poly tank - Wolseley€¦ · merchants to plumber to site to cupboard or loft it is inevitable that...

2
engineering in plastic polytank group ® www.polytank.co.uk [email protected] NAZE LANE EAST, FRECKLETON, PRESTON, LANCS. PR4 1UN Telephone 01772 632850 Facsimile 01772 679615 engineering in plastic polytank group ® tank poly ® fitting instructions for all plastic cisterns to meet requirements of BS4213:2004, WRAS, and current water regulations These instructions are intended as a guide only and all installations are the responsibility of the installer and must be carried out to good working practices and in accordance with Water Supply (Water Fittings) regulations 1999. Ordering Ordering your products from POLYTANK has always been easy. We hope you have found us extremely responsive, offering you a warm welcome. Now it is the POLYTANK Group, this will only get better. Whatever you need from POLYTANK Group these are your contact points. Telephone 01772 632850 Fax 01772 679615 Email [email protected] Or if you are sending your order by post, send it to: POLYTANK Group Limited Naze Lane East, Freckleton Preston, Lancashire. PR4 1UN Delivery The POLYTANK Group has always been recognised as responsive in delivery times and we are determined this is maintained and hopefully improved. All stock orders will be delivered on POLYTANK Group transport on a maximum 10 day delivery. Single product orders can be taken and will be delivered within approximately 72 hours, on outside transport, where a carriage charge will apply. Further information on POLYTANK products or any facet of the POLYTANK Group please look at our website which is on www.polytank.co.uk Due to the company’s policy of continuous improvement, we reserve the right to change specifications and prices without notice. 2004 engineering in plastic polytank group ® handling All plastic tanks should be handled carefully at all times to ensure long trouble-free life. POLYTANKS have been specially designed for strength and look and are very robust but they can be damaged. on-site test Always carefully test to avoid embarrassment. With multi-handling of the tank from manufacturers to merchants to plumber to site to cupboard or loft it is inevitable that occasionally a tank will be damaged. Our PT2 package is a number of components. Conversion into a working system is the responsibility of the installer and all components should be tested to ensure on-site function, particularly the ballvalve function for correct fill and shut off. insulation Always fit insulation, it is part of your PT2 package, which ensures your POLYTANK will deliver good quality drinking water to your taps and meet all the requirements of British standards. important Ensure warning pipe accommodates incoming supply. Fit restrictor to inlet if necessary. CAUTION ALWAYS ENSURE ADEQUATE MOVEMENT IN PIPEWORK TO ALLOW FOR EXPANSION WITHOUT STRESSING CISTERN always 1. Fully support the base on a flat level platform. 2. Hole centre for float valve 60mm +/-5mm from top of cistern, fit backplate. 3. Use sharpe hole cutters. 4. fit approved washers internally and externally. 5. Support all pipework. 6. Fit screened air inlet screened warning pipe & vent pipe sleeve. 7. Fit lid and insulation. never 1. Over tighten cistern connections. 2. Use jointing compound or putty. 3. Leave notch when cutting holes. 4. Distort cistern with fittings. 5. Scribe or score cisterns when marking out. 6. Site near heater or light bulb. SNAP ON POLYLID POLYTANK BYELAW 30 KIT AND FITTING INSTRUCTIONS 1/2” BS1212 PART 2 BALL VALVE AND 41/2” FLOAT BALL VALVE BACK PLATE 22MM COMPRESSION TANK CONNECTOR 15MM X 1/2” ANGLED SERVICE VALVE INSULATION AND TIES. ADDITIONAL COMPONENT KITS COMPLY WITH BS 4213.2004 package contents tank poly ® tank poly ® fitting instructions Drill 27mm dia. for screwed vent pipe sleeve BL30/3 Drill 27mm dia. for screwed breather BL30/2 Plastic support washer BL30/5 Always fit ballvalve backplate BL30/7 Angled service valve Drill for part 2 float operated valve Warning pipe connects here. Accepts any 22mm overflow pipe including copper BL30/1 Drill 29mm dia. for 22mm compression tank connector Rubber sealing washer BL30/6 Drill 27mm dia. holes to suit installation Ensure support is flat and level and is adequate to support tank when filled with water Dip tube BL30/4 Drill 27mm dia. for warning pipe assembly 90mm 60mm 2715 06/05 DESIGNED AND PRODUCED BY MARKSMAN INTERNATIONAL Grimsby and Preston. TEL: +44 (0)1472 240869 www.marksman-int.co.uk

Transcript of poly tank - Wolseley€¦ · merchants to plumber to site to cupboard or loft it is inevitable that...

Page 1: poly tank - Wolseley€¦ · merchants to plumber to site to cupboard or loft it is inevitable that occasionally a tank will be damaged. Our PT2 package is a number of components.

en

gin

ee

rin

g

in

pla

st

ic

poly

tank

gro

up®

ww

w.p

oly

tank.

co

.uk

sale

s@p

oly

tank.

co

.uk

NA

ZE

LA

NE

EA

ST,

FR

EC

KLE

TO

N,

PR

ES

TO

N,

LA

NC

S.

PR

4 1

UN

Tele

pho

ne 0

17

72

63

28

50

Fa

csi

mile

0

17

72

67

96

15

en

gin

ee

rin

g

in

pla

st

ic

poly

tank

gro

up®

tank

poly

®

fittin

gin

stru

ctio

nsfo

r all pla

stic

cis

tern

s to

meet r

equi

rem

ent

s of

BS

4213:2

004, W

RA

S,

and

cur

rent

wate

r re

gul

atio

ns

Thes

e in

stru

ctio

ns a

re in

tend

ed a

s a

guid

e on

ly an

d al

lin

stal

latio

ns a

re th

e re

spon

sibilit

y of

the

inst

alle

r and

mus

tbe

car

ried

out t

o go

od w

orkin

g pr

actic

es a

nd in

acc

orda

nce

with

Wat

er S

uppl

y (W

ater

Fitt

ings

) reg

ulat

ions

199

9.

Ord

ering

Ord

ering

your

pro

ducts

fro

m P

OLY

TAN

K h

as

alw

ays

been e

asy

. W

e

hop

e y

ou h

ave

found

us

ext

rem

ely

resp

onsi

ve, offering

you a

warm

welc

om

e. N

ow

it is

the P

OLY

TAN

K G

roup

, th

is w

ill o

nly

get b

etter.

Whate

ver yo

u n

eed

from

PO

LYTA

NK

Gro

up

these

are

your co

nta

ct p

oin

ts.

Tele

phone 01772 6

32850

Fax

01772 6

79615

Em

ail

sale

s@p

oly

tank.

co.u

k

Or

if yo

u a

re s

end

ing

your

ord

er

by

post

, se

nd

it to:

PO

LYTA

NK

Gro

up

Lim

ited

Naze

Lane E

ast

, F

reckl

eto

n

Pre

ston,

Lancash

ire.

PR

4 1

UN

Deliv

ery

The P

OLY

TAN

K G

roup

has

alw

ays

been r

ecog

nis

ed

as

resp

onsi

ve

in d

eliv

ery

tim

es

and

we a

re d

ete

rmin

ed

this

is m

ain

tain

ed

and

hop

efu

lly im

pro

ved

. A

ll st

ock

ord

ers

will

be d

eliv

ere

d o

n P

OLY

TAN

K

Gro

up

tra

nsp

ort

on a

maxi

mum

10 d

ay

deliv

ery

.

Sin

gle

pro

duct ord

ers

can b

e take

n a

nd

will

be d

eliv

ere

d w

ithin

ap

pro

xim

ate

ly 7

2 h

ours

, on o

uts

ide tra

nsp

ort

, w

here

a c

arr

iag

e

charg

e w

ill a

pp

ly.

Furt

her

info

rmatio

n o

n P

OLY

TAN

K p

rod

ucts

or

any

facet of th

e

PO

LYTA

NK

Gro

up

ple

ase

look

at our

web

site

whic

h is

on w

ww

.poly

tank.

co.u

k

Due to the c

om

pany’s

polic

y of contin

uous

imp

rove

ment,

we r

ese

rve the r

ight to

chang

e s

pecifi

catio

ns

and

prices

with

out notic

e.

2004

en

gin

ee

rin

g

in

pla

st

ic

polyta

nkgro

up®

ha

nd

ling

All p

lastic

tanks sh

ould

be h

and

led

care

fully a

t all

times to

ensu

re lo

ng

troub

le-fre

e life

. PO

LYTA

NK

S

have

been sp

ecia

lly desig

ned

for stre

ng

th a

nd

look

and

are

very ro

bust b

ut th

ey c

an b

e d

am

ag

ed

.

on-site

test

Alw

ays c

are

fully te

st to a

void

em

barra

ssment. W

ith

multi-h

and

ling

of th

e ta

nk fro

m m

anufa

ctu

rers to

merc

hants to

plu

mb

er to

site to

cup

board

or lo

ft it is

inevita

ble

that o

ccasio

nally a

tank w

ill be d

am

ag

ed

.

Our P

T2 p

acka

ge is a

num

ber o

f com

ponents.

Conve

rsion in

to a

workin

g syste

m is th

e re

sponsib

ility

of th

e in

stalle

r and

all c

om

ponents sh

ould

be te

sted

to e

nsu

re o

n-site

functio

n, p

artic

ula

rly the b

allva

lve

functio

n fo

r corre

ct fill a

nd

shut o

ff.

insu

latio

nA

lways fit in

sula

tion, it is p

art o

f your P

T2 p

acka

ge,

whic

h e

nsu

res yo

ur P

OLY

TAN

K w

ill delive

r good

quality d

rinkin

g w

ate

r to yo

ur ta

ps a

nd

meet a

ll the

req

uire

ments o

f British

stand

ard

s.

imp

orta

nt

Ensu

re w

arn

ing

pip

e a

ccom

mod

ate

s incom

ing

sup

ply. F

it restric

tor to

inle

t if necessa

ry.

CA

UTIO

NALW

AYS ENSURE ADEQUATE MOVEM

ENT INPIPEW

ORK TO ALLOW FOR EXPANSION

WITHOUT STRESSING CISTERN

alw

ays

1.Fully support the base on a flatlevel platform

.

2.Hole centre for float valve 60m

m+

/-5mm

from top of cistern,

fit backplate.

3.Use sharpe hole cutters.

4.fit approved w

ashers internally andexternally.

5.Support all pipew

ork.

6.Fit screened air inlet screenedw

arning pipe & vent pipe sleeve.

7.Fit lid and insulation.

neve

r1.

Over tighten cistern connections.

2.Use jointing com

pound or putty.

3.Leave notch w

hen cutting holes.

4.Distort cistern w

ith fittings.

5.Scribe or score cisterns w

henm

arking out.

6.Site near heater or light bulb.

•SNAP ON POLYLID

•POLYTANK BYELAW

30 KIT ANDFITTING INSTRUCTIONS

•1/2” BS1212 PART 2 BALL VALVEAND 41/2” FLOAT

•BALL VALVE BACK PLATE

•22M

M COM

PRESSION TANKCONNECTOR

•15M

M X 1/2” ANGLED SERVICE VALVE

•INSULATION AND TIES.

ADD

ITION

AL COM

PON

ENT KITS CO

MPLY W

ITH BS 4213.2004

packa

ge c

onte

nts

tank

poly

®

tank

poly

®

fitting instructio

ns

Drill 27mm

dia.for screw

ed ventpipe sleeveBL30/3

Drill 27mm

dia.for screw

edbreatherBL30/2

Plastic supportw

asher BL30/5

Always fit

ballvalvebackplateBL30/7

Angledservicevalve

Drill for part 2 floatoperated valve

Warning pipe connects

here. Accepts any22m

m overflow

pipeincluding copperBL30/1

Drill 29mm

dia. for22m

m com

pressiontank connector

Rubbersealingw

asherBL30/6

Drill 27mm

dia. holes to suit installation

Ensure support is flat and level and is adequate to support tank when filled w

ith water

Dip tubeBL30/4 Drill 27m

m dia.

for warning pipe

assembly

90mm

60mm

2715 06/05 DESIGNED AND PRODUCED BY MARKSMAN INTERNATIONAL Grimsby and Preston. TEL: +44 (0)1472 240869 www.marksman-int.co.uk

Page 2: poly tank - Wolseley€¦ · merchants to plumber to site to cupboard or loft it is inevitable that occasionally a tank will be damaged. Our PT2 package is a number of components.

e n g i n e e r i n g i n p l a s t i c

polytankgroup®

Carefully cut the security straps on the lid/s of thetank.Remove the kit inside the tank and take thecontents from the plastic bag.

Spread the contents out in front of you and ensureyou have all the contents to proceed and thereis nothing missing.

Fit the screwed breather assembly.

Add the insulation jacket that was provided withthe tank kit, wrapping the larger section all theway round the tank.

Familiarise yourself with the individual items andthe fitting instructions overall. Read carefully.Understanding the instructions is your bestprotection from costly mistakes.

Having transferred the tank into the roof space withall the holes drilled, first put in and fasten the 22mmcompression tank connector with the rubber washerinternally and the plastic washer externally andassemble outlet pipe.

Fit the screwed vent pipe sleeve for theexpansion pipe.

Fasten the insulation using the ribbon provided.Use the smaller insulation piece provided asinsulation for the top of the tank.

Offer up and mark holes for the breather and vent using asharp 27mm hole saw, drill the holes for the breather and thevent. All the drilling and marking of the holes can be doneat a lower level than the roof space. Once drilled, the tankcan be passed up through the loft opening prior to the fittingof any of the kit.

Now connect the 22mm warning pipe to thescreened warning pipe elbow ensuring warningpipe accommodates incoming supply.Fit restrictor to inlet if neccessary.

1 23

45

78

1314

1516

17

19

2021

Take your ball valve attach the 41/2" float andassemble into the tank.

9Pass the brass connector through and attach theball valve back plate to the outside face of the tank.This back plate is designed to spread the load ofthe continually moving ball valve as the tank emptiesand fills. Assemble service valve onto ball valve.Adjust float position to suit waterline in tank.

Add the screw and tighten the ball valve fitting.Hand tighten and then tighten with spanner 1/2a turn. Do not over tighten.

10

11

Mark the first of a series of holes. First the ball valve this holeis situated 60mm (+/- 5mm) from the top of the tank. Markthe hole to be drilled with a light marker or crayon. Do not useany scribe or sharp instrument whatsoever. Make a mark forthe warning pipe hole - this should be 90mm (+/- 5mm) fromthe top using a sharp 22mm hole saw, drill the hole for theball valve and 27mm hole saw for the warning pipe.

Turn on the cold water supply (stop cock usuallyunder the kitchen sink) and then turn the servicevalve using a screw driver, to the on position (in linewith water flow).

The above illustrations show a normaltank installation. Circumstances andaccess can change the approach butwe hope the above extensiveprocedure, in pictures, gives anyoneinstalling a tank the ability to deal evenwith the most difficult circumstancesand still do the job right.

WE APOLOGISE, IN ADVANCE, TO ANYPROFESSIONAL PLUMBER ORINSTALLER WHO REGULARLYINSTALLS OUR TANKS. WEAPPRECIATE THAT YOU DO NOT NEEDTHIS LEVEL OF FITTING INSTRUCTION.

Attach the cold water pipe (inlet) to the service valveconnection and tighten ensuring fittings are heldfirm while tightening. DO NOT OVER TIGHTEN.

Turn the tank round and mark the hole for the outletpipe. This hole should be 50mm from the baseand again marked with a marker or light crayonnot a scribe or sharp instrument.

Now assemble the screened elbow filter/meshwarning pipe into the other hole. This warning pipeaccepts any 22mm overflow pipe including copperthen push fit the dip tube internally into the elbow.

12

18

As the tank fills, check all round for leaks bothwith eye and hand. Clip down the lid/s.

6

IMPORTANTBefore positioning tank ensure it is supported on a solid suitable baseover the whole area of the tank, ensuring correct load over joints toaccommodate weight when full.

Drill using a 29mm diameter hole saw. This isthe hole for the 22mm compression tank connectorthat will be the outlet. As stated above drill thehole for the outlet pipe at the opposite end to theball valve. This means the inlet and outlet createa circulatory flow of water inside the tank.