Point class patrol vessel 207
-
Upload
nelson-bravo -
Category
Documents
-
view
329 -
download
0
Transcript of Point class patrol vessel 207
DRY DOCK PERIOD OF PATROL VESSEL P-207 “28 DE NOVIEMBRE”, BELONG TO SERVICIO NACIONAL AERONAVAL DE PANAMÁ (PANAMANIAN COAST GUARD).LOA : 25.25 MTS (82 FT)BEAM : 5.36 MTS (17 FT)DISPLACEMENT : 69 TONS
PERIOD: DEC 04TH 2013 TO JULY 18TH 2014
DRY DOCK: MEC PANAMÁ, BRANCH VERACRUZ
GENERAL AND PROJECT MANAGER: NELSON AGUIRREASSISTANT : ISMAEL VARELAPRODUCTION SUPERVISOR : TRADIO GONZÁLEZ
IN THE DOCKING MANUEVERING
CONDITION OF THE HULL AT THE ARRIVING
CONDITION OF THE HULL AT THE ARRIVING CONDITION OF THE HULL AT THE ARRIVING
REPLACING THE SHELL PLATE.
FINALLY, WE REPLACED 107.71 MT2 (1,159.4 FT2)
CONDITION OF THE MAIN DECK AT THE ARRIVING
WE REPLACED 100% OF MAIN DECK
MAIN DECK FINISHED
TWO OLD GENERATORS, TO BE REPLACED BY NEW CATERPILLAR C 4.4
INSTALLATION OF NEW GENERATORS
PROPULSION ENGINES, TO BE MADE AN OVERHAUL(CATERPILLAR 3412)
INSTALLATION OF PROPULSION ENGINES OVERHAULED
CONDITION OF STEERING ROOM AT THE ARRIVING
CONDITION OF THE BOW PEAK AT THE ARRIVING
CONDITION OF CO2 ROOM AT THE ARRIVING
INTERNAL SPACES, AFTER TO PAINT
CO2 ROOM CO2 ROOMSTEERING ROOMSTEERING ROOM
BOW PEAK
CONDITON OF THE CREW’S ACOMMODATION
CONDITON OF THE CREW’S BATHRROM
CREW’S ACOMMODATIONS, FINISHED
CONDITION OF THE CREW’S MESS, AT THE ARRIVING
CREW’S MESS, FINISHED
CONDITION OF THE GALLEY AT THE ARIVING
GALLEY, AFTER
CONDITION OF THE BRIDGE (PILOT HOUSE) AT THE ARRIVING
NEW NAVIGATIONS AND COMMUNICATIONS EQUIPMENT INSTALLED
THE PILOT HOUSE IS READY!!!
CONDITION OF THE MAST AND NAVIGATION LIGHTS AT THE ARRIVING
THE MAST AND NAVIGATION LIGHTS FINISHED
CONDITION OF THE CAPTAINS’S CABIN AT THE ARRIVING
CAPTAIN’S CABIN, FINISHED
CONDITION OF THE ENGINES ROOM, AFTER TO REMOVE THE MAIN ENGINES AND GENERATORS
ENGINE ROOM, FINISHED
CONDITION OF SOME PUMP AT THE ARRIVING
AIR COMPRESSOR FIRE PUMP
FRESH WATER PUMP
HYDRAULIC STARTER PUMP
HYDRAULIC STEERING PUMP HYDRAULIC STEERING PUMP
ALIGNING AND MACHINING THE PROPULSION LINE
NEW THORDON BEARING WAS INSTALLED
REPAIRING AND BALANCING THE PROPELLERS
UNDOCKING MANEUVERING, AFTER 7 MONTHS
THE TEAM MANAGER:NELSON AGUIRRE: GENERAL AND PROJECT MANAGER.ISMAEL VARELA : PRODUCTION ASSISTANT.
P-207 “28 DE NOVIEMBRE”, SAILING AGAIN….