POSITIVE MATERIAL IDENTIFICATION PROCEDURE Issued By : Kumaran QA Approved By : Bernard Wong Managing Director Date 18 th Oct 2011 18 th Oct 2011 Version 1.0

description

PMI Test Procedure

Transcript of PMI Test Procedure

Page 1: PMI Test Procedure

POSITIVE MATERIAL

IDENTIFICATION

PROCEDURE

Issued By : Kumaran QA

Approved By : Bernard Wong Managing Director

Date 18th Oct 2011 18th Oct 2011

Version 1.0

Page 2: PMI Test Procedure

PANAFLO CONTROLS PTE LTD

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

DOC. NO PFC-QA-PMI-01

REVISION 01

Page 2 of 5

CONTENTS

SECTION DESCRIPTION

1.0 SCOPE

2.0 EQUIPMENT USED

3.0 REFERENCES

4.0 EXTENT OF ALLOY VERIFICATION

5.0 DETECTIVITY

6.0 SURFACE PREPARATION

7.0 EXAMINATION AREA

8.0 CONFIGURATION & CALIBRATION

9.0 TAKING MEASUREMENT

10.0 CHECKING RESULTS

11.0 REPORTS / VERIFICATION

12.0 ACCEPTANCE CRITERIA

13.0 NON-MATCHING

14.0 ENVIRONMENTAL CONDITIONS

15.0 REPORT FORMAT

GENERAL NOTES:

1. This procedure is applied on the raw material & fabricated piping spools or other

fabricated material to meet the requirements of ASME SECTION II 2010 edition or

client procedure.

2. Personnel operating the test instrument shall be registered with the Radiation

Protection Inspectorate and fully conversant with NITON XLp 800 of XL3p800,

X-Ray Fluorescence Analyzer’s Operation Manual.

3. Caution: When the instrument is in the operation mode, the radiation level at Probe

Plastic –Film Window is about 0.1 mRihr. However, confinement of the Testing area will

not be Necessary.

4. Film Badge or Pocket Dosimeter shall be used for PIVII Technician when doing test.

Page 3: PMI Test Procedure

PANAFLO CONTROLS PTE LTD

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

DOC. NO PFC-QA-PMI-01

REVISION 01

Page 3 of 5

1. Scope

This procedure covers the requirements for Positive Material Identification to determine the

material to be tested, complies with that specified in the drawings or mill certificates or Client

procedures

2. EQUIPMENT USED

2.1 NITON XLt 898 or XL3p-800 X-ray Spectrum Analyzer

2.2 AM 241 Isotope 30mCi & X-Ray tube (Battery Operated)

3. REFERENCES

3.1 NITON XLt 898 or XL3p 800 User’s Guide 3.2 ASTM E 1476

3.2 ASTM E 1476Metallurgist Pro Alloy Data

3.3 API Recommended Practice 578 (2nd Edition 2010)

3.4 Metallurgist Pro Alloy Data

3.5 Client Specification

4. EXTENT OF ALLOY VERIFICATION

4.1 The location of alloy verification to be canied out shall be in accordance to client

requirements/specifications.

4.2 Location of alloy verification to be tested are restricted by the accessibility of test items for the

alloy analyzer to be replaced.

5. DETECTIVITY

5.1 The instrument provides fast and efficient measurement of the elements of atomic munber 22

and above

6. SURFACE PREPARATION

6.1 The test surface to be measured shall be free from surface irregularities, paint, loose scale or

any contaminant that might interfere with the examination.

6.2 Such surface conditioning can be achieved by power brushing, shot blasting or any approved

methods.

Page 4: PMI Test Procedure

PANAFLO CONTROLS PTE LTD

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

DOC. NO PFC-QA-PMI-01

REVISION 01

Page 4 of 5

7. EXAMINATION AREA

7.1 The examining area of the metal surface to be prepared for measurement shall be at least

30min in diameter.

8. CONFIGURATION & CALIBRATION

8.1 On initial switching on of the instrument, it will undergo configuration process of approximately

thirty (30) minutes.

8.2 Following which the screen will indicate the test mode, later than the instrument is calibrated

using the known sample.

8.3 If the composition is not very near to 100% the test is repeated & once the sample is

confirmed, tests are done similarly on the material to be analyzed.

9. TAKING MEASUREMENT

9.1 Take the window where the radiation is emitted shall be placed, flushed against the surface of

the prepared spot.

9.2 Held in the position, the instrument will be turned on in operation mode by triggering the lock

and hold

9.3 Measurement is accomplished within thirty (30) seconds.

10. CHECKING RESULTS

10.1 Results shall be compared against mill certificates of the pipe manufacturers, while the

electrode / filler rod manufacturer or the identified material grade from the supporting spool

drawing.

10.2 Upon completion of all positive material identification, the area being tested shall be marked

with "PMIV" with a low stress stamp, if the client specifically requests.

11. REPORTS / VERIFICATION

11.1 The spool drawings of all items tested shall be stamped "Alloy Verified" signed and dated by

the Inspector who performed the testing, if requested by the client.

11.2 A report containing all readings taken and also be generated as per clients request

Page 5: PMI Test Procedure

PANAFLO CONTROLS PTE LTD

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

DOC. NO PFC-QA-PMI-01

REVISION 01

Page 5 of 5

11.3 The report shall contain major elements and composition shall be within limits as specified in

standards or client specification.

12. ACCEPTANCE CRITERIA

12.1 The acceptance criteria shall be in accordance with ASIVIE Section II or ASTM

Specifications.

13. NON-MATCHING

13.1 Disparity on any fittings, pipe piece or weld shall be re-verified by taking an additional

measurement.

13.2 Upon confirmation of nonconforming material, the item shall be marked "R" and reported to

client's representative.

13.3 Non-conforming material is recommended for replacement or repairs, followed by retest.

14. ENVIRONMENTAL CONDITIONS

14.1 The location where the "PIVII" to be canied out shall be flee from noise / vibration and