1| Page Police Department CIP Presentation City of Boise October 2012 Presentation Purpose: The Mayor and Council received a broad overview of the 8‐Year capital planning framework developed by staff in late June. This planning framework and the updated repair and maintenance, major equipment, and major capital plans were developed to reflect: The priorities outlined in the City’s Strategic Plan Adequate annual and major repair & maintenance funding to preserve existing city assets Adequate equipment replacement funding to avoid increased maintenance costs A fiscally constrained plan ‐ including the identification of projects that are realistic to fund on an annual cash basis; projects that may be considered for unallocated end‐of‐year funds; projects that may be considered for debt or alternative financing; and projects that will not create an undue strain on projected O&M funding capacity. A summary of this framework, which includes estimated needs and projected revenues by cost category, is attached (Appendix A). Data specific to the Police Department is highlighted. The first stage of the Mayor and Council’s review of the planning framework, which will ultimately lead up to the FY14/15 budget development, is designed to: Gain consensus on the operating philosophy regarding the future funding of annual maintenance, major repair and maintenance, equipment and new capital assets. Identify elements of each Department’s repair and maintenance, major equipment, and major capital plans that need deeper policy discussion or further refinement. Mayor and Council will receive briefings throughout September and October to discuss the objectives and key drivers of each Department’s plans. This will be followed in November and December by the development of financial strategies and alternative funding options.

Transcript of Police CIP Presentation 101512 - City of Boise Department CIP Presentation ... Identify elements of...

1 | P a g e   

PoliceDepartmentCIPPresentationCityofBoiseOctober2012

PresentationPurpose:

TheMayorandCouncilreceivedabroadoverviewofthe8‐YearcapitalplanningframeworkdevelopedbystaffinlateJune.Thisplanningframeworkandtheupdatedrepairandmaintenance,majorequipment,andmajorcapitalplansweredevelopedtoreflect:

TheprioritiesoutlinedintheCity’sStrategicPlan Adequateannualandmajorrepair&maintenancefundingtopreserveexistingcityassets Adequateequipmentreplacementfundingtoavoidincreasedmaintenancecosts Afiscallyconstrainedplan‐includingtheidentificationofprojectsthatarerealistictofundon

anannualcashbasis;projectsthatmaybeconsideredforunallocatedend‐of‐yearfunds;projectsthatmaybeconsideredfordebtoralternativefinancing;andprojectsthatwillnotcreateanunduestrainonprojectedO&Mfundingcapacity.

Asummaryofthisframework,whichincludesestimatedneedsandprojectedrevenuesbycostcategory,isattached(AppendixA).DataspecifictothePoliceDepartmentishighlighted.

ThefirststageoftheMayorandCouncil’sreviewoftheplanningframework,whichwillultimatelyleaduptotheFY14/15budgetdevelopment,isdesignedto:

Gainconsensusontheoperatingphilosophyregardingthefuturefundingofannualmaintenance,majorrepairandmaintenance,equipmentandnewcapitalassets.

IdentifyelementsofeachDepartment’srepairandmaintenance,majorequipment,andmajorcapitalplansthatneeddeeperpolicydiscussionorfurtherrefinement.

MayorandCouncilwillreceivebriefingsthroughoutSeptemberandOctobertodiscusstheobjectivesandkeydriversofeachDepartment’splans.ThiswillbefollowedinNovemberandDecemberbythedevelopmentoffinancialstrategiesandalternativefundingoptions.

2 | P a g e   

Overview:

ThePoliceDepartment’s8‐YearMajorEquipmentandMajorCapitalPlans(AppendicesB‐C)1reflectthefollowingobjectives:

1. FacilitatetheDepartment’sDistrict‐BasedPolicingModelbyleveragingFederaldollarstoconstructaCentralDistrictStation;

2. ImprovetheFiringRangetoaddressserviceleveldeficiencies;3. AddressthefacilityneedscreatedbytheDepartment’sassumptionofallProperty&Evidence

functionsfromAdaCounty;4. Addressthelong‐rangefacilityneedsnecessarytofacilitateoperationalobjectivesincluding

theconsolidationofPoliceandFireStores/Supplyfunctions;5. Addressthelong‐rangesecurestorageneedsforabandonedvehicles,fleetstorage,andother

storageneedscurrentlyhouseinaninadequateleasedfacility;and6. Replaceexistingapparatusandotherequipmentaccordingtoscheduletoavoidunnecessary

increasesinmaintenancecosts.

Background:

In1977,theBoisePoliceDepartment’sHeadquarterswasco‐locatedwiththeAdaCountySherriff’sOfficeandtheCountyJailatthePublicSafetyComplexonBarristerStreet.Additionalspacewasleasedasaroundthecityforsmallsub‐stationsandseparatePolicefunctions.ThisconfigurationofphysicalresourcesreflectedaDepartmentstructurecreatedinthe1980’sthathadconsolidatedfourpolicingdistricts(Central,Foothills,WestgateandOverland)totwo(ValleyandBench),andwasorganizedintofunctionaldivisions(Patrol,CriminalInvestigations,AdministrativeSupportandtheChief’sOffice).

Thisstructuredidnoteffectivelyservethepublic.EachDivisionwasautonomousandreluctanttoshareresourceswhenneeded.Eachdivisionbudgetedandmanageditequipmentandfacilitiesindividually,leadingtodissimilarvehicles,disconnectedfacilitiesandaninefficientuseofresources.InformationwasnotsharedstrategicallyacrosstheDepartment,andcitizensdidnotfeeltheyhadastrongenoughrelationshipwiththePoliceDepartmenttoaddresscrimeissuesspecifictotheirneighborhoods.

Beginningin2005,theDepartmentimplementedacommunitypolicingphilosophydesignedtobetterconnecttheDepartmentwiththecommunity,workingacrossdivisionstoaddresspublicsafetyissues.TheNeighborhoodContactOfficer(NCO)programwasdevelopedandbeganworkingalongsideotherpatrollingfunctionsincludingschoolresourceofficers(SROs),BSU,andBikePatrol.In2008theCitypurchasedan85,000squarefootfacilityonthewestsideoftheCityforthePoliceandFireDepartments,andthePoliceDepartmentwasabletoconsolidateallofitsfunctionsintoonefacility.

TheseaccomplishmentswerethefirststepsinastrategicplantomovetowardaDistrict‐basedpolicingmodel.Designedtofostercooperationbetweencitizenswhoidentifywithspecific                                                            1ThePoliceDepartmentdoesnothaveaMajorR&MPlan,asallofitsfacilitiesaremanagedbyGovernmentBuildings.

3 | P a g e   

geographicdistrictsandofficerswhoareassignedtopolicetheseuniquedistricts,DistrictPolicingprovidesindividualcommunities(districts)withavoiceinhowtheywillbepolicedandinsettinglawenforcementpriorities;andallowscitizenstoworktogetherwithofficerstoidentifyandsolvecrimerelatedproblems.Furthermore,itenablestheDepartmenttoincreasethequalityandquantityofstrategicandtacticalintelligence.

Districtpolicingcannotbeeffectivelyoperatedfromacentralizedfacility.OfficersandotheremployeesneedtobephysicallylocatedbyandaccessibletothemembersoftheDistrictstheyserve.Departmentresourcesaredeployedfromwithindistrictstations,withacentrallylocatedHeadquarters.Districtboundariesaredeterminedbasedonseveralfactors,includingpopulation;landuse;thenumberofcallsforservice;thetypesofcallsforservice;neighborhoodboundaries;responsetimes;andgeographicbarriers.Basedonthesefactors,theBoisePoliceDepartmenthasrecommendedtheCitymovetoa3‐districtpolicingmodel:Central,WestandEastdistrictsasshownonthefollowingmap:

4 | P a g e   

TheWestDistrictwouldbeco‐locatedwithPoliceHeadquartersandwouldserveanareaboundedbytheBenchtotheNorth;FederalWaytotheEast,Victory/AmitytotheSouth,andthecitylimitstotheWest.TheCentralDistrictwouldservethespecificneedsoftheurbancore’sresidential,employmentandentertainmentcenters;aswellastheFoothillsandtheNorthwestportionoftheCitytothecitylimits.TheEastDistrictwouldserveBoiseStateUniversity,theeasternportionoftheCityfromBroadwayandHighway21tothecitylimits,andalloftheundevelopedindustrialareasouthandeastoftheCity.AfacilitytohousetheCentralDistrictwouldbetheDepartment’sfirstpriorityasincreasedmixed‐usedevelopmentinthedowntownwillrequireadditionalresourcestrainedtopreventandaddresscrimeinanurbanenvironment.

Eachdistrictstationwouldhousepatrol,NCO,SRO,BikePatrol,detectives,andaproportionalnumberofadministrativesupportpersonnel.SpecializedfunctionssuchasNarcotics,GangIntelligence,andCrimesAgainstPersonsandPropertywouldremaincentralizedatHeadquarters.Communityserviceswouldbeavailableateachstation,includingconferenceroomsandothercityservices.

TheDepartmentprovideslawenforcementserviceswithavehicleinventoryof317units.Thesevehiclesareassignedtothefollowingprograms:

Program NumberofVehicles

PercentofTotal

Patrol2 131 41%CommunityOutreach3 84 26%CriminalInvestigations 82 26%Training 12 4%Impound 4 1%CrimePrevention 2 1%Administration 2 1%

VehiclesarereplacedaccordingtolifecycleguidelinesrecommendedbytheCity’sFleetManagementDivision.Patrol‐typevehiclesarereplacedonaverageevery7yearsor100,000miles.FleetManagementhasrecommendedtheCityreplacepatrolcarsevery4‐5yearstomaximizeresalevalueandbalanceoperatingcosts.TheannualcosttoreplaceexistingPolicevehiclesandacquireotherpolicingequipmentaveragesapproximately$1.6millionperyear.Whenpossible,equipmentisfundedwithgrantrevenues.TheDepartmentspendsapproximately$1.0millionperyearontherepairandmaintenanceofitsfleet,plusanaverageof$643,000peryearonfuel.

CapitalPlanningProcess:

Oneoftheprioritiesinthisprocesswastodevelopalong‐rangecapitalplanthatwouldsustainthePoliceDepartment’scurrentlevelofserviceastheCitygrewandaddressinefficienciesinthewaycurrentfacilitieswerefundedandutilized.Inadditiontothereplacementofexistingequipmentassets,thisrequiresupgradestothefiringrangetomeettrainingobligationsandaddressnoiseandsafetyissuestothesurroundingcommunity;anefficientlong‐termsolutiontotheDepartment’s

                                                            2IncludesAirportandCanines3IncludesNeighborhoodContactOfficers,SchoolResourceOfficers,BSU,Bikes,Motors,andSpecialOperations.

5 | P a g e   

vehicleandevidencestorageandsupplydistributionneeds;andaCentralDistrictPolicestationtofurthertheDepartment’sDistrict‐BasedpolicingphilosophyandaddresstheneedsofdevelopmentintheDowntowncore.

TheDepartmenthasrecentlyupdateditssystemforthetrackingandreplacementofallexistingDepartmentvehiclesandequipment.Basedonrecommendedreplacementcriteria,lifecycleanalysisandhistoricalmaintenancecostdata,anaverageof$1.6millionannuallyor$13.1millionoverthe8‐Yearperiodwillbeneededtoreplacecurrentvehicleassets.ItisanticipatedthataDistrict‐PolicingModelwoulddecreasemileageandoperationalcostsasfewertripswillbetakenbetweenanofficer’sstationandpolicingdistrict.

ThetotalcostoftheCIPis$7.6million;thetotalcostofMajorEquipmentis$13.1million.Ofthetotal$20.7millionofcapitalandequipmentneedsprojectedforthe8‐Yearperiod,$2.4millionisimpactfeeeligible.4Impactfeescashflowisanticipatedtobeadequatetofundthegrowth‐relatedportionofthePolicestorageandatleast$1millionofthegrowth‐relatedportionofaDowntownDistrictStationby2019.Grantfundingisanticipatedforsomeequipmentpurchases.

TheDepartmentmetseveraltimeswiththeCity’sDevelopmentImpactFeeAdvisoryCommittee(DIFAC).ThisCommitteeapprovedtheDepartment’sCapitalandMajorEquipmentplansandrecommendedadoptionoftheassociatedfull‐costrecoveryimpactfees.

MajorThemesofDepartment’s8‐YearPlan(MajorEquipmentandCapital):

ThecumulativeAnnualMaintenance,MajorEquipmentandCapitalneedsaresummarizedinAppendixAandtotalapproximately$29millionoverthe8‐Yearperiod.

ThetotalestimatedneedinMajorEquipmentoverthe8‐Yearperiodis$13.1million(seeAppendixB).ThetotalestimatedcostforcompletingthePoliceDepartment’sCapitalImprovementPlanisapproximately$7.6million(seeAppendixC).$1.8millionofthisamountisrelatedtotherenovationofexistingfacilities;theremaining$5.9millionisrelatedtotheacquisitionofaCentralDistrictStation;spacetoenabletheCitytoassumethepropertyandevidencefunctionfromtheCounty;andfacilityneedstofacilitateoperationalefficienciesincludingco‐locatedstoragewiththeFireandotherCityDepartment.

Themajorthemesreflectedintheseplansareasfollows:

1. FacilitatetheDepartment’sDistrict‐BasedPolicingModelbyleveragingFederaldollarstoconstructaCentralDistrictStation.

InordertofacilitatetheDepartment’sDistrictpolicingobjectives,andmeettheuniqueneedsofdiversedevelopmentintheurbancore,theDepartmenthasproposedtheacquisitionofaCentralDistrictStationby2016.Thisfacilitywouldhouseapproximately1/3ofthePatrolDivision;1/3oftheSROandNCOteams;8detectives;theBikePatrolTeam;andtheBarTeam;plus10administrativepersonnel.

                                                            4NoneoftheitemsonthePoliceDepartment’sMajorEquipmentPlanarerelatedtonewgrowth,and/ordonothaveausefullifeoftherequiredtenyears.Therefore,noneoftheseitemsareeligibleforimpactfeefunding. 

6 | P a g e   

Theestimatedspaceneedforthisstationisapproximately25,000squarefeetand100parkingspaces.50%oftheestimated$3.9millioncostisimpactfeeeligible.Annualoperatingcostsareestimatedat$76,000.

TheDepartmenthasbeenworkingwiththeMayor’sOfficetoevaluatepotentialopportunitiesforaCentralDistrictStationintheDowntowncore.Atlessthan25,000squarefeet,theDepartmentcannoteffectivelyimplementthedistrict‐basedpolicingmodel,althoughasmallerspacecouldaccommodateadrop‐inPolicefacilityinthedowntownfortheBikeTeam,temporaryevidencestorage,interviewroomsanddrop‐inworkstations;andasmallEmergencyOperationsCenterforusebytheDepartmentandotherCityDepartments.

Ifafacilitycannotbefounddowntowntohouseafull‐sizedstation,theDepartmentwouldproposeacquiringa50,000squarefootfacilityontheborderoftheCentralandEastDistrictstohousebothstationswithinthenext5‐10years.

DoestheCouncilhaveanyquestions?ArethereareaswheretheCouncilwouldliketoseeachangeinstrategicdirection?

2. ImprovetheFiringRangetoaddressserviceleveldeficiencies.

ThePoliceDepartmentpurchaseditscurrentfiringrangefromtheBoisePoliceAssociationin2008.Abudgetwasdevelopedtobringtherangeuptorequiredindustryandenvironmentalstandards,includingimprovingandwideningtheroadfromMountainCoveRoadtotheRange;producingenoughwateron‐sitefor2‐hoursoffiresuppression;re‐orientingtheriflerangetorunparalleltotheadjacentwalkingtrail;providinglandscapingtomitigatethenoisefromtherangeexperiencedbyadjacentneighborhoodsandtrailusers,andreducefiredanger;installingrubberfilledbullettrapstoeliminatestraybullets;andcreatingawaterfiltrationsystemtoensureallwaterleavingtherangeisfreefromlead.Theestimatedcostfortheprojectwas$1.8million.

7 | P a g e   

Thecurrentsiteplanisasfollows:

$46,000wasapprovedinFY12toprepthesitefortheimprovements,includinggradingtheroadanddiggingtherequiredwell.Anadditional$32,901hadtobeappropriatedduringaninterimbudgetchangeatyear‐endbecausethecontractorswereunabletofindwaterattheanticipateddepth.Thebudgetfortheremaining$1.76millionoftheprojectwastentativelyspreadoverthenext5yearsasfollows:

FY13 $440,000(approved)FY14 $220,000FY15 $300,000FY16 $400,000FY17 $400,000

Itshouldbenotedthatthisprojectisnoteligibleforimpactfeefunding.

TheseamountsdonotcorrespondwithparticularphasesorcomponentsoftheRangeMasterPlan.Theywereusedasplaceholderswhentheprojectwasfirstdesigned.Thefirstphaseoftheprojectwillneedtobetheconstructionofthe50yardrangeandammunitionstorage,whichisestimatedtocost$800,000.IftheCitywishestoincludeallofthenoisemitigationandsafetyworkcommittedtotheadjacentneighborhoodinthefirstphase,theDepartmentwillneedtocompletealloftheexcavationwork,bermingandlandscapingatanestimatedcost

8 | P a g e   

of$250,000.Iffundingisappropriatedasscheduledabove,thefirstphasewouldnotbeginconstructionuntilFY15.

TheDepartmentwillbegoingouttobidfortheconstructionofthisprojectinOctober.WhenthebidsarereceivedtheDepartmentwillbeabletomakefinalrecommendationsaboutphasingandalternatives.

TheDepartmentintendstoimprovetheenvironmentalefficiencyoftheRangeasitproceedswiththisproject.Forexample,theprojectwillincludethe:

Useofrecycledtiresaspartofthebullettraps Drought‐resistantnativelandscaping Reuseofexistingbuildings,andretrofitwithefficientlighting Recyclingofsteelboxcar

TheestimatedO&Mimpactoftheserangeimprovementsisapproximately$12,500peryear.

WouldtheCouncilconsiderapprovingenoughfundinginFY14tocompletetheentirefirstphaseoftheprojectifcashflowallows?

3. AddressthefacilityneedscreatedbytheDepartment’sassumptionofallProperty&Evidence

functionsfromAdaCounty.RecordsManagementServicesandPropertyandEvidenceServiceshavebeencontractedwithAdaCountySheriff’sOfficeforthepast35years.OnOctober1,2012theCityassumedmanagementofRecordsManagementServicesfromtheCounty.ThisnewfunctionwasabletobeaccommodatedwithintheexistingCityHallWestfootprint.OnOctober1,2013theCitywillassumemanagementofPropertyandEvidenceServicesfromtheCounty.

PropertyandEvidencewillneedatleast2,900squarefeetofevidencestorageon‐siteatCityHallWest.TheDepartmentiscurrentlyevaluatingseveralon‐siteoptionstomeetthisneed.Theshelvingtoaccommodatetheon‐sitestoragecanbefundedwithcontractsavingsfrombringingthefunctionin‐house.

Anadditional10,000squarefeetofsecuredspace,plusanadditional3,000squarefeetofcoveredanduncoveredspaceisnecessarytostorethemajorityofthepropertyandevidence.ThissquarefootageisnotavailableatCityHallWestbutwillneedtobelocatedincloseproximity.

TheDepartmentiscurrentlyworkingwithGovernmentBuildingstoidentifyashort‐termleasedspacetomeetthisneed,ideallyinaCity‐ownedfacility.Inthelongterm,theDepartmentwouldprefertohavethisfunctionco‐locatedwithotheroff‐sitePoliceandFirefunctionsincludingvehicleandimpoundstorage,and/orstoresandsupplies.ThisneedisidentifiedintherecentlycompletedFacilitiesPlanUpdate.

9 | P a g e   

A$2millionplaceholderisincludedinthePoliceCIPforvehicleandevidencestorage.25%ofthiscostisimpactfeeeligible.Contractsavingsofupto$350,000peryearwillfundtheremainingcostfortheportionofanyfacilitydedicatedtopropertyandevidencestorage,whetherleased,ownedordebt‐financed.

DoestheCouncilagreewiththeDepartment’sobjectivetopursuespaceforthepropertyandevidencestoragefunctioninafacilityco‐locatedwithPolice/Firevehicleandimpoundstorage,and/orSupply/Stores?

4. Addressthelong‐rangefacilityneedsnecessarytofacilitateoperationalobjectivesincludingthe

consolidationofPoliceandFireStores/Supplyfunctions.TheDepartmentisevaluatingthepotentialforconsolidatingPoliceandFireStores/Supplyaspartofitsefforttocreatecapacitywithinitsadministrativeservices.Ifafacilitywasidentifiedtohousepropertyandevidence(see#3above)and/orPoliceandFirestorage(see#5below)theDepartmentwouldliketoconsiderincludingthesefunctionsinthatfacility.Approximately10,000squarefeetwouldbeneeded,andhasbeenidentifiedintherecentlycompletedFacilitiesPlanUpdate.AcostforthissquarefootagehasnotbeenspecificallyincludedinthePoliceCIP,asthemajorityofthespaceneedswouldbegeneratedfromFire.

DoestheCouncilagreewiththeDepartment’sobjectivetoconsiderconsolidatingStoresandSupplyfunctionswiththeFireDepartmentandco‐locatinginafacilitywithPolice/Firevehicle,propertyandevidence,andimpoundstorage?

5. Addressthelong‐rangesecurestorageneedsforabandonedvehicles,fleetstorage,andother

storageneedscurrentlyhouseinaninadequateleasedfacility.

AsthecurrentHeadquartersfacilitydoesnothaveenoughspaceforvehicleandotherstorage,thePoliceDepartmentiscurrentlyleasing16,800squarefeeton3.2acresonBraniffStreet.Theaveragemonthlyleasepaymentonthis5‐yearleaseis$7,600;almost$500,000overthelifeofthelease.Thespaceisnotcentrallylocatedtoanyotherpolicefunction,andtherehavebeenproblemswithperimeterlotsecuritybreachesleadingtotamperingwithevidentiaryimpoundedvehicles,andinteriorwaterdamagetoevidencestorage.TheDepartmentwouldliketoacquireCity‐ownedspacetosupportthisstoragefunctionbeforetheleaseexpiresin2017.Estimatedspaceneedsare12,000squarefeetofenclosedstoragespace;3,000squarefeetofcoveredspaceforimpound;and26,500squarefeetofoutdoorsecuredvehiclestorage.TheDepartmentisworkingwiththeFireDepartmentandGovernmentBuildingstoevaluateopportunitiestoco‐locatethistypeofstorage,atbothDepartmentshaveidentifiedtheneedontheir8‐YearCIPs.

10 | P a g e   

Asindicatedabove,a$2millionplaceholderisincludedinthePoliceCIPforvehicleandevidencestorage.25%ofthiscostisimpactfeeeligible.Savingsfromtheforegoneleasepaymentscouldfundsomeoftheremainingcostfortheportionofthisfacility,whetherleased,ownedordebt‐financed.

DoestheCouncilagreewiththeDepartment’sobjectivetoconsiderco‐locatingPolicevehicleandotherstoragewiththeFireDepartment?

6. Replaceexistingapparatusandotherequipmentaccordingtoscheduletoavoidunnecessary

increasesinmaintenancecosts

Themajorityofthe8‐YearMajorEquipmentPlanforPoliceisthereplacementofexistingassetsaccordingtoreplacementcriteriaadoptedbytheFleetManagementDivisionasfollows:.

AspartoftherecentconsolidationofPoliceandFireadministrativeservices,specificattentionisbeinggiventotheDepartments’longrangestrategyforfundingmajorequipmentneeds.AworkinggrouphasbeenestablishedofPoliceandFleetrepresentativestoidentifywaystoreducethecostofequipmentreplacementwithoutthreateningservicelevels.Areastobeexploredincludeunitutilizationanalysis;poolingvehicleswiththeassistanceofautomatedvehiclereservationandcheck‐outtechnology;evaluationofalternatevehiclesizes(i.e.,V6pilot);evaluationofnewvs.usedequipment;increasingthefleet’sfuel‐efficiencyandreducingitscarbonfootprint;researchintonewpracticesinfleetandequipmentreplacement,andtheinvestigationofotherfinancingmechanisms,suchasleasing.ThefleetreplacementplanforPolicevehicleswillbereviewedagainaspartoftheFY14/15budgetdevelopment.

TheCouncilmaywishtoprovidefurtherdirectiononalternatefundingmechanismsorotherstrategiesforreplacingexistingPolicevehiclesandequipment.

2014 2015 2016 2017 2018 2019

Police Equipment

Funding ItemGF Instant Armor Tactical Blanket 8,500                17,000GF Patrol Canine ‐ 1 every 2 years 10,000              10,000            10,000             GF Thermal Imager 12,000              12,000GF Evidence Light Source 20,000             GF CNT Rescue Phone 22,000             GF ESU/ Jail Transport Van 25,000             GF CSS Vehicle Replacement ‐ 1 per year 26,010              26,530 27,061 27,602 28,154 28,717GF Motorcycles ‐ 5 per year 85,372              87,080 88,821 90,598 92,410 94,258GF Police SUV's ‐ 3 per year 100,112           102,115 104,157 106,240 108,365 110,532GF Narcotics Vehicle ‐ 1 per year 128,481           131,051 133,672 136,345 139,072 141,853GF SRO (V6) ‐ 6 per year 171,325           174,752 178,247 181,812 185,448 189,157GF CID Mid‐Size Vehicles ‐ 10 per year 246,481           251,411 256,439 261,568 266,799 272,135GF Place Holder for Property and Evidence  300,000          GF Police Vehicles (V6) ‐ 12 per year 342,528           349,379 356,366 363,494 370,764 378,179GF Police Vehicles (V8) ‐ 13 per year 488,556           498,327 508,294 518,459 528,829 539,405GF Intoxalizer 5000 6,000GF Polygraph Computer/Software/Equipment 7,500GF Fingerprint Development Chamber 10,450GF Vehicle Disrupter 15,000

GF

Smart Board Replacement/ Printer for Patrol Briefing 

Room 10,000GF Clubcar Utility Vehicle 12,000Grant ICAC UC Computers Mac Pro w/ Software 7,500Grant ICAC Storage System 20,000Grant Laser Scene Capture 60,000TBD Lenco Bearcat Armored Vehicle 250,000

Equipment Total 1,986,366        1,776,094           1,685,056      1,686,118         1,729,840        2,004,237     

Fiscal Year

8 YEAR DEPARTMENT SUMMARY

Capital & Equipment Needs and Resources FY12‐FY19

Projected Expenditures

Department Dept Total

Arts 326,568 Routine Minor R&M plus 

approximately $40k a year for art 

maintenance, Currently Funded via 

0.4% Art ordinance

120,000 Amount estimated for Major R&M, currently 

under funded, using 0.4% resources.  This estimate 

is based on 15k a year for unplanned major 

repairs.

0 N/A 0 N/A 0 N/A 4,549,850 Estimated New Art via the 1% Art 

Ordinance ($800k) and a new Cultural 

Facility ($3.75M)

4,996,418

F&A 925,472 32% of total is software maintenance 

costs, other notable accounts include 

R/M Office (25%) and R/M Shop (21%)

0 N/A 362,800 Copiers, Printers and Vehicle 

replacements

400,000 OnBase improvement and growth 0 N/A 0 N/A 1,688,272

Fire 5,899,624 Vehicle Maintenance accounts for 

approximately 58% of total Minor R/M 

costs; followed by Building R/M at 19%

6,116,197 Hydrants account for $3.6M or 59%, Remainder 

consists of Roofing, Painting, etc.  Fire is working 

with Public Works to see if they can pass the 

hydrant assets on to United Water for a more 

sustainable future replacement strategy.  There is 

a large bubble for replacement in 2020.

11,955,689 9 Engine/Truck Replacements $6.6M; 

SCBA Replacement $1.9M; Heavy 

Rescue Truck $703k; Hackney Tractor 

& Trailer $672k; Staff Vehicle 

Replacement $758k; Dive Team 

Equipment $285.  Equipment 

replacement is large due to recent 

budget constraints and as a result 

deferred purchases.

17,068,000 The majority is station remodels and 

replacements $13.0M.  Fire Burn Tower 

replacement $3.7M

3,603,643 Ladder Truck $1.9M; Station 14 

Engine $642k; Additional water 

tender $468k; Tech Rescue 

equipment $233k; Command Trailer 

$125k

3,791,000 Training Props $3.3M (not IF eligible); 

Station 8 Land Purchase $500k

48,434,153

IT 4,371,752 IT's Minor R&M is predominately 

made up of two accounts System 

Maintenance (93%) and Software 

Maintenance (5%)

6,880,000 Infrastructure and Phone Replacement Fund, 

$860k/year; switches, routers, servers, etc.

538,500 AV , Electrical total $320k, $40k/year;  

Remainder is auto and printer/copier 

needs

11,596,860 Current ERP replacement funding in FY 

2012, New IT Strategic Plan in progress 

and preliminary number is estimated at 

$1.4M a year starting in FY 2013.

0 N/A 0 N/A 23,387,112

Legal 254,392 Legal's Minor R&M is predominately 

made up of two accounts Software 

Maintenance (62%) and Equipment 

R/M (29%)

0 N/A 98,000 50k for JustWare system, remainder is 

copier replacements

0 N/A 0 N/A 0 N/A 352,392

Library 1,795,192 Library spends the majority of it's 

Minor R/M budget on Building R/M 

(53%) with System Maintenance at 

31%

4,669,224 Carpet & Paint $797k; HVAC $1.0M; Exterior 

Improvements $828k; Doors & Windows $482k; 

Electrical $337k; Safety Upgrades $456k; Other 

$509k, If new Main is built $2.15M would not 

occur

767,227 Copiers, Furniture replacement, check‐

in stations, shelving, and service 

vehicles

5,599,000 $1.1M Cole & Ustick expansion; $700k 

relocation of Hillcrest; ILS System 

upgrade $600k; Main Lib Re‐design 

$70k; $3.2 would not occur if new Main 

is built

0 N/A 11,559,000 Bown Library $6.8M; RFID Tags & 

Workstations $750k; RFID Auto Sort 

$4.0M

24,389,643

Parks 9,172,960 Parks has the largest Minor R/M 

budget due to the size of the 

department's footprint; 44% of Park's 

Minor R/M expenses are related to 

Buildings, 30% to R/M Shop and 22% 

to R/M Office

16,176,976 This includes Asphalt, Building/Structure, 

Irrigation, Sports Facility, Pool, Fence, Playground 

repair/replacement and several other types.  All of 

the repairs in this category are in excess or 5k, 

making them Major R&M.   

7,513,606 Utility Vehicles, Mowers, 3/4 Ton and 

1/2 Trucks, Lifts, Tractors, Zamboni, 

and Copiers

11,752,000 Amenities in Existing parks, 61% of total, 

for 27 park locations $7.19 M, Largest is 

Julia Davis $1.9M (funded by 

donations); ; Whitney and Lowell Pool 

Re‐build $4.5M;  Given General Fund 

fiscal constraints, $10.3M in GF funded 

projects have been differed beyond FY 

2019. 

0 N/A 21,202,828 Open Space Acq $5.1M; Marianne 

Williams $2.7M; River Recreation Park 

$5.6M; Remainder is amenities in new 

parks; Given Impact Fee fiscal 

constraints, $32.6M in projects have 

been deferred beyond FY 2019 

65,818,370

PDS 760,592 R/M Shop accounts for 51% of 

historical expenditures followed by 

System Maintenance at 34%

0 N/A 1,076,930 Majority is staff service vehicles and 

copiers.

0 N/A 0 N/A 0 N/A 1,837,522

Police 8,273,000 85% of historical expenses are R/M 

Shop, the remaining expenses are 

spread over several accounts

0 N/A 13,109,598 Patrol Cars ($6.9M) are approximately 

53% of the total, 25 units per year, 

while other vehicles make up 44% 

($5.7M) which includes Staff, SRO, CID 

and NARC vehicles and Police SUV's 

and motorcycles.  Misc equipment 

accounts to the remainder.

1,760,000 Consists of Firing Range Improvements 

that will be phased over 5 years.

0 N/A 5,850,000 Central District Station $3.8M (50% 

Impact Fee eligible); Vehicle Storage 

$2.0M (25% Impact Fee eligible)

28,992,598

PW ‐ GB 4,088,960 Public Works Minor R/M is spread 

evenly throughout all of their accounts 

(buildings, office, paint, HVAC, 

electrical, plumbing, etc.)

2,067,794 HVAC $245k, Carpet $420k, HR Remodel $340k, 

Roofing $400k

722,389 Vehicles and Security technology 0 N/A 0 N/A 0 N/A 6,879,143

Total Expenses 35,868,512 36,030,191 36,144,739 48,175,860 3,603,643 N/A 46,952,678 206,775,622

average per year 4,483,564$        4,503,774$      4,518,092$             6,021,983$        450,455$            5,869,085$        25,846,953$                     

8‐Year Dept Total8‐Year Category Totals by Department

New Assets (New Service Level/Growth Related)Existing Assets

New CapitalNew Equipment (Growth Related)Major Capital Remodel, Renovation & 

ReplacementMajor Equipment (Replacement)Major R&M (Repair & Maint.)Annual Maintenance (Minor R&M)

mzuzel
Typewritten Text
mzuzel
Typewritten Text
Appendix A

8 YEAR DEPARTMENT SUMMARY

Anticipated Resources

Funding Source Dept Total

General Fund 35,868,512$       This category is funded fully currently 

and represents the resources 

necessary to cover Minor R&M costs 

(items < 5k); Underfunding this can 

lead to increased Major R&M costs 

31,889,324$     This expense has historically occurred in the 

Capital Fund.  $3.8 million a year is what the City 

has recently dedicated to Major R&M.  The 

General Fund transfer portion of this resource is 

assumed to grow at 2.75% a year. 

30,848,434$            Approximately $3.5 million a year 

growing at 2.75% a year has been 

assigned to Major Equipment (items > 

5k)  

12,587,591$       This expense has historically occurred 

in the Capital Fund.  $1.5 million a year 

is what the City has recently dedicated 

to Capital after allotting Major R&M 

funds.  The General Fund transfer 

portion of this resource is assumed to 

grow at 2.75% a year. 

‐$                         N/A ‐$                         N/A 111,193,861$                  

average per year 4,483,564$        3,986,166$      3,856,054$             1,573,449$        . ‐$                         ‐$                         13,899,233$                     

Impact Fees ‐$                          Station 14 Engine ($642k) and a 

ladder truck ($1.9M) are eligible but 

repayment would have to occur after 

FY 2020 

9,642,328$         Parks: $7.2M,   Police: $2.4M (50% 

Central Dist. Station, 25% Vehicle 

Storage) 

9,642,328$                       

Donations/Other 300,000$            ILS system upgrade equity account 6,850,000$         $4.5 M River Recreation Park; $1.9M 

Julia Davis;   

7,150,000$                       

Foothills Levy 4,200,000$        Foothills Levy 4,200,000$                       

NACFR 271,850$           Station 16, 18 and 20 Major R/M, NACFR funded  114,375$                 Replacement of 4 NACFR vehicles, 

NACFR funded 

360,000$             Station 16 Remodel, NACFR funded  746,225$                          

Airport 41,550$            ARFF Station Major R/M 2,500,000$        Airport Funded New ARFF Station 2,541,550$                       

Total Revenues 35,868,512$      32,202,724$    30,962,809$           15,747,591$      ‐$                         20,692,328$      135,473,964$                  

average per year 4,483,564$        4,025,341$      3,870,351$             1,968,449$        ‐$                         2,586,541$        16,934,246$                     

Difference 0 (3,827,467) (5,181,930) (32,428,269) (3,603,643) (26,260,350) (71,301,658)

average per year ‐$                        (478,433)$        (647,741)$               (4,053,534)$       (450,455)$          (3,282,544)$       (8,912,707)$                     

*8‐Year timeframe does not include the City Hall West roof ($1.46M), City Hall Code Update ($9.9M) and a New Main Library ($119.0M)

   Each of the projects are 30+ year asset replacements and do not represent a normal 8‐Year timeframe

Estimated Operating Costs Associated with 8‐Year Capital Needs as Presented:Parks: Total $909,506, $252k Existing Assets, $657k New AssetsLibrary:  Bown Crossing $800,000, if Main were added, Main: $2,000,000 

Capital Fund Resources (Used to Fund Major R&M and Capital Needs)*Excludes Partnerships/Donations/Impact Fee Fund

General Fund Transfer 2,550,000       Assumes a Growth Rate of 2.75% annually

Electric Franchise Fee 2,550,000       Static, No Growth Rate

Interest 200,000           Assumed Static, No Growth Rate

Total 5,300,000      

Major R&M (Replacement) Major Equipment (Replacement) Capital New Equipment (Growth Related) New Capital

8‐Year Category Totals by Department8‐Year Dept Total

Existing Assets New Assets

Annual Maintenance (Minor R$M)

Police Major Equipment

Appendix B

2014 2015 2016 2017 2018 2019

Police Equipment

Funding ItemGF Instant Armor Tactical Blanket 8,500                17,000GF Patrol Canine ‐ 1 every 2 years 10,000              10,000            10,000           GF Thermal Imager 12,000              12,000GF Evidence Light Source 20,000             GF CNT Rescue Phone 22,000             GF ESU/ Jail Transport Van 25,000             GF CSS Vehicle Replacement ‐ 1 per year 26,010              26,530 27,061 27,602 28,154 28,717GF Motorcycles ‐ 5 per year 85,372              87,080 88,821 90,598 92,410 94,258GF Police SUV's ‐ 3 per year 100,112           102,115 104,157 106,240 108,365 110,532GF Narcotics Vehicle ‐ 1 per year 128,481           131,051 133,672 136,345 139,072 141,853GF SRO (V6) ‐ 6 per year 171,325           174,752 178,247 181,812 185,448 189,157GF CID Mid‐Size Vehicles ‐ 10 per year 246,481           251,411 256,439 261,568 266,799 272,135GF Place Holder for Property and Evidence  300,000          GF Police Vehicles (V6) ‐ 12 per year 342,528           349,379 356,366 363,494 370,764 378,179GF Police Vehicles (V8) ‐ 13 per year 488,556           498,327 508,294 518,459 528,829 539,405GF Intoxalizer 5000 6,000GF Polygraph Computer/Software/Equipment 7,500GF Fingerprint Development Chamber 10,450GF Vehicle Disrupter 15,000

GF

Smart Board Replacement/ Printer for Patrol 

Briefing Room 10,000GF Clubcar Utility Vehicle 12,000Grant ICAC UC Computers Mac Pro w/ Software 7,500Grant ICAC Storage System 20,000Grant Laser Scene Capture 60,000TBD Lenco Bearcat Armored Vehicle 250,000

Equipment Total 1,986,366        1,776,094           1,685,056      1,686,118        1,729,840      2,004,237     

Fiscal Year

Police CapitalAppendix C

City of BoisePolice Capital Improvement Plan, 2011-2020

Square CIP Associated

Type of Capital Infrastructure Feet Acreage Value times equals O&M Cost

Facilities not including staffing

2013 Improvements to Firing Range 440,000$ 0%

2014 Improvements to Firing Range 220,000$ 0% -$ $ -

2015 Improvements to Firing Range 300,000$ 0%

2016 Improvements to Firing Range 400,000$ 0%

2017 Improvements to Firing Range 400,000$ 0%

2016 Central District Station 18,500 3.00 3,850,000$ 50% 1,925,000$ $ 75,850

2017 Vehicle Storage (impound and evidence) 24,000 2.00 2,000,000$ 25% 500,000$ $ -

Total Infrastructure 7,610,000$ 2,425,000$ 75,850$

Growth Amount to