Plant Life Management Activities for Long Term Operation in Nuclear PowerLong Term Operation in Nuclear Power

Plants

Feb. 22, 2011

Ki Sig Kang,T h H d PLiM/ LTOTech. Head, PLiM/ LTO

Page 2: Plant Life Management Activities for Long Term Operation in ...

America and Pacific Asia Npps

5

6

7

2

3

4

• America : 128 NPPs

0

1

1 2 3 4 5 6 7 8 910111213141516171819202122232425262728293031323334353637383940414243

14• A i 116 NPP

• More than 20 years:122 NPPs (95%)

8

10

12

14• Asia: 116 NPPs

• More than 20 years : 62 NPPs (53%)

2

4

6

8

01112131415161718192021222324252627282930313233343536373839404142

Page 3: Plant Life Management Activities for Long Term Operation in ...

Western and Eastern Europe

12

14Unit of Reactor

6

8

10

• Eastern Europe : 70 NPPs

0

2

4

6

7

• More than 20 years : 47 NPPs (67%)

Unit of Reactor

• Western Europe : 135 NPPs• More than 20 years : 109 NPPs (80%)

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

3

4

5

6

Operating years

0

1

2

3

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33

Operating years

Page 4: Plant Life Management Activities for Long Term Operation in ...

PWR in France EPR

GRAVELINES6 units

NOGENT-sur-SEINE2 units

DAMPIERRE4 units

CHOOZ

PENLY2 unitsPALUEL

4 it

19 sitesFA3

PE3

- 58 PWR reactors in operation on 19 sites, 63 GW

2 unitsCATTENOM

4 units

FESSENHEIM

FLAMANVILLE2 units

4 units

SAINT-LAURENT

Paris- 3 standardized levels :

• 900 MW – 3 loops 34FESSENHEIM2 units

BELLEVILLE2 units

LE BUGEY4 unitsCIVAUX

2 units

CHINON4 units

SAINT LAURENT2 units

Lyon

900 MW 3 loops, 34 units, 31 GW

• 1300 MW – 4 loops, 20 units 26 GW

SAINT-ALBAN2 units

CRUAS4 units

GOLFECH2 units

LE BLAYAIS4 units

Marseille

units, 26 GW• 1500 MW – 4 loops, 4

units, 6 GWTRICASTIN

4 units

1300 MW unit (20)900 MW unit (34) 1450 MW unit (2)- 1 EPR under

construction1 th EPR d id d

Nov 3-6, 2009IAEA Workshop-Plant Life Management for LTO - Zagreb

4

- 1 other EPR decided

Page 5: Plant Life Management Activities for Long Term Operation in ...

Reactor Age of French NPP's

Page 6: Plant Life Management Activities for Long Term Operation in ...

Service life in France Npps

• Design life : 40 years• Improvement of safety continuously through

operation and maintenanceoperation and maintenance• 10 years basis through modification of installations

• Management of physical ageing of the plants (causes / consequences): • Improvement operating performanceImprovement operating performance• Dynamic and proactive way

C id i 50 tiConsidering 50 years operation.

Page 7: Plant Life Management Activities for Long Term Operation in ...

Nuclear Power Plants in Japan (March, 2011)

Hokkaido EP Co./Tomari

C /

JAP Co./Tsuruga

Kansai EP Co /Mihama

Hokuriku EP Co./Shika

Tokyo EP Co./Kashiwazaki Kariwa

Kansai EP Co./Mihama

Kansai EP Co./Ohi

Kansai EP Co /TakahamaKansai EP Co./Takahama

Chugoku EP Co./Shimane

EPDC Co./Ohma

Tohoku EP Co./Higashidori

Chugoku EP Co./Kaminoseki

Tokyo EP Co./Higashidori

Tohoku EP Co./Onagawa

Kyushu EP Co./Genkai Tohoku EP Co./Namie・Odaka

Shikoku EP Co./Ikata

Tokyo EP Co./Fukushima No.1

Tokyo EP Co./Fukushima No.2

JAP Co /Tokai No 2

Kyushu EP Co./Sendai

PWR In operation : 24 units 19.4 GWeBWR In operation : 30 units 30.2 GWeUnder construction: 3 units 3.7 GWePlanned : 11 units 13.5 GWe

JAP Co./Tokai No.2

Chubu EP Co./HamaokaOperated over 30 years

Operated over 40 years

Shut down

7

Page 8: Plant Life Management Activities for Long Term Operation in ...

Reactor Age in Japan NPPs

As of Feb, 2011

BWR : 30 unitsPWR : 24 unitsTotal : 54 unitsTotal : 54 units20 Y : 36 units

8

Page 9: Plant Life Management Activities for Long Term Operation in ...

Three Stage-Approach of the Roadmaps for Ageing Management and Safe Long Term Operation

3 Japanese LWR Plants Exceed 40 years of Operation 50 Y 60 Y

2005 2010-2011 2020 2030

Ph IPhase I Phase II Phase IIICheck & ReviewCheck & Review Check & ReviewCheck & Review

Establishment of BasisContinuousImprovement of N St f

for Ageing ManagementFrom Technical andEvaluation Systems

Improvement ofAgeing Managementby R&D andPlant Experiences

New Stage ofAgeing

Management?Plant Experiences

9Ageing Management Technical Evaluation

Page 10: Plant Life Management Activities for Long Term Operation in ...

Russian NPPs

Operated beyond design lifetime

- Under preparation for beyond design lifetime operation

10 NPPs, 30 units – 22 242 МW including12 units of the 1-st generation - 5 752 MW

- Under preparation for beyond design lifetime operation

1010

Page 11: Plant Life Management Activities for Long Term Operation in ...

Scenario Of Npps’ Power Generation In Russia

19968

21825

21408

22242

199682140821825

20000

22000

24000МW

15480

1748018492

19504

15480

1748018492

19504

16000

18000

20000

1044011440

12440

13880

1044011440

12440

13880

12000

14000 Lifetime prolongation on 15 years

6000

900010440

6000

900010440

6000

8000

10000

100020003000

40005000

6000

100020003000

40005000

2000

4000 Operation during

30 years

11

000

02000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046

Page 12: Plant Life Management Activities for Long Term Operation in ...

Long Term Operation (LTO) Strategy

1. RF Nuclear power development programme for the period up to 2010”, approved by Government act № 815,21 07 9821.07.98

2. Strategy of Development of Nuclear Power Industry in2. Strategy of Development of Nuclear Power Industry in the 1st Half of 21 Century

WWER 440 230 D i lif 25 Y 15 Y (40Y)• WWER 440- 230: Design life : 25 Y 15 Y (40Y)• WWER 440- 213 : Design life 25 Y 25 Y (50Y)• WWER 1000 : Design life 30 Y 30 Y (60Y)WWER 1000 : Design life 30 Y 30 Y (60Y)

Considering 60 years operation.

1212

Page 13: Plant Life Management Activities for Long Term Operation in ...

Czech Republic

• 4 units of WWER-440/V-213C type in DUKOVANYDUKOVANY• Operation start-up : 1985, 1986, 1986, 1987• Design lifetime: NPP – 30 years, RPV – 40 yearsg y , y

• 2 units of WWER-1000/V-320 C type in TEMELIN2 units of WWER 1000/V 320 C type in TEMELIN• Operation start-up: 2002, 2003• Design lifetime: NPP – 40 years, RPV – 40 years

Considering 60 years operation.

24.2.201113

Page 14: Plant Life Management Activities for Long Term Operation in ...

UK Reactor

• Magnox (4)• Gas cooled • Graphite core• Magnox fuel• Design life time : 25 Y• Design life time : 25 Y

• AGR (14)• Evolution from original

Magnox design• Design life time : 25 Yg

• PWR (1) Source: British Energy

Page 15: Plant Life Management Activities for Long Term Operation in ...

UK Reactor

• PLiM/PLEX for LTO considered within the framework of PSRs

• British Energy became part of EDF Energy during second half of 2010

• In Dec. 2010 EDF Energy announced 5-year lifetime extensions to 2 AGR NPPs;extensions to 2 AGR NPPs; • Noted PLEX programme could enable 5-year lifetime extensions

for remaining AGRs 20 lif ti t i f Si ll B PWR• 20-year lifetime extension for Sizewell B PWR

Page 16: Plant Life Management Activities for Long Term Operation in ...

PSR Overall Process and InputsPlant1. Plant design2. Actual condition of SSCs3. Equipment Qualification4. Ageing

Safety Analysis5. Deterministic Safety Analysis6. Probabilistic Safety Analysis6. Probabilistic Safety Analysis7. Hazard Analysis

Performance & Feedback experience8. Safety performance9. Use of experience from other NPP9. Use of experience from other NPP

Management10. Organization and administration11. Procedures12 Human factor12. Human factor13. Emergency planning

Environment14. Radiological impact and environment

16

Global Assessment

Page 17: Plant Life Management Activities for Long Term Operation in ...

Intensive PSR ( PSR + Ageing Man)

Normal PSR Additional Req. beyond d i lif

• Physical condition• Safety assessment• Equipment qualification

design life

Time-limited aging analysisAging management• Aging effect

• Safety Performance• Use of operation experience & • research results

Aging management program

Back-fitting rulesNewly assessed regulatory

i t t

+research results

• O&M procedure• Organization & administration• Human factors

E l

requirements at international level

Radiation environmental effects• Emergency plan

• Environmental effects Field inspection

17

Intensified PSR

Page 18: Plant Life Management Activities for Long Term Operation in ...

Summary

• Operating Npps T t f lif t i 50 60• Target of life extension : 50~ 60 years

• LB 60 years operation ???

• No limitation of operational life : 10 f t i b d PSR• 10 years safety review based on PSR

• More focused on ageing management technical evaluationtechnical evaluation

Page 19: Plant Life Management Activities for Long Term Operation in ...

IAEA Actviites for Plant Life Management

Feb. 7 2011

Ki Sig Kang,T h H d PLiM/ LTOTech. Head, PLiM/ LTO

Page 20: Plant Life Management Activities for Long Term Operation in ...

What is the Plant Life Management ?

Page 21: Plant Life Management Activities for Long Term Operation in ...

Plant Life Management for Long Term Operation Activities

• Current Status of Nuclear Power

• PLiM Approach• Periodic Safety Review• Ageing Management• SALTO Mission• RPV Irradiation Embrittlement• RPV Irradiation Embrittlement• Heavy Comp. Replacement• Effective In-Service Inspection• Power Uprates• Continuous Process

Optimization• Independent Engineering

Review of I&C systems• Power Reactor Information

Systems• Recently Published IAEA

Nuclear Energy and TECDOC S iSeries

Page 22: Plant Life Management Activities for Long Term Operation in ...

International Generic Ageing Lessons Learned

EBP IGALL expected programme stages

P f th

operators

Scoping Meeting/ Briefing for PMs of

the MSs

Launching of the Programme

Progress of the programme in

accordance with time schedule

IGALL final

report

Organization set-up

Steering Group

regulators

p

Working Groups

vendors

1st – 2nd Q 2010 2nd -3rd Q 2010 2011-12 2nd Q 2013

vendors

22

Page 23: Plant Life Management Activities for Long Term Operation in ...

2010 New Publications

• Information Technology for NPP Configuration Management g g(TECDOC-1661),

• Risk -informed In-service Inspections of Piping Systems ofInspections of Piping Systems of NPPs (NP-T-3.1),

• Power Uprate in nuclear power p pplants : Guidelines and Experiences(NP-T-3.9)

• Stress corrosion cracking in LWR• Stress corrosion cracking in LWR : Good practices and Lessons Learned

Page 24: Plant Life Management Activities for Long Term Operation in ...

Current Activities on I & C system programmesp g

• Impact of modern technology on I&C systems

• Increasing Instrumentation calibration ginterval through on-line calibration technology

• I&C Aging management• Large Retrofit Modernization Projects in• Large Retrofit Modernization Projects in

I&C Systems• Maintenance and repair procedures of

I&C systems • Performance monitoring of

instrumentation, control, and protection systems

• Testing dynamic response and calibrationTesting dynamic response and calibration of instrument channels

• Database on I&C modernization projects

24

Page 25: Plant Life Management Activities for Long Term Operation in ...

Int. Research Programme SHM

1. Reactor and Signal N i A l iNoise Analysis

2. Acoustic and Vibration Monitoringg

3. Prognostics and Structural Material I t itIntegrity

4. Instrument and Equipment ConditionEquipment Condition Monitoring and Enabling Technologies

Page 26: Plant Life Management Activities for Long Term Operation in ...

Computer Model for the Economic Assessment of PLiM

Front End Kernel

Input module

Reduced

Finance Pl

Int

Input module Initialization

Nuclear Variable Selection

Alternative Generation

Scenario Option & Calculation

F l I

Computer model for E i Plan

(FINPLAN)

d l

er face m

P f P j i

Output module

Fuel Input

Taxes InputEconomic Assessmentof PLiM

module

module

• Performance Projection Report

• Fuel Expense Report

• Economic Performance Report

• Production Cost Repot

• Production Cost Analysis

• MRRD Report

26

Page 27: Plant Life Management Activities for Long Term Operation in ...

Reactor Pressure Vessel Knowledge Preservation Reactor Pressure Vessel Knowledge Preservation for RPV in WWER NPPsfor RPV in WWER NPPs

- Non-electronic publishing in the past- Collection & Storage (scanning + OCR)- Limited dissemination possibilities- Retirement and Generation Gap

Page 28: Plant Life Management Activities for Long Term Operation in ...

Reactor Pressure Vessel Integrity

Developing E-learning Modules (10)

Page 29: Plant Life Management Activities for Long Term Operation in ...

PLiM- SALTO TC Programme

Support to establish PLiM Programme under TC project

A ti PLiM f E b l NPP• Argentina : PLiM programme for Embalse NPP• China : Ageing management of Critical Components • Hungary : License Renewal of Paks Nuclear Power Plant Operation• Mexico : Life Management programme for Laguna Verde NPPs• Mexico : Life Management programme for Laguna Verde NPPs• Ukraine : Action Plans for Nuclear Power Plant Lifetime Management• Pakistan : Development of Capabilities in Automatic UT and Material

Corrosion testing for Assessment of Structural Integrity

Review missions (SALTO peer review services) implemented:

g g y

• South Ukraine NPP (Mar. 2007, Ukraine)• Kori 1 NPP – LTO Peer review (Republic of Korea – July 2007) • Dukovany NPP – LTO Peer review (Czech republic 3Q 2008)

P k NPP SALTO P i (H S t 2008)

29

• Paks NPP SALTO Peer review (Hungary – Sept. 2008)• Borssele NPP SALTO Peer review (Netherlands)

Page 30: Plant Life Management Activities for Long Term Operation in ...

Third International Conference on NPP Life Management for Long Term Operation

14-18 May 2012, Salt Lake City Utah, USA