POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION …€¦ · poplar st bridge interchange reconstruction...
Transcript of POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION …€¦ · poplar st bridge interchange reconstruction...
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
STAGING PLAN DETOUR ROUTES
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
PSB
NEW RAMP CONSTRUCTION
EXISTING RAMP REMOVAL
I-70 AND MEMORIAL
WESTBOUND PSB TO
PSB TO I-55
WESTBOUND
NEW I-70
PHASE 1: JULY 2014-MARCH 2015 RECONSTRUCT EXIT RAMP
I-64
I-44/5
5
I-44 (
TO I-7
0)
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
STAGING PLAN
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
PSB
NEW RAMP CONSTRUCTION
NEW RAMP OPEN
EXISTING RAMP REMOVAL
NEW I-70
ROUTES AFTER RAMP REMOVAL
(SPRING 2016)CONNECTORMLK
PHASE 2A: MARCH 2015 REMOVE SOUTHBOUND TO EASTBOUND RAMP
RAMP TO EB PSB
(FUTURE I-44)
REMOVE I-70
I-64
XX
XX
XXX
I-55
I-44 C
LO
SE
D
I-44 C
LO
SE
D
XXX
XX
TO I-7
0
XX
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
STAGING PLAN
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
PSB
NEW RAMP CONSTRUCTION
NEW RAMP OPEN
EXISTING RAMP REMOVAL
XXX
XX
XX
TU
CK
ER B
LV
D.
4T
H S
T.
I-44 C
LO
SE
D
PHASE 2B: MARCH 2015 - REMOVE WESTBOUND TO SOUTHBOUND RAMP
I-64
I-55
FOR PHASES 2A AND 2BWEEKEND INTERSTATE CLOSURE DETOURS
TO SB I-55 RAMP
REMOVE WB PSB
XXXX
XX
I-44 C
LO
SE
D
TO I-7
0
X
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
STAGING PLAN
POPLAR ST BRIDGE INTERCHANGE
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
PSB
NEW RAMP CONSTRUCTION
NEW RAMP OPENSOUTHBOUND I-55 DETOUR ROUTES
PHASE 3: APRIL-MAY 2015 - COMPLETE WESTBOUND TO SOUTHBOUND RAMP
I-44 (
TO I-7
0)
I-64
I-44/5
5
PSB TO SB I-55
WESTBOUND
COMPLETE
U-TURN - SUMMER 2014
AND WASHINGTON AVE.
RECONFIGURED RAMPS
BROADWAY AVE
MAIN ST
BROADWAY BLVD
COLLINSVILLE AV
RIVER PARK DRIVE
8TH ST
4TH ST
TRENDLEY AVE
EADS BRIDGE(METROLINK)
3RD ST
MISSOURI AVE
MLK BRIDGE
PRO
PO
SE
D IL-3 (B
Y OTH
ER
S)MLK DRIVE
DOWNTOWNEAST ST. LOUIS
!"d$
!"b$!"e$
MIS
SISS
IPPI
RIV
ER
MLKCONNECTOR
!"e$
!"d$
!"b$
CITY OFST. LOUIS
MCARTHUR BRIDGE
POPLAR STREET BRIDGE
PIGGOTT AVE.
TUDOR AVE.
MIS
SISS
IPPI
AVE
. (IL
-3)
RIVER PARK DRIVECONNECTOR(BY OTHERS)
CityHall
(TO BE RELOCATED 2014)GATEWAYGEYSER
CASINOQUEEN
RAMP BTO BE REMOVED
(FUTURE I-44)
LegendMLK ConnectorFuture Illinois Route 3Proposed PSB InterchangeImprovements
I0 1,000500
Feet
Path
: K:\1
_GIS
\MLK
_Con
nect
or\a
_MXD
\131
127_
Figu
re_0
1_E-
size
.mxd
MLK CONNECTORPROPOSED
IMPROVEMENTS
BROADWAY AVE
MAIN ST
BROADWAY BLVD
COLLINSVILLE AV
RIVER PARK DRIVE
4TH ST
3RD ST
BY OTH
ERS)
MLK DRIVE
!"d$
!"b$
!"e$
MLKCONNECTOR
RIVER PARK DRIVECONNECTOR(BY OTHERS)
Arrow Realty
CSX/L&N
Arrow Realty
CSX/L&N Halenkamp
Petro-Fuel
CBS Outdoor
TRRA
Bi-State
CSX/NS
Mid-America
CSX/L&N
Retaining Wall
ProposedRight of Way
TemporaryEasement
PermanentEasement
ProposedRight of Way
ProposedRight of Way
ProposedRight of Way
CityHall
(TO BE RELOCATED 2014)
GatewayGeyser
CasinoQueen
LegendMLK Bridge StructurePermanent EasementTemporary EasementProposed Right of WayProperty LineRetaining WallProposed Edge of PavementProposed Edge of ShoulderFuture Illinois Route 3
I0 500250
Feet
Path
: K:\1
_GIS
\MLK
_Con
nect
or\a
_MXD
\131
127_
Figu
re_0
2_E-
size
.mxd
MLK CONNECTORPROPOSED
IMPROVEMENTS
OF TRANSPORTATION
MISSOURI DEPARTMENT
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
SCALE
0 500100 200 300 400
PSB
I-55 TO PSB
NORTHBOUND
NEW RAMP CONSTRUCTION
NEW RAMP OPEN
EXISTING RAMP REMOVAL
SCALE
0 500100 200 300 400
PSB
I-55 TO PSB
NORTHBOUND
PHASES 4-5: APRIL 2016-JUNE 2017 NORTHBOUND I-55 RAMP CONSTRUCTION
STAGING PLAN: CONSTRUCT RAMP 1/2 AT A TIME
I-44 (
TO I-7
0)
I-64
I-44/5
5
I-44 (
TO I-7
0)
I-64
I-44/5
5
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
STAGING PLAN
POPLAR ST BRIDGE INTERCHANGE
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
NEW RAMP OPEN
CLOSED
PSB
BRIDGE 9 FEET SOUTH
SLIDE EASTBOUND
XX
X
REGIONAL DETOUR ROUTES
3
157
159
162
370
270
70
170
64 40
270
55
255
15
255
64
255
270
55
70
70
55
255
64
MISSOURI
RIVER
MER
AM
EC
RIVER
MIS
SIS
SIP
PI
RIV
ER
44
PHASE 6: JULY 2017 - EASTBOUND BRIDGE WEEKEND CLOSURE
I-44 (
TO I-7
0)
I-64
EB I-64 CLOSED
I-44
XX
NB I-5
5 C
LO
SE
D
OF TRANSPORTATION
MISSOURI DEPARTMENT
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
PSB
NEW I-70
ALTERNATE ROUTES
SCALE
0 500100 200 300 400
STAGING PLANNEW RAMP OPEN
PSB
AND WB BRIDGES
CONNECT EB
CONSTRUCTION
PHASE 7: JULY-NOVEMBER 2017 - CONNECT BRIDGES
I-44 (
TO I-7
0)
I-64
I-44/5
5
SCALE
0 500100 200 300 400
OF TRANSPORTATION
MISSOURI DEPARTMENT
POPLAR ST BRIDGE INTERCHANGE RECONSTRUCTION
FINAL CONFIGURATION: COMPLETION DECEMBER 2017
PSB
I-44 (
TO I-7
0)
I-64
I-44/5
5
STAN MUSIAL VETERAN’S MEMORIAL BRIDGE MEETING RELOCATED I-70 NEAR * I-70 RENAMED TO I-44 THROUGH DOWNTOWN
MEMORIAL DRIVE RAMP EASTBOUND I-70/SOUTHBOUND* REMOVE I-70 FROM PSB INCLUDING
CHANGES
* IMPROVE TRAFFIC FLOW
FROM NB I-55 ENTRANCE RAMP TO ILLINOIS 3* WIDEN WB POPLAR STREET BRIDGE TO 5 LANES
* EXTEND 6TH STREET RAMP ACROSS PSB BETWEEN PSB AND I-55 * INSTALL HIGHER SPEED TWO-LANE RAMPS
IMPROVEMENTS