Port: 01-16
Date Time Lmt.
29.06.2016 2300 2300
2340 2340
30.06.2016 0125 0125
0130 0130
0135 0135
0135-0200 0135-0200
0300 0300
0325 0325
0335 0335
0825 0825
0840 0840
0850-1045 0850-1045
1030 1030
EOSP / NOR - Tendered.
POB
Voy.:Svetly Loading
First line ashore
All fast alongside load. Berth no. 07 - Svetliy
Gangway ashore / D.O.P.
Tank Inspection
Safety Checks
Hose connected
Comm Loading
Completed loading Cr.SBO Rate- 311mt/hr
Line blown
Ullage /Temp/Cargocalculation Df-4,10m Da-4,45m
Hose disconnected
Port: 01-16
Date Time Loc. Time
02.07-2016 0520
0930
1000
1005
1010
1015-
1030-1045
1050
1055
1710
1720
1725
1835
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Århus Discharging
Line blown
Hose disconnected
Departure without pilot and without boatman
Completed Discharging Avg Rate=240Mt/hr Drafts: F=2,1 A=4,1
First line ashore
All Fast alongside disch. Berth no. 313 / NOR - Tendered.
Gangway ashore / DOP (Harbour pilot)
Ullage /Temp/Sampling/ Cargocalculation
Hose connected
Sea pilot onboard
Change of pilots / EOSP
Voy.:
Safety check.Cargohandling
Commenced discharging Cr.SBO
Port: 02-16
Date Time
03.07.2016 1705
04.07.2016 0001
1045
1120
1130
1815-1835
05.07.2016 0710
0740
0750
0755
1505
1515
1520
1545
1615
1745
1800
1815
Karlshamn Loading Voy.:
Documents on board
+ Pilot
Departure Karlshamn
- Pilot
Safety checks
Tank inspection - accepted
Hose connected
Commenced loading
Completed Loading Avg Rate: 167mt/hr
Line blown
Hose disconnected
Ullages and samples
EOSP + Dropped anchor off Karlshamn
+ NOR
Shifting without boatman and pilot.
Anchor away
1. Line waiting berth - .
All fast --------------- + Boatman.
Port: 02-16
Date+A5:J20 Time
06.07.2016 1010
1100
1105
1125
1130
1140
1150
2100
07.07.2016 0700
1115
1120
1130
1135
1235
Hose blown empty
Hose connected
Commenced discharging 2>6 bars on manifold
(Shore-) stop for the night, 811 MT discharged
Resumed discharging: 6.1 bar on manifold
Departure without pilot and + boatman
- Pilot, EOSP, NOR
1. line Helsigborg 709
Samples, ullages and calculations
All fast
Helsingborg - Discharging Voy.:
Completed discharging. Average pumping rate: 89MT7hr
Safety checks
Hose disconnected
Papers onboard
Port: 03-16
Date Time
08.07.2016 2240
2350
09.07.2016 2400
0610
0640
0645
0655
0750
0810
0815
0905
0920
0930
0935
1030
1135
1230
Completed 1. pcl. Rate: 240 MT/hr
Commenced loading (2 lines)
+ Pilot, EOSP, NOR
1. line Trafikhavnen Esbjerg 103
Hoses connected
All fast ------------------------ - Pilot
Safety checks
Tanks accepted
Red line blown
"Red" hose disconnected
Completed 2. pcl. Rate: 200 MT/hr
Line blown
Hose disconnected
Papers onboard
+ Pilot, departure Esbjerg
Ullages and calculations Da.: 4.4m Df.: 3.2m
- Pilot
Esbjerg Loading Voy.:
Port: 03-16
Date Time LMT
11.07.2016 0205 0105
0415-0425 0315-0325
0445 0345
0455 0355
0500 0400
0730 0630
0750 0650
0800 0700
0810 0710
0935 0835
1050-1105 0950-1005
1105 1005
1125 1025
16:20 15:20
16:25 1525
16:30 15:30
16:35 15:35
1700 1600
12.07.2016 2200 2100
2210 2110
2225-2240 2125-2140
Grangemouth Discharging Voy.:
Hose disconnected
Commenced tank cleaning
Departure Grange Dock No 4
Passed Sea Lock
- Pilot
+Pilot
Line blown
Commenced discharging 1st. pcl. (200MT). 5 bars (shore max)
Sweeping tank
Completed discharging and hose blown . Rate: 134 MT/hr
Ullages and calculations
Completed Discharging 2nd Pcl. 75mt/hr (including sweeping)
Tanks inspection
Commenced 2nd. Pcl. (440MT). 5 bar
Samples taken - awaiting analysis
Safety checks, cargo operations meeting
EOSP , POB + NOR
Grangemouth lock
Hose connected
1. Line Grange Dock No. 4 ps.
All fast ----------------------------- - Pilot
Gangway rigged
Port: Hvide Sande - Crew change + waiting for Orders
Date Time LMT
15.07.2016 0855
0905
16.07.2016 0930
12.07.2016
Line Hvide Sande New S. Berth
All Fast ---------------------------------- + Boatman
Shifting to waiting berth - no pilot - no boatman
Port: 04-16
Date Time
22.07.2016 0630
1100
1140
1350
1405
1410
1420
1500
1450
1605
1640
23.07.2016 0140
0150
0200
0210
0330
0400
0500
0710
Zeebrügge Loading Voy.:
Ullage /sampling / temperatures
Final draft survey / Calculations completed
Papers onboard
- Pilot, Wandelaar
POB / Sailing Df 4,48 Da 5,08
Safety checks
Tanks accepted / STS safety checklist / Draft survey commenced
Hose connected
Initial draft survey completed
Commenced loading Molasses
Loading completed Ave rate 280mt/h
Completed blowing
Hose disconnected
EOS +NOR (Dropped anchor Westhinder Anchorage.)
Anchor up
Before cargo ops meeting held
+ Pilot
1. Line AL. "Amor"
All fast ----------- PS - Pilot
Port: 04-16
Date Time LMT
25.07.2016 0840 0740
1050-1105 0950-1005
1120 1020
1130 1030
1135 1035
1140 1040
1140 1040
1150 1050
1245 1145
1320 1220
26.07.2016 0230 0130
0240 0140
0245 0145
0200 0300
0300 0400
1430 1330
Tanks inspected
Final draft survey
Papers onboard
Departure Df- 3,6 m Da-4,1m
Lock Passage
- Pilot, Barry Roads
Initial draft survey commenced / ullages, temperatures and samples
Hose connected
Initial draft survey completed
Commenced discharging Molasses
Discharging completed Ave. Rate 190mt/h
Steaming the line
+ Pilot, Barry Road, EOSP, NOR
Avonmouth Lock
1. Line Avonmouth Dock Oil Nr. 1 (Koole Terminal.)
All fast ------------------------------------------------------------------- - Pilot
Surveyor onboard
Safety checks / Safety checklist
Bristol Discharging Voy.:
Port: 05-16
Date Time LMT
29.07.2016 1435
1720
1840
1845
1850
1900
2020
2030
2020
2050
2115
2325
2355
30.07.2016 0005
0220
0230
0240
0330
0500
0610
Brake Loading Voy.:
EOS + NOR - passing L/B 3A
+ Pilot ( Bremerhaven )
1. Line Brake Fett N. PS
All Fast ----------------------- - Pilot
Bunkerbarge "Cora" AL
Gangway rigged
Bunkerboat left
Tank inspection
Hose connected
Commenced loading POS (5P/S)
Completed loading
Hose blown
Safety checks
Commenced loading PO (6P/S)
Loading completed
Blowing completed
Hose disconnected
Ullages / samples / calculations
POB / Departure Df 3,41 Da 4,47
- Pilot, Bremerhaven
Port: 05-16
Date Time (+2) LMT
31.07.2016 1840 1840
1905
1915
01.08.2016 0655
0710
0735
0740
1405
1415
1420
1435
1450
1500
1520
Karlshamn Loading Voy.:
+Pilot, EOSP, NOR
1. Line Soya Kaj STB
All fast ------------------ - Pilot
Safety checks
Tank inspection
Hose connected
Commenced loading
Loading completed Ave. Rate 158 mt / h
Blowing completed
Hose disconnected
Ullage / temp. / samples
Calculations completed
Dep / POB Df 3,43 Da 4,8
- Pilot
Port: 05-16
Date Time LMT
02.08.2016 0715
0735
0745
0820
0830
0845
0855
0910
0920
1900
03.08.2016 0700
0845
0850
0915
0920
1130
1150
1200
1420
1430
1435
1440
1900
Helsingborg Discharging Voy.:
EOS + POB + NOR
1. Line Helsingborg 707
All fast --------------------- - Pilot
Ullages and samples
Safety checks
Hose connected
Commenced discharging
Pump stopped, no flow through shore line??
Resumed pumping
Stop for the night, 855 discharged
Resumed discharging
Completed discharging. Average pumping rate: 88 MT/hr
Hose blown
Changing shore- and ship's line (same hose)
Commenced discharging PO-parcel
Completed discharging. Pumping rate: 92 MT/hr
Hose and shore line steamed.
Commenced discharging POS-parcel
Completed discharging Ave rate 103 mt/h
Completed steaming
Hose disconnected
Papers on board
Departure Helsingborg Df 2.4m Da 4.3m
Port: 06-16
Date Time LMT
04.08 - 2016 2340
05.08 - 2016 0015
0025
0040
0050
0055
0100
0105
0115
0120 - 0150
0115
0155
0935
0955
1020
1025
1050
1130
1300
1315
Gdynia Loading Voy.:
EOSP / NOR - Tendered.
POB
Pass. Breakwater
First line ashore
All fast alongside load. Berth: "Indyjskie Quay" - Gdynia
DOP
Before cargo ops meeting held
Safety checklist completed
Tanks inspected
Initial draft survey
Hose connected
Commenced loading Molasses
Completed loading. Rate 313 MT/hr
Line and hose blown
Disconnected
Ullages and calculations
Final draft survey completed
Documents onboard
+ Pilot, departure Gdynia
- Pilot
Port: 06-16
Date Time LMT
08.08.2016 2000
2025
2310
2330
09.08.2016 0350
0415
0630
0700
0710
0730
0750
0810
0815
0900
0900
0905
0950
1000
1930
1935
1945
2230
2330
0025-0055
0245
0520
Initial draft survey compl.
Final draft survey, calculations completed
+ Pilot, departure Wemeldinge
Passed Hansweert Lock
Pilot change Vlissingen
- Pilot, Steenbank
Ullages and samples
Commenced discharging
Completed discharging, Rate: 255 MT/hr
Hose steamed
Hose disconnected
Pass. 2nd bridge
First line ashore
All fast alongside "Ecotank - terminal" - Wemeldinge
DOP
Safety checks
Hose connected
Arr. Hansweert locks
Dep. Hansweert lock
Pass. Vlakebrûgge
POB
Drpped anchor, Vlissingen Road
DOP
EOSP, NOR
POB
Anchor aweigh
Wemeldinge Discharging Voy.:
Port: 07-16
Date Time LMT
10.08.2016 1035
1810
1900
2205
2215
2220
2245
2310
2350
10/11-08-2016 2350 - 0140
11.08.2016 0140
1300
1305 - 1340
1430
1820
1900 Shore line and hose blown
2000
2030
2105
2130
2130
2150
2250
2300
2325
12.08.2016 0030
0155
0200
0205
0215
0330
0635
0645
0700
Rotterdam Loading Voy.:
Blowing the line
Dropped anchor, Maas 4E, EOSP
Weighed anchor
+ Pilot, Maas Appr.
First line ashore
All fast alongside load. Berth: Koole Pernis - Jetty no. 3 / N.O.R. - tendered
DOP
Waiting for terminal readiness
Commenced loading CCNO
Completed loading CCNO
Ullages and calculations
Resumed loading adding shortage of abt.23 MT of CCNO
Completed pumping, pigging and blowing. Gross rate: 87 MT/hr
Safety checks
Tanks inspected
Hose connected
Commenced loading Rbd PKO
Completed loading Rbd PKO. Gross rate: 75 MT/hr
Ullages and calculations
Barge "RANA" alogside
Commenced loading PKS-parcel
Completed loading Rate 170 MT/hr
Line and hose blown
Ullages and calculations
Commenced loading PKO
Completed loading PKO
Blowing completed
Hose disconnected
Ullages and calculations
Papers onboard
POB
Dep. Koole Pernis jetty no. 03
First line ashore
0710
0715
0815
0900
1020
1245
1245-1300
1305
1320
1400
1610
1800
Hose connected
Commenced loading Veg.Oil Acid
Completed loading Veg Acid Oil Ave Rate 62 mt / h
Blowing the line
Hose disconnected
All Fast alongside Vopak Vld. - Jetty no. 628
DOP
Ullages / Temp / samples
Papers onboard
Departure Df 3,4 Da 5,1
-Pilot
Safety checks and before corgoop. Meeting
Port: 07-16
Date Time LMT
15.08 - 2016 0550
0615
0625
0630
0710
0740
0740-0830
0755
0805
1200
1210
1300
1400
1430
1445
2035
2035-2050
2115
2130
16.08.2016 0810
0920
0935
0940
0945
0950
1150
1205
1210
1215
1220
Ullage/Temp/Cargohandling
Karlshamn Discharging Voy.:
Sampling
Hose connected
Commenced discharge CCNO
Completed discharge. Rate - 146 mt/hr
Line blown
P.O.B. / E.O.S.P. / N.O.R. - Tendered.
Pass. Break water
First line ashore
All fast alongside disch. berth "Soya Quay" - Karlshamn / D.O.P.
Safety check.Cargohandling
Commenced discharge Ref.PKO SG
Completed discharging Ref.PKO SG Ave rate 125mt/h
Completed blowing
Commenced discharging Rbd PKO
Completed discharging Rate- 146 mt/hr
Line blown
Hose disconnected
Hose connected for 4th parcel Rbd PKS
Commenced discharging Rbd PKS
Completed discharging Rate- 145 mt/hr
Line blown
Hose disconnected
Hose connected for 5th parcel Veg.oil Acid
Commenced discharging
Completed discharging Rate - 72 mt/hr
Line blown
Hose disconnected
Doc on board
Commenced wash
Port: 08-16
Date Time LMT
23.08 - 2016 07:30
24.08 - 2016 06:30
07:00
07:10
07:20
07:25
0730
0740
0750
1915
1935
1945
1955
Commenced loading Fish Solubles
Completed loading Rate- 155mt/hr
Ullages/Temp/Cargocalculation
Doc on board Df-4,05m Da- 4,27m
Hose disconnected
Pass. Breakwater - inward bound
First line
All Fast - alongside load. Berth "FishPro" - Nexoe
Hose connected
Safety check.Cargohandling
Tank inspection.Tanks accepted
Anchor droppedm Off Nexoe / EOSP / NOR - Tendered.
Anchor aweigh
Nexoe - Loading Voy.:
Port: 08-16
Date Time LMT
26.08 - 2016 1320
1340
1350
1405
1410
1415
1410
1500
2130
2140
2200
2210
27.08.2016 0300
0800
Hvide Sande - Discharging Voy.:,
EOSP / NOR-Tendered
Pass. Break water inward bound
First line ashore
All Fast - alongside disch. Berth - Hvide Sande
Safety Checks
Ullages and temperatures
Hose connected
Comm discharging
Completed discharging Rate 272 mt/hr
Line blown
Hose disconnected
Commenced wash
Completed wash
Doc on board
Port: 09-16
Date Time LMT
29.08 - 2016 1905
2000
2220
2230
2235
2235
30.08 - 2016 1520
1615
2150
2155
2200
2315
2340
2345
31.08 - 2016 0001
0100
0105
0125
0215
Rotterdam - Loading Voy.:
POB / EOSP
Pass. Breakwater
First Line (Mooring dolphins 19+20)
All Fast - Waal Haven / NOR - Tendered (1)
Anchor dropped
DOP
Bunker barge "Marilele" - alongside
Bunker barge "Marilele" - aweigh
POB
Anchor aweigh
Dep. Waal Haven
First line
All fast alongside importer "Bow Achitecht"
DOP
NOR - Tendered (2)
Ship to Ship Check lists
Tanks accepted
Hose connected
Comm loading Lecithin
Completed loading Rate-
Line blown
Hose disconnected
Port: 09-16
Date Time LMT
Voy.:
Port: 09-15
Date Time LMT
22.08.2015 2359
23.08.2015 0035
0110
0600
0830
1025
1550
1600
1605
1615
1625
1635
1640
2315
2320
2330
2340
24.08.2015 0240
0250
0750
0845
1045
1155
1500
1935 - Pilot, Troubaduren
Departure Lidköping Da.: 4.2m Df.: 2.9m
Pilot changeover Vänersborg
Brinkebergkulle Lock
Trolhätten locks 1-4 passed
Moored before Ström Lock
Passed Lock Ström
Commenced discharge
Completed discharging Rate: 151 MT/hr
Hose and shore line steamed
Hose disconnected
Commenced tank cleaning
POB
First line ashore
All Fast alongside disch. Berth "Gödnings kaien" - Lidköping
DOP
Ullage/Temp/Cargocalculation
Hose connected
Safety check
POB/EOSP/NOR
Passing breakwater
Change of pilot
Passed Lock Ström, Pilot changeover
Passed last lock Trollhättan
Passed Vänersborg, pilot changeover
Lidköping - Discharging Voy.:
Port: 10-15
Date Time LMT
24.08.2015 0830
0840
0850
0900
1000
1010
1035
1045
1050
1235
1240
1325
1330
1340
1650
1655
1705
1825
1830
1850
1905
2000
2100
2140
2210
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Århus Loading Voy.:
Pass Fairway buoy / EOSP/NOR - Tendered.
Pass. Breakwater
First line
All Fast alongside load. Berth no. 109 - Aarhus
Tank inspection
Safety checks
Hoses connected
Commenced loading (PO 68)
Commenced loading Shea Oleine
Completed loading PO 68 Rate- 229mt/h
Line blown
Completed loading Shea Oleine Rate- 194mt/h
Line blown
Hose disconnected (Yellow line).Commenced loading PO 61(Red line)
Completed loading PO 68 Rate- 215 mt/h
Line blown
Commenced loading PO 45
Completed PO45-parcel Rate- 154 mt/h
Hose blown
Hose disconnected (red line)
Ullages and calculations
Documents onboard Da: 5.0m Df.: 3.5m
Sea pilot onboard, awaiting harbour pilot
Htbr. Pilot on board, departure Århus
- Hrbr. Pilot
- Pilot, off Grenå
Port: 10-15
Date Time LMT
26.08.2015 2355
27.08.2015 0030
0040
0045
0545
0645
0645
0655
0935
0940
0945
1025
1405
1415
1455
1645
1650
1725
2120
2125-2130
2125
2145
2155
2205
2310
2315
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn Discharging Voy.:
POB / EOSP / NOR - Tendered
First line
All Fast alongside disch. Berth "Soya Quay" - Karlshamn
DOP
Safety checks
Ullages, samples and calculations
Hose connected
Commenced discharging 1st. parcel (PO MF IV 68), 3.2 bar
Completed 1st. Parcel. Rate: 158 MT/hr
Hose blown, awaiting shore readiness
Tanks accepted, steaming empty tanks
Commenced 2nd. parcel (Shea Oleine).
Completed discharge 2nd parcel Rate- 137mt/h
Line blown
Commenced discharge 3rd parcel (PO 45 )
Completed discharge Rate - 158 mt/h
Line blown
Commenced discharge 4th parcel ( PO 61 )
Completed discharge Rate - 175 mt/h
Blowing lines
Tankinspection.
Hose disconnected.
Hose for prewash connected.
Commenced prewash
Completed Prewash
Hose disconnected.
Port: 11-15
Date Time LMT
29.08-2015 0800
0810
0820
0830
1605-1630
31.08.2015 0700
0810
0820
0830
0835
1035
1035-1040
1050
1050-1055
1110
1115
1250
1255
1310
1425
1430
1500
1655
1700
1715
1730
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Aarhus - Loading Voy.:
Pass. Fairway l/b / EOSP / NOR
Pass. Breakwater
First line
Tank inspection.Tanks accepted
Safetycheck - Cargohandling.
Hose connected - Red line
All Fast
Hose connected - Yellow line
Commenced loading Rbd Pos - Yellow line.
Commenced loading Shea Stearine - Red line.
Completed loading Shea Stearine / rate 210 mt/hr.
Blowing red line.
Completed loading Rbd Pos / rate 210 mt/hr.
Blowing yellow line.
Hose yellow line disconnected.
Commenced loading Shea Oleine.
Completed loading Rate- 183mt/h
Line blown
Commenced loading PMF 45
Completed loading Rate-232 mt/h
Line blown
Commenced loading Cr.Sheaoil
Completed loading Rate-204mt/h
Line blown
Hose disconnected Df- 3,4m Da- 4,92m
Ullage/ temp/ Cargocalculation
Doc on board
POB
Port: 11-15
Date Time LMT
01.09.2015 2245
2305
2315
2325
2330
02.09.2015 1710-1740
1740-1800
03.09.2015 1625
1635
1700
1705
1725
1745
1750
1945
1945-1950
1950-2030
2035
2110
2215
2215-2225
2230
04.09.2015 0615
0800
0800-0810
0810-0850
0855
1105
1105-1110
1110-1145
1150
1340
1345
1355
1405
1410
1450
1455
Karlshamn - Discharging Voy.:
POB / EOSP / NOR - Tendered
Pass. Breakwater
First line ashore
All Fast alongside awaiting berth - Karlshamn. / DF: 3,35 m DA: 4,96 m
DOP
Ullage/Temp /Cargocalculation
Sampling
Shifting without Pilot and boatman
All Fast alongside discharging berth - Karlshamn. / DF: 3,35 m DA: 4,96 m
Safety check/Cargohandling/Cargocalculation
Hose connected (Red line)
Commenced discharge Shea Stearine
Completed discharge Shea oil. / Rate 170 mt/hr,
Hose connected (yellow line)
Commenced discharge POS
Completed discharge Shea Stearine. / Rate 176 mt/hr
Blowing line Shea Stearine.
Lining up for discharge Shea oil 3P only.
Commenced discharge Shea Oil 3P
Stop discharge Shea Oil for the day. 297 mt remaining onboard.
Completed discharge Rbd Pos. / Rate 109 mt/hr - 6 bar
Blowing/steaming lines Rbd Pos.
Blowing line Shea oil .
Lining up ashore for discharge Shea olein 4P+6S.
Commenced discharge Shea Olein 4P+6P
Completed discharge Shea Olein 4P+6S / Rate 133 mt/hr
Blowing line Shea Oleine.
Lining up ashore for discharge PMF iv 45 4s+6p.
Commenced prewash
Hose yellow line disconnected.
Resumed discharge Shea Oil 3 P/S.
Line steamed
Completed discharge Rate- 160mt/h
Commenced discharge PMF iv 45
Line blown
Hose disconnected
Completed prewash
Hose connected for prewash
1500
1505
1805
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Commenced final wash Df-2,3m Da-4,1m
Departure with boatman and without pilot
Port: 12-15
Date Time LMT
05.09.2015 1245
1455
1520
1635
1700
1945
1950
2100
2100-2135
2135
2140
2155
2300
2305
2320
06.09.2015 0145
0755
0755-0855
0830
0900
1110
Parcel APP MGO MT
Ship's figure 1995,105 Arrival
Bill of Lading fig. 2000,000
Difference MT 4,895 Departure
Difference % 0,245
Kaliningrad - Loading Voy.:
EOS + NOR ( Baltiysk Road L/B No. 1 )
Baltiysk Traffic order ship to anchorage due to weather condition.
Baltiysk Anchorage 68 - stb anchor 4 cha.
Anchor up
POB ( Inside Brk. Water)
1. Line Fish Port Nr. 18
All fast ------------------- - Pilot / DF 2,55 m DA 4,05 m.
Surveyors onboard.
Initial draftsurvey. / Tankinspection - Tanks passed.
+ Slopbarge
Safetycheck - Cargohandling.
Hose connected.
Commenced Loading.
- Slopbarge.
+ Bunkerbarge.
- Bunkerbarge
Completed loading. / Rate224 mt/hr.
Ullage-Temp cargocalculations / Final draft survey.
Hose disconnected.
Documents onboard.
Departure + Pilot and linesmen
Kaliningrad local time is UTC +2 all the year.
Port: 12-15
Date Time LMT
09.09.2015 1350
1555
2150
2325-2340
10.09.2015 0025
0030
0045
0600
0610-0635
0700-0715
0735
0745
1225
1235
1240
1405
1410
1415
1425
1555
1600
1610
1620
2100
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig. 73,9
Difference MT Departure
Difference % 72,6
Ruisbroek Discharge Voy.:
EOS +NOR +POB ( Steenbank Pilot )
Pilot Change Vlissing Rds
Pilot Change Antwerpen Rds
Wintam Sleuis - Pilot change
1. Line Ruisbroek, "PRAYON Nr. 4"
All fast ---------------------------------------- - Pilot. / DF: 2,78 m DA: 4,92m
+ Barge " Synthese-3 "
NOR Received.
Sampling - Ullage-Temp cargocalculations.
Safetycheck - Cargohandling.
Hose connected.
Commenced discharge to barge Synthese-3.
Completed discharge. Acc.ship´s ullage discharged 1542,516 mt
Line blown Rate - 331mt/h
Hose disconnected
- Barge "Synthese-3 "
+ Barge " Ducheesse "
Hose connected.
Commenced discharge to barge " Ducheesse "
Completed discharge. Rate - 301 mt/h
Line blown
Hose disconnected
- Barge "Ducheesse "
Departure Ruisbroek + Pilot
Port: 13-15
Date Time LMT
11.09.2015 1425 1325
13.09.2015 0900 0800
0920 0820
1110 1010
1205 1105
1225 1125
1330 1230
1345 1245
1355 1255
1430 1330
2210 2110
2215-2225 2115-2125
2225-2230 2125-2130
2245 2145
2250-2300 2150-2200
2310 2210
14.09.2015 0100 0000
Parcel Lecithin MGO MT
Ship's figure 800,150 Arrival
Bill of Lading fig. 800,150 68,3
Difference MT 0,000 Departure
Difference % 0,000 67,7
EOS - Dropped anchor Mouse Anchorage
Anchor weighed.
POB
Erith - Loading Voy.:
Pilotchange at Gravesend.
1. Line
All fast Erith ADM. - Pilot
Safety check.Cargohandling
Hose connected
Hardarm disconnected.
Tank inspection.Tanks passed
Ullage - Temp cargocalculations. / DF: 3,40m DA: 5,25m
Documents onboard.
Blowing the hardarm.
Commenced loading
Stop loading lineclearence.
Lineclearance.
Departure + Pilot
Port: 13-15
Date Time LMT
14.09.2015 1600
1825
1835
1900
1935-1950
2015
2045
2055
15.09.2015 1010
1010-1025
1030-1035
1035
1050
1345
1420
1445
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
EOS + POB + NOR ( Maas pilot )
1. Line Petroleumshaven 3 Vopak N. Jetty
Rotterdam - Discharge Voy.:
All fast --------------------------------------------- - Pilot
Surveyors onboard Rep. Glencore (sampling) and Rep. ADM Europort(ullage)
Safetycheck - Cargohandling.
Sampling / Ullage - Temp cargocalculations completed.
Hardarm connected.
Commenced discharge.
Completed discharge. / Rate incl sweeping 147 mt/hr
Awaiting shore for blowing lines / disconnect.
Blowing lines.
Tankinspection
Hardarm disconnected.
Shifting with pilot df. 3,00 - da. 3,90
1. Line + Stb Anchor 1. Petroleumshaven bouy 50&51
All fast ------------------------------------------------------------------ - Pilot
Port: 14-15
Date Time LMT
17.09.2015 1630
1835
1845
1900-1925
1940
1945
18.09.2015 0300
0310
0315
0340
0415
0530
0535
0800
0820
0845-0850
0930
1110
1330
1630
1725
1745
1750
1755
2005
Ref RSO Parcel MGO MT
1995,620 Ship's figure Arrival
2000,000 Bill of Lading fig. 71,6
4,380 Difference MT Departure
0,219 Difference % 71,2
Rotterdam - Loading Voy.:
EOS + NOR + POB ( River pilot 1. Petroleumshaven moored in bouy's)
1. Line ADM Main Jetty Europort
All fast ---------------------------------- - Pilot
Safetycheck - Cargohandling - Tankinspection - Tanks passed.
Hose connected.
Commenced loading.
Completed loading Rate-206mt/h
Line blown
Hose disconnected Df-3,8m Da-4,80m
Ullage/Temp/ Cargocalculation
Doc on board
POB
Shifting with Pilot
1. Line Koole Pernis Nr. 10
All fast ------------------------ - Pilot ( Only 1. boatman.)
Surveyor onboard - tankinspection - tanks passed.
Ullage /Temp/Cargocalculation
Hose disconnected
Hose connected.
Safetycheck - Cargohandling
Commenced loading.
Completed loading Rate-105 mt/h
Doc on board
Dep. + Pilot
Line blown Df-4,00m Da-5,00m
Port: 14-15
Date Time LMT
19.09.2015 1130 1030
1405 1305
1425 1325
1915 1815
1925 1825
1945 1845
1945-2045 1845-1945
2045-2150 1945-2050
2200 2100
2250 2150
2250-2300 2150-2200
2300-2400 2200-2300
20.09.2015 0010 2310
0300 0200
0315 0215
0345 0245
1300 1200
1310 1210
1320 1220
1335 1235
1415 1315
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Discharging - Purfleet Voy.:
EOS + NOR + Dropped anchor Margate Rds.
Anchor weighed.
POB
1. Line. Purfleet "Jürgens"
All fast. --------------------- - Pilot / DF: 3,80 m DA: 4,90 m
Hose connected.
Sampling / Ullage - Temp calgocalculations / Safety check / Cargohandling
Awaiting analysis.
Commenced discharge PFAD 2S.
Completed discharge 2S
Working on broken valve to 2P - Cargo must be discharged over top.
Preparing for emergency discharge of 2P.
Commenced discharge PFAD 2P via top.
Completed discharge. Avarage Rate-62mt/h
Line blown
Commenced discharge Cr.SBO
Completed discharge Rate 160mt/h
Line blown
Hose disconnected
Shifting to Erith Swing buoy + Pilot
All moored at Erith Swing buoy. - Pilot
Port: 15-15
Date Time LMT
20.09.2015 1325 1225
1415 1315
21-22.09.2015 0001 2301
0010 2310
0020 2320
22.09.2015 0050 2350
0130 0030
0735 0635
0745 0645
1500 1400
1510 1410
1520 1420
1550 1450
1610 1510
1700 1600
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Ullage/ temp/Cargocalculation
Doc on board
Departure Erith + 2xPOB
Tankinspection
Hardarm connected.
Commenced loading.
Completed loading Rate-245mt/h
Line blown
Hose disconnected Df-4,05m Da-4,90m
Dep. Purfleet.
Fast Erith swingbouy
Shifting with pilot from Swing buoy to Erith Oil works Jetty
1. Line Outer Jetty PS.
All fast -------------------- - Pilot.
Safety check.Cargohandling
Erith - Loading Voy.:
Port: 15-15
Date Time LMT
23.09.2015 0920
1840
1900
2120
2130
2135-2300
2200-2215
24.09.2015 0035
0040
0935
1125
1125
1125-1135
1225-1235
1245
1450
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Blowing lines.
Tankinspection
Hardarm disconnected.
Departure + Pilot
Safetycheck - Cargohandling.
Hardarm connected.
Commenced discharge.
+ Bunkerbarge "Calendula 7"
- Bunkerbarge "Calendula 7"
Completed discharge. / Rate incl sweeping 167 mt/hr.
EOS + NOR ( Dropped anhor Maas Anchorage 4 E, awaiting ready berth )
Anchor weighed
POB
1. Line Vopak Noord Botlek - Jetty 4116
All fast ----------------------------------------- - Pilot
Sampling - Ullage/Temp cargocalculations.
Rotterdam - Discharge Voy.:
Port: 16-15
Date Time LMT
25.09.2015 0300
0340-0400
0515
0525
0530-0550
0630
0630
0805
1420
1420-1435
1435
1515-1530
1530
1535
1610-1700
1810
1830
1840
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Amsterdam - Loading Voy.:
EOS + NOR + POB
Middle Sleuss
1. Line Usselincxhaven Jetty nr. 4
All fast ---------------------------------- - Pilot
Loading master onboard. Safety checks.
Tankinspection / Tanks passed.
Hose connected.
Commenced loading.
Ceased cargo ops
Change cargo hoses, change shore line.
Resumed loading
Blowing shore line
Completed loading F3,40 A5,22 Avg Load Rate: 231mt/hr
Hose disconnected
Ullage, temperatures, cargo calculation
Documents onboard
+ Pilot
Departure
Port: 16-15
Date Time LMT
28.09.2015 0910 0810
1245 1145
1300 1200
1305 1205
1350 1250
1405 1305
1405-1600 1305-1500
1505 1405
1530-1600 1430-1500
1610 1510
2305 2205
2305-2315 2205-2215
2315 2215
2315-0015 2215-2315
2355 2255
29.09.2015 0200 0100
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
DUBLIN - DISCHARGE Voy.:
eos + nor + Dropped anchor Dublin anchorage No. 2
Commenced heaving up s/s anchor
Anchor aweight.
+ Pilot
1. Line Berth 46 PS
All fast ----------------- - Pilot
Ullages, sampling, draft survey, calculations.
Hose connected
Safety checks
Commenced discharging Cr SBO
Completed discharge. / Rate incl sweeping 249 mt/hr
Blowing lines.
Tankinspection
Final draftsurvey.
Hose disconnected.
+ Pilot; Departure
Port: 17-15
Date Time LMT
16.10.2014 02.10.2015 0325
0550
0600
0605
0615-0630
0745-0805
0800
0825
1005
1010-1020
1030
1045
1240
1245
1420
1435
1515-1530
1515-1600
1635
1645
1755
1820-1845
1850
1900
1900-2030
2130
2335
2345
03.10.2015 0045
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Due to big difference ship's figure and shore figure checking ballasttanks ullage
and shore checking tank plus pipelines.
Problem so
+ Pilot
Departure
- Pilot
Hose connected.
Commenced loading Crokvitol
Completed loading 1S + 2 P/S / DF: 2,90 m DA: 4,15 m
Blowing the shoreline. / Sampling.
Hose disconnected.
Ullage-Temp cargocalculations.
POB
Shifting from Vopak Vlaardingen to Maasvlakte 8228.
1. Line "Loders Key" Maasvlakte
All fast ---------------------------------- - Pilot
Surveyer on board. Tanks incpection. Tanks accepted.
Safety checks with Loading Master
Hose connected.
Commenced loading Crokvitol 1P. / DF: 2,20 m DA: 4,50 m
Completed loading 1P
Blowing shoreline.
Hose disconnected.
Ullage-Temp cargocalculations completed.
EOSP / POB / NOR tendered.
First Line Vopak 626 STB
All Fast ------------------ -Pilot
DOP
Safetycheck - Cargohandling.
Surveyor onboard. / Tankinspection - Tanks passed.
Rotterdam - Loading Voy.:
Port: 17-15
Date Time LMT
03.10.2015 1935
2325
04.10.2015 0120
0130
0135
0200
0230
0230-0240
0340
0410
0620
0620-0630
0655
0920
0930
0940
1000
1200
1205
1220
1240
1425
1435
1500
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose and ship's line blown
Hose disconnected
Ullages and temperatures. Cargo calculation.
Documents onboard.
POB
Departure
Commenced loading POS
Completed loading POS Rate: 120 MT/hr
Hose and ship's lines blown
Lined up for loading PKO in 5P/S
Commenced loading PKO
Completed loading PKO Rate: 125 MT/hr F 3,05 A 4,28
Tanks accepted.
Line up
Hose connceted
Commenced to load PO IV 36
Completed to load PO IV 36 Rate: 116 MT/hr
Blowing the hose into ship.
EOSP / POB / NOR Tendered.
Change of Pilot
FLA
All Fast alongside load. Berth - Wilmar Brake
DOP
Loading Master onboard and surveyor. Safety checks. Tanks inspection.
Brake - Loading Voy.:
Port: 17-15
Date Time LMT
06.10.2015 0530
0630
0715
0725
0730
07.10.2015 0930-1005
1055
1100
1105
1110
1355
1355-1410
1420
2050
2110
2125
2350
2400
08.10.2015 0020
0300
0300-0305
0305-0315
0320
0345-
0430
0750
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced tank cleaning
Departure Helsingborg
Commenced disch. PO (4P/S)
Completed disch. PO Avg Rate: 95mt/hr
Blowing shore line
Steaming shore line
Hose disconnected
Steaming shore line, cargo pipes and tanks
Commenced discharging Crokvitiol 1P/S 6 bars
Compl. Disch. Croc. (reduced rate during replacement of steam valve)
Shoreline steamed O.a. Rate: 81 MT/hr
Commenced discharging PKO (5P/S), 6 bars
Compl. Disch. PKO, Rate: 105 MT/hr
Shore line steamed
Gangway rigged & safety checks
Ullages and calculations
Hose connected
Commenced discharging POS (3P/S) 6 bars
Completed disch. POS 3P/S Rate: 104 MT/hr
Blowing and steaming the shore line
EOSP / NOR - Tendered.
POB
FLA
All Fast alongside awaiting Berth no. 706 - Helsingborg
DOP
Shifting to 709
Helsingborg - Discharge Voy.:
Port: 18-15
Date Time LMT
09.10.2015 1430
1530
1715
1720
1725
1830
1910
1930
1955
2005
10.10.2015 0030
0030-0115
0130
0115-0300
1320
1400
1410
1550
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Ullages, temperatures, cargo calculation.
POB
Papers onboard
Departure
DOP
Tank Inspection
Safety checks
Hose connected
Commenced loading Cr SBO
Completed loading Cr SBO Avg Rate 341mt/hr
Blowing shore line to 4P
EOSP, NOR
POB
FLA
All Fast alongside load. Berth no. 06 - / NOR - Received and accepted by agent
DOP
Inward bound clearance.
Swetliy Voy.:
Port: 18-15
Date Time LMT
11.10.2015 2230 2330
12.10.2015 0405 0505
0415 0515
0420 0520
0610 0710
0615 0715
0625 0725
0635 0735
1115 1215
1130 1230
1340 1440
1340-1350 1440-1450
1400 1500
1445 1545
1500 1600
2010 2110
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Pilot onboard
Departure Turku
- Pilot
Ullages and calculations
Commenced discharging - 6 bars
Shore stop. Change of shore line.
Resumed discharging
Completed discharging Avg Rate 212mt/hr including sweeping
Blowing the line
+ Pilot, Utö, EOSP, NOR
FLA
All Fast alongside disch. Berth no. P-23 - Turku
DOP
Safety checks
Hose connected
Turku Disch. Voy.:
Port: 19-15
Date Time LMT
14.10.2015 0730
0735
0750
0800
0830
0835
0850
15.10.2015 1400
1905-15
2225-30
16.10.2015 0200
0220
0300
0700
1700
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
EOSP / NOR - Tendered
Pass. Breakwater
First line ashore
Nexø Loading Voy.:
All Fast alongside load. Berth "FishPro" - Nexoe / NOR - Recieved and accept.
Safety checks
Hose connected
Tank inspection
Commenced to load Fish Pulp
1. pcl. Compl. Shore stop for changing shore tank (Abt. 850 MT loaded)
2. pcl. Compl. Shore stop for tank change
Completed loading 3. pcl. Avg rate 159mt/hr
Hose disconnected
Ullages and calculations
Ballast trimming to Da.: 4.5m Df.: 4.0m
Departure Nexø
Port: 19/15
Date Time LMT
18.10.2015 0930
0955
1005
1015
1030
1035
1045
1050
1350
1350-1400
1400
1910
1920
2225
2235
2245
2245
2320
2345
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hvide Sande / Disch. Voy.:
EOSP / NOR - Tendered
Pass. Breakwater
First line
All Fast - alongside berth no. 98 - Hvide Sande
Safety checks
Ullages and calculations
Hose connected
Commenced 1st. parcel (F. Sol B, 1+5 P/S) Manifold press. 4 bar.
Completed 1st. Parcel
Line up ship and shore line
Commenced 2nd. Parcel (F. Sol A, 3+4 P/S)
Completed 2nd. Parcel.
Departure Hvide Sande
Commenced last parcel (2+6P/S)
Completed disch Over all rate: 164 MT/hr
Hose blown
Hose disconnected
Tanks accepted
Ballasting to: Da.: 4.2m Df.: 3.5m
Port: 20-15
Date Time LMT
20.10.2015 0800
0830
0850
0900
0905
0940
0950
1020
1020
1025
1935
1940
2000
2030
2035
2050
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Malmö Loading Voy.:
POB, EOSP, NOR
Pass. Breakwater
First line ashore
All Fast alongside load. Berth no. 1010 - Malmoe
DOP
Tanks inspected
Safety checks
Initial draft survey
Hoses connected for loading over top from trucks
Commenced loading
Completed loading 75 MT/hr
Hose disconnected
Ullages and calculations
Final draft survey
Papers onboard
Departure Malmö Da: 5.3m Df 4.3m
Port: 20-15
Date Time LMT
23.10.2015 1055 (Z -2)
1535 (Z -2)
1545 (Z -2)
1555 (Z -2)
1555-1620 (Z -2)
1620 (Z -2)
1645 (Z -2)
24.10.2015 0950 (Z -2)
(Z -2) 1935 (Z -2)
25.10.2015 0330 (Z -1)
(Z -1) 0330-0340 (Z -1)
0345 (Z -1)
0350 (Z -1)
0655
1020
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Stockholm Discharging Voy.:
+ Pilot, EOSP, NOR
1. line Berth 650
All fast
- Pilot
Safety checks
Hose conncected
Commenced discharging (1+3) P/S
Tks. 1+3 steamed and stripped
Tks. 2+5 steamed and stripped
Completed discharging Avg rate: 69mt/hr F2,50 A4,30
Steaming the hose.
Hose disconnected.
Empty tank certificate signed.
+ Pilot, departure Stockholm
- Pilot, Sandhamn
Port: 21-15
Date Time LMT
26.10.2015 0700 0800
0845 0945
1723 1823
1815 1915
1825 1925
1845 1945
1905 2005
1915 2015
2030 2130
2010 2110
0750 0850
0805 0905
0820 0920
0810 0910
0850 0950
1100 1200
1150 1250
1200 1300
1250 1350
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Klaipeda Loading Voy.:
E.O.S.P. & N.O.R (Klaipeda Roads)
Dropped anchaor, Anchorage No. 1
+Pilot
1. line berth 640
All fast
Hose connected
Tank Inspection
Safety checks
Initial draft survey
Commenced loading
Completed loading rate: 210 MT/hr
Hose and shore line blown
Hose disconnected
Ullages and temperatures
Final draft survey Da.: 5.2m Df.: 4.3m
Papers on board
+ Pilot
Departure Klaipeda
- Pilot
Port: 21-15
Date Time LMT
28.10.2015 1820 1920
2010 2110
2020 2120
2100 2200
2110 2210
2115 2215
29.10.2015 2315 0015
2115 2215
2125 2225
2135 2235
2140 2240
2145 2245
2200 2300
2305 0005
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Kantvik Discharging Voy.:
+ Pilot, EOSP, NOR
1. line Kantvik
All fast
Hose connected
Safety checks (Form 7-0303B)
Commenced discharging
Changed to yellow pump, manifold press.: 5 bar
Completed discharging Rate: 111 MT/hr
Hose steamed
Hose disconnected
Tanks accepted
+ Pilot Da.: 4.1 Df.: 2.2
Departure Kantvik
- Pilot
Port: 22-15
Date Time LMT
30.10.2015 1645 1745
31.10.2015 2225 2325
2345 0045
01.11.2015 0045 0145
0100-0230 0200-0330
0130 0230
0210 0310
0215 0315
0500 0600
0510 0610
0530 0630
0700 0800
0720 0820
0830 0930
1630 1730
2005 2105
2010 2110
2100 2200
2110 2210
2140 2240
2310 0010
2315 0015
2320 0020
Ventspils Loadng Voy.:
Dropped anchor, Ventspils No 3, EOSP
Weighed anchar
+ Pilot
All fast
Surveyer and loading master onboard. Safety checks.
Tanks accepted.
Hose connected
Commenced inerting tanks with nitrogen.
Completed inerting ship's tanks with nitrogen.
Inert gas hose disconnected
Cargo hose connected
Commenced loading (for foot samples)
Shore stop (for analyzing samples)
Commenced loading (stated 250 cbm/hr)
Terminal reported reducing rate due to change/stripping shore tank. Abt 50cbm/hr.
Completed loading Average rate: 146 MT/hr
Hose blown with nitrogen
Ullages and sampling Da.: 5.1 Df.: 3.4
Hose disconected
Calculations completed
Papers onboard
Pilot onboard
Departure Ventspils
Port: 22-15
Date Time LMT
02.11.2015 1355
1715
1730
1740
1740-1800
1740-1835
1830
1840
0320
0320-0330
0320-0330
0330
0340
0400
0845
0900
1200
+ Pilot, EOSP, NOR
First Line
All fast Berth #6
Södertälje Discharging Voy.:
Surveyer, Loading Master onboard.
Safety checks
Ullages, samples, cargo calculation.
Hose connected
Commenced discharging
Completed discharging Avg disch rate 220mt/hr
Blowing
Tanks inspection
Tank empty certificated signed
Hose disconnected
Commenced tank cleaning. Awaiting pilot.
Pilot on board
Departure Södertälje
Pilot left, Landsort.
Port: 23-15
Date Time LMT
04.11.2015 0930
0945
0955
1010
1020
1100
1125
1915
1920
1930
1945
1950
2000
2030
2045
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn Loading Voy.:
EOSP, NOR
1. line Soya Kaien
All fast
Safety checks
Hose connected
Tanks accepted
Commenced loading
Completed loading Rate: 147 MT/hr
Shore line and hose blown
Hose disconnected
Ullages and calculations Da.: 4.5m Df.: 3.5m
Samples taken
Papers onboard
+ Pilot, departure Karlshamn
- Pilot
Port: 23-15
Date Time LMT
05.11.2015 1110
1130
1140
1220
1225
1230
1250
06.11.2015 0300
0305
0310
0315
0330
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Helsingborg Discharging Voy.:
+ Pilot, EOSP, NOR
1. line 707
All fast
Hose connected
Safety checks
Ullages and calculations
Commenced discharging
Discharging completed Ave. Rate: 71 MT/hr
Finish blowing
Hose disconnected
Papers signed
Departure Helsingborg without pilot, + boatman
Port: 24-15
Date Time LMT
08.11.2015 1735 1935
09.11.2015 0300 0500
0315 0515
0505 0705
0515 0715
0700-0745 0900-0945
0750 0950
0805 1005
0835 1035
0840 1040
1220 1420
10.11.2015 0830 1030
0900 1100
0920 1120
0925 1125
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Papers onboard
Tank inspection
Hose connected, ready for loading, but shore line problems
Commenced loading
Completed loading Average rate: 122 MT/hr
Ullages and calculations Da.: 5.2m Df.: 4.5m
Samples taken
Dropped Anchor Vysotsk Anchorage 18 D. + EOSP+ NOR
+ Pilot
1. Line Vyborg Berth Nr. 13 - port side
Immigration and Custom
Surveyor and loading master onboard
Safety checks
Anchor Up.
All fast -------------------------------------------- - Pilot
Vyborg Loading Voy.:
Port: 24-15
Date Time LMT
13.11.2015 0755
1130
1140
1240
1250
1315
14.11.2015 0540
0550
0615
0630
0635
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Unberthing
POB
Papers completed
Completed discharging
Hose disconnected
+Pilot, EOSP, NOR
1.st line Fosfatowa Dalba
All fast----------------Pilot off
Ullages / Temp / Cargocalculation
Hose connected
Commenced discharging
Szczecin discharging Voy.:
Port: 25-15
Date Time LMT
15.11.2015 1545 1645
1610 1710
1625 1725
1635 1735
1730 1830
1735 1835
1740 1840
2005 2105
2015 2115
2100 2200
2105 2205
2325 0025
16.11.2015 0010 0110
0905 1005
1030 1130
1050 1150
1055 1155
1200 1300
1230 1330
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
POB
Loadig resumed
Loading completed Rate - 227mt /H
Sampling / Ullage / Temp
Hose disconnected
Cargocalculation
Doc on board
Commenced purging nitrogen
Completed purging
Purging hose disconnected
Loading hose connected
Commenced loading
Shore stop- foot sample
EOSP, NOR,
POB
1.line
All fast.Pilot off
Tanks inspection.Tanks passed
Purging hose connected
Ventspils loading Voy.:
Port: 25-15
Date Time LMT
17.11.2015 0215
0520
0535
0545
0550
0555
0625
0630
1450
1455
1500
1510
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Ullage /Temp / Cargocalculation
Commenced discharging
Discharging completed
Blowing hose completed
Cargo tanks accepted
Hose disconnected
POB, EOSP, NOR Tendered (Landsort)
1. Line Södertälje Berth No. 6 stb. Side
All fast -------------------------------------------- - Pilot
Loading master onboard
Safety Check.Cargohandling
Hose connected
Sodertajle Discharging Voy.:
Port: 26-15
Date Time LMT
20.11.2015 0001
1140 1240
1155 1255
1205 1305
1210 1310
1250 1350
1305 1405
1330 1430
1350 1450
1410 1510
1430 1530
1445 1545
1500 1600
1500 1600
2110 2210
2145 2245
2230 2330
2301 0001
2330 0030
2335 0035
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
POB
Departure with pilot
Sampling first foot
Resumed loading
Completed loading Rate-314mt/h
Ullage /Temp /Cargocalculation
Hose disconected
Doc on board Df-4,35m Da- 4,56m
Surveyor on board
Tanks accepted
Papers
Hose connected
Commenced loading
First foot Loaded, Loading stopped
Eos + NOR ( Safe waiting distance from Klaipeda Rds avv VTS:)
Passing BRk. Water
+ Pilot
1. Line Klaipeda Berth Nr. 4
All fast --------------------------- - Pilot
Customs, Agent
Klaipeda loading Voy.:
Port: 26-15
Date Time LMT
21.11.2015 2225
22.11.2015 0205-0215
0905
0915
0950
1020
1030
1040
1805
1815
1825
1825
1845
2330
23.11.2015 0600
0610
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced washing
Complete tankwashing
+ Pilot
Departure with pilot - and without boatman.
Safety check.Cargohandling
Commenced loading
Completed discharging Rate-282mt/h
Line blown
Hose disconnected
Doc on board
POB / EOSP / NOR
Södertälje sluss - pilot change
1. Line Köping oliepier no. 30
All fast ----------------------------- stb side, - Pilot
Ullage /Temp /Cargocalculation
Hose connected
Køping Voy.:
Port: 27-14
Date Time LMT
27.11.2015 0335
0500
0505
0515
0520
0535
0540
0615
0645
0900
0945
0955
1015
1030
1050
1240
1245
1440
28.11.2015 0835
0855
0905
0930
0950
1040
1105
1215
1310
1330
1345
1350
1600
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Rotterdam - Loading Voy.:
POB / EOSP / NOR ( Maas pilot )
1. Line Maasvlakte " Loaders Key "
All fast --------------------------------- - Pilot
Before cargo ooperation meeting held.Surveyor on board
Loading master onboard
Tanks accepted
Papers
Hose connected
Commenced loading Crokvitol ( Eres 10 )
Completed loading Rate-150mt/h
Sampling
Line blown
Ullage / Temp /Cargocalculation
Hose disconnected
Doc on board Df- 3,00m Da- 4,27m
POB
Shifting to waiting berth KW 640
All fast --------------------------------- - Pilot
Shifting with pilot
1. Line Vopak 626 - stb side
All fast --------------------------------- - Pilot
Surveyor on board
Tanks accepted
Safety Check.Cargohandling
Hose connected
Commenced loading SFO
Completed loading SFO / Commenced blowing hose
Completed blowing hose
Calculations / Papers completed
Hose disconnected
Departure with pilot
Port: 27-15
Date Time LMT
30.11.2015 1915
2005
2010
0820
0840
0920-1040
1040
1440
1500
1510
1615
1620
1630
1635
1700
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Helsingborg-Discharging Voy.:
EOS + POB + NOR ( Helsingborg Pilot )
1. Line Helsingborg 709
All fast -------------------- - Pilot
Hose connected
Safety check.Cargohandling
Steaming line due to block in a shore hose
Commenced discharging
Completed discharging crokvitol / commenced steaming average rate 96/h
completed steaming
commenced discharging SFO
completed discharging SFO / commenced blowing average rate 100/h
blowing completed
hose disconnected
papers completed
Departure Helsingborg - without pilot + boatman
Port: 28-15
Date Time LMT
02/03.12.2015 2305 0005
0010 0110
0015 0115
0100 0200
0110 0210
0130 0230
0200 0300
0230 0330
0230 0330
1425 1525
1430 1530
1450 1550
1455 1555
1710 1810
Parcel Molasses MGO MT
Ship's figure 2407,730 Arrival
Bill of Lading fig. 2409,600
Difference MT -1,870 Departure
Difference % -0,078
Klaipeda _ Loading Voy.:
POB /EOSP /NOR
1. Line Klaipeda Berth nr. 140 stb side
All fast -------------------------------------------- - Pilot
Before cargo ops meeting held
Foreman on board / ship shore safety checklist
Surveyor onboard / Hose connected
Tanks inspection
Calculations completed
Commenced loading
Loading completed
Surveyor on board
Calculations completed
Hose disconnected
Departure with pilot
fwd - 4,6 aft - 5,08 average rate 220
Port: 28-15
Date Time LMT
04.12.2015 2215 2315
05.12.2015 0735 0835
0850 0950
0900 1000
0920 1020
0940 1040
0950 1050
1020 1120
2100 2200
2115 2215
2120 2220
07.12.2015 0600 0700
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Kantvik discharging Voy.:
EOSP .Adrift off Kantvik pilot boarding place. Pilot suspended due to bad weather
POB + NOR
1. Line Kantvik North Quay. Stb side
All fast ----------- - Pilot
Safety check .Cargohandling
Hose connected
Ullage /temp.Cargocalculation
Commenced discharging
Completed discharge Rate - 220mt/h
Line steamed
Hose disconnected
Departed Kantvik + Pilot and boatman
Port: 29-15
Date Time LMT
09.12.2015 1300
1325
1335
1335
1340
1400
1500
1510
1515
10.12.2015 1910
1915
1945
2010
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Malmø- Loading Voy.:
EOSP + NOR ( Malmø Red Fairway Buoy )
1 Line Olie hamnen 1010 stb side
All fast -------------------------------------
Before caego operation meeting held
Safety checklist completed
Cargo tanks accepted
Calculations completed
Hose connected
commenced cargo ops
Completed loading Rate- 86mt/h
Hose disconnected
Draft survey Df- 4,58m Da-4,91m
Doc on board
Port: 29-15
Date Time LMT
12.12.2015 1230
1255
1730
1740
1750
1805
1810
1815
1840
14.12.2015 0700
0710
0720
0730
0740
0830
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Stockholm- Discharging Voy.:
NOR + EOSP
POB
FLA
All Fast - alongside disch. Berth no. 650 - Stockholm
DOP
Draft survey.Before cargo operation meeting held
Cargohandling.Safety check
Hose connected
Commenced discharge
Completed discharging Rate- 68mt/h
Line steamed
Hose disconnected
Tank inspection.
Draft survey.Doc on board
POB
Port: 30-15
Date Time LMT
15.12.2015 0500 0600
0540 0640
0610 0710
0630 0730
0715 0815
0800 0900 Tankinspection.Tanks accepted
0900 1000
0910 1010
0915 1015
17.12.2015 1420 1520
1500 1600
1620 1720
1800 1900
Parcel H.O. SFO MGO MT
Ship's figure 1010,282 Arrival
Bill of Lading fig. 1012,313 17,98
Difference MT 2,031 Departure
Difference % 0,201
Liepaja-Loading Voy.:
EOSP / NOR - Tendered
POB
FLA
All Fast - load. Berth no. 60 - Liepaja / NOR - Received by agent - only.
Hose connected
Draft survey.
Safety check/Cargohandling
Commenced loading
Loading Completed
Hose disconnected Rate-20mt/h
Draft survey. Fwd 3,72 Aft 4,61
Cargo doc´s onboard
Port: 30-14
Date Time LMT
19.12.2015 1400
1510
1515
1520
1530
2000-2100
20.12.2015 0700
0830
0840
0845
1810
1815
1820
1830-1910
1900
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Holmsund - Discharging Voy.:
POB/EOSP/NOR - Tendered
FLA
All fast alongside disch. Berth no. 2 - North Quay - Holmsund
DOP
NOR - accepted
Draft survey
Before cargo operation meeeting held
Hose connected
Safety check.Cargohandling
Commenced discharge
Completed discharge Df-3,44m Da- 4,43m
Line steamed
Hose disconnected Rate- 110 mt /h
Draft survey
POB
Port: 31-14
Date Time LMT
23.12.2015 0630 0730
0720 0820
0730 0830
0740 0840
0745 0845
0915 1015
0935 1035
1020 1120
1050 1150
2030 2130
2035 2135
2115 2215
2230 2330
2255 2355
1000 1100
1015 1115
1020 1120
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Klaiprda - Loading. Voy.:
EOSP / NOR - Tendered
POB
First line ashore
All Fast berth no. 4 - Klaipeda
DOP
Surveyor on booard.Tank inspection.Tanks passed
Safety check.Cargohandling
Hose connected
Commenced loading
Completed loading Ave. Rate: 249 MT7hr
Hose drained inti ship
Hose disconnected
Ullages and calculations
Documents onboard
Pilot onboard
Departure Klaipeda Da.: 5.0m Df.: 4.5 m
Hrbr. Plt. Left
Port: 31-15
Date Time LMT
25.12.2015 1430
26.12.2015 1135
1155
1515
1525
1530
1545
1545-1700
1605
1725
27.12.2015 0405
0405-0415
0420
0425
0450
0605
0615
0935
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Szczecin Discharging Voy.:
Dropped anchor Swienujcie No. 1A, EOSP. NOR
Weighed anchor
+ Pilot
FLA
All Fast alongside Fosfatowe-Dalby Pier - Szczecin
DOP
Safety checks
Surveyor onboard: Ullages, sampling, calculations
Hose connected
Commenced discharging
Completed discharging
Blowing the line Avg disch rate 225mt/hr
Tank empty certificate signed.
Hose disconnected
Commenced tank cleaning
POB
Departure Szczecin Da.: 4.3m Df.: 2.3m
- Pilot
Port: 32-15
Date Time LMT
27.12.2015 2200 2200
28.12.2015 0440
0500
1005
1015
1025
1030
1105
1125
1130
2155
2200
2205
2245
29.12.2015 0750
0800
0810
1010 + Pilot, Skellerev
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Nykøbing F Loading Voy.:
Hose blown
Dropped anchor of Hestehoved, EOSP
Anchor aweigh
POB
1. line
All fast
Safety checks
Hose connected
Final draft survey completed
Documents onboard
Pilot onboard
Departure Nykøbing
Tanks accepted
Hose connected
Initial draft survey completed
Commenced loading
Completed loading (to marks)
Port: 32-15
Date Time LMT
29.12.2015 1900
1940
1950
2015
2030
2030
2045
2200
2235
30.12.2015 2045
2100
2110
2130
2200
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Grenå Discharging Voy.:
EOS + NOR
1. Line Århus 313
All fast -------------- + Boatman
Safety check.Cargohandling
Ullages and calculations
Hose connected
Commenced discharging
Ship's stop (work on generators)
Completed discharging
Hose and shoreline steamed
Hose disconnected
Tanks inspected
Resumed disch.
Departure Grenå
Port: 33-15
Date Time LMT
02.01.2016 0115
0255
0305
0315
0330-0420
0830-0900
0905
0915
1150
1220
1230-1240
1255
1325
1325-1340
1400
1420
1535
1535-1550
1645
1550-1720
1755
1850
2030
2045
2105
2120
2130
2200
2225
2315
2340
2340
03.01.2016 00:40
0340
0340-0400
0410
0430-
0550-0610
Rotterdam Loading Voy.:
POB, EOSP, NOR
1. Line
All Fast alongside IOI Maasvlakte 8228
DOP
Safety checks.
Surveyor onboard, tank inspection
Hose connected
Commenced loading PKO, Tks. 2S+6P
Completed 1. parcel Rate 120 MT/hr
Lines blown
Hose changed for next pcl.: PO
Commenced loading PO, Tks. 2P+6S
Completed 2. parcel Avg Rate 449 MT/hr
Blowing the shore line
Hose changed for next pcl.: POS
Commenced loadin POS, Tks. 5 P/S
Completed 3. parcel Avg Rate 200 MT/hr
Blowing the shore line
Hose disconnected
Ullages and cargo calculation
Documents on board
+ Pilot, departure IOI Terminal
1. Line Vopak 634
All Fast - Pilot
Safety checks.
Hose connected
Tank inspection (1P)
Hose changed. Rotation altered by surveyor
Commenced loading SFO-parcel (1P)
Completed SFO Pcl.
Lines blown
Syrveyor onboard. Ullages and cargo calculation.
Rechecked ullages in all ship's cargo tanks due to cargo shortage for 5th parcel
Hose change
Commenced 5th. Pcl. Crockvitol 4P/S
Completed loading Avg rate: 69MT/hr including blowing
Blowing the shore line
Hose disconnected
0705
0900
0905
Papers onboard
Pilot omboard Da.: 4.3m Df.: 3.3m
Departure Rotterdam
Pilot disembarked
Port: 33-15
Date Time LMT
05.01.2016 1730
1755
1840
1845
1900
06.01.2016 0700
0745
0755
0810
0920
0925
0930
0935
1200
1200-1210
1210-1220
1230
1450
1450-1500
1500-1505
1505
1740
1740-1745
1745-1755
1800
2030
2035
2050
2055
2100
2120
07.01.2016 0200
Helsingborg Discharging Voy.:
EOSP, NOR
POB
1. line Helsingborg 709
All fast
Safety checks
Cargo meeting
Samples and ulages
Hose connected
Commenced discharging SFO
Completed SFO-pcl. Rate: 86 MT/hr
Hose blown
Shore connection changed
Commenced discharging POS-pcl.
Completed POS-parcel Rate105 MT/hr
Blowing the line
Steaming the shore line
Commenced PO-parcel
Completed PO-parcel Rate 96 MT/hr
Blowing the line
Steaming the shore line
Commenced discharging PKO-pcl.
Completed PKO-parcel Rate98 MT/hr
Blowing the line
Steaming the shore line
Commenced discharging Crockvitol-pcl.
Completed discharging last parces Rate: 95 MT/hr
Hose blown
Shore line steamed
Hose disconnected
Tanks accepted
Commenced tank cleaning
Departure Helsingborg. Without pilot and with boatman.
Port: 34-15
Date Time LMT
07.01.2016 2130
2145
2200
2220
0645
0640
0650
0750
1525
1530-1540
1540-1620
1605
1710
1730
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn Loading Voy.:
EOS + NOR ( Karlshamn Brk Water )
1. Line Karlshamn "Soya-kajen" stb side
All fast ------------------------------------------------
Gangway rigged and safety checks
NOR recieved
Tank inspection
Hose connected
Commenced loading
Completed loading Avg Rate: 157Mt/hr
Blowing the shore line.
Ullages, samples and cargo calculation.
Hose disconnected.
Documents on board.
+Pilot, departure Karlshamn
Port: 34-15
Date Time LMT
09.01.2016 1020
1040
1055
1200
1220-1235
1235
10.01.2016 0240
0240-0245
0250
0300
0830
Helsingborg Discharging Voy.:
+ Pilot, EOSP, NOR
1. line Helsingborg 707 stb side
All fast ----------------------------------- - Pilot
Hose connected
Surveyer onboard, samples, ullages and cargo calculation.
Commenced disch Cr RSO
Completed disch Cr RSO Avg disch rate: 84t/hr
Blowing the line
Hose disconnected
Commenced tank cleaning
Departure Helsingborg
Port: 35-15
Date Time LMT
10.01.2016 1910
1945
1955
11.01.2016 0515
0535
0550
0600
0815
0815
0850
0900
1705
1710
1805
1820
1845
1900
1945
Loading Frederecia Voy.:
+Pilot, EOSP, NOR
1. line, Kaj 23, Oil Pier, Centerhavn
All fast --------------------------------- - Pilot
Surveyer onboard, safety checks, tanks inspection.
Tanks accepted
Hose connected
Commenced loading ASS I
Completed ASS I pcl. Rate: 153 MT/hr
Commenced ASS II (2S)
Completed ASS II Rate: 170 MT/hr
Commenced UAN-parcel
Completed UAN-parcel Rate: 167MT/hr
Resumed ASS II
Complteted ASS II Rate: 34,7MT/hr
Hose disconnected
Ullages and calculations Da.: 5.05m Df.: 3.85m
Documents onboard
+Pilot, departure Frederecia
Port: 35-15
Date Time LMT
12.01.2016 2110
13.01.2016 0050
0110
0625
0630
0650
0700
0650-0820
0900
1030
1035
1050
1850
1900
1905
2010
2340
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Szczecin Discharging Voy.:
EOS + Dropped anchor on Swinouijsce Road, 1A + NOR
Anchor aweigh
+ Pilot
1. Line "Fosfatowe" stb. Side
All fast --------------------------- - Pilot
Hose connected
Safety checks, cargo meeting
Ullages and sampling
Commenced discharging ASS (1P/S) 4.2 bar
Completed ASS-parcel Rate: 227 MT/hr
Hose blown, lining up for next parcel.
Commenced UAN-parsel
Completed UAN pcl. Rate: 190 MT/hr
Hose blown, lining up for next parcel.
Hose disconnected
+ Pilot, departure Szczecin Da: 4.1m Df: 2.7m
- Pilot, Swinouijcie Rd.
Port: 36-15
Date Time LMT
15.01.2016 0700 0800
0750 0850
0810 0910
0815 0915
0845 0945
0855-0910 0955-1010
0930 1030
0930 1030
0935 1035
1000 1100
1100 1200
2030 2130
2040 2140
2100 2200
2115 2215
2155 2255
2250 2350
2315 0015
2335 0035
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Ventspils Loading Voy.:
EOSP & NOR, Ventspils Plt.station
POB, Brk. Water
1. Line Ventspils berth .nr. 34 . Stb side
All fast -------------------------------------------- - Pilot
Safety checks
Purging of lines and tanks with N2
Tank inspection
Loading hose connected
Commenced loading
Shore stop for 1 foot samples and analyzies
Resumed loading. Quoted rate: 250 cbm/hr ~ 217 MT/hr
Completed loading, Shore stop Average rate: 189 MT/hr
Hose blown
Hose disconnected
Calculations completed
Documents onboard
+Pilot, departure Ventspils
- Pilot
Ullages and sampling Da.: 4.95m Df.: 3.90m
Port: 36-15
Date Time LMT
16.01.2016 1235
1555
1605
1620
1620-1640
1630-1720
1630
1730
17.01.2016 0200
0200-0205
0215
0215
0420
0630
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Södertälje Discharging Voy.:
EOS + >POB + NOR ( landsort pilot.)
1. Line Södertälje Berth nr. 6
All fast ------------------------------ - Pilot
Loading Master on board and surveyer
Safety checks
Sampling and ullages, cargo calculation.
Hose conneceted
Commenced discharging RME
Completed disch Avg disch rate: 211mt/hr
Blowing the line. F 2,00 A 4,30
Empty tank certificate signed
Hose disconnected
Departure + Pilot
- Pilot, Landsort
Port: 37-15
Date Time LMT
18,01,2016 0715 0815
0730 0830
0755 0855
0815 0915
0815 0915
0835-0930 0935-1030
0930-0935 1030-1035
1000 1100
1000-1015 1100-1115
1015 1115
1030 1130
1040 1140
1045 1145
1830 1930
1950 2050
2020 2120
2010 2110
2045 2145
2125 2225
2150 2250
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Klaipeda Loading Voy.:
L/B Nr. 1 + EOS + NOR
POB inside Brk. Water
1. Line Berth nr. 6
All fast ------------- - Pilot
Gangway rigged
Tank inspection
Safety checks and cargo handling
Hose connected
Filling shore line
Commenced loading: 2P & 5S for foot samples
Shore stop
Foot samples final tank acceptance
Resumed loading,
Completed loading Ave. Rate: 242 MT/hr
Ullages and samples
Calculations completed Da.: 4.6m Df. 4.45m
Hose disconnected
Papers onboard
+ Pilot, departure Klaipeda
- Pilot
Port: 37-15
Date Time LMT
20.01.2016 1410
1510
1515
1520-1535
1520-1600
1530
1605
21.01.2016 00:54
0054-0100
0105
0110
0130
0830-0855
24.01.2016 1505
Rødbyhavn Discharging Voy.:
+ Pilot, EOSP, NOR
1. Line Rødbyhavn
All fast ------------ - Pilot
Safety checks
Sampling, ullages and cargo calculation
Hose connceted
Commenced disch
Completed disch UAN Avg disch rate: 234 mt/hr
Blowing the line
Hose disconnected
Empty tank certificate
Commenced tanl cleaning
Shifting Da.: 4.1m Df.: 2.9m
Departure without pilot and boatman.
Port: 38-15/16
Date Time LMT
26.01.2016 1015
27.01.2016 2350
28,01,2016 0001
0055
0135
0140
0150-0210
0150-0225
0245
0330
0435
0435-0455
0510
0525
0710
0710-0730
0745
0800
1045
1045-1115
1120
1110-1130
1305
1455
1500
1655
1705
1715-1730
1715-1730
1815
1830
1950
1950-2015
2020
2030
2115
2240
2310
Shifting with pilot
1. Line Vopak 634 stb side.
Commenced loading POS
Completed loading Rate- 188mt/hr
Blowing the shore line
Hose disconnected
Ullage/Temp/Cargocalculation
Doc on board
Rotterdam Loading Voy.:
E.O.S.P. / Dropped anchor Maas 4 E
Anchor up.
Tender NOR
POB inside Brk. Water
1, line Maasvlakte Loaders Croklaan
All fast -------------------------------------- - Pilot
Tanks inspection. Tanks accepted.
Safety checks.
Hose connected
Commenced loading PO parcel
Completed loading PO parcel Avg Rate 187mt/hr
Blowing the shore line
Change of cargo hose
Commenced loading Crockvitol parcel
Completed loading. Rate- 246mt/hr
Blowing the shore line
Change of cargo hose
Commenced loading Rbd .PKO
Completed loading Rate- 92mt/hr
Blowing the shore line
Hose disconnected
Sampling/Ullages/Temp/Cargocalculation
Doc on board
+ Pilot
Dep IOI Maasvlakte
1. Line Koole Pernis Nr. 10 - stb. Side.
All fast -------------------------------------------- - Pilot
Tanks inspection. Tanks accepted.
Safety checks.
Hose connected
2325
2340
29.01.2016 0000
0015
0050
0130
0130-0155
0210
0200-0215
0310
0445
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
POB
Dep fm Vopak #634
Hose connected
Tank inspection.Tanks accepted
Commenced loading Cr SFO
Completed loading Cr SFO Avg rate: 92mt/hr incl blowing F2,70 A4,75
Blowing the shore line
Hose disconnected
Sampling/Ullages/Temp/Cargo calculation
Documents on board
All fast -------------------------------------- - Pilot
Safety check.Cargohandling
Port:
Date Time LMT
31.01.2016 0710
0735
0745
0750-0815
0815-0825
0830
0900
1000
1020
1035
1050
1330
1350
1400
1405
1510
1715
1730
1735
2020
2055
2105
01.02.2016 0200
0205 Commenced steaming shore line
0210 Ceased steaming due to ships boiler break down.
0440 Boiler repaired.Resumed steaming.
0450
0455
0500
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Helsingborg Discharging 38-15/16 Voy:
+ Pilot, EOSP, NOR
1st. Line Helsingborg 707
All fast ---------------------- - Pilot
Ullage /Temp / Cargocalculation
Safety check.Cargohandling
Hose connected-Red manifold
Commenced discharge Cr.SFO
Completed discharging Rate-100mt/h/ manifold pressure 6 bars
Line blown
Change shore hose to Yellow manifold
Commenced loading Rbd POS
Completed discharging Rbd POS Rate - 94mt/h/manifold pressure 6 bars
Completed blowing the line
Commenced discharging PO
Discharging stopped due to terminal installation problems
Resumed discharging
Completed discharging PO Rate 62mt/h/manifold pressure 6 bars
Commenced discharging PKO
Line steamed
Completed discharging Rate-91mt/hr manifold pressure 6 bars
Line steamed
Commenced discharging Crokvitol
Completed discharging Crckvitol Rate-88mt/h/manifold pressure 6 bars
Line steamed
Hose disconnected
Empty tank certificate
Difference MT Departure
Difference %
Port: 39-15/16
Date Time LMT
02.02.2016 0645
0700
0710
0730
0730
0730
0750
0800
0805
1750
1800
1805
1815
1825
1830
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn - Loading Voy.:
EOSP
1. Line Karlshamn - Soya kajen stb side
All fast ---------------------------------------------- + NOR
Safety check.Cargohandling
Tanks inspection
Tanks passed
NOR received
Hose connected
Commenced loading Cr.RSO
Completed loading Rate- 154 mt/hr
Line blown
Hose disconnected
Ullage / temp/ cargocalculation
Doc on board Df-3,35m Da-4,80m
POB
Port: 39-15/16
Date Time LMT
03.02.2015 1840 1840
1905
1910
04.02.2016 0630
0640-0650
0700
0705
2310
2320
2325
2335
2340
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Helsingborg - Discharging Voy.:
EOSP / POB / NOR Tendered ( Helsingborg Pilot )
1. Line Helsingborg Nr. 709 stb side
All fast --------------------------------------- - Pilot
Before cargo operation meeting held
Ullage/Temp/Cargocalculation
Hose connected
Commenced discharging Cr.RSO
Completed discharging Rate- 89mt/hr Manifold press. 6 bars
Line blown
Hose disconnected
Tank inspection
Doc on board
Port: 40-15
Date Time LMT
06.02.2016 0800 0900
0815 0915
0820 0920
0835 0935
0850 0950
0900 1000
0915 1015
0915-1000 1015-1100
1005 1105
1035 1135
1035-1110 1135-1210
1110 1210
1115 1215
1130 1230
2020 2120
2020-2140 2120-2230
2150 2250
2200 2300
2250 2340
2250 2350
2259 2359
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
POB
Departure from Klaipeda
DOP
Ceased loading.1st foot sampling
Resumed loading
Completed loading Rate- 273mt/Hr
Ullage /temp/Cargocalculation Df-4,55m Da-4,97m
Hose disconnected
Doc on board
Inward bound clearance
Surveyor on board.Tanks inspection.Tanks passed
Hose connected
Safety check.Cargohandling
Shore line filling up
Commenced loading UAN
EOSP / NOR - Tendered
POB
Pass. Breakwater
First line
All Fast alongside load. Berth no. 06 - Klaipeda
DOP
Klaipeda - Loading Voy.:
Port: 40-15
Date Time LMT
07.02-2016 2345
08.02-2016 0325
0335
0340
0345
0350
0400
0510
0515
0540
15:55
1615
1620
1630
1630
1725
1730
2035
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Tank inspection
Doc on board Df 2,3 - ; Da - 4,59
POB
Departure
DOP
Surveyor onboard / Safety checklist & Cargo handling
Ullage/Temp/Sampling/Cargo calculations
Hose connected
Commenced discharging
Discharging Completed Ave.Rate 240mt/h
Line blown
POB / EOSP / NOR - Tendered
First line ashore
All Fast alongside Fosfatowe Daly Pier - Szczecin
DOP / Gangway ashore / Agent onboard
NOR recieved as per C/P - by agent
Before cargo ops meeting held
Szczecin - Discharging Voy.:
Port: 41-14
Date Time LMT
10.02-2016 0655
0825
0840
0845
0845-0905
0915
0920
1555
1605
1610
1615
1630
16:45
17:00
Parcel CR RSO H.O. SFO MGO MT
Ship's figure 1250,930 704,914 Arrival
Bill of Lading fig. 1253,636 705,836
Difference MT 2,706 0,922 Departure
Difference % 0,216 0,131
Fredrikstad - Loading Voy.:
POB / EOSP / NOR - Tendered
First line ashore
All fast alongside load. Berth "DENOFA" - Fredrikstad.
Gangway shore / DOP
Surveyor on board.Tank inspection.Tanks passed.Safety check/Cargohandling
Hose connected
Commenced loading Cr.SBO
Loading completed Ave. rate 300mt/h
Finished blowing
Ullage /temp/Cargocalculation Df - 3,84m Da - 4,98m
Hose disconnected
Doc on board
POB
Departure from Fredikstad
Port: 41-15
Date Time LMT
12.02.2016 0700
0725
0730
0735
0740-0800
0810
0815
2120
2130
2140
2150
2200
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn - Discharging Voy.:
EOSP / NOR Tendered / POB.
FLA
All Fast alongside disch. Berth: "Soya Quay" - Karlshamn
Gangway ashore / DOP
Ullage /temp/Cargocalculation.Hose connected
Safety check
Commenced discharging Cr.SBO
Completed discharge Rate- 154 mt/hr
Line blown df-2,20m Da- 4,20m
Hose disconnected
Tanks inspection.Tanks empty
Doc. on board
Port: 42-14
Date Time LMT
13.02.2016 1530
1630
1640
1645
1710
1830
1950
14.02.2016 0120
1130
1140
1150
1215
1230
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced loading Molasses
Loading completed
Gdansk - Loading Voy.:
EOSP / POB / NOR - Tendered.
First line ashore
All Fast aslongside load. Berth "Chemikow" - Gdansk
Gangway ashore / DOP
Surveyor on board.Tank inspection.Tanks passed.Safety check/Cargohandling
Calculations completed
Hose connected
Finished blowing
Hose disconnected
Ullage /temp/Cargocalculation/Draft survey
Doc on board
Port: 42-15
Date Time LMT
18.02.2015 1620 1520
1850 1750
1900 1800
1910 1810
1915 1815
1920 1820
1935-2050 1835-1950
2025 1925
2040 1940
2125 2025
19.02.2016 1350 1250
1400 1300
1405 1305
1410 1310
1455 1355
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Grangemouth - Discharging Voy.:
POB / EOSP
Arr. Grangemouth locks
Dep. Grangemouth locks
First line ashore
All Fast alongside disch. Berth: "1 North Jetty" / N.O.R. - Tendered.
Gangway ashore / DOP
Draft survey.Sampling.Cargocalculation
Hose connected
Safety check.Cargohandling
Commenced discharging Molasses
Discharging Completed
Line blown
Surveyor on board / Tanks inspected
Hose disconnected
Draft survey / calculation completed Df-3,52 Da - 4,08
Port: 43-15
Date Time LMT
22.02.2016 0955
1120
1130
1135
1135
1155
1225
1300
1305
2015
2025
2030-2130
2140
2200
23.02.2016 1935
2000
2015
2020
2030
2045
2045
2100
2230
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Nakskov- Loading Voy.:
POB / EOSP / NOR-Tendered.
First line ashore
All Fast
DOP
Surveyor on board.
Tank inspection.Tanks passed.Safety check/Cargohandling
Calculations completed
Hose connected
Commenced loading Molasses
Ceased loading due to shifting 50 m backwards
Completed loading Average rate: 79 MT/hr
Line and hose plown
Ullages and calculations
Hose disconnected
Hose disconnected
Shifting
Hose connected
Resumed loading
- Pilot
Final draft survey
Papers onboard
+ Pilot
Departure Nakskov
Port: 43-15
Date Time LMT
24.02.2016 0730
0805
0820
0825
0900
0910
0825-0945
0920
0615
0625
0645
0730
0735
0745
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Åbenrå Dsicharging Voy.:
EOSP / NOR- Tendered
First line ashore
All fast alongside disch. Berth no. 9 - Aabenraa / NOR - recieved by agent.
Gangway ashore / Surveyor onboard.
Safety checks
Hose connected
Initial draft survey
Commenced discharging
Completed discharging Rate: 115 MT/hr
Line steamed
Hose disconnected
Final draft survey
Documents onboard Da.: 4.2 Df: 3.5m
Departure Åbenrå
Port: 44-15
Date Time LMT
25.02.2016 1420
1550
1610
1615
1650
1655
1755
1800
1240
1245
1255
1255
1315
1320
1330
EOSP, NOR,
First line
All Fast alongside load. Berth no. 8 - Nakskov.
Nakskov - Loading Voy.:
Surveyor on board.
Tank inspection.Tanks passed.Safety check/Cargohandling
Calculations completed
Hose connected
Commenced loading Molasses
Loading completed,
Blowing
Hose disconnected
Agent on board
Calculations completed
Papers on board
Dep. Nakskov
Port: 44-15
Date Time LMT
26.02.2016 2315
2350
2359
27.02.2016 0005
0520
0610
0625
0635
1440
1445
1450
1530
1545
1600
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Århus - Discharging Voy.:
EOSP, NOR
First Line ashore
All Fast alongside disch. Berth no. 124 - Aarhus
Gangway ashore. Hose connected
Surveyor on board
Safety checks
Commenced loading
Initial draft survey
Completed discharging Ave. rate: 300mt/h
Line steamed
Hose disconnected / Tanks inspected
Draft survey completed
Documents onboard Da.: 3,71 Df: 3,16
Departure Århus
Port: 45-14
Date Time LMT
29.02.2016 1740
2010
2155
2325
2340
2345
01.03.2016 0001
0010
0110
0140
0145
0150
0205
0210
0220
0245
0250
0300
0815
0835
0850
0930
0950
1145
1155
02.03.2016 0945
1000
1015
1025
1040 DOP
1030
1045
1050
1115
1455
1510
1535 - 1715
1720
Rotterdam - Loading Voy.:
NOR-tendered
Dropped anchor, Maas No 5, EOSP
Weighed anchor
Pilot onboard
Tanks accepted / Safety checklist
First line ashore
All Fast alongside load. Berth No. 8228 - IOI Maasvlakte.
Hose connected
Commenced loading PO
Loading stopped / Sampling first foot
Resumed loading PO
Completed loading PO Ave.Rate 360 mt/h
Completed blowing / Change of hose
Hose connected
Commenced loading Crockvitol
Loading stopped / Sampling first foot
Resumed loading Crockvitol
Completed loading Rate: 89 MT/hr
Shore line and hose blown
Hose disconnected
Ullages, samoples and calculations
Papers onboard
POB
Dep. 8228 IOI Maasvlakte
Commenced loading PKO (4P+6S)
Completed loading PKO Ave.Rate 82 mt/h
Completed blowing / Change of hose / Change of line
Waiting for terminal
All fast
Safety checks
Departure waiting berth 636
POB
1. line vopak 634
Hose connected
Tanks accepted
Hose connected
DOP
1855
2020
2035
2045
2220
2350
03.03.2016 0005
0130
Papers onboard
POB
Departure Vlaadingen Da.: 4.7m Df:3.2m
- Pilot
Commenced loading SFO
Completed loading Rate: 169 MT/hr
Shore line and hose blown
Hose disconnected
Port: 45-15
Date Time LMT
03.03.2016 2100
04.03.2016 0105
0245
0255
0300
0430
0435
0440
0450
0500
0755
0815
0820
0830
1020
1015
1035
Pass Weser 2 / Jade 3
POB / EOSP / NOR - Tendered.
First line ashore
Brake Loading Voy.:
All fast alongside load. Berth: Wilmar Brake
DOP
Surveyor on board
Tanks accepted
Safety checklist
Hose connected
Commenced loading POS
Completed loading Rate: 98 MT/hr
Shore line and hose blown and steamed
Hose disconnected
Ullages and calculations Da.: 4.6m Df.: 3.8m
Papers onboard
Pilot onboard
Departure Brake
- Pilot, Bremerhaven
Port: 45-15
Date Time LMT
05.03.2016 2020
2030
2040
2045
2050
06.03.2016 0745
0750
0800
0805
1055
1105
1110
1140
1650
1710
1735
1740
2055
2110
2130
00:45
01:00
01:15
0255
0310
0320
0325
0330
0415
0420
0900
Papers on board
Ship's lines steamed
Commenced tank cleaning
Departure Helsingborg
Steaming
Commenced discharging PO
Completed discharging PO Ave. Rate 90 mt/h
Steaming shore line and hose
Hose disconnected
Tanks inspected
Change of line
Commenced discharging Rsd. POS
Completed POC-parcel Rate: 92 MT/hr
Shore line and hose steamed
Commenced discharging PKO-parcel
Completed discharging PKO Ave. Rate 93 mt/h
Completed discharging Rate: 85 MT/hr
Blowing
Change of hose
Commenced discharging Crockvitol
Completed discharging Crockvitol Ave. Rate 97mt/h
Steaming
- Pilot
Hose connected
Safety checks
Gangway rigged, awaiting shore readyness
Ullages, samples and calculations
Commenced discharging SFO-parcel
EOSO, NOR, +Pilot
1. line 707
All fast
Helsingborg Discharging Voy.:
Port: 46-14
Date Time LMT
08.03-2016 0200
0200-0230
0300
0310
0330
0610
0630
0650
1555
1605
1610
1625
1645
1700
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn - Loading Voy.:
EOSP / NOR - Tendered
Vsl poceeding with reduced speed due to load. berth occupied by "Keybay"
First line ashore
All fast alongside load. berth: "Soya Quay" - Karlshamn
Hose connected
Safety checks, before loading meeting
Tanks accepted
Commenced loading Cr RSO
Loading completed
Blowing
Hose disconnected
Calculations
Docs onboard
Departure
Port: 46-15
Date Time LMT
09.03.2016 1010
1050
1100
1105
1105-1400
1400-
1415
1425
1430
1505
10.03.2016 0905
0910
0915
0920
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Helsingborg Discharging Voy.:
+ Pilot, EOSP, NOR
1. line Helsingborg 707
All fast
Gangway rigged, DOP
Heating cargo (5oC/24 hrs.) and awaiting instructions
Heating cargo (8C/24 hrs.)
Safety checklist
Ullages/Sampling/Calculations
Hose connected
Commenced discharging RSO
Completed discharging Rate: 78 MT/hr
Shore line and hose blown
Hose disconnected
Papers onboard
Departure Helsingborg Da.: 4.1m Df.: 2.8m
Port: 47-15
Date Time LMT
11.03.2016 22:20 23:20
12.03.2016 2250 2350
2300 2400
2340 0040
2355 0055
0005 0105
0010 0110
0045 0145
0105 0205
0120 0220
0120 0220
0845 0945
0930 1030
0950 1050
1000 1100
1100 1200
1130 1230
1130 1230 Departure Klaipeda
EOS +POB +NOR (L/B No1)
1. Line Berth No. 4 Stb. Side
All fast ----------------------------- - Pilot
Klaipeda / Loading Voy.:
SURVEYOR ON BOARD
LOADING MASTER ON BOARD
SHIP SHORE SAFETY MEETING
TANK INSPECTION
HOSE CONNECTED
COMM LOADING
FIRST FOOT
TANKS ACCEPTED FOR LOADING
Completed loading Rate: 274 MT/hr
Ullages and samples
Calculations
Hose disconnected
Papers onboard
Pilot onboard Da.: 5.2m Df.: 3.7m
Port: 47-15
Date Time LMT
13.03.2016 1915
1955
2005
2015
2045
2045
2055
14.03.2016 0540
0545
0550
0600
0615
0645
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Rødbyhavn Discharging Voy.:
+ Pilot, EOSP, NOR
1. Line Rødbyhavn
All fast ---------------- - Pilot
Safety checks
Samples and ullages and calculations
Hose connected
Commenced discharging
Completed discharging Rate 245 M/T/hr
Shore line and hose blown
tank inspection
Hose disconnected
Documents onboard
Departure Rødbyhavn without pilot and boatman
Port: 48-15
Date Time LMT
15.03.2016 1615 1715
1645 1745
1650 1750
1730 1835
1800 1900
1735 1835
1800 1900
1810 1910
1830 1930
1845 1945
16.03.2016 0400 0500
0440 0540
0450 0550
0510 0610
0600 0700
0615 0715
0620 0720 Departure Klaipeda
EOS +POB +NOR (L/B No1)
1. Line Berth No. 6 Port. Side
All fast ----------------------------- - Pilot
Klaipeda Loading Voy.:
Papers onboard
SURVEYOR ON BOARD
LOADING MASTER ON BOARD
TANK INSPECTION
SHIP SHORE SAFETY MEETING
HOSE CONNECTED
COMM LOADING
Pilot onboard Da.: 5,32m Df.: 4,37m
FIRST FOOT 1P & 6S, tanks accepted
Completed loading Rate 270 MT/hr
Ullages and samples
Calculations
Hose disconnected
Port: 48-15
Date Time LMT
18.03.2016 0145
0525
0535
0545
0550
0550
0600
0630
1720
1725
1725
1725-45
1905
+ POB + EOS + NOR (Fynshoved )
1. Line Fredericia nr. 23 stb side
All fast ----------------------------------- - Pilot
Fredericia - Discharging Voy.:
Safety checks
Hose connected
Safety checks
COMM DISCHARGING
Changed to center pump: Poor pumping by green pump.
COMPLETED DISCHARGING Rate: 231 MT/hr
SHORE LINE AND HOSE BLOWN
Hose disconnected
Shifting to bunkering berth nr. 25 - without boatman and pilot
Departure Frederecia Da.: 4.2m Df.: 3.1m
Port: 49-15
Date Time LMT
20.03.2016 0955 1055
2220 2320
2330 0030
21.03,2016 2355 0055
0000 0100
0010 0110
0020 0120
0020 0120
0100 0200
0100 0200
0150 0250
0200 0300
0215 0315
0220 0320
1205 1305
1255 1355
1310 1410
1330 1430
1400 1500
1435 1535
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Klaipeda Loading Voy.:
EOS + Anchor + NOR ( Dropped anchor Klaipeda anchorage Nr. 1 )
Anchor up
+ Pilot
1. Line Klaipeda nr. 4
All fast ------------------ - Pilot
Safety checks - Before Loading meeting
SURVEYOR ON BOARD
TANKS INSECTION
LOADING MASTER ON BOARD
SHIP SHORE MEETING
HOSE CONNECTED
COMM LOADING
TANKS ACCEPTED
FIRST FOOT
Completed loading Rate: 247 MT/hr
Ullages and samples
Calculations
Cargo hose disconnected
Documents on board
Departure with pilot and boatmen. Da.: 5.4m Df.: 4.3m
Port: 49-15
Date Time LMT
23.03.2016 0835
1150
1200
1205
1205
1215
1215
1220
1240
2315
2320
2330
2335
Completed discharging Rate: 236 MT/hr
Hose blown
Hose disconnected Da.: 4.1m Df.: 2.7m
Ullages and samples
Comm Discharging
Frederecia Discharging Voy.:
+ Pilot, EOSP, NOR ( Pilot Fyns Hoved.)
1. Line Fredericia Berth nr. 23 stb side
All fast ----------------------------------- - Pilot
Surveyor on board
Safety checks
Departure Frederecia without pilot and boatman.
Ship shore safety meeting
Hose connected
Port: 50-15
Date Time LMT
23.03.2016 1135
1220
1230
1235
1235
1240 Loading Master on board
1245
1245
1245
1250
1300
25.03.2016 0115
0125
0140
0155 Ullages , sampling completed
0210
0240
København Loading Voy.:
+ Pilot, EOSP, NOR
1. line Prøvestenen, 840
All fast ------------------------- - Pilot
Safety checks before loading
Surveyor on board
Hose connected
Tank inspection
Ship shore meeting
Tanks accepted
Comm Loading
Completed Discharging Drafts: F=4,8 , A=4,82 , Rate=202 Mt / hr
Blowing completed
Hose disconnected
Documents on board
Departure Prøvestenen, W/Pilot
Port: 50-15
Date Time LMT
25.03.2016 1905
26.03.2016 0510
0545-0600
0600
0830
0835
0840
0855
0855
0900
1825
1835
1845
1900
27.03.2016 0635 DST
, 0830
Nykøbing F Discharging Voy.:
EOS + Anchor "Skellerev" + NOR
Pilot onboard - awaiting daylight and good visability
Heave anchor
Departure from "Skellerev" with pilot.
1. Line Nordkajen Nykøbing Falster
All fast -------------------------------------- - Pilot
Safety checks
Ullages and calculations
Hose connected
Commenced discharging
Completed loading Rate: 258 MT/hr
Hose blown
Hose disconnected
Documents onboard
+ Pilot, departure Nyøbing F Da.: 4.2m Df.: 2.8m
- Pilot, Skellerev
Port: 51-15
Date Time LMT
27.03.2016 1550
1645
1655
1700
1705
1705
1710
1710 Tanks inspection
1710 Ship-shore safety meeting
1715 Comm loading
28.03.2016 0355
0400
0410
0435
0510
0530
ullages and calculations
documents on board
Departure + pilot + boatman
Surveyour onboard
Safety checks before loading
Hose connected
Completed Loading Drafts: F=4,4 A=4,49 Rate=200mt/hr
Hose blowing
Hose disconnected
EOS ( Passerer Drogden )
1. Line Prøvestenen 840, NOR
All fast --------------------- stb side al.
Loadin Master on board
København - Loading Voy.:
Port: 51-15
Date Time LMT
28.03.2016 1545
1625
1635
1640
1645
1650
1655
00:45
00:50
00:55
0115
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced discharging Drafts: F=2,6 A=4,2
Completed discharging - Discharge rate 274 mt/hour
Hose blown
Hose disconnected
Departure without pilot and boatman.
EOS + POB + NOR
1. Line N. Berth Rødbyhavn
All fast ------------------------- - Pilot
Safety checks
Ullages and calculations
Hose connected
Rødbyhavn Discharging Voy.:
Port: 52-15
Date Time LMT
29.03.2016 1120
1220
1230
12:35
12:35
12:35
1240
1245 Tanks inspection
1245 Ship-shore safety meeting
1250 Comm loading
0705
0710
0720
0735 Ullages and calculation Da.: 4.9m Df.: 4.7m
0745
0750
Papers onboard
+ Pilot, deparure København
- Pilot
1. Line Prøvestenen 840 stb side + NOR
All fast ------------------------------
Loadin Master on board
Surveyor on board
Hose emtied by gravity
Hose disconnected
København Loading Voy.:
Completed loading Ave. Rate: 135 MT/hr
Safety checks before loading
Hose connected
EOS - Passerer Drogden
Port: 52-15
Date Time LMT
30.03.2016 1845
2250
2300
2305
2320
2320
2330
31.03.2016 0750
0800
0805
0810
0815
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced discharging
Completed discharging Rate-298mt/h.Tanks inspection
Line blown
Doc on board
Hose disconnected
Departure Fredericia without pilot and boat man
+ Pilot. Off Røsnæs + EOS
1. line Pier 28, NOR
All fast ---------------- -Pilot
Safety checks
Ullages and calculations
Hose connected
Frederecia Discharging Voy.:
Port: 53-14
Date Time LMT
31.03.2016 1915
1955
2000
2020
2030
2040
1710
1720
1725
1735
1800
1825
1830
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Dep København - Prøvetstenen
Completed Loadig Drafts: F=4,7 A=4,95 Av rate =123Mt
Hose disconnected
Ullages and samples
Cargocalculation
Doc on board
POB
EOSP ( Middelground )
1. Line Prøvestenen 840 + NOR
All fast ------------------------------
Hose connected
Safety check.Cargohandling
Commenced loading UAN
København (Prøvestenen) Loading Voy.:
Port: 53-15
Date Time LMT
02.04.2016 0705
1300
1310
1315
1320
1320-1425
1425-1500
1510
2255
2300
2310
2315
2325
03.04 0630
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced washing
Departure with pilot.
Ullages and samples
Commenced discharging
Completed discharge Rate- 327 mt/h
Line blown
Hose disconnected
Tanks inspection
POB.EOSP, NOR ( GREATBELT South.)
1. Line Stb side al.
All fast --------------- - 2 pilots
Safety check
+ Hose
Awaiting surveyer before bstart discharge
Nykobing F. Voy.:
Port: 54-15
Date Time LMT
04.04.2016 0555
0600
0610
0610-0650
0630
0645
0705
1425
1435
1450
1500
1500
1515
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Departure with pilot and boatman
Commenced loading Cr.RSO
Completed loading Drafts: F=3,2 A=4,96 Avg rate=144 mt/h
Hose blowing
Hose disconnected
Ullages and samples
Documents on board
1. Line Karlshamn Soya kaj
All fast --------------------------- + NOR
Before cargo operation meeting held
Surveyor on board.Tank inspection.Tanks accepted
Hose connected
Safety check.Cargohandling
Karlshamn Voy.:
Port: 54-15
Date Time LMT
05.04.2016 0630
0655
0700
0715
0720
0715-0730
0730
2010
2015
2025
2040
2100
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced discharging Cr.RSO
Completed discharging Rate- 95mt/hr
Line blown
Hose disconnected Df-2,20m Da- 4,2m
Commenced tank wash
Dep.Helsingborg
+ Pilot, EOSP, NOR
First Line
All Fast alongside disch. Berth 709
Safety checks
Hose connected
Samples and ullages
Helsingborg Discharging Voy.:
Port: 55-15
Date Time LMT
06.04.2016 1340
1545
1550
1600
1610
1610
1620
1640
07.04.2016 0700
0720
0730
0800
0830 POB
Tanks accepted
Comm loading
Completed loading UAN Rate-178mt/hr
Ullage/temp/cargocalculation
Hose disconnected Df-4,75m Da5,00m
Doc on board
PILOT, EOSP , NOR
1 Line Lübeck Lagerhaus 2, stb side
All fast ------------------------------------- - Pilot
Surveyor on board.Tank inspection.Tanks accepted
Hose connected
Safety check.Cargohandling
Lubeck Loading Voy.:
Port: 55-16
Date Time LMT
07.04.2016 2115
08.04.2016 0045
0055
0100
0110
0115 hose connected
0120
0120-0135
0140
1000
1005
1010
1000-1010
1015
1020
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Doc on board
Dep.Fredericia
comm discharging
Completed discharging Rate- 306mt/hr
Line blown
Hose disconnected Df-2,20m Da- 4,10m
Tankinspection
+ Pilot / EOSP ( Pilot Fynshoved )
1. line Fredericia Pier 23 stb side
All fast / NOR - tendered
Surveyor on board
calculations
ullages and samples
Fredericia Discharging Voy.:
Safety checks
Port: 56-15
Date Time LMT
09.04.2015 0725
0745
0750
0810
0815
0820
0840
1940
1950
2000
2010
2015
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced loading Fish Solubles
Completed loading Rate-169mt/hr
Hose disconnected df-395m da-4,47m
Ullage.Temp.Cargocalculation
Doc on board
Departure Nexø without pilot and boatmen
EOSP - Brk. Water Nexø
1. Line PRO FISH Nexø
All fast -------------------- + NOR
Safety check.Cargohandling
Hose connected
Tankinspection.Tanks accepted
Nexø Loading Voy.:
Port: 56-15
Date Time LMT
11.04.2016 1125
1500
1555
1600
1615
1620
1625
1630
12.04.2016 0500
0510
0520
0520
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
All Fast alongside disch. Port side. / N.O.R. - Tendered.
Tankinspection
Safety check
Ullage temp. Cargocalculation
Commenced discharging
Completed discharging Drafts: F=2,7m , A=4,32m Rate- 150 MT / hr
Line blown
Hose disconnected
Hose connected
EOSP + Dropped anchor off. Hvidesande awaiting HW
Anchor up
First Line Industrikaj N.
Hvidesande Discharging Voy.:
Port: 57-15
Date Time LMT
13.04.2016 2220
14.04.2016 0345
0400
0420
0605
0615
0620
0630
0630-0650
0650
0655
1940
1940-2010
2000
2100
2140
2200
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Completed loading Rate- 165mt/hr
Ullage/Temp/Cargocalculation
Hose disconnected Df-4,41m Da- 4,48m
Doc on board
POB
Dep. From Lübeck
All fast alongside load. Berth - Lübeck
DOP
Hose connected
Surveyor on board.Tanks inspection.Tanks accepted
Safety check.Cargohandling
Commenced loading UAN
Anchor dropped Off. Travemünde roads / EOSP / NOR - Tendered.
Anchor aweigh
POB
Pass. Breakwater
First line ashore
Lubeck Loading Voy.:
Port: 57-14
Date Time LMT
15.04.2016 0455
0530
0550
0550-0615
0605
0620
0620
0635
17:50
18:00
1810
1815
1900
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Dep. Rodbyhavn
Sampling
Commenced discharging UAN
Completed discharging Drafts: F=2,3 A=4,25 Av Rate=188 Mt/hr
Line blown
Hose disconnected
Tankinspection.Tanks accepted
POB / EOSP / NOR - Tendered.
First Line
All Fast - alongside disch. Berth No. 5 - Roedbyhavn
Ullage Cargocalculation
Hose connected
Safety check.Cargohandling
Roedbyhavn Discharging Voy.:
Port: 58-14
Date Time LMT
16.04.2016 0930
0950
1000
1010
1015
1040
1945
1950
2000
2030
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Completed loading Rate- 170 mt/hr Fa -4,20m
Hose disconnectede
Ullage cargocalculation
Dep.Nexo
EOSP / Pass. Breakwater / NOR - Tendered
First line ashore
All Fast alongside load. Berth - Nexoe
Safety check.Cargohandling
Hose connected
Commenced loading Fish Solubles
Nexoe - Loading Voy.:
Port: 58-14
Date Time LMT
17.04.2016 1850
1920
1930
1950
1955
2000
0710
0715
0720
0730
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Completed discharging Rate 140 mt/hr Press.-4,2 bar
Line blown
Hose disconnected
Tankinspection.
EOSP / NOR
First line ashore
All fast alongside disch. Berth no. 10 - Aabenraa
Ullage.Cargocalculation.Hose connected
Safety check.Cargohandling
Commenced discgarging Fish Solubles
AAbenraa - Discharging Voy.:
Port: 59-15
Date Time LMT
23.04 - 2016 1515
25.04 - 2016 0001
1510
1550
1605
1610
1620 Safety checks with Shore
1640
1725 Initial draf survey
1800 Hoses connected
1840 Commenced loading Molasses
27.04.2016 0610
0615-0700
0620
0750
0800
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
First Line ashore
All Fast - Alongside load. Berth No. 1010 - Malmoe oil harbour
Surveyor on board
Tanks accepted
Loading Completed Rate- 68mt/hr
Draft Survey / Sampling
Hose disconnected Df- 4,45m Da-5,05m
Doc on board
Departure
Anchor dropped at anchorage area - Off Malmoe roads / EOSP
N.O.R. - Tendered
Anchor aweigh
Loading Malmoe Voy.:
Port: 59-15
Date Time LMT
28.04.2016 2320
29.04.2016 0335
0350
0410
0420
0425
0450
0500
30.04.2016 1225
1240
1245
1250-1330
1355
1945
2000
2340
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Docs on board
Tank cleaning / Ballasting
POB
Dep. From Stockholm
DOP
Draft survey
Commenced cargo ops
Discharging Completed Rate- 77mt/hr
Finished steaming
Hose disconnected / Tanks inspected
Draft survey
P.O.B. / E.O.S.P. / N.O.R. - tendered
First Line
All Fast alongside disch. berth No. 650 - (Frihamnen - Stockholm)
Before cargo ops meeting held
Safety checklist/ Cargo handling
Hose connected
Stockholm - Discharging Voy.:
Port: 60-15
Date Time LMT
02.05-2016 0730 Anchor dropped NE of Nexoe roads
0820 Anchor awaigh
0840
0840-0930 Avaiting berthing availability - due to congestion
0935 First Line
0950 All Fast alongside load. Berth: "FishPro - Nexoe
1000
1010
1020
1630
1645
1650
1655
1730
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Hose disconnected
Papers on board
Departure
Pass. Breakwater / EOSP / NOR - Tendered
Safety check.Cargohandling
Hose connected
Commenced loading Fish Solubles
Loading completed
Calculations/Ullage/temp
Nexoe - Loading Voy.:
Port: 60-15
Date Time LMT
04.05.2016 1045
1100
1115
1120
1125
1130
1135
17:55
18:00
1805
1810
1830
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Commenced discharging
Discharging Completed Ave. Rate 160
Blowing
Tank inspection / Hose disconnected
Docs onboard
Departure from Hvide Sande
Pass. Breakwater / EOSP / NOR - Tendered.
First line ashore
All Fast alongside disch. Berth no. 5-6 - Hvide Sande
Safety check.Cargohandling
Hose connected
Ullage/temp/cargocalculation
Hvide Sande - Discharging Voy.:
Port: 60-14
Date Time LMT
30.04.2015 2120
2150
2200
2220-2400
-"-
01.05.2015 0020
0030
0130
0650
0650-0700
0720
0725
0730-0830
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Bayonne - Discharging Voy.:
EOSP / POB / NOR Tendered.
1 Line Quai Europe'en
All fast ------------------ - Pilot
Initial draftsurvey - Ullage-Temp cargocalculations- Safetycheck-
- Sampling - Cargohandling.
Hardarm connected.
Commenced discharging.
Increased back pressure to 4,6bar
Completed discharge. / Rate 267 mt/hr - Backpressure 4,6 Bar.
Blowing lines.
Tankinspection
Hardarm disconnected.
Final draftsurvey.
Port: 61-14
Date Time LMT
05.05 - 2016 2000
06.05 - 2016
07.05 - 2016 0001
0705
0830
0855
0925 Arr. at the middle lock
0940 Dep. From Middle lock
1055 Anchors dropped for mooring....
1105 First line
1115 All Fast Amerika Haven - mooring buoy no. 6
1120 DOP
08.05 - 2016 0900
0930
1020
1040
1045
1050-1200
1230
1305
1330
2245
2250
2255
09.05.2016 0010
0030
0050
0100-0115
0115
0250
0310
0330
Anchor dropped at anchorage area no. 7 Ijmuiden Approach / EOSP
Vsl. At anchor - awaiting berthing instruction´s
NOR - Tendered.
Amsterdam - Loading Voy.:
Anchor aweigh
POB
POB
Anchors aweigh / Dep. Amerikahaven
First line
All fast alongside "Champion Tern"
Pass. Breakwater inbound
DOP
Initial draft survey
Cargohandling.Safety check
Hose connected
Commenced loading molasses
Completed loading Ave. Rate 269
Draft survey / ullages / sampling
Hose disconnected
Draft survey completed
Papers onboard
POB
Awaiting arr. Of linesmen
Dep. Amsterdam
DOP
Arr. South lock
De. South lock
Port: 61-15
Date Time LMT
10.05.2016 1700
1900
2155
2210
2215
2230
2215-2315
2300
2305
2315
11.05.2016 1330
1350
1415
1400
1420-1520
1540
1655
1705
1955
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Fiskaa - Discharging Voy.:
NOR - Tendered
POB / EOSP
First line ashore
All Fast alongside disch. Berth "Fiskaa Moelle"
DOP
Safety checks
Initial draft survey
Hose connected
NOR accepted
Commenced discharging Molasses
Completed discharging Ave. Rate 175mt/h
Completed blowing
Tank inspection
Hose disconnected
Draft survey / Calculations
Papers onboard
POB
Departure
- Pilot
Port: 62-15
Date Time LMT
13.05.2016 1110
1235
1245
1255
1305
1320
1330
1340
0840
0855
0910
0925
0940
0945
1150
Nakskov - Loading Voy.:
EOSP / NOR - Tendered
First line ashore
All Fast alongside load. Berth No. 8 - Nakskov
Before cargo ops meeteing held
Tanks accepted / Safety checklist
Initial draft survey
Hose connected
Commenced loading molassess
Completed laoding Rate: 128 MT/hr
Hose blown
Hose disconnected
Final draft survey, ullages and calculations Da.: 5.05m Df.: 4.5m
Papetrs onboard
+ Pilot, departure Nakskov
- Pilot
Port: 62-15
Date Time LMT
14.05.2016 2100
2135
2140
15.05.2016 0610
0615
0620
0525-0645
1605
1605-1615
1620
1625-1710
1715
1745
Århus - Discharging Voy.:
EOSO & NOR
1. line pier 124
All fast
Safety checks
Hose connected
Commenced discharging
Initial draft survey / Ullages / Temp/ Calculations
Discharging Completed Ave. Rate 249 mt/h
Steaming line
Hose disconnected
Draft survey / Calculations
Papers onboard
Departure
Port: 63-15
Date Time LMT
16.05.2016 1440
1450
1455
1505
1520
1525
1540
17.05.2016 0155
0210
0215
0220
0700
Nexø - Loading Voy.:
EOSP / NOR - tendered
Pass. Breakwater
First line ashore
All Fast alongside load. Berth "FishPro" - Nexoe
Safety checklist / Tanks accepted / NOR accepted
Hose connected
Commenced loading
Loading completed Ave. Rate 160mt/h
Ullage/Temp/calculations
Hose disconnected
Papers onboard
Departure Df- 3,85 Da- 4,35
Port: 64-14
Date Time LMT
18.05.2016 0615
0650
0700
0710
0720
0725
1655
1700
1700-1705
1710
1710
1725
19.05.2016 0030
0300
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Åbenrå - Discharge Voy.:
EOSP / NOR - Tendered
First line ashore
All fast alongside disch. Berth no. 10 - Aabenraa
Hose connected
Safety checks
Commenced discharging
Discharging completed Ave. Rate 170 mt/h
Line blown
Tank inspection
Hose disconnected
Papers onboard
Commenced washing
Washing completed
Departure Df - 3,45 Da - 4,2
Port: 64-15
Date Time LMT
19.05.2016 0825
0930
1020
1045
1055
1100
1105
1105-1120
1130
1140
1150
1910
1915
1920
1940
2000
2030
Kiel Loading Voy.:
Pass. Kiel L/h / EOSP / NOR - Tendered.
POB
Arr. Holtenau locks
Dep. Holtenau locks
First line ahore
All Fast alongside load. Berth "Bomin" - Kiel
DOP
Tank inspection
Safety checks
Hose connected
Commenced loading
Completed loading Rate: 273 MT/hr
Hose blown
Hose disconnected
Ulalges and calculations
Documents onboard
Departure Kiel
Port: 64-15
Date Time LMT
20.05.2016 1650
2010
2015
2025
2040
2050
2055
21.05.2016 0525
0535
0540
0545
0545
0700
Ålborg Discharging Voy.:
EOS + POB + NOR ( Limfjord pilot )
1 Line Ålborg 4124 stb side
All fast --------------------------- - Pilot
Safety checks
Hose connected
Ullages and calculations
Commenced discharging
Discharging completed Ave. Rate 240 mt/h
Line blown
Tank inspection
Hose disconnected
Papers onboard
Departure Df.: 2.3 Da.: 4.1
Port: 65-15
Date Time LMT
22.05.2016 0800
0815
0825
0835
0835
0845
0850
1720
1740
1745
1750
1825
EOS ( Nexø Brk. Water)
1 Line
All fast - Nexø Fish Pro + NOR
Nexø Loading Voy.:
Safety checks
Hose connected
Tanks accepted
Commenced loading
Loading completed Ave. Rate 165mt/h
Ullages and calculations Df-3,7 Da-4,38
Papers onboard
Hose disconnected
Departure without pilot
Port: 65-15
Date Time LMT
23.05.2016 1600
1605
1615
1620
1630
1635
1640
24.05.2016 0220
0225
0230
0235
0240
0300
Åbenrå Aproach Bouy + EOS
1. Line Åbenrå Pier 10 Stb side
All fast -------------------------------- + NOR + Boatman
Åbenrå Discharging Voy.:
Surveyor onboard
Ullage /temp/ calculations
Hose connected
Commenced disch.
Discharging completed Ave Rate 145mt/h
Blowing the line
Tank inspection
Hose disconnected
Papers onboard
Departure without boatmen and pilot. Df 3,3 Da 4,1
Port: 66-15
Date Time LMT
25.05.2016 1740 1840
1910 2010
1920 2020
1940 2040
1940 2040-2100
1950-2000 2050-2100
2000-2035 2100-2135
2035 2135
26.05.2016 0715 0815
0720 0820
0715-0745 0815-0845
0800 0900
0900 1000
0930 1030
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Klaipeda - Loading Voy.:
POB/EOSP/NOR-tendered
1. Line Klaipeda Berth 140 stb. Side
All fast ---------------------------------------- - Pilot
Hose connected
Tank inspection
Safety check.Cargohandling
Initial draft survey
Commenced loading Molasses
Completed loading Rate- 207 mt/hr
Line blown
Final draft survey Df- 3,84m Da-5,32m
Hose disconnected
Doc on board
POB
Port: 66-15
Date Time LMT
28.05.2016 0530
0610
0630
0640-0800
0700
0705
0705
1700
1720
1725
1735
1800
1820
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Falkenberg Discharging Voy.:
EOSP (Falkenberg Safe water bouy.)
1. Line Falkenberg stb. Side
All fast --------------------------- + NOR. + boatman
Initial survey draft
Hose connected
Safety check.Cargohandling
Commenced discharging
Steaming completed
Draft survey
Hose disconnected
Calculations completed / Papers onboard Df 3,54 Da 4,32
Departure - without pilot but with boatman
Dishcharging completed Ave. Rate 120 mt/h
Port: 66-15
Date Time LMT
29.05.2016 0010
1945
1955
2005
30.05.2016 0055
0120
0245
0350
0500
0520
0555
1120
1130
1140
1145
1150
1925
1930
1940
1945
1945-2030
31.05.2016 0030
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Lidköping - Discharge Voy.:
EOSP + NOR Anchor ( Rivö Fjord Anchorage Nr. 1 ) Waiting due to pilot strike
+ Pilot
Anchor up + Departure
Pilot change
Entering the lock
Leaving the lock + Pilot change
Entering the locks
Leaving the locks + Pilot change
Lock
Leaving lock
Pilot change
1 Line Lidköping
All fast ----------- - Pilot
Ullage/ temp/cargocalculation.Hose connected
Safety check.Cargohandling
Commenced discharging
Completed discharging Rate- 132 mt/hr
Line steamed
Tankinspection
Hose disconnected
Final draft Df - 3,08 Da - 3,82
POB + Departure + compulsary boatman
Port: 67-15
Date Time LMT
01.06.2016 1800
1805
1815
02.06.2016 0545
0630
0640
0645
0700
1625
1635
1650
1700
2000
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Karlshamn Loading Voy.:
Karlshamn Brk. Water - EOS
1. Line Karlshamn "Soya-Kaj" stb. Side
All fast -------------------------------------------- + NOR + Boatman
Surveyor on board.Tankinspection
Safety check cargohandling
Tanks accepted
Hose connected
Commenced loading Cr.RSO
Loading completed Ave. Rate 160mt/h
Hose disconnected
Ullage/temp/calculations
Papers on board
Departure Df - 4,69 Da - 3,65
Port: 67-15
Date Time LMT
03.06.2016 0945
1005
1010
1020
1030
1140
1150
2300
04.06.2016 0730
1515
1525
15:30
1600-2000
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Helsingborg Discharging Voy.:
EOS + POB
1. Line Helsingborg 707 stb side
All fast -------------------------------------- + NOR - Pilot
Safety check.Cargohandling
Ullage/Temp/Cargocalculation
Hose connected
Commenced discharging
Discharging ceased
Resumed discharging
Completed Discharging Avg Rate=75mt
Line blown
Hose disconnected
Tankwash completed
Port: 68-14
Date Time LMT
20.06-2016 06:00 07:00
07:35 08:35
07:45 08:45
07:50 08:50
0800 0900
0750-0805 0850-0905
0815 0915
0830 0930
1420 1520
1425 1525
1435 1535
1510 1610
1630-1710 1730-1810
1710 1810
1715 1815
1750 1850
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Uusikaupunki Loading / Voy. 68 Voy.:
P.O.B. / E.O.S.P. / N.O.R. - Tendered.
Fist line ashore
All Fast alongside load. Berth no. 2 - Uusikaupunki
D.O.P.
Safety check.Cargohandling
Tankinspection.Tanks passed
Hose connected
Commenced loading Cr.SBO
Completed loading Rate-250mt/hr, Drafts: F=3,6 , A=4,8
Line blown
Hose disconnected
Doc´s onboard
Awaiting pilot
POB
Departure
DOP
Port: 68/15
Date Time LMT
22.06-2016 0630 0730
0715 0815
0800 0900
0815 0915
0825 0925
0840 0940
0850-0930 0950-1030
0925 1025
0935 1035
2310 0010
2315 0015
2325 0025
2330 0030
Klaipeda - Discharging Voy.:
EOSP / NOR - Tendered
POB
First Line
All fast alongside disch. Berth no. 67 - Klaipeda
Gangway ashore / D.O.P.
Hose connected
Ullage /tenp/Cargocalculation/Sampling
Safety check.Cargohandling
Commenced discharging Cr.SBO
Completed discharge Avg Rate=110Mt/hr Drafts: F=2,3 A=4,5
Line blown
Hose disconnected
Tankinspection
Port: 69-15
Date Time LMT
24.06 - 2016 1140
1300
1310
13:20
13:30
13:50
13:55
25.06.2016 0140
0155
0200
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Nakskov - Loading Voy.:
EOSP / NOR - Tendered.
First line ashore
All fast alongside load. Berth no. 8 - Nakskov.
Draft Survey
Safety checks
Hose connected
Comm Loading
Completed Loading Avg Rate=204MT/hr Drafts: A=4,91 F=4,52
Line blown
Hose disconnected
Port: 65-15
Date Time LMT
28.06.2015 1455
1545
1555
1600
1615
1625
1630
26.06.2016 0135
0150
0220
0230
0240
0245
28.06.2016 1210
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Grenaa - Discharging Voy.:
EOSP / NOR - Tendered
Fist line ashore
All Fast alongside disch. Berth no. 35 - Grenaa
Safety checks
Hose connected
Calculations
Comm Dischargin
Completed Discharging Avg Rate=269 mt/hr
Line blown
Final draft survey - compl.
Empty tank cert . Issued / signed
Doc´s onboard
Comm. Tank cleaning…..
Dep. Grenaa
Port: 72-14
Date Time LMT
01.07.2015 1525
1550
1600
1600-1730
1730
1740
02.07.2015 0850
0850-0855
0900
0905
0915
0930
Parcel MGO MT
Ship's figure Arrival
Bill of Lading fig.
Difference MT Departure
Difference %
Completed discharge. / Rate 166 MT/HR incl stripping. / DF : 2,40 m DA: 4,65 m
Steaming shoreline.
Tankinspection.
Hose disconnected.
Doc's onboard.
Departure with boatman IB and without pilot
EOSP, NOR
First line
All fast Berth 35 ps. Al.
Draft survey, ullages, calculations.
Hose connected.
Commenced discharging.
Grenå - Discharging Voy.: