5022241
Sankhari-EHT22011
6EHT (Consumer's name?)EHT-Sankhari2201111
7Jangral220220/661x10011121
8Kheralu220220/662x10022241
Sub-total151530810
TOTAL Palanpur15153081
BMehsana Transmission circle
1Mehsana220220/661x10011121
2Mitha220220/661x10011121
Mitha-ONGC22022
3ONGCONGC(Santhal)-Mitha2201111
ONGC(Santhal)-Soja S/C220111
4Chhatral220220/663x100+1x5044481
5Vijapur220220/661x100+1x5022241
6Jamla220220/661x100+1x5022241
7Dhansura220220/662x5022241
8Agiol (Himmatnagar)220220/661x100+2x5033361
9SojaSoja-Santhal (ONGC)220111
Sub-total17183592
TOTAL Mehsana17183592
CNadiad Transmission circle
1Khanpur220220/662x10022241
Khanpur-AECo D/C22022
2Dhrangadhra220220/662x100+1x5033361
3Viramgam220220/661x100+2x5033361
V'gam-Mandal-Patdi S/C11
5Ranasan220220/13211121To check no. of Xers
9Halvad220220/661x10011121
TOTAL Nadiad13102350
CINTER-DISCOM POINTS
1RandhejaRandheja-AECo S/C66111
2NarolNarol-AECo66111
3Samhadra1
Samhadra-Dholka(MG)-Kheda(MG)11
4Barejadi1
Barejadi-M'dabad(MG)-Kanbha(MG)11
locationsSub-total40440
GRAND-TOTALUTTAR Gujarat494392263
*1 : Bhestian-______ line has tap at D2 Stn. (Whether SECo-D2 ?)
Mota (Banduj) proposed220220/66
&L&F&C&D &T&RPage &P of &N
UG-1
Uttar GVCLALTERNATIVE -1
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of LocationsMeters at Cons End
IWith Gandhinagar TPS
Ranasan-Gandhinagar D/C220001Meters at ICTs at Ranasan
Jamla-Gandhinagar D/C220221
Mehsana-Gandhinagar D/C220221
Chhatral-Gandhinagar D/C220221
Soja-Gandhinagar D/C220221
Sub-total0885
2With Wanakbori
Ranasan-Wanakbori D/C40000Meters at ICTs at Ranasan
Dhansura-W'bori D/C220221
Sub-total0221
3With KadanaDhansura-Kadana D/C220022
Sub-total0220
4With Dhuvaran
Paliyad-Dhuvaran D/C132221
5With PGVCL
DhandhukaDhandhuka-Gondal D/C132221
Dhandhuka-Barvala-Vallabhpur(PG) S/C13211
DhrangadhraDhrangadhra-Choraniya D/C220221
Dhrangadhra-Morbi S/C22011
HalvadHalvad-Morbi S/C220111
BarejadiBarejadi-kanbha/M'bad S/C66111
DeodarDeodar-Anjar S/C220111
SankhariSankhari-Anjar S/C220111
Sub-total100106
6With MGVCL
Samhadra-Salejada S/C661011
Khanpur-Kapadvanj D/C220221
Sub-total3032
6With AECO
AECo-Khanpur D/C220221
AECo-Sabarmati D/C132221
AECo-Narol66111
AECo-Randheja66111
Sub-total6064
7Drawal Points
Ranasan220220/132224To confirms Xers
220220/66224
Khanpur-Dehgam D/C220202
Ranasan-Dehgam D/C22000Meters at ICTs at Ranasan
GRAND-TOTALUTTAR Gujarat27164319
&L&F&C&D &T&Rpage &P of &N
PG-2
ALTERNATIVE -2
Pashchim GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of LocationsMeters at Cons End
AGondal Transmission Circle
1Jamnagar220220/662x10022241
2Ranavav220132/663x5033361
3Motipaneli220220/661x100+1x5022241
4Sardargadh220220/661x100+1x5022241
5Rajkot (Nyara)220220/662x10022241
6Jetpur220220/662x10022241
7Visavadar220220/662x5022241
TOTAL Gondal1515307
BAmreli Transmission Circle
1Keshod220220/661x100+2x5033361
2Dhokadwa(Kansari)220220/661x100+1x5022241
3Timbdi220220/660001
4Savarkundla220220/661x100+2x5033361
Savarkundla-L&T Kovaya D/C22022CPP
5L&T(Kovaya)L&T Kovaya-Savarkundla D/C220221
6Amreli22033361Not in the list
7Mahua (Otha)220220/661x10011121
8Dhasa220220/662x5022241
9Vartej220220/663x10033361
10Palitana(Sagapara)220220/661x10011121
No I-Discom feders with Amreli TC
TOTAL Amreli20204010
CAnjar Transmission Circle
1Morvi220220/662x10022241
2Anjar220220/661x5011121
3Shivlakha220220/6622241Not in the list
4Nanikhakar220220/661x100+1x5022241
5Nakhatrana220220/662x5022241
TOTAL Anjar99185
DNadiad Transmission Circle
1Limbdi220132/663x5033361
TOTAL Nadiad3361
EOTHER INTER-DISCOM POINTS
1PatdiPatdi-Mondal-Viramgam S/c66111
1 locationsSub-total1011
GRAND-TOTALPASHCHIM Gujarat48479524
*1 : Bhestian-______ line has tap at D2 Stn. (Whether SECo-D2 ?)
Mota (Banduj) proposed220220/66
&L&F&C&D &T&Rpage &P of &N
PG-1
ALTERNATIVE -1
Pashchim GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of LocationsMeters at Cons End
IWith SikkaTPS TPS
50MVA Xers132132/66111ICT Losses to be borne by GS
Naghedi-Sikka S/C132111
Jamnagar-Sikka T/C132331
Bhatia-Sikka S/c132111
Ranavav-Sikka S/C132111
Vadinar66111
Meghapar66111
Sikka D/C6622
GSFC D/C662212
Sub-total0131372
2With KLTPSICT Losses to be borne by GS
50MVA ICT220220/66111
Anjar-Panandro D/C220221
Nakhatrana-Panandro D/C220221
Akrimota-Panandro D/C220221
GMDC-KLTPS D/C662212
Dayapar-KLTPS S/C66111
Akrimota1111
Koteshwar11111
Varma Nagar11111
Godhatad11111
Sub-total014148
3With UGVCL
Soja-Wanakbori D/C40021
Dhansura-W'bori D/C22021
GondalGondal-Dhandhuka D/C132221
BarvalaBarvala-Vallabhpur-Dhandhuka(UG) S/C66112
ChoraniyaChoraniya-Dhrangadhra D/C220221
Choraniya-Limbdi D/C22022
Choraniya-Viramgam S/C22011
MorbiMorbi-Dhrangadhra(UG) D/C220221
Morbi-Halvad S/C22011
Kanbhakanbha/M'bad-Barejadi S/C66111
AnjarAnjar-Deodar S/C22011
Anjar-Sankhari S/C22011
Anjar-Panendro D/C22022
ShivlakhaShivlakha-Mehsana S/c(UG)220111
Sub-total170177
4With MGVCL
Vartej-Karamsad D/C220221
Choraniya-Salejada S/C22011
5With CPP
Savarkundla-L&T D/C220221
6Drawal Points from 400kV GETCO
Jetpur (400/220kV)400400/2203x31533361
Amreli(400/220kV)400400/2202x315(not sure)22241
Choraniya(400/220kV)400400/2202224
GRAND-TOTALPASHCHIM Gujarat29346326
&L&F&C&D &T&Rpage &P of &N
MG-1
ALTERNATIVE -1
Madhya GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of Locations
1With Kadana(H)
Godhra- Kadana(H) D/C220221
2With Wanakbori TPS
Kapadvanj-W'bori S/C220111
Asoj-Wanakbori D/C220221
Godhra-W'bori S/C22011
3With GPEC
Karamsad-GPEC D/C220221
4With Mangrol
Gavasad-Mangrol SLPP D/C220221
5With GIPCL
Nandesari (MG)-GIPCL D/C132221
Jawaharnagar-GIPCL D/C132221
6With Dhuvaran
Gotri-Dhuvaran D/C132221
Karamsad-Dhuvaran D/C13222
Undel-Dhuvaran S/C132111
Vatwa-Dhuvaran D/C132221Line not shown in SLD.
12.5MVAICT132132/1111
7PanamPanam-Shehra111121
With UGVCL
Karamsad-Ranasan D/C22022
Kapadvanj-Ranasan S/c22011
Kapadvanj-Dehgam D/c22022
Kheda-Salejada(MG)-Samhadra(UG)661111
Salejada-Kheda-Samhadra(UG)661111
Kanbha-Barejadi(UG)-M'bad(MG)661111
With PGVCL
Karamsad-Vartej S/C22011
Kasor-Vartej S/C220111
Salejada-Choraniya S/C22011
With DGVCL
JambuvaJambuva-Halderwa S/C220111
Jambuva-Jagadia S/C22011
Jambuva-Achhalia Q/C22044
KarjanKarjan-Halderwa(DG) S/C132111
Karjan-Jambusar(DG) S/C6611
Karjan-Palej(DG) D/C6622
Karjan-Sarbhan(DG)66111
Masar RdMasar Rd-Jambusar(DG)66111
Masar Rd-GGL(DG)6611
ChanddodChanddod-Rajpipla(DG)66111
GRAND-TOTALMADHYA Gujarat4814920
No Inter-Discom and Discom-Genco tie-points.
WaghodiyaNone
ChandrapuraNone
MG-2
ALTERNATIVE -2
Madhya GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of Locations
Alternate 1
AJambuva Transmission Circle
IJambuva division
1Asoj220220/1322x5022241
2Jambuva220220/1322x10022241
3Waghodia220220/662x5022241
Sub-total46123
IIGodhra Division
1Chandrpura220220/663x5033361
2Godhra220220/1323x5033361SLD shows 3 Xers
220/6622224
Sub-total68162
III.Gotri
1Gavasad(Mobha)220220/662x5022241
Sub-total2241
IV.Karamsad Division
1Karamsad220220/1322x100+1x5033361
Sub-total3361
TOTAL Jambuva1519387
Kasor2200000
BNadiad Transmission Circle
INadiad division
1Kapadwanj220220/662x5022241
1 locationsSub-total2241
II.Vatwa Division
1Salejada220220/661x100+1x5022241
1 locationsSub-total2241
TOTAL Nadiad4482
COTHER INTER-DISCOM POINTS
1Karjan1
Karjan-Jambusar S/C6611
Karjan-Palej D/C6622
2Masar RdMasar Rd-Jambusar66111
Masar Rd-GGL6611
3SarbhanSarbhan-Karjan66111
4ChanddodChanddod-Rajpipla66111
5Kheda-Dholka(MG)-Samhadra(UG)66111
6Dholka-Kheda-Samhadra(UG)66111
7Kanbha-Barejadi(UG)-M'bad(MG)66111
Sub-total100107
GRAND-TOTALMADHYA Gujarat29235616
DG-2
ALTERNATIVE -2
Dakshin GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of LocationsMeters at Cons EndType C Meters
ANavsari Transmission Circle
IIchhapore division
1Ichhapore220220/661x100+1x5022241
I'pore-RIL D/C22022
I'pore-Essar D/C22022
2Sachin (Talangpur)220220/662x10022241
Sachin-Essar D/C22022
3RILRIL-Ichhapore D/C2202212Large Consumer
Sub-total61016320
IIVav Division
1Vav220220/665x100555101
Vav-SECo-E D/C6622I-Discom line
Vav-SECo-C D/C6622I-Discom line
2Mota(Bardoli)220220/661x100+1x5022241
2 locationsSub-total711182
III.Navsari Division
1Navsari220220/661x100+2x5033361
220220/1323336
2Ambheta220220/661x10022241
Sub-total8816200
IV.Vapi Division
1Vapi220220/663x100+1x5044481
2Bhilad220220/662x100+1x5033361
Sub-total7714200
TOTAL Navsari283664920
BBharuch Transmission Circle
IAchhalia division
1Achhalia220220/661x2511121
220/1322x100+1x503336
Sub-total448100
IIKim division0
1Kim(Lindiad)220220/662x10022241
Kim-Utran GBPP D/C22022
Kim-GSEG(Hazira) D/C22022GENCO tie
2Zagadia220220/661x10011121
Zagadia-Rami Metal S/C22011
Zagadia-Mangrol D/C22022GENCO tie
3Rami MetalRami Metal-Zagadia S/C2201111
3 locationsSub-total41014310
III.Haldarva division0
1Haldarva220220/662x5022241
220220/1322224
Haldarva-IPCL D/C22022CPP
Haldarva-GPEC D/C22GENCO tie
2IPCLIPCL-Haldarva D/C2202212
2 locationsSub-total6814220
IV.Bharuch division
1Dahej2201
Dahej-GACL D/c22022
Dahej-IndoGulf D/C22022
Dahej-Petronet LNG22022
2INDOGULF220kV Indo-Gulf Dahej D/C220221
3LNG Petronet220kV LNG Petronet-Dahej D/C220221
4GACL220kV GACL-Dahej D/C220221
Sub-total6612400
TOTAL Bharuch2028481030
CJambuaTransmission Circle
1Tilakwada132132/661x50+1x4022221
TOTAL Jambua222100
DOTHER INTER-DISCOM POINTS
1TapiTapi-SECo A66111
2VariavVariav-SECo F D/C66221
3GGL*GGL-Masar Road66111
4JambusarJambusar-Nasar Road(MG)66111
5SarbhanSarbhan-Karjan(MG)66111
6RajpiplaRajpipla-Chandod (MG)66111
7Sachin (Talangpur)Sachin-SEC D2 S/c66111
8BhestanBhestan-SECo D2 S/C1320I-Discom
9GovalakGovalak-SECo D266111I-Discom
Sub-total808700
*GGL gets supply from MGVCL (Masar Rd s/s. The unit can be billed by MGVCL
GRAND-TOTALDAKSHIN Gujarat58661222750
*1 : Bhestian-______ line has tap at D2 Stn. (Whether SECo-D2 ?)
Mota (Banduj) proposed220220/66
DG-1
ALTERNATIVE -1
Dakshin GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of Locations
*1 : Bhestian-______ line has tap at D2 Stn. (Whether SECo-D2 ?)
Mota (Banduj) proposed220220/66
1With MGVCL
HalderwaHalderwa-Jambuva S/C220111
Halderwa-Karjan S/C13211
JagadiaJagadia-Jambuva S/C220111
AchhaliaAchhalia-Jambuva Q/C220441
HaldervaHalderva-Jambuva S/C22011
VavVav-Jambuva S/C111
JambusarJambusar(DG)-Karjan S/C66111
Jambusar(DG)-Masar Rd-6611
PalejPalej-Karjan(DG) D/C66221
SarbhanSarbhan(DG)-Karjan66111
*GGLGGL(DG)-Masar Rd66111
RajpiplaRajpipla(DG)-Chanddod66111
*GGL gets supply from MGVCL (Masar Rd s/s. The unit can be billed by MGVCL
2With SECo
Sachin (Talangpur)Sachin-SEC D2 S/c66111
BhestanBhestan-SECo D2 S/C132111
GovalakGovalak-SECo D266111
TapiTapi-SECo A66111
VariavVariav-SECo F D/C66221
VavVav-SECo-E D/C66221
Vav-SECo-C D/C6622
3With EssarI'pore-Essar D/C220221
Sachin-Essar D/C22022
4With GSEGKim-GSEG D/C220221
5With Ukai TPS
Mota-Ukai(T) S/C220111
Achhalia-Ukai(T) T/C22033
6With Ukai(H)
Achhalia-Ukai(H) D/C22022
7With SLPP
ZagadiaZagadia-Mangrol D/C22022
8With OA Customer
IchhapurIchhapur-RIL D/C22022
RILRIL-Ichhapur D/C220221
HaldervaHalderva-IPCL D/C22022
IPCLIPCL-Halderva D/C220221
DahejDahej-IPCL D/C22022
Dahej-PLNG D/C22022
GACLGACL-Dahej D/C220221
Petro LNGP LNG-Dahej D/C220221
9With ISTS
NavsariNavsari-Kawas D/C2021
Navsari-Nasik D/C22
Navsari-TAPS S/C11
VapiVapi-KAPS D/C221
Vapi-TAPS11
BhiladBhilad-Magarwada D/C221
Bhilad-Kharadpada D/C22
VavVav-KAPS T/C331
Vav-Kawas S/C11
IchhapurIchhapur-Kawas S/C11
HaldervaHalderva-KAPS D/C22
Halderva-Kawas D/C22
Halderva-Gandhar D/C22
GRAND-TOTALDAKSHIN Gujarat59207926
SEC
Surat Eco
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersCheck metersStandby metersTotal meters
1SECo-A
SECo-A-Tapi6611I-Discom feeder
2SECo-B
SECo-B-Utran6611I-Discom feeder
3SECo-B2
SECo B2-Utran6611I-Discom feeder
4SECo-C & C2
SECo-C - VavD/C6622I-Discom line
5SECo-D
SECo D - Sachin D/C6622I-Discom line
6SECo-D2
SECo D2 - Bhestan6611I-Discom line
SECo D2 - Govalak6611
7SECo-E
SECo-E - VavD/C6622I-Discom line
8SECo-F
SECo-F-Variav D/C6622I-Discom feeder
9SECo-G
SECo-G-Utran D/C6622I-Discom feeder
Total150015
AECo
Ahmedabad Electricity Company
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersCheck metersStandby MetersTotal Meters
AECo
AECo-Khanpur D/C22022All at one loc?
AECo-Sabarmati D/C13222
AECo-Narol6611
AECo-Randheja6611
Total66
IPP
IPPs Generating Stations
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersStandby metersTotal metersNo. of Locations
IPPs
1GIPCL-I (MoU route)0
GIPCL-Nandesari (MG)D/C13222
GIPCL-II (IPP)0
GIPCL-Nandesari (MG)D/C13222
GIPCL-Jawaharnagar D/C13222
Sub-total6061
2Surat LigniteMangrol-Mobha (Gavasad)D/C22022
Mangrol-Zagadia (DG)D/C22022
Sub-total4041
3GPEC
GPEC-Haldarva(DG) D/C22022
GPEC-Karamsad (MG)D/C22022
400/220 kV xer22011
Sub-total5051
4GSEG
GSEG-Kim D/C22022
Sub-total2021
5Essar GPS
Essar-Sachin D/C22022
Essar-Ichhapore D/C22022
Sub-total4041
Total IPPs210215
Windfarms
Bhatia
1Bhogat W F661121
2Navadara661121
3Lambha661121
4GEDA111121
5KalyanpurPatelka661122
6SardargarhMervadar661122
7Dhank661121
TanasvaDhank661121
0
0
8MamsaUkhrala661122
9ArambdaOkha661122
ShikarpurSamkhiali1321121Other end already provided
11112215
&L&F&C&D &T&RPage &P of &N
Summary
Summary of Meter requirement for intra-state ABT in Gujarat
Alternative-4
No. of MetersNo. DCDsNo. of MetersNo. DCDs
MainStandbyCheckTotalMainStandbyCheckTotal
GSEC Power Stations66820214126682021412
IPPs21002152100215
DISCOMs
DGVCL5920079265866012227
MGVCL48104920292305616
UGVCL271604319494309226
PGVCL293406326484709524
AECo6006260062
SECo1500151015001510
Windfarms11110221111112211
Sub-total1958202771142161900408116
TOTAL28216405121313032720643133
20% spares102129
Total614772
*Options for DCD requirement calculations
Case A : One DCD for each location
Case B : One for each division (not for each location)
&C&"trebuchet,Bold Italic"&12WRLDC, Mumbai
&L&D
Summary-GSEC
A.GSEC Power StationsGT-side metersOutgoing Feeders
SNo.ThermalInstalled Capacity(MW)No. of GT/STMainCheckStandbyDISCOMkV Level
1Ukai TPS2x120+2x200+210=8505GTs + 2 STs787DakshinAt 220 kV
2Utran GBPP3x30+45 = 1354 GTs+ 2 STs6146DakshinTo check gen only at 220kV
3Utran TPS3x13 = 393 GTs+ 2 STsTo check gen only at 220kV
4Dhuvaran4x63.5 + 2x140 = 5346 GT+2 STs80MadhyaAt 132 kV
Dhuvaran GPS2x27 +40 = 943 GT+2 STs30Madhya
5Gandhinagar TPS2x120+3x210=8705 GTs +2 STs70UttarAt 220 kV
6Sikka TPS2x120 = 2402 GTs+ 2 STs40Pashchim132/66kV
7Wanakbori TPS6x210 = 12606 GTs+ 2 STs80Madhya400/220 kV
8Panandro TPS2x70+1x75 = 2153 GTs+ 2 STs50Pashchim220/66/11 kV
8Sub-total482213
Hydro
1Ukai Hydro4x75 = 3004 GTs+ 2 STs686Dakshin220/66kV
2Ukai LBPH1x5 = 51 GTs+ 2 STs323DakshinAt 11 kV
3Kadana4x60 =2404 GTs+ 2 STs646MadhyaAt 220 kV
4Panam1x2 = 21 GT+ 2 STs313MadhyaAt 11 kV
4Sub-total181518
12Total (A)663731
BIPPs
1GIPCL3x32+49 = 1454 GTs+ 2 STs60
104+56 = 1602 GTs+ 2 STs40
2Surat Lignite2x125 = 2502 GTs+ 2 STs40
3GPEC3x138+1x242 = 6564 GTs+ 2 STs60
4GSEG15640
5Essar3x110+185 = 5154 GTs+ 2 STs60
6RPL24040
7GACL9730
7Sub-total (B)370
19Total (A)+(B)1033731
Note : To check the number of station transformers
CCPPs connected at 66kV and above:
1GSFC
2Gujarat Refinery
3IPCL
4SCL
5ONGC-1
6IPCL
7GNFC
8GACL
9Nirma
10L&T
11Essar
12RIL240
13ONGC-2
Summary-DISCOMs
Transmission Circles and divisions in DISCOMS
DGVCLList of CPPs at 66kV and aboveList of CPPs (at 220kV)List of EHV Consumers (at 220kV)
Bharuch
ONGC (feed from 66kV Wagra)IPCL (feed from 220kV Haldarva)
ONGC (feed from 66kV Ichhapore)GNFC (feed from 220kV Achhalia)
GACL (feed from 220kV Dahej)
RIL (feed fom 220kV Ichhapore)
Navsari
MGVCL
Jambuva
UGVCL
Patanpur
Mehsana
Nadiad
PGVCL
Gondal
Nadiad
Amreli
Anjar
DG-consumers
Energy supplied to EHV consumers of DGVCL
Sr. No.Name of ConsumerName Of S/S
Navsari Circle
1220kV RIL D/C220Kv Ichchhapore
2132kv Railway D/C132Kv Bhestian
Bharuch Circle -Haldarva divn
3220kV IPCL D/C220kV Haldarwa
4132kV RPL D/c132kV Achhalia
5132kV GNFC132kV Achhalia
6220kV Rami Metal S/C220kV Zagadia
7132kV GGL132kV Valia
8132kV Petrofils132kV Valia
9220kV INDOGULF D/C220kV Dahej
10220kV LNG Petronet-D/C220kV Dahej
11220kV GACL D/C220kV Dahej
12132kV Railway D/C132kV Bharuch
13220kV GSPCL(Hazira)220kV Kim
Total
Sheet3
GSEC-o
GEB & GSECL Power Stations
Sr. No.Name of Power StationName of Inter face meter locationMetersRemark
DGVCL
1Ukai(TPS)400kv Ukai-Asoj1
220kv Ukai-Achhalia- T/C3
220kv Ukai-Vav-1.1
220kv Ukai-Mota.1
220kV Ukai(T)-Ukai(H) D/C28
2Ukai(Hydro)220kv Ukai-Achhalia D/C2
66kv Ukai-Nizar.1
66kv Ukai-Sagbara.1
66kv Ukai-Songadh D/C2
220kV Ukai(T)-Ukai(H) D/C28
3Ukai (LBPH)
11kv Dam feeder.1
11kv Colony feeder.12
4Utran GBPP220KV Utran Kim D/C2Gen at 220kV Bus
66kv Utran SEC B Stn 1
66kv Utran SEC B Stn 2
66kv Utran SEC G Stn 1
66kv Utran SEC G Stn 2
66KV Utran Kim
66kv Utran Vav
22kv UGPP Colony Fdr.
22kv Utran Fdr.
22kv UGPP Colony & JP Mill Fdr.
22kv Amroli Town Fdr.
22kv Radial Well & Mota varachha Fdr.
22kv Sayan -kosad Fdr.
Total
1Kadana220KV Kadana-Godhra-1
220KV Kadana-Godhra-2
220KV Kadana-Dhansura-1
220KV Kadana-Dhansura-2
Total
2Panam11KV Panam-Sahera
Total
3Dhuvaran132KV Dhuvaran-Gotri -1
132KV Dhuvaran-Gotri -2
132KV Dhuvaran-Karamsad-1
132KV Dhuvaran-Karamsad-2
132KV Dhuvaran-Undel
132KV Dhuvaran-Dhandhuka-1
132KV Dhuvaran-Dhandhuka-2
132KV Dhuvaran-Vatva-1
132KV Dhuvaran-Vatva-2
Total
132KV GSECL-Limdi-1
132KV GSECL-Limdi-2
Total
5G'Nagar TPS220 kv G'Nagar-Ranasan-1
220 kv G'Nagar-Ranasan-2
220 kv G'Nagar-Jamla-1
220 kv G'Nagar-Jamla-2
220 kv G'Nagar-Mehsana-1
220 kv G'Nagar-Mehsana-2
220 kv G'Nagar-Chhatral-1
220 kv G'Nagar-Chhatral-2
220 kv G'Nagar-Soja-1
220 kv G'Nagar-Soja-2
Total
9Sikka132 KV Sikka/Jam - 1
" Sikka/Jam - 2
" Sik/RPL/ Jam-3
" Sikka/Naghedi
" Sikka/Bhatia
66 KV Sikka/Sikka - I
" Sikka/Sikka - II
" Sikka/Meghpar
" Sikka/Vadinar
" Sikka/GSFC - I
" Sikka/GSFC - II
Total
10Wanakbori400KV Asoj
400KV Soja-1
400KV Soja-2
220KV Ranasan
220KV Kapadwanj
220KV Asoj-1
220KV Asoj-2
220KV Dhansura-1
220KV Dhansura-2
220KV Godhra
Total
11Panandhro220 KV Anjar-Pan-I
220 KV Anjar-Pan-II
220 KV Nakhatrana-Pan-I
220 KV Nakhatrana-Pan-II
66 KV Dayapar-Pan
66 KV GMDC-Pan-I
66 KV GMDC-Pan-II
11 KV Akrimota
11 KV Koteshwar
11 KV Godhatad
11 KV Varmanagar (SKV nagar)
Total
Energy Received by GEB & GSECL Power Stations for MAR-2004 (Import)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1Kadana220KV Kadana-Godhra-1
220KV Kadana-Godhra-2
220KV Kadana-Dhansura-1
220KV Kadana-Dhansura-2
Total
2Panam11KV Panam-Sahera
Total
3Dhuvaran132KV Dhuvaran-Gotri -1
132KV Dhuvaran-Gotri -2
132KV Dhuvaran-Karamsad-1
132KV Dhuvaran-Karamsad-2
132KV GSECL-Limdi-1
132KV GSECL-Limdi-2
Total
4G'Nagar T.P.S.220 kv G'Nagar-Ranasan-1
220 kv G'Nagar-Ranasan-2
220 kv G'Nagar-Jamla-1
220 kv G'Nagar-Jamla-2
220 kv G'Nagar-Mehsana-1
220 kv G'Nagar-Mehsana-2
220 kv G'Nagar-Chhatral-1
220 kv G'Nagar-Chhatral-2
220 kv G'Nagar-Soja-1
220 kv G'Nagar-Soja-2
Total
5Ukai(TPS)400kv Ukai-Asoj
220kv Ukai-Achhalia-1.
220kv Ukai-Achhalia-2.
220kv Ukai-Achhalia-3.
220kv Ukai-Vav-1.
220kv Ukai-Mota.
Total
6Ukai(Hydro)220kv Ukai-Achhalia-1.
220kv Ukai-Achhalia-2.
66kv Ukai-Nizar.
66kv Ukai-Sagbara.
66kv Ukai-Songadh-1.
66kv Ukai-Songadh-2.
Total
7Utran GBPP220KV Utran Kim 1
220KV Utran Kim 2
66KV Utran Kim
66kv Utran Vav
Total
8Sikka132 KV Sikka/Jam - I
132 KV Sikka/Jam - II
" Sikka/RPL/Jam3
" Sikka - Naghedi
" Sikka - Bhatia
66 KV S/S Sikka -I
" Sikka - II
" Meghpar
" Vadinar
" GSFC - I
" GSFC - II
Total
9Wanakbori400KV Asoj
400KV Soja-1
400KV Soja-2
220KV Ranasan
220KV Kapadwanj
220KV Asoj-1
220KV Asoj-2
220KV Dhansura-1
220KV Dhansura-2
220KV Godhra
Total
10Panandhro220 KV Anjar-Pan-I
220 KV Anjar-Pan-II
220 KV Nakhatrana-Pan-I
220 KV Nakhatrana-Pan-II
66 KV Dayapar-Pan
66 KV GMDC-Pan-I
66 KV GMDC-Pan-II
Total
Energy Supplied by IPP for MAR-2004 (Export)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1GIPCL132KV GIPCL-Nandesari-1&2
132KV GIPCL-Nandesari-3&4
Total
2Surat Lignite220kv Mangrol-Zagadia-1
220kv Mangrol-Zagadia-2
220kV Mangrol - Mobha 1
220kV Mangrol - Mobha 2
Total
3GPEC400kV GPEC - Kasor
220kv GPEC-Haldarva-1
220kv GPEC-Haldarva-2
220kv GPEC-Karamsad-1
220kv GPEC-Karamsad-2
400kv GPEC - Zanor
Total
4GSEG220kv GSEG-Kim-1
220kv GSEG-Kim-2
Total
Energy Received by IPP for MAR-2004 (Import)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1GIPCL132KV GIPCL-Nandesari-1&2
132KV GIPCL-Nandesari-3&4
Total
2220kv Mangrol-Zagadia-1
220kv Mangrol-Zagadia-2
Total
3GPEC400kV GPEC - Kasor
220kv GPEC-Haldarva-1
220kv GPEC-Haldarva-2
220kv GPEC-Karamsad 1
220kv GPEC-Karamsad 2
400kv GPEC - Zanor
Total
4GSEG220kv GSEG-Kim-1
220kv GSEG-Kim-2
Total
Energy Supplied by CPP for MAR-2004 (Export)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1GSFC66KV GSFC-F'Nagar-1-2-3-4-5
2Guj.Refinary66KV GRP-Koyali-1
Guj.Refinary66KV GRP-Koyali-2
3IPCL33KV IPCL-1,2,3
4SCL66kv Zagadia-SCL
5ONGC66kv Vagra-ONGC-1& 2
6IPCL220kv IPCL-Haldarva-1&2
7GNFC132kv GNFC-Achhalia-1&2
8GACL220kv Dahej-GACL 1&2
966kv Nirma66kv Nari-Nirma I/C
10L&TL&T Kovaya1
L&T Kovaya2
11ESSAR220kv I'pore Essar
220kv T'pur Essar 1
12RIL220kv I'pore RIL 1
220kv I'pore RIL 2
13ONGC66kv I'pore ONGC 1
66kv I'pore ONGC 2
Total
Energy Supplied by Non-Conventional Power Stations for MAR-2004 (Export)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1Non Conventional66KV Mervadar -Sardargadh
266KV Dhank - Tanasava
366KV Dhank - Sardargadh
466 KV BTY - LMB D.P.Line
566 KV BTY - LMB Tower Line
611 KV Okhamadhi W/M I & II
7Wind mill - 2
866 KV KalyanpurPatelka Line
966kv Ukharla-Mamsa
1011 KV Gasy fire feeder
1111 KV GEDA at G'dham FTZ
1211 KV Wind far at 66 KV Mandvi S/S
13132 KV Shikarpur
Total
Energy Supplied by Non-Conventional Power Stations for MAR-2004 (Import)
Sr. No.Name of Power StationName of Inter face meter locationRemark
1Non Conventional66KV Mervadar -Sardargadh
266KV Dhank - Tanasava
366KV Dhank - Sardargadh
466 KV BTY - LMB D.P.Line
566 KV BTY - LMB Tower Line
611 KV Okhamadhi W/M I & II
7Wind mill - 2
866 KV KalyanpurPatelka Line
966kv Ukharla-Mamsa
1011 KV Gasy fire feeder
1111 KV GEDA at G'dham FTZ
1211 KV Wind far at 66 KV Mandvi S/S
13132 KV Shikarpur
Total
DG-66
Dakshin GVCL
Meter Locations
kVRatioTransformer CapacityNo. of X'ersMain metersCheck metersStandby meters
ANavsari Transmission Circle
IIchhapore division
1Ichhapore220220/661x100+1x50222
I'pore-RIL D/C2202
I'pore-Essar D/C2202Double ckt with summ CT ?
I'pore-ONGC D/C662
I'pore-HWP D/C662Double ckt with summ CT ?
I'pore-Rama D/C662Double ckt with summ CT ?
2Sachin (Talangpur)220220/662x100222
Sachin-SECo D662
3Bhestian132132/664x5044
Bhestian-Rly S/C1321SLD shows D/C ?
Bhestian-NFL661To be checked in SLD
Bhestian-SECo-D2661Special Case - Tap on line*1
4GovalakTap on Bhestian-SECo D2661
IIVav Division
3Vav220220/665x100555
Vav-SECo-E D/C662I-Discom line
Vav-SECo-C D/C66I-Discom line
Vav-Kribhco D/c662Tap at Sarthan
5UchhalUchhal -Ukai (H) S/C661
6Mota (Banduj) proposed220
Mota-Rly-D/C662
7Vyara-KAPP S/C661
Kadodara
Kadodara-Garden VSM D/C662
Kadodara-jolva661
III.Navsari Division
7Navsari220220/661x100+2x50333
8Ambheta220220/661x100111
IV.Vapi Division
9Vapi220220/663x100+1x50444
Vapi-Ganga Paper661Damanganga may not be consumer
Bhilad220220/662x100+1x50333
AtulXers132132/661x50+1x70222
Xers132132/112x12.5222Same or diff loc?
Atul-Atul Product D/C662Double ckt with summ CT ?
Atul-Rly D/C1322Double ckt with summ CT ?
BBharuch Transmission Circle
IAchalia division
12Achalia220220/661x25111
132132/661x40111Same or diff loc?
Achalia-GNFC D/C1322
Achalia- RPL D/c1322
13Valia132132/662x50222
Valia-Petrofils-D/C1322
Valia-Guj Guradian D/C1322Consumer - not listed in given data
Guj-Godrej S/C661
IIKim division
14Kim(Lindiad)220220/662x100222
Kim-Utran GBPP D/C2202
15Jhagadia220220/661x100111
III.Haldarva division
16Haldarva220220/662x50222
Haldarva-IPCL D/C2CPP
Haldarva-Karjan1321I-Discom
17Wagra-ONGC CTF D/C662ONGC-CPP
IV.Bharuch division
18Bharuch132132/663x20333
19Palej-Karjan D/C662I-DISCOM
20Ankaleshwar132132/663x50333
21Dahej220
Dahej-GACL D/c2202CPP
Dahej-IndoGulf D/C2202Not mentioned in list of consumers/CPP
Dahej-Petronet LNG2202Not mentioned in list of consumers/CPP
Dahej -Puspa Polymer S/C661Not mentioned in list of consumers/CPP
Dahej-GCPTCL S/C661Not mentioned in list of consumers/CPP
*1 : Bhestian-______ line has tap at D2 Stn. (Whether SECo-D2 ?)
INTER-DISCOM POINTS
Tapi
Tapi-SECo A661I-Discom feeder
Variav
Variav-SECo F D/C662
GCLGCL-Nasar Road661
JambusarJambusar-Nasar Road661
SarbhanSarbhan-Karjan661
RajpiplaRajpipla-Chandoq661
GENCO Power Stations
1Utran GBPP220/66kV Xers220220/66111To check Gen at 220kV
220KV Utran Kim D/C22022
Utran-SECo-G D/C662I-Discom feeder
Utran-Kribhco661CPP/Consumer
Utran-Velanja661Discom-GENCO
Utran-SECo-B661I-Discom feeder
Utran-SECo-B2661I-Discom feeder
2Ukai TPSUkai-Mota-Vav2201Gen at 220kV
Ukai-Achhalia T/C2203
Ukai-Ukai(H) D/C2202
Ukai-KAPP-Vav2201
400/220kV Xers220400/2201
3Ukai (H)
Ukai-Achhalia D/C2202Gen at 220kV
Ukai(H)-Ukai D/C2202
220/66kV Xers220220/6622
4Ukai LBPHDirectly feeding to DISCOM
Ukai-Dam feeder111
Ukai-Colony feeder111
5Essar GPS
Essar-Sachin D/C22022
Essar-Ichhapore D/C22022
EHV Consumers
-
Allocations from PPAs Options
1.Pro-rata allocation in the ratio of demands at the time of restructuring. fixed for complete period of PPA or life of shared generating stations.
Differential allocation based on Capacity to payMore allocation from cheaper power stations to Discoms with higher percentage of low-revenue loads (agriculture/social etc.). Reviewed at intervals depending on consumer mix of DiscomsConsistent with principles on which consumer tariff is based
Recommended:Differential allocation based on Capacity to pay
-
Regulatory issues
-
Regulatory issuesABT Structure and inter-utility tariff scheme.Generation TariffSERC to notify principles for fixation of tariff for SGS. Cost-plusMarket based (may be explored in future)If cost-plus tariff, then fixing profitReturn on Equity Return on Capital EmployedNorms of Operation for SGSs for Thermal & Hydro, Gas, Wind GeneratorsTarget availabilitySpecific oil consumption Gross Heat RateAuxiliary Power ConsumptionFinancial Norms for existing and new SGSsRoEInterest on Working CapitalNorms for O&M ExpensesDebt:Equity allowed for new power stationsInterest on loan component
-
Regulatory issuesIf market based tariff (in future)
Procedures for Long-term Procurement through Competitive bidding
-
Regulatory issuesTransmission TariffSERC to notify principles for fixation of tariff for STS i.e., for STU and the private licensees.Cost-plusProcedure for owners profitReturn on Equity Return on Capital EmployedNorms of Operation for STSTarget availabilityFinancial Norms for STSRoEInterest on Working CapitalNorms for O&M ExpensesDebt:Equity allowed for new power stationsInterest on loan component
-
Regulatory issuesApproval of Grid code and its enforcement.
Procedure for scheduling with time flow diagram.Provision related to revision of schedulesProvision related to demonstration of declared capability.Provision related to frequency linked despatch guidelines. Impermissibility of schedules due to ramp up/down restrictions or network constraints. Estimated lossesDefinition and demarcation of notional control areas. Settlement system and pool accounts for UI and REC.Interest on delayed UI and REC payments. Broad specifications and requirements of Energy meters. Treatment of bilateral agreements and open access transactions. State Energy AccountingReactive energy charges.
-
Regulatory issues Approval of Grid code and its enforcement.(contd.)
Meter data collection, processing and billing intervals and responsibility. Time frame for verification of schedules and accounts by the stake holders. Reduction of schedules of gas turbines due to variations in frequency and temperature post factor revisions. Gaming by Generators.Minimum generation levels of thermal units.
Payment defaultOpen Access in Distribution
-
Intra-state ABT Specific Benefits
-
Intra-state ABT Achieves.Mechanism to price power based on Demand / Supply Harness surplus generating capacity available in state with CPPs/IPPsOperation of grid on economic principles Merit Order Despatch Open Access in Intra-state Transmission and Distribution.
-
Intra-state ABT achievesGenerate signals for efficient grid operation at the intra-state level.
Deviations from schedule by different DISCOMs to be priced.Encourage maximisation of generation during deficit conditions.Each DISCOM and state generating station to be responsible for its actions a profit centre.
-
Intra-state ABT achieves.Introduce UI mechanism at the intra-state level.
UI to be applied on the deviations from the schedules of the DISCOMs/State generators/IPPs/CPPs.
State Utilities to be liable for the States liabilities with the regional UI pool account.
-
Intra-state ABT Implementation Plan
-
Implementation Plan1st Phase ActivitiesListing of Metering Locations Specification Of SEMs2nd Phase Activities Tariff for SGS/IPPs and CPPsAllocating the PPAs
3rd Phase Activities
Supply and commissioning of SEMSScheduling methods and Accounting System
-
Implementation Plan1st Phase ActivitiesFinalisation of listing of entitiesDemarcation of DISCOM boundariesListing of Metering locationsFinalisation of quantities of SEMs, DCDs/MTEsFinalisation of Reactive Charge schemeFinalisation of technical specifications of SEMs/DCDsInitiate tendering process for procurement of metersExplanation of Intra-state ABT
-
Implementation Plan2nd Phase Activities Finsalisation of Tariff of State Generating Stations as per ABT parameters/normsDetermination of Allocations of different Discoms in State Genco/ ISGS/ IPPs.Formulation of market structure Conversion of existing PPAs into ABT-compliant formFinalisation of commercial mechanism for CPPs, Wind farms, Wheeling and banking, Open Access Customers etc.
-
Implementation Plan3rd Phase Activities Supply and commissioning of meters at different locations.Training the field staff for meter reading/data collectionInstallation of software for data processing Installation of software for schedulingOrganising UI and REC Pool Account Operation
-
Scope of Work Listing of entities on whom ABT/UI principles would apply Listing of metering locations for each above listed entitiesPreparation of complete list of SEMs required, assigning location code, type of meters etc.Finalisation of quantity of SEMs, DCDs, Meter Testing EquipmentFinalisation of technical specifications of SEMs/DCDs /MTEs.Association during installation and commissioning of SEMs(five locations)
-
..Scope of WorkPresentation/ discussions of new commercial mechanism, scheduling procedure to all concernedAssociation during allocation to different DISCOMs from SGSs and allocations from CGSsFormulation of Commercial mechanism for power supply to DISCOMs from SGSs and Share from CGSsConversion of existing PPAs into two-part tariffFormulation of New Commercial Mechanism to Licensees, large Industries, CPPS, IPPs Knowledge transfer to staff for weekly meter reading (five locations) and transferring data to SLDCs
-
..Scope of WorkFinalising the daily scheduling procedure, establish at SLDCs and use of softwareOrganising the operation of Pool Account at SLDCTailoring of software used at RLDC for regional energy accounting and scheduling purpose for needs specific to SLDCs
-
ABT in NRReal time operation Frequency linked despatch guidelines
Optimisation of storage hydro
Reactive Power Management and voltage control
SCADA/EMS facilities---the eyes and ears of the system operator
-
50.5 HZ49.5 HZ50 HZUI PRICE CURVE SINGLE SLOPE
-
UI Rate as specified by CERCRate of Unscheduled Drawal/Injection
Frequency (Hz)Rate (p/u)Above 50.5050.015049.821049.0 and below570
Chart1
50.5000
50.485.686
50.4611.21612
50.4416.82418
50.4222.43224
50.4284030
50.3833.64836
50.3639.25642
50.3444.86448
50.3250.47254
50.3568060
50.2861.68866
50.2667.29672
50.2472.810478
50.2278.411284
50.28412090
50.1889.612896
50.1695.2136102
50.14100.8144108
50.12106.4152114
50.1112160120
50.08117.6168126
50.06123.2176132
50.04128.8184138
50.02134.4192144
50140200150
49.98145.6208156
49.96151.2216162
49.94156.8224168
49.92162.4232174
49.9168240180
49.88173.6248186
49.86179.2256192
49.84184.8264198
49.82190.4272204
49.8196280210
49.78201.6288219
49.76207.2296228
49.74212.8304237
49.72218.4312246
49.7224320255
49.68229.6328264
49.66235.2336273
49.64240.8344282
49.62246.4352291
49.6252360300
49.58257.6368309
49.56263.2376318
49.54268.8384327
49.52274.4392336
49.5280400345
49.48285.6408354
49.46291.2416363
49.44296.8424372
49.42302.4432381
49.4308440390
49.38313.6448399
49.36319.2456408
49.34324.8464417
49.32330.4472426
49.3336480435
49.28341.6488444
49.26347.2496453
49.24352.8504462
49.22358.4512471
49.2364520480
49.18369.6528489
49.16375.2536498
49.14380.8544507
49.12386.4552516
49.1392560525
49.08397.6568534
49.06403.2576543
49.04408.8584552
49.02414.4592561
49420600570
48.98420600570
48.96420600570
48.94420600570
48.92420600570
48.9420600570
48.88420600570
Frequency
UI rate
Chart2
000
5.686
11.21612
16.82418
22.43224
284030
33.64836
39.25642
44.86448
50.47254
568060
61.68866
67.29672
72.810478
78.411284
8412090
89.612896
95.2136102
100.8144108
106.4152114
112160120
117.6168126
123.2176132
128.8184138
134.4192144
140200150
145.6208156
151.2216162
156.8224168
162.4232174
168240180
173.6248186
179.2256192
184.8264198
190.4272204
196280210
201.6288219
207.2296228
212.8304237
218.4312246
224320255
229.6328264
235.2336273
240.8344282
246.4352291
252360300
257.6368309
263.2376318
268.8384327
274.4392336
280400345
285.6408354
291.2416363
296.8424372
302.4432381
308440390
313.6448399
319.2456408
324.8464417
330.4472426
336480435
341.6488444
347.2496453
352.8504462
358.4512471
364520480
369.6528489
375.2536498
380.8544507
386.4552516
392560525
397.6568534
403.2576543
408.8584552
414.4592561
420600570
420600570
420600570
420600570
420600570
420600570
420600570
v
Frequency ---->
UI rate ----->
Sheet1
50.5000
50.485.686
50.4611.21612
50.4416.82418
50.4222.43224
50.4284030
50.3833.64836
50.3639.25642
50.3444.86448
50.3250.47254
50.3568060
50.2861.68866
50.2667.29672
50.2472.810478
50.2278.411284
50.28412090
50.1889.612896
50.1695.2136102
50.14100.8144108
50.12106.4152114
50.1112160120
50.08117.6168126
50.06123.2176132
50.04128.8184138
50.02134.4192144
50140200150
49.98145.6208156
49.96151.2216162
49.94156.8224168
49.92162.4232174
49.9168240180
49.88173.6248186
49.86179.2256192
49.84184.8264198
49.82190.4272204
49.8196280210
49.78201.6288219
49.76207.2296228
49.74212.8304237
49.72218.4312246
49.7224320255
49.68229.6328264
49.66235.2336273
49.64240.8344282
49.62246.4352291
49.6252360300
49.58257.6368309
49.56263.2376318
49.54268.8384327
49.52274.4392336
49.5280400345
49.48285.6408354
49.46291.2416363
49.44296.8424372
49.42302.4432381
49.4308440390
49.38313.6448399
49.36319.2456408
49.34324.8464417
49.32330.4472426
49.3336480435
49.28341.6488444
49.26347.2496453
49.24352.8504462
49.22358.4512471
49.2364520480
49.18369.6528489
49.16375.2536498
49.14380.8544507
49.12386.4552516
49.1392560525
49.08397.6568534
49.06403.2576543
49.04408.8584552
49.02414.4592561
49420600570
48.98420600570
48.96420600570
48.94420600570
48.92420600570
48.9420600570
48.88420600570
Sheet2
50.550.4850.4650.4450.4250.450.3850.3650.3450.3250.350.2850.2650.2450.2250.250.1850.1650.1450.1250.150.0850.0650.0450.025049.9849.9649.9449.9249.949.8849.8649.8449.8249.849.7849.7649.7449.7249.749.6849.6649.6449.6249.649.5849.5649.5449.5249.549.4849.4649.4449.4249.449.3849.3649.3449.3249.349.2849.2649.2449.2249.249.1849.1649.1449.1249.149.0849.0649.0449.024948.9848.9648.9448.9248.948.88
05.611.216.822.42833.639.244.850.45661.667.272.878.48489.695.2100.8106.4112117.6123.2128.8134.4140145.6151.2156.8162.4168173.6179.2184.8190.4196201.6207.2212.8218.4224229.6235.2240.8246.4252257.6263.2268.8274.4280285.6291.2296.8302.4308313.6319.2324.8330.4336341.6347.2352.8358.4364369.6375.2380.8386.4392397.6403.2408.8414.4420420420420420420420
081624324048566472808896104112120128136144152160168176184192200208216224232240248256264272280288296304312320328336344352360368376384392400408416424432440448456464472480488496504512520528536544552560568576584592600600600600600600600
06121824303642485460667278849096102108114120126132138144150156162168174180186192198204210219228237246255264273282291300309318327336345354363372381390399408417426435444453462471480489498507516525534543552561570570570570570570570
Chart3
570
570
570
570
570
570
561
552
543
534
525
516
507
498
489
480
471
462
453
444
435
426
417
408
399
390
381
372
363
354
345
336
327
318
309
300
291
282
273
264
255
246
237
228
219
210
204
198
192
186
180
174
168
162
156
150
144
138
132
126
120
114
108
102
96
90
84
78
72
66
60
54
48
42
36
30
24
18
12
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
&L&"Arial,Bold Italic"&8 &C &R&"Arial,Bold Italic"&8UI Comparative chart
Below 49.0 Hz UI rate =570 p/u
At 50.0 Hz UI rate =150 p/u
At 49.8 Hz UI rate =210 p/u
Above 50.5 Hz UI rate =0 p/u
from 01.10.04 onwards
Frequency ----------->
UI rate ----------------->
Sheet3
48.9420600570
48.92420600570
48.94420600570
48.96420600570
48.98420600570
49420600570
49.02414.4592561
49.04408.8584552
49.06403.2576543
49.08397.6568534
49.1392560525
49.12386.4552516
49.14380.8544507
49.16375.2536498
49.18369.6528489
49.2364520480
49.22358.4512471
49.24352.8504462
49.26347.2496453
49.28341.6488444
49.3336480435
49.32330.4472426
49.34324.8464417
49.36319.2456408
49.38313.6448399
49.4308440390
49.42302.4432381
49.44296.8424372
49.46291.2416363
49.48285.6408354
49.5280400345
49.52274.4392336
49.54268.8384327
49.56263.2376318
49.58257.6368309
49.6252360300
49.62246.4352291
49.64240.8344282
49.66235.2336273
49.68229.6328264
49.7224320255
49.72218.4312246
49.74212.8304237
49.76207.2296228
49.78201.6288219
49.8196280210
49.82190.4272204
49.84184.8264198
49.86179.2256192
49.88173.6248186
49.9168240180
49.92162.4232174
49.94156.8224168
49.96151.2216162
49.98145.6208156
50140200150
50.02134.4192144
50.04128.8184138
50.06123.2176132
50.08117.6168126
50.1112160120
50.12106.4152114
50.14100.8144108
50.1695.2136102
50.1889.612896
50.28412090
50.2278.411284
50.2472.810478
50.2667.29672
50.2861.68866
50.3568060
50.3250.47254
50.3444.86448
50.3639.25642
50.3833.64836
50.4284030
50.4222.43224
50.4416.82418
50.4611.21612
50.485.686
50.5000
50.52000
50.54000
50.56000
50.58000
50.6000
50.62000
50.64000
50.66000
50.68000
50.7000
50.72000
50.74000
50.76000
50.78000
50.8000
50.82000
50.84000
50.86000
50.88000
50.9000
50.92000
50.94000
50.96000
50.98000
51000
POWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDDetermine the best close for your audience and your presentation. Close with a summary; offer options; recommend a strategy; suggest a plan; set a goal. Keep your focus throughout your presentation, and you will more likely achieve your purpose.POWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDIf you have several points, steps, or key ideas use multiple slides. Determine if your audience is to understand a new idea, learn a process, or receive greater depth to a familiar concept. Back up each point with adequate explanation. As appropriate, supplement your presentation with technical support data in hard copy or on disc, e-mail, or the Internet. Develop each point adequately to communicate with your audience.POWERGRIDIf you have several points, steps, or key ideas use multiple slides. Determine if your audience is to understand a new idea, learn a process, or receive greater depth to a familiar concept. Back up each point with adequate explanation. As appropriate, supplement your presentation with technical support data in hard copy or on disc, e-mail, or the Internet. Develop each point adequately to communicate with your audience.POWERGRIDIf you have several points, steps, or key ideas use multiple slides. Determine if your audience is to understand a new idea, learn a process, or receive greater depth to a familiar concept. Back up each point with adequate explanation. As appropriate, supplement your presentation with technical support data in hard copy or on disc, e-mail, or the Internet. Develop each point adequately to communicate with your audience.POWERGRIDIf you have several points, steps, or key ideas use multiple slides. Determine if your audience is to understand a new idea, learn a process, or receive greater depth to a familiar concept. Back up each point with adequate explanation. As appropriate, supplement your presentation with technical support data in hard copy or on disc, e-mail, or the Internet. Develop each point adequately to communicate with your audience.POWERGRIDIf you have several points, steps, or key ideas use multiple slides. Determine if your audience is to understand a new idea, learn a process, or receive greater depth to a familiar concept. Back up each point with adequate explanation. As appropriate, supplement your presentation with technical support data in hard copy or on disc, e-mail, or the Internet. Develop each point adequately to communicate with your audience.POWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRIDPOWERGRID