Port of Quebec · (minimum 1 hour) High pressure unit On trailer Air compressor On trailer...
Transcript of Port of Quebec · (minimum 1 hour) High pressure unit On trailer Air compressor On trailer...
Section description Rates
External hourly rate
Maintenance worker (minimum one hour)
Regular schedule (7:30 am to 4 pm)
Weekday evenings and Saturdays*
Sundays and public holidays*
Electrician: Two workers required from Arc Flash category #2 (minimum one hour)
Regular schedule (7:30 a.m. to 4 p.m.)
Weekday evenings and Saturdays*
Sundays and public holidays*
Standard electrical connection and disconnection fee (equipment and cable included)(1)
Amperage
Monday to Friday Additional
7:30 a.m. to 4 p.m.
time
100 amps and less
200 amps
400 amps and more (2)
(1) The standard time required to connect a Ship is 4 hours maximum per electrician. The requester will be charged for any unexpected delays they cause.
(2) Two electricians are required for electrical connections and disconnections of 400 amps or more.
Vehicles Unit no. Excluding the operator
(minimum 1 hour)
Bucket truck No. 13–80
Mechanical unit No. 12–08
Ten-wheel truck No. 08–21
Komatsu charger No. 09–20
CAT 908 mini charger No. 12–75
New Holland tractor No. 14–18
Merlo No. 11–48
Equipment Including the vehicle
(minimum 1 hour)
High pressure unit On trailer
Air compressor On trailer
Snowblower On tractor
Rafters Includes: ship, fuel, maintenance, crew (one captain and two sailors) (minimum four (4) hours)
Regular schedule (7:30 a.m. to 4 p.m.)
Weekday evenings and Saturdays*
Sundays and public holidays*
Hourly rate after four (4) hours
Equipment rental Day Week Month
Water hoses
Barricade, excluding delivery (price per barricade)
Start of connection or disconnection schedule (1)
Monday to Friday
Saturday
Sundays and holidays
Service fees
For each connection or disconnection or for each intervention by the Québec Port Authority at the request of a ship’s representative.
Water tax
a) For each cubic metre delivered
b) Minimum fee per order
(1) Rates may be doubled from December 15 to March 31 depending on the labour required
Section description Time spent
1. Electrical connection
2. Burning or welding permit
3. Snow removal
4. Rafter rental
5. Bumper rentals
6. Barricade rental
7. Grey and black water disposal
8. Waste disposal
9. Permit for handling dangerous goods
10. Provision of drinking water
11. Water supplies for ships
48 hours
12 hours
12 hours
24 hours
48 hours
12 hours
48 hours
24 hours
12 hours
12 hours
12 hours