PLTU SELURUH INDONESIA
KELOMPOK 1
AMALIA SARASWATI L2F008005ARI HASTANTO L2F008011BAYU PRIMASTHA L2F008016GIGIH MAHARTOTO L2F008039
Fast track – Power Plants in Java
3
Consortium Sinomach CNEEC and PT Penta Adi Samudra
2 x 300 MWPLTU 3 Jawa Timur – Tanjung Awar-Awar
10
1 x 600 MWPLTU 2 Jawa Tengah - Cilacap9
Consortium Harbin Power Engineering and Mitra Selaras Hutama Energi
1 x 600 MWPLTU 2 Jawa Timur - Paiton8
Consortium Dongfang Electric and Dalle Energy
2 x 315 MWPLTU 1 Jawa Timur - Pacitan7
Consortium Zelan, Tronoh and Priamanaya2 x 315 MWPLTU 1 Jawa Tengah - Rembang6
Consortium Shanghai Electric and Maxima Infrastruktur
3 x 350 MWPLTU 2 Jawa Barat – Pelabuhan Ratu5
Consortium Sinomach, CNEEC, PT Penta Adi Samudra
3 x 330 MWPLTU 1 Jawa Barat - Indramayu4
Consortium Dongfang Electric and Dalle Energy
3 x 315 MWPLTU 3 Banten – Lontar,Teluk Naga3
Consortium Truba Jurong Engineering and Chengda Engineering Corp.
2 x 300 MWPLTU 2 Banten - Labuhan2
Consortium of China National Technical Import & Export Corporation (CNTIC), China National Machinery Import & Export Corporation, Zhejiang Electric Power Design Institute and PT Rekayasa Industri
1 x 625 MWPLTU 1 Banten – Suralaya1
StatusEPC ContractorCapacity (MW)Power PlantNo
On hand
On hand
On hand
On hand
On hand
PLTU Tanjung Jati B Jepara
Pengelola : PT. PLN (Persero) Pembangkitan Tanjung Jati B
LOKASI :Desa Tubanan Kecamatan Kembang
Kabupaten Jepara 59457
KAPASITAS :2 x 661 MWBahan bakar : batu baraDistribusi : Jawa-Bali
PLTU PT Krakatau Daya Listrik
Pengelola : PT Krakatau Steel (KS) dan PT Truba Alam Manunggal Engineering Tbk (TAME)
LOKASI : Cilegon, Banten KAPASITAS : 400 MW JENIS & JUMLAH
PEMBANGKIT : 5 PLTUBahan bakar : batu baraDistribusi : Jawa-Bali
PLTU SURALAYA (BANTEN 1)
Pengelola : PT. Indonesia PowerPLTU Suralaya terletak di desa
Suralaya Merak Kotamadya Cilegon, Jawa Barat 7 Km kearah utara dari Pelabuhan Penyeberangan Merak
PLTU Suralaya pembangunannya dilakukan dalam 3 (tiga) tahap yang seluruhnya berjumlah 7 unit :- Tahap I = 2x400 MW beroperasi tahun 1984- Tahap II = 2x400 MW beroperasi tahun 1989- Tahap III = 3x600 MW beroperasi tahun 1997
BAHAN BAKAR : BATU BARAMemasok energi ke JAMALI
PLTU I JAWA TIMUR-PACITAN
Pengelola : PT. PLN (Persero) dan Konsorsium dari China National Machenery Industry (SINOMACH ), China National Electric Equipment Corporation (CNEEC ) dan Perusahaan Lokal PT. Penta Adi Samudera
Lokasi proyek berada di Desa Sukorejo,
Kecamatan Sudimoro, Kabupaten Pacitan
PLTU I Jawa Timur – Pacitan dengan kapasitas 2 x 315 MW
PLTU Asam-Asam
Pengelola : PT Mentawai Surak Wisata (PMA)
LOKASI : Desa Asam-asam, Kecamatan Jorong, Kabupaten Tanah Laut, Kalimantan Selatan
KAPASITAS : 2 x 65 MWJENIS & JUMLAH
PEMBANGKIT : Unit I dan II
Bahan bakar: batu bara
Bangka Power PlantProject Company PT Bangka Manunggal Power
Location Bangka-Belitung
Fuel Coal
Units 2x12 MW
Minimum fuel requirements 30,000 tons per annum
Off Take PLN
Construction status 14%
EPC contractor PT Truba Jaya Engineering (TJE)
Expected COD September 2009
Off Take status 25 years PPA to PLN
Off Take price Rp.448.15/ Kwh (Coal cost pass through)
Designed delivery per annum 147,269,000 Kwh
Financing status Secured project finance from local bank
Pontianak Power PlantProject Company PT Equator Manunggal Power
Location Pontianak, West Kalimantan
Fuel Coal
Units 2x30 MW
Minimum fuel requirements 218,000 tons per annum
Off Take PLN
Construction status 10%
EPC contractor PT Truba Jaya Engineering (TJE)
Expected COD December 2010
Off Take status 25 years PPA to PLN
Off Take price Rp.447.05/ Kwh (Coal cost pass through)
Designed delivery per annum 350,640,000 Kwh
Financing status Secured syndicated loan from local banks
CP Bahari Power PlantProject Company PT Central Daya Energi
Location Tulang Bawang, Lampung
Fuel Coal
Units 4x30 MW
Minimum fuel requirements 590,000 tons per annum
Off Take Central Pertiwi Bahari and Central Protein Prima
Construction status 30%
EPC contractor Shanghai Electric Group Company, TAME Turnkey, PT Manunggal Engineering
Expected COD 1st unit in May 2009, and completion in December 2009
Off Take status 30 years PPA to CPB and CPP
Off Take price Rp.1,165/ Kwh
Designed delivery per annum 781,200,000 Kwh
Financing status In discussion
Kuala Tanjung Power PlantProject Company PT Ranyza Energi
Location Kuala Tanjung, North Sumatra
Fuel Coal
Units 2x135MW
Minimum fuel requirements 930,000 tons per annum
Off Take PLN
Construction status
EPC contractor PT Manunggal Engineering and Shanghai Machinery
Expected COD July 2010
Off Take status 30 years PPA to PLN
Off Take price USD cents 4.748/ Kwh (Coal cost pass through)
Designed delivery per annum 1,789,315,920 Kwh
Financing status In discussion
Banyuasin Power PlantProject Company PT Banyuasin Power Energi
Location Banyuasin, South Sumatra
Fuel Coal
Units 2x125MW
Minimum fuel requirements 949,000 tons per annum
Off Take PLN
Construction status
EPC contractor TAME Turnkey Contracting
Expected COD December 2010
Off Take status 30 years PPA to PLN
Off Take price USD cents 4.2568/ Kwh (Coal cost pass through)
Designed delivery per annum 1,758,000,000 Kwh
Financing status In discussion
Banjarsari Power PlantProject Company PT Bukit Pembangkit Innovative
Location Gunung Kembang, South Sumatra
Fuel Coal
Units 2x100MW
Minimum fuel requirements 870,000 tons per annum
Off Take PLN
Construction status
EPC contractor CNEEC
Expected COD September 2010
Off Take status 30 years PPA to PLN
Off Take price Rp.459.4/ Kwh (Coal cost pass through)
Designed delivery per annum 1,401,600,000 Kwh
Financing status Local bank financing
PLTU DI LUAR JAWA BALI