Activity ID Activity Name OriginalDuration
Predecessors Successors
CHEMICAL IN
CHEMICAL INJECTION FACILITIES AT ADRD 360d
MILESTONES
MILESTONES 324d
MILESTONE1000 Effective Date Of Contract 0d PRELIM1000
MILESTONE1010 APPROVED PM PLANS 0d PM1010, PM1006, PM1009,
PM1007, PM1008, PQP1010
MILESTONE1050, CONST1000, CONST1060
MILESTONE1020 QHSE DOCUMENTS APPROVED 0d QHSE1030, QHSE1050,QHSE1040, QHSE1070,QHSE1125
MILESTONE1050, CONST1000, CONST1060
MILESTONE1030 Method Statements Approved 0d MS1011, MS1007, MS1013,MS1015, MS1019, MS1009,MS1001, MS1003, MS1005,MS1017
MILESTONE1050, CONST1000, CONST1060
MILESTONE1040 DESIGN DELIVERABLE LIST 0d ENG1160, ENG1290,ENG1180, ENG1190,ENG1200, ENG1210,ENG1220, ENG1230,ENG1240, ENG1250,ENG1260, ENG1140
CONST1000, CONST1060, CONST1120
MILESTONE1050 CONSTRUCTION START 0d MILESTONE1010,MILESTONE1020,
MILESTONE1060 Final Hand Over 0d COMM1040, COMM1015, C
PRELIMINARI
PRELIMINARIES 24d
PRELIM1000 Recipt of Letter of Award ( LOA) 1d MILESTONE1000 PRELIM1010
PRELIM1010 Letter of Acknowledgement 1d PRELIM1000 PRELIM1020PRELIM1020 Letter of Assistance 10d PRELIM1010 PRELIM1030
PRELIM1030 Secrurity & Refinery Pass 10d PRELIM1020 PRELIM1040
PRELIM1040 Kick Off Meeting for the Project 1d PRELIM1030 PM1001, PM1004, PM1002, PQP1000, ENG1001,PM1005, PM1003, PM1000, MS1010, MS1006,MS1012, MS1014, MS1018, MS1008, MS1000,MS1002, MS1004, MS1016, QHSE1000,QHSE1010, QHSE1020, QHSE1060, QHSE1100
PROJECT MA
PROJECT MANAGEMENT 32d
PM1000 Mobilization of Project team 20d PRELIM1040 ENG1001
SUBMISSION
SUBMISSION 20d
PM1001 Sumbission of Project Execution Plan 20d PRELIM1040 PM1006
PM1002 Submission of Organization Chart 7d PRELIM1040 PM1007
PM1003 Submission of Project Co-Ordination Register 7d PRELIM1040 PM1008
PM1004 Submission of Project Procurement Plan 7d PRELIM1040 PM1009
PM1005 Submission of Document Deliverables Register 7d PRELIM1040 PM1010
APPROVAL
APPROVAL 25d
PM1006 Approval Project Execution Plan 12d PM1001 MILESTONE1010
PM1007 Approval of Organization Chart 12d PM1002 MILESTONE1010
PM1008 Approval of Project Co-ordination Register 12d PM1003 MILESTONE1010
PM1009 Approval of Project Procurement Plan 12d PM1004 MILESTONE1010
PM1010 Approval Of Document Deliverable Register 12d PM1005 MILESTONE1010
CHEMICAL INJECTION FACILITIES AT ADRD
Engr Nouman Zia
-
7/27/2019 PM With Comments 12october
2/8
Activity ID Activity Name OriginalDuration
Predecessors Successors
PROJECT QU
PROJECT QUALITY PLAN 17d
PQP1000 Submission of Project Quality Plan ( PQP) 5d PRELIM1040 PQP1010
PQP1010 Approval of Project Quality Plan 12d PQP1000 MILESTONE1010
QHSE DOCU
QHSE DOCUMENTATION 45d
HSE PLAN
HSE PLAN 15dSUBMISSION
SUBMISSION 5d
QHSE1000 Submission of HSE Plan 5d PRELIM1040 QHSE1030
QHSE1010 Submission of TRA 5d PRELIM1040 QHSE1040
QHSE1020 Submission of Emergency Rescue Plan 5d PRELIM1040 QHSE1050
APPROVAL
APPROVAL 10d
QHSE1030 Approval of HSE Plan 5d QHSE1000 MILESTONE1020
QHSE1040 Approval of TRA 10d QHSE1010 MILESTONE1020
QHSE1050 Approval of Emergency Rescue Plan 10d QHSE1020 MILESTONE1020
INSPECTION T
INSPECTION TEST REPORT 15d
QHSE1060 Submission Of ITP 5d PRELIM1040 QHSE1070
QHSE1070 Approval Of ITP 10d QHSE1060 MILESTONE1020
WELDER PRO
WELDER PROCEDURE SPECIFICATION 15d
QHSE1100 Submission Of WPS 5d PRELIM1040 QHSE1105
QHSE1105 Approval Of WPS 10d QHSE1100 QHSE1110
PROCEDURE
PROCEDURE QUALIFICATION REPORT 15d
QHSE1110 Submission Of PQR 5d QHSE1105 QHSE1115
QHSE1115 Approval Of PQR 10d QHSE1110 QHSE1120
WELDER QUA
WELDER QUALIFICATION TEST 15d
QHSE1120 Submission Of WQT 5d QHSE1115 QHSE1125QHSE1125 Approval Of WQT 10d QHSE1120 MILESTONE1020
METHOD STAT
METHOD STATEMENTS 15d
CIVIL WORKS
CIVIL WORKS 15d
MS FOR FO
MS FOR FOUNDATION FOR SKIDS 15d
MS1010 Submission of MS for the Foundations for Skids 5d PRELIM1040 MS1011
MS1011 Approval of MS for the Foundation for Skids 10d MS1010 MILESTONE1030
MS FOR CO
MS FOR CONSTRUCTION OF DUCT BANKS IN ROAD CROSSING 15d
MS1006 Submission of MS for the construction of Ducts Banks in Road Crossing 5d PRELIM1040 MS1007
MS1007 Approval of of MS for the construction of Ducts Banks in Road Crossing 10d MS1006 MILESTONE1030
METHOD STAT
METHOD STATEMENTS FOR MECHANICAL WORKS 15dMS FOR INS
MS FOR INSTALLATION OF EQUIPMENT 15d
MS1012 Submission Of MS For Equipment 5d PRELIM1040 MS1013
MS1013 Approval For MS For Equipment 10d MS1012 MILESTONE1030
MS FOR INS
MS FOR INSTALLATION OF PIPING 15d
MS1014 Submission Of MS For Installation Of Piping 5d PRELIM1040 MS1015
MS1015 Approval For MS For Installation Of Piping 10d MS1014 MILESTONE1030
MS FOR INS
MS FOR INSTALLATION OF VALVES 15d
MS1018 Submission Of MS For Installation Of Valves 5d PRELIM1040 MS1019
MS1019 Approval For MS For Installation Of Valves 10d MS1018 MILESTONE1030
MS FOR SA
MS FOR SANDBLASTING & PAINTING 15d
MS1008 Submission of MS for Sandblasting & Painting 5d PRELIM1040 MS1009
MS1009 Approval of MS for Sandblasting & Painting 10d MS1008 MILESTONE1030
ELECTRICAL &
ELECTRICAL & INSTRUMENTATION WORKS 15d
CHEMICAL INJECTION FACILITIES AT ADRD
Engr Nouman Zia
-
7/27/2019 PM With Comments 12october
3/8
-
7/27/2019 PM With Comments 12october
4/8
-
7/27/2019 PM With Comments 12october
5/8
-
7/27/2019 PM With Comments 12october
6/8
Activity ID Activity Name OriginalDuration
Predecessors Successors
PROC1330 Submission of submittals of Flow Transmitter 1d ENG1220, ENG1230,ENG1240, ENG1250,ENG1260
PROC1340
PROC1340 Approval of Flow Transmitter 5d PROC1330 PROC1350
PROC1350 PO for Flow Transmitter 1d PROC1340 PROC1360PROC1360 Delivery at Site 52d PROC1350 INST1000
CONSTRUCTICONSTRUCTION 174d
CIVIL WORKSCIVIL WORKS 155d
FOUNDATION FFOUNDATION FOR ANTI STATIC SKID 5122-L 22d
CONST1000 Excavation For Skid Foundtion 5122-L 7d PROC1030,MILESTONE1010,
CONST1010, MECH1040
CONST1010 Compaction 2d CONST1000 CONST1020
CONST1020 Steel Reinforcement 3d CONST1010 CONST1030
CONST1030 Shuttering Fixing 3d CONST1020 CONST1040
CONST1040 Concrete Pouring 1d CONST1030 CONST1050
CONST1050 Curing For Skid Foundtion 5122-L 7d CONST1040 MECH1010, MECH1020, MECH1170
FOUNDATION FFOUNDATION FOR LUBRICITY IMPROVER 7006-L 24d
CONST1060 Excavation For Skid Foundtion 7006-L 7d PROC1430,MILESTONE1010,
CONST1070
CONST1070 Compaction 2d CONST1060 CONST1080
CONST1080 Steel Reinforcement 3d CONST1070 CONST1090
CONST1090 Shuttering Fixing 3d CONST1080 CONST1100
CONST1100 Concrete Pouring 1d CONST1090 CONST1110
CONST1110 Curing For Skid Foundtion 5122-L 9d CONST1100 MECH1240, MECH1025EXCAVATION FEXCAVATION FOR CABLE TRENCHES 9d
CONST1120 Excavation for Cable Trenches 7d MILESTONE1040,PROC1200, PROC1240
CONST1130
CONST1130 Laying of Cable Trenches 1d CONST1120 CONST1140
CONST1140 Backing Filling 1d CONST1130
MECHANICALMECHANICAL WORKS 130d
MECH1010 Installation of Safety Sign & Emergency Procedure Board Near Anti Static inj Facility 5d CONST1050 COMM1012
MECH1020 Installation Of Safety Shower & Eyewash Facility For 5122-L 5d CONST1050, PROC1120 MECH1030
MECH1025 Installation Of Safety Shower & Eyewash Facility For 7006-L 5d PROC1710, CONST1110 MECH1035
MECH1030 Laying Of Water Supply line & Tie in to Nearest Potable water system For 5122-L 5d MECH1020 COMM1012
MECH1035 Laying Of Water Supply line & Tie in to Nearest Potable water system For 7006-L 5d MECH1025 COMM1012
MECH1040 Removal Of 4'' Existing Redundant Water Pipeline & Gas Oil Flushing 7d CONST1000 MECH1110
PIPE FABRICAPIPE FABRICATION 130d
SHOP FABRISHOP FABRICATION 39d
MECH1050 Marking & Cutting Of Pipes as Per Isometeric Drawing 5d PROC1510, PROC1450,PROC1470, PROC1550,PROC1080, PROC1590,PROC1630, PROC1160,PROC1670
MECH1060
MECH1060 Preparation of Fitups 3d MECH1050 MECH1070
MECH1070 Welding Of Pipe Spools 10d MECH1060 MECH1080
MECH1080 RT Of Pipe Spools 4d MECH1070 MECH1090
MECH1090 Hydrotesting of Pipe Spools 3d MECH1080 MECH1100
CHEMICAL INJECTION FACILITIES AT ADRD
Engr Nouman Zia
-
7/27/2019 PM With Comments 12october
7/8
-
7/27/2019 PM With Comments 12october
8/8
Activity ID Activity Name OriginalDuration
Predecessors Successors
ELECTRICALELECTRICAL WORKS 18d
POWER & SIGPOWER & SIGNAL CABLE INSTALLATION 18d
CHEMICAL ICHEMICAL INJECTION SKID 7006-L 18d
ELECT1020 Installation of All Power & Control Cables in New cable Trays From substation 70 to 2 nosInj Pump Motors
3d PROC1200, PROC1240 ELECT1030
ELECT1030 Installation of All Power & Control Cables in New cable Trays From substation 70 to 1 no 3d ELECT1020 ELECT1040
ELECT1040 Installation Of Earth/ Grounding cables, fittings & Accessories to Existing Earth Grid 3d ELECT1030 ELECT1050
ELECT1050 Installation of All Power & Control Cables in below ground Tranches 3d ELECT1040 ELECT1055
ELECT1055 Termination of Cables with the Skid 3d ELECT1050 ELECT1065
ELECT1065 Installation of Junction Boxes 3d ELECT1055 COMM1015
CHEMICAL ICHEMICAL INJECTION SKID 5122-L 18d
ELECT1000 Installation of All Power & Control Cables in New cable Trays From substation 21 to 1 nosTransfer Pump Motor
3d PROC1200, PROC1240 ELECT1010
ELECT1010 Installation of All Power & Control Cables in New cable Trays From substation 21 to 2 no 3d ELECT1000 ELECT1060
ELECT1060 Installation Of Earth/ Grounding cables, fittings & Accessories to Existing Earth Grid 3d ELECT1010 ELECT1070
ELECT1070 Installation of All Power & Control Cables in below ground Tranches 3d ELECT1060 ELECT1090
ELECT1090 Termination of Cables with the Skid 3d ELECT1070 ELECT1110
ELECT1110 Installation of Junction Boxes 3d ELECT1090 COMM1015
INSTRUMENTAINSTRUMENTATION & CONTROLS WORKS 8d
INST1000 Installation of Flow transmitter 2d PROC1360 INST1005
INST1005 Installation of Flow Element 2d INST1000 INST1015
INST1015 Installation Of Instrumentation Control System 2d PROC1280, INST1005 INST1020
INST1020 Configuration of DCS 2d INST1015 COMM1015
TESTING & CTESTING & COMMISSIONING 54d
COMM1012 Commissioning of Chemical Injection Skids 7d MECH1160, MECH1300,MECH1230, MECH1470,MECH1010, MECH1030,MECH1410, MECH1035
ENG1170, COMM1015, COMM1040,MILESTONE1060
COMM1015 Commissioning Of Instruments 7d ELECT1065, ELECT1110,INST1020, COMM1012
COMM1020, COMM1040, MILESTONE1060
COMM1020 Demobilization 7d ENG1172, COMM1015 COMM1050
COMM1040 Training Of Personnel 4d COMM1012, COMM1015 COMM1050, MILESTONE1060
COMM1050 Project Close Out Report 10d COMM1040, COMM1020