Port of Long Beach Development Projects

Al Moro, P.E.Chief Harbor Engineer

ACEC January 18, 2012

Page 2: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Economic Engine

• 2nd busiest U.S. container cargo seaport; part of the world’s 6th busiest port complex

2

Page 3: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Jobs engine

• 30,000 jobs locally, 300,000 regional jobs and • 1.5 million national jobs

Page 4: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

U.S.-Asia Trade Routes

Pacific Northwest (Prince Rupert, Vancouver, Seattle, Tacoma)

Port of LONG BEACH (San Pedro Bay)

Mexico (Lazaro Cardenas)

All Water (Gulf and East Coast)

3

3

1

4

2

1

4

Page 5: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Future

•Port is fiscally strong, investing $4 billion over next decade in terminal, infrastructure improvements

Page 6: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Capital Expenditures

2011 2012 2013 2014 2015 20160

100

200

300

400

500

600

700

800

900

Misc ProjectsMiddle HarborPier GGD BridgePier SRail

$M

Page 7: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Navigational Projects

Page 8: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
Page 9: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Gerald Desmond Bridge

• Replacing obsolete bridge with a $950 million replacement to improve traffic flow and safety

Page 10: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Existing GD Bridge

10

Page 11: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

New Cable-Stayed Bridge

•Improve traffic flow and safety•Bids due February 2012

Page 12: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Design build

•RFP for estimated $675 million design-build contract issued September 2, 2011.

Page 13: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Rail Enhancements

• $1.1 billion in projects to expand rail yard, realign tracks to support increased on-dock rail operations

Page 14: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Off Terminal Rail ProjectsThenard Jct. Realignment

Cerritos Channel Rail Bridge

Expanded Control Points

Closure of Reeves Crossing

Navy Mole Storage

Yard

Reeves Grade Separation

Wye Track Realignment

Pier B Rail Yard

Ocean Blvd. Track

Realignment

Harbor Scenic Track

Realignment

Pier F Support Yard

Pier B Realignment

$1.1 billion in projects

Page 15: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Shore-to-Ship Power

• Ships switch off engines and shift to shore power • to improve air quality

Page 16: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Port-wide plug-in

• $200 million investment

• By 2014, 50% of container ships will plug in to shore power

• By 2020, 80% of container ships will plug in to shore power

Page 17: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Terminal Projects

Pier GRedevelopment

Page 18: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Pier G Redevelopment

• $470 million terminal redevelopment, adding• deep-water berths & expanding on-dock rail

Page 19: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Pier G Redevelopment Program

Page 20: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Terminal Projects

Middle Harbor Terminal

Development

Page 21: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Middle Harbor

$1.2 billion Middle Harbor Project will improve terminal efficiency, cut pollution 50%, create

14,000 new jobs 21

Page 22: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Terminal Projects

Pier S Terminal

Development

Page 23: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Proposed Pier S Project

• Port proposes development of Pier S marine container terminal and Back Channel safety

improvements

Page 24: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Pier S Terminal Project

•Draft EIR released Sept 16th. $650 million green shipping terminal to support 35,000 new jobs

Page 25: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Proposed Pier S Project

Page 26: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Project Background

• Badly contaminated oil field

Original Pier S Project approved decade ago

• Need for navigational improvements

• Only cleanup completed

• New, updated EIS/EIR

Page 27: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Three-Berth Alternative

• 160-acre container terminal

• Wharves, buildings, truck gates

• On-dock rail yard• Dredging• Back Channel

navigational improvements

Page 28: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Three-Berth PlanHeim

Bridge

Ocean Boulevard

Page 29: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Environmental Measures

• CAAP Measureso Shore Powero Low-sulfur fuels o Emissions controlso Vessel speed

reduction• On-dock rail yard• LEED buildings

Page 30: Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.

Questions?

For more information, go towww.polb.com