Dam Removal Europe Sep 2017 Dam and Weir Removal in the Urban Environment Weir Removal in a Town Centre Pont Aran

Transcript of Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction...

Page 1: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Dam Removal Europe Sep 2017

Dam and Weir Removal in the Urban Environment

Weir Removal in a Town Centre

Pont Aran

Page 2: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

• Oly Lowe - NRW Geomorphologist

• John Davies – NRW Project Manager

• Ann Griffith – NRW Flood Risk Management Team

• Marianne Jones – NRW Environmental Lead

• Tommi Hughes and Phil Oliver – NRW Fisheries/Biodiversity

• Heulwen Baughn – B&V Environmental lead and ECW

• Will Shaw – B&V Engineering Design lead

• Alun Griffiths (Contractor)

04/10/2017 Mott MacDonald | Presentation 2

Team

Page 3: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 3

Project

Dolgellau Flood

Alleviation

Scheme

Client

Natural

Resources Wales

Location

Gwynedd, Wales

Expertise

Flood Risk

Management

OpportunityWeir removal as part of flood

risk management scheme

SolutionRemoval of weir and bed-

regrading

Discussions with local

community groups

Archaeological record taking

Protection to bridge and wall

foundations

OutcomeReduced flood risk

Improved fish passage

potential

Improved river connectivity

Cost-effective

Page 4: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Historic context

04/10/2017 Mott MacDonald | Presentation 4

Page 5: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

2014

04/10/2017 Mott MacDonald | Presentation 5

Page 6: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Flood Risk

04/10/2017 Mott MacDonald | Presentation 6

Page 7: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Flood Risk – raise walls?

04/10/2017 Mott MacDonald | Presentation 7

Page 8: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Weir removal – effect on flood level

04/10/2017 Mott MacDonald | Presentation 8

Page 9: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 9

• Visual impact less than wall raising

• Less and shorter construction impact (short term risk to fish and sediment release)

• Local WFD and fish passage benefits

• Risk of changes in erosion and deposition - geomorphological input

• Risk to services and existing infrastructure

• Consultation with town council, local heritage group Snowdonia National Park Authority

• Works undertaken as permitted development in advance of main scheme

Benefits, risks, consultation

Page 10: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Archaeological record

04/10/2017 Mott MacDonald | Presentation 10

Page 11: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

• Consultation with local fisheries officers

• Monitoring sites (salmon, sea trout, eel)

• Timing and risk of disturbance (traffic light)

• Map of sensitive spawning locations

• Temporary works / construction mitigation

• Reinstating river bed features

04/10/2017 Mott MacDonald | Presentation 11

Fish

Page 12: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Sediment control

04/10/2017 Mott MacDonald | Presentation 12

Page 13: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 13

• Engineering supervision 2-3 visits per week

• Client communication

• Environmental Clerk of Works

• Geomorphologist at key stages

• Communicate bed reinstatement to site foreman and surveyors

• Direct placement of larger stone and bed features

• Photos illustrating construction and reinstatement on following slides

Communication during (de)construction

Page 14: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

• Material management, stockpiling and re-use

• Japanese Knotweed

• Vehicle movements

04/10/2017 Mott MacDonald | Presentation 14

River bed out of water

Page 15: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

• In-channel construction and flow management

• Asymmetric levels under arches

• Roughness / fish passage

• Retro-fit of low cost baffles in one arch

04/10/2017 Mott MacDonald | Presentation 15

Bridge invert design

Page 16: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

• Change in level within 2 hours - just while finishing bed reinstatement on final day of works!

04/10/2017 Mott MacDonald | Presentation 16

Flashy rivers!

Page 17: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 17

Photos from Black & Veatch

Page 18: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 18

Photos from Black & Veatch

Page 19: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 19

Photo from Black & Veatch Photo from Natural Resources Wales

Page 20: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 20

Photos from Black & Veatch

Page 21: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 21

Photos from Black & Veatch

Page 22: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

04/10/2017 Mott MacDonald | Presentation 22

Photos from Natural Resources Wales

Page 23: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

Weir removal can have multiple benefits for flood risk & environment

Flood risk

Weir removal can be cost effective compared to other options

Value

Short term impacts and risks require management

Risks

Need to consider proportionate erosion protection

Design

In urban areas expect public interest!

Public

Words, pictures, face to face

Communicate

04/10/2017 Mott MacDonald | Presentation 23

Summary

Page 24: Pont Aran - damremoval.eu · Pont Aran • Oly Lowe - NRW ... Communication during (de)construction • Material management, stockpiling and re-use • Japanese Knotweed • Vehicle

[email protected]

Thank you – any questions?