Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3...

51
MIRIAM VALE SHIRE COUNCIL OCTOBER 2008 Planning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure Contributions Policy

Transcript of Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3...

Page 1: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

MIRIAM VALE SHIRE COUNCIL

OCTOBER 2008

Planning Scheme Policy 3 – Water Supply, Sewerage,

Transport, Stormwater, & Public Parks and Community Land Infrastructure Contributions Policy

Page 2: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Document Control

Client Gladstone Regional Council (Miriam Vale Shire) Document Name

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contributions Policy

Client Number

0509-1

File Location

M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Date

Project Manager

JMN

Author

Signature Reviewer Signature

Document Status Prelim. DS NC

Draft

DS NC

Draft Final

Final

Revision

Other (specify)

Page 3: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) i M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Table of Contents

1.0 PRELIMINARY ................................................................................................................................... 1

1.1 COMMENCEMENT .................................................................................................................................... 1 1.2 POSITION STATEMENT ............................................................................................................................. 1 1.3 NAME OF PLAN........................................................................................................................................ 1 1.4 INTENT.................................................................................................................................................... 1 1.5 SCOPE ..................................................................................................................................................... 1 1.6 APPLICATION .......................................................................................................................................... 2

2.0 DEFINITIONS...................................................................................................................................... 3

3.0 PLANNING ASSUMPTIONS .............................................................................................................. 6

3.1 OVERVIEW .............................................................................................................................................. 6 3.2 RESIDENTIAL AND NON-RESIDENTIAL PLANNING ASSUMPTIONS ............................................................... 6

3.2.1 Residential Planning Scheme Provisions............................................................................................. 6 3.2.2 Non-residential Provisions ................................................................................................................. 7

3.3 PROJECTED URBAN GROWTH ................................................................................................................... 7

4.0 DESIRED STANDARD OF SERVICE................................................................................................ 8

5.0 TRUNK INFRASTRUCTURE............................................................................................................. 9

5.1 TRUNK INFRASTRUCTURE ITEMS THAT WILL BE FUNDED ........................................................................... 9 5.2 KEY REFERENCE DOCUMENTS ............................................................................................................... 10 5.3 PROPORTION OF CAPITAL COSTS FUNDED THROUGH INFRASTRUCTURE CONTRIBUTIONS .......................... 11 5.4 ESTABLISHMENT COST OF TRUNK INFRASTRUCTURE .............................................................................. 11

6.0 INFRASTRUCTURE CONTRIBUTIONS ........................................................................................ 12

6.1 METHOD OF CALCULATING THE CONTRIBUTION...................................................................................... 12 6.1.1 Contribution Rate............................................................................................................................. 14 6.1.2 Infrastructure Indexation Unit Rate .................................................................................................. 14

6.2 ALTERNATIVE METHOD OF CALCULATION ............................................................................................. 15 6.3 PAYMENT OF THE CONTRIBUTIONS ......................................................................................................... 16 6.4 RECOGNITION OF PREVIOUS APPROVALS AND ‘AS OF RIGHT’ USES ......................................................... 16 6.5 METHOD AND TIMING OF PAYMENT ........................................................................................................ 16 6.6 ALTERNATIVES TO PAYING CONTRIBUTIONS .......................................................................................... 16

6.6.1 Water Supply and Sewerage Infrastructure Contributions ................................................................. 16 6.6.1.1 Construction of Trunk Infrastructure in Lieu of Contribution ........................................................ 16 6.6.1.2 Land Dedication in Lieu of Contribution ...................................................................................... 17 6.6.2 Transport, Stormwater and Public Parks Infrastructure Contributions.............................................. 18

7.0 INFRASTRUCTURE AGREEMENTS.............................................................................................. 19

7.1 SITUATIONS WHERE AN INFRASTRUCTURE AGREEMENT MAY BE STRUCK ................................................. 19 7.2 INFRASTRUCTURE AGREEMENT PREPARATION ........................................................................................ 19

8.0 REGISTER OF INFRASTRUCTURE CONTRIBUTIONS AND INFRASTRUCTURE

AGREEMENTS.................................................................................................................................. 20

9.0 SCHEDULES OF DEMAND.............................................................................................................. 21

9.1 SCHEDULE – WATER SUPPLY EQUIVALENT DEMAND UNITS (EDUS) BY ZONE FOR RECONFIGURING A LOT

21 9.2 SCHEDULE – WATER SUPPLY EQUIVALENT DEMAND UNITS (EDUS) BY DEFINED USE FOR MATERIAL

CHANGE OF USE .................................................................................................................................... 21 9.3 SCHEDULE – SEWERAGE EQUIVALENT DEMAND UNITS (EDUS) BY ZONE FOR RECONFIGURING A LOT ..... 23

Page 4: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) ii M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

9.4 SCHEDULE – SEWERAGE EQUIVALENT DEMAND UNITS (EDUS) BY DEFINED USE FOR MATERIAL CHANGE

OF USE .................................................................................................................................................. 23 9.5 SCHEDULE – TRANSPORT EQUIVALENT DEMAND UNITS (EDUS) BY ZONE FOR RECONFIGURING A LOT .... 25 9.6 SCHEDULE – TRANSPORT EQUIVALENT DEMAND UNITS (EDUS) BY DEFINED USE FOR MATERIAL CHANGE

OF USE .................................................................................................................................................. 25 9.7 SCHEDULE – STORMWATER EQUIVALENT DEMAND UNITS (EDUS) BY ZONE FOR RECONFIGURING A LOT 27 9.8 SCHEDULE – STORMWATER EQUIVALENT DEMAND UNITS (EDUS) BY DEFINED USE FOR MATERIAL

CHANGE OF USE .................................................................................................................................... 27 9.9 SCHEDULE – PUBLIC PARKS AND COMMUNITY LAND EQUIVALENT DEMAND UNITS (EDUS) BY ZONE FOR

RECONFIGURING A LOT.......................................................................................................................... 29 9.10 SCHEDULE – PUBLIC PARKS AND COMMUNITY LAND EQUIVALENT DEMAND UNITS (EDUS) BY DEFINED

USE FOR MATERIAL CHANGE OF USE ..................................................................................................... 29

10.0 SCHEDULE OF INFRASTRUCTURE CONTRIBUTIONS ............................................................ 31

10.1 INFRASTRUCTURE CONTRIBUTIONS – WATER SUPPLY ............................................................................. 31 10.2 INFRASTRUCTURE CONTRIBUTIONS – SEWERAGE .................................................................................... 31 10.3 INFRASTRUCTURE CONTRIBUTIONS – TRANSPORT ................................................................................... 31 10.4 INFRASTRUCTURE CONTRIBUTIONS – STORMWATER................................................................................ 31 10.5 INFRASTRUCTURE CONTRIBUTIONS – PUBLIC PARKS AND COMMUNITY LAND .......................................... 31

11.0 SCHEDULE OF CAPITAL WORKS ................................................................................................ 32

12.0 SCHEDULE - DESIRED STANDARDS OF SERVICE.................................................................... 33

13.0 SUPPORTING INFORMATION....................................................................................................... 37

14.0 SCHEDULE – CONTRIBUTION CATCHMENT MAPS ................................................................ 38

15.0 SCHEDULE – PLANS FOR TRUNK INFRASTRUCTURE............................................................ 39

Page 5: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 1 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

1.0 Preliminary

1.1 Commencement

This Planning Scheme Policy No 3 – Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contributions Policy, has been adopted by Gladstone Regional Council (GRC) on …(date to be inserted)……. 2008. This Planning Scheme Policy has been prepared for the former Miriam Vale Shire area and replaces the existing Planning Scheme Policy 4.24 titled “Determination of Water Supply & Sewerage Contributions on Development Applications”, Planning Scheme Policy 4.1 titled “Park Contributions” and Planning Scheme Policy titled “Roadworks Contributions”. This policy has force and effect from…(date to be inserted)….. 2008.

1.2 Position Statement

This policy has been developed in accordance with s6.1.20 of the Integrated Planning Act 1997 (and associated amendments). This policy will deliver infrastructure contributions in accordance with the Integrated Planning Act 1997 (‘the Act’) under the former Miriam Vale Shire Council’s IPA planning scheme. The provisions of this policy are subject to review by Gladstone Regional Council from time to time and the adoption of any revised policy will be in accordance with Schedule 3 of the Act.

1.3 Name of Plan

This document is to be known as Planning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contributions Policy.

1.4 Intent

The policy provides the method of calculating contributions to be paid to Council as a consequence of a development approval. The Act, Council policy and supporting documentation empowers Council to apply a condition to require an infrastructure contribution to be made by the applicant towards the provision of trunk Infrastructure.

1.5 Scope

The scope of this policy covers the following infrastructure networks: Infrastructure Network Establishment

Cost Existing Trunk

Infrastructure Costs Future Trunk

Infrastructure Costs Water Supply Yes Yes Yes

Sewerage Yes Yes Yes

Transport (Council roads, pedestrian and cycleways)

Yes Yes No

Public Parks and Community Land

Yes Yes No

Stormwater Yes Yes No

Trunk infrastructure is defined in Section 2.0 Definitions by relevant network.

Page 6: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 2 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

1.6 Application

This policy applies to all development applications for a Material Change of Use or for Reconfiguring a Lot on land:

• which is determined under this Planning Scheme Policy to be serviced with trunk infrastructure; and

• where an increased demand on the infrastructure network is determined.

Such a determination will be made by Council during the IDAS process and specified as a specific condition of a development permit made under the Act.

Page 7: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 3 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

2.0 Definitions

The following terms are used frequently throughout this planning scheme policy and have definitions either defined under the Act or by Miriam Vale Shire Council.

Applicant – has the meaning defined by the Integrated Planning Act and the Integrated Planning and Other Legislation Amendment Act. Capital works – infrastructure works that ensure land is suitably serviced for its intended development purpose. Capital Works Program – means Council’s schedule of works and capital costs outlined over a period of time, generally coinciding with the budget cycle, which plans out the implementation of trunk Infrastructure. Contributions Catchment – a generic reference to water supply regions/zones, sewerage catchments, stormwater catchments, transport sectors and public parks and community land catchments over which the cost of infrastructure will be shared. Deemed Trunk Infrastructure – infrastructure that is not currently part of the plans for trunk infrastructure but which Council may determine to be Trunk infrastructure based on meeting all of the following qualification criteria:

a) Meet the Desired Standards of Service within the planning scheme policy; and b) Be generally planned ahead of detailed layout planning but is clarified/refined by the

more detailed analysis; and c) Be required by the overall planned demands including those partially generated by a

development permit whether it is located within the site or external to the development site; and

d) Be shared by a number of users; and e) Provide a system function that is generally trunk, which may not necessarily be

related to its size or capacity. Desired Standards of Service (DSS) – are a set of parameters referred to within the planning of infrastructure to guide the form and function of the infrastructure which is to be constructed. Development – means any actual or anticipated lot, work or use resulting from ‘development’ as defined in the Integrated Planning Act 1997 which creates a demand for infrastructure. Equivalent Demand Unit (EDU) – the basic unit used to determine demand for infrastructure as a result of a proposed development. This unit is generally based on a comparison with the demand of one residential dwelling. Equivalent Person (EP) – the basic unit or units used for determining the change in demand for water or sewerage services as a result of a proposed development. This unit is based on a comparison with the usage of a service by an average occupant of an average residential dwelling. First Principles Assessment – is a process where the demand generated by undefined development (i.e not directly specified in any way by the tables in the policy) is assessed and determined case by case, based on research of similar known uses and demands.

Page 8: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 4 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Where a development is a compilation of documented uses outlined in the policy the demand shall be assessed by aggregating the use demands for each component. First principles assessment is to be undertaken by suitably qualified professionals. Submissions shall include detailed research and methodology that is compliant with the averaged user pays method used in this planning scheme policy.

Infrastructure Agreement – has the meaning as defined in the Integrated Planning Act 1997 and includes an agreement between Council and an applicant where:

• trunk infrastructure is being provided in lieu of an infrastructure contribution;

• trunk infrastructure is being provided at a different time to that stated in the capital works program;

• alternative trunk infrastructure is provided to meet the desired standards of service;

• trunk infrastructure (unplanned) is provided and is not identified in the capital works program;

• trunk infrastructure being provided is valued in excess of an infrastructure contribution;

• infrastructure contribution is made at a different time to that stated in the infrastructure condition and/or is proposed to be paid in instalments.

Infrastructure Contribution – a charge applied to development through the conditions of the development permit for the provision of trunk infrastructure that services, or is planned to service, the development. Planned capacity – capacity within the existing and future defined network assets (which may supply current demand) to service future planned growth. Plans for Trunk Infrastructure (PFTI) – trunk infrastructure that is included in Council’s capital works program and contained in reports and strategies (PFTI) that is the subject of the contributions, as reviewed from time to time.

Planning Assumptions – are those statements within the planning scheme that outline the basis for planning, design and funding the networks of infrastructure that are to serve development undertaken in the community. Public Parks and Community Land Trunk Infrastructure – Means all parks and associated embellishments (including, site preparation, infrastructure services, landscaping, sporting facilities and play equipment) within the network which provide a range of recreational and open space opportunities. The term also indicates any other works, structures or equipment that Council designates from time to time to be trunk infrastructure, and the land component only for community facilities such as libraries and community halls. Stormwater Trunk Infrastructure – Means all infrastructure, land and equipment including constructed or enhanced underground pipes, channels or overland flow paths that are shared between developments, and is generally exclusive of minor drainage systems for roads and relief systems. The term also indicates any other works, structures or equipment that Council designates from time to time to be trunk infrastructure. Transport Trunk Infrastructure – Means all infrastructure, land, equipment and other items identified in Council’s adopted transport (roads, pedestrian and cycle ways) strategy as the trunk infrastructure used for the determination of the contributions. The term also indicates any other works, structures or equipment that Council designates from time to time to be trunk infrastructure.

Page 9: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 5 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

The Act – is a reference to the Integrated Planning Act (as amended). Unplanned Trunk Infrastructure – Trunk infrastructure that is not within Council’s capital works program. Water Supply & Sewerage Trunk Infrastructure – Means all infrastructure, equipment and other items identified in Council’s adopted water supply and sewerage strategies as the trunk infrastructure used for the determination of the contributions. The term also indicates any other works, structures or equipment that Council designates from time to time to be trunk infrastructure.

Page 10: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 6 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

3.0 Planning Assumptions

3.1 Overview

Planning Assumptions form a key part of trunk infrastructure planning, having a number of key roles including:

a) Linking demands for infrastructure to Zones within the planning scheme;

b) Determining the scale, form and intensity of demands associated with land uses; and

c) Determining the timing of infrastructure delivery. The development of infrastructure contributions for the Water Supply and Sewerage Trunk infrastructure networks have been based on an assessment of the land use outcomes envisaged under the Miriam Vale planning scheme. The assumed development demands for different Zones and Uses are tabled in section 3.2 and in Schedule 9. The demands which are generated by both the existing developed areas and future development areas are combined and modelled to provide an indication of the scope and scale of trunk infrastructure required. Infrastructure contributions for the Transport, Public Parks and Community Land and Stormwater networks are based on the demand rates identified in Schedule 13 Trunk Infrastructure Charge Rates of the Integrated Planning Regulation 1998. These regulated demand rates have been aligned with the various development types contained within the Miriam Vale planning scheme zones and defined uses – refer to Schedule 9 of this Policy.

3.2 Residential and Non-residential Planning Assumptions

3.2.1 Residential Planning Scheme Provisions

Tables 1 and 2 Residential Planning Assumptions are based on the planning scheme requirements and defines the minimum lot/unit sizes and assumed density provisions to determine trunk infrastructure requirements to service Miriam Vale’s future population.

Page 11: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 7 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Table 1: Residential Planning Assumptions1 (Detached Dwellings)

User Group Zone/Land Use Description

Density2 (Dwellings/Ha)

Relevant Locality(s)*

Minimum Lot Size (sqm)

Average Lot Size (sqm)

Base Occupancy Rate (2006)

2021 Occupancy

Rate Low Density Residential 9 1,2,3,4,5 600 800 2.3 2.0

Special Residential 3 1 2,500 2500 2.3 2.0

Rural Character (with reticulated water)

2 1,3 4,000 4,000 2.3 2.0

Residential

Rural Character (with no reticulated water) 0.4 1,3 20,000 20,000 2.3 2.0

Other Rural 0.004

1,3,4,5

(Rosedale),7 2,000,000 2,000,000 2.3 2.0

Note:

Locality 1 = Agnes Water

Locality 2 = Seventeen Seventy

Locality 3 = Miriam Vale

Locality 4 = Turkey Beach

Locality 5 = Lowmead, Rosedale and Bororen (Rural Villages)

Locality 6 = Offshore Islands

Locality 7 = Rural

Table 2: Residential Planning Assumptions (Attached Dwellings)

User Group Zoning/Land Use Description

Density (Dwellings/

Ha)

Relevant Locality(s)

Density (units per site area)

Maximum Site Cover (%)

Maximum Storeys

Base Occupancy Rate (2006)

2021 Occupancy

Rate

Medium Density Residential

53 1,2

1 per 150sqm

site area 50 3 1.7 1.4

Residential

Medium Density

Residential (Lots 1 & 3, SP130692) 32 1

1 per 250sqm

site area 50 3 1.7 1.4

Commercial Tourist Commercial

(Residential Component) 53 1

NA 100* 2 1.7 1.4

*Site cover reduced if adjoining a Low Density Residential or Medium Density Residential area.

3.2.2 Non-residential Provisions

Schedule 9 outlines the assumed non-residential demands by Zones and Defined Uses that have been used as the basis for the future water supply and sewerage trunk infrastructure requirements.

3.3 Projected Urban Growth

The adopted population projections in Table 3 – Miriam Vale Population Projections 2006 to Ultimate define projected growth for the Shire to the year 2026 and ‘ultimate’. Forecasts are based on the Miriam Vale Shire population model, which is benchmarked against the State Government’s Population Information Forecasting Unit’s medium series population projection. An allowance has also been made for the Shire’s tourist population, as they will create additional demand for accommodation and associated infrastructure.

1 Residential planning assumptions have been generalized for the purpose of developing future population and dwelling forecasts only. 2 Gross densities (which exclude 20% – 30% of land for services, roads, waterways and parks) have been applied for residential lots.

Page 12: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 8 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Table 3: Miriam Vale Population Projections 2006 to Ultimate

2006 2011 2016 2021 2026 Modelled Ultimate

Capacity 2006- Ultimate

PIFU Projections 5,408 6,734 7,837 9,056 10,340 - -

Tourist Projections 512 589 695 820 984 - -

Adjusted PIFU Projections 5,920 7,323 8,532 9,876 11,324 - -

Localities

Agnes Water 2270 3944 5140 6464 7487 12032 9762

Seventeen Seventy 563 585 596 603 607 595 32

Miriam Vale 410 397 401 413 472 793 383

Turkey Beach (Coastal Village) 395 395 395 395 433 597 202

Lowmead (Rural Village) 28 28 28 28 49 142 114

Rosedale (Rural Village) 90 90 90 90 144 382 292

Bororen (Rural Village) 179 160 156 155 172 248 69

Rural 1715 1712 1711 1709 1935 7881 6167

Total Modelled* 5,920^ 7,312 8,516 9,856 11,298 22,671 17,022

(Source: Miriam Vale Shire Pop Model 2007 & PIFU, 2007) *Differences between modelled projections and adjusted PIFU projections are a result of number rounding. ^ Total modelled 2006 population includes 271 people to calibrate with PIFU

For the purposes of infrastructure planning the population projections outlined in Table 3 and the non-residential demand as set out in Schedule 9 have been aggregated to the respective infrastructure service catchments.

4.0 DESIRED STANDARD OF SERVICE

Desired Standards of Service (DSS) direct the form and scale of infrastructure networks to be constructed to service areas within the local government area. The performance of each network will vary over time. The DSS does not imply a guaranteed level of performance for the network. DSS are expressed for each network in terms of planning and design criteria based on quantitative and qualitative standards.

• Planning based criteria are qualitative, specify the types of outcomes envisaged by the supply of the infrastructure (contained in Planning Scheme); these initially scope how the network is laid out to physically service development , this may include hierarchies of densities of provision.

• Design based criteria which are quantitative in nature and specify the size, capacity,

operational performance (contained in the Network Design Documentation).

Schedule 12 defines the Desired Standards of Service for each Trunk Infrastructure Network.

Page 13: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 9 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

5.0 Trunk Infrastructure

5.1 Trunk Infrastructure Items that will be funded

The infrastructure networks and items to be provided under this planning scheme policy are for the provision of existing and future trunk water supply and sewerage infrastructure; and provision of existing trunk transport (roads, pedestrian and cycle ways), stormwater, and public parks and community land infrastructure3. The scope of trunk infrastructure used in the development of the contribution is outlined in Schedule 11 of this planning scheme policy. The infrastructure is considered in three forms: Catchment Works Trunk infrastructure (including land) which serves the wider community including: Water Supply and Sewerage

• Supply sources, treatment plants, major trunk mains, major pump stations and pressure mains, outfall/disposal infrastructure.

Transport

• Roads in Council ownership, whose primary function is the carriage of traffic between and across the local government area, serving two integral purposes of connectivity (between origin and destination); and performing a true network function (provides a variety or routes and connections). This includes road drainage and all forms of cross drainage.

• Selected components of the State road network, with a primary function of the carriage of traffic within and about the local government area (i.e. having a local function).

• Pedestrian and cycle way network consists of a series of on-road facilities for cycling (defined by signage and road markings) and off-road facilities with shared paths being the common form of infrastructure.

Stormwater

• Constructed underground pipes, channels or overland flow paths that are shared between developments. All road culverts and cross drainage for watercourses and overland flow paths are not included, generally being piped drainage for Q5 flows and above for residential and Q10 flows and above for commercial/industry.

Public Parks and Community Land

• Parks and associated embellishments (including, site preparation, infrastructure services, landscaping, sporting facilities and play equipment) within the network which provide a range of recreational and open space opportunities, and the land component only for local community facilities.

3 As part of the development of its Priority Infrastructure Plan, Council is currently developing trunk infrastructure charges for

transport, stormwater, and public parks and community land. In the interim the application of a contribution in accordance with rate set by the Integrated Planning Amendment Regulation (No.3) 2008 is considered a fair and reasonable average minimum contribution.

Page 14: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 10 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Works External Infrastructure (including land) that provides a link from the development site property boundary to the trunk infrastructure network. The applicant is responsible for all non-trunk works external.

If the works external is deemed trunk by Council, then Council may require the applicant to construct the works external to a larger capacity or to a greater extent than required to service the subject land and proposed development. Where works external are deemed to be trunk and required for the development to proceed, such shall be directed through the conditions of approval. Section 6.6 outlines the process for reimbursement of such trunk infrastructure costs against the applicant’s infrastructure contribution. This planning scheme policy may be amended from time to time to include any deemed trunk infrastructure in the trunk infrastructure schedules and maps. In such instances the relevant infrastructure contribution will be amended to reflect the cost inclusion of such deemed infrastructure. Works Internal Networks internal to premises are not trunk infrastructure and are to be provided by the applicant at the applicant’s expense.

5.2 Key Reference Documents

A number of key reference documents have been used in the determination of existing and future infrastructure and existing and future demands. From these documents future capital works schedules and maps have been developed along with infrastructure contribution rates. The table below identifies the current key reference documents.

Trunk Infrastructure Network

Key Reference Documents

Water Supply and Sewerage

• Coleridge Water Engineers (2008), Agnes Water & Seventeen Seventy Water Supply & Sewerage Infrastructure, A Summary

• GHD (2008), Sewerage Planning Report for Agnes Water/Town of 1770

• GHD (2005), Report for 1770 Sewerage Scheme – Pressure Sewerage System

• Parsons Brinkderhoff (2006), Agnes Water Desalination Project – Early Studies Investigations Final Report

• Cardno (2006) Town of 1770 Water Supply Reticulation Planning Report.

• Cardno (2006) Agnes Water-Town of 1770 Benaraby-Agnes Waer Pipeline Cost Report

• Burns Bridge Transactions (2007), Engineering Estimates and Financial Implication of Pipeline and Desalination Options for Agnes Water and 1770

• Strategic Asset Management Plan

• Total Asset Management Plan

• Council Asset data and mapping

Page 15: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 11 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Trunk Infrastructure Network

Key Reference Documents

Transport • Council Asset data and mapping

• Miriam Vale Shire Council (2006), Pathways and Bikeways Management Plan

Stormwater • Council Asset data and mapping

Public Parks and Community Land

• Council Asset data and mapping

• Strategic Leisure Group (2008), Miriam Vale Shire Public Open Space and Recreation Plan

5.3 Proportion of Capital Costs funded through Infrastructure Contributions

Infrastructure contributions are levied on a full cost recovery basis4. Users shall contribute to the cost of existing and planned works in accordance with the estimated use of those works, as determined by Council. Where subsidies have been provided by other sources to fund the infrastructure these have been appropriately accounted for in the costs.

5.4 Establishment Cost of Trunk Infrastructure

Water Supply and Sewerage Establishment costs for water supply and sewerage trunk Infrastructure comprise of:

(a) Value of planning, design, financing and construction costs of future trunk infrastructure including land acquisition;

(b) existing infrastructure (valued as the replacement cost using contemporary materials techniques and technologies);

(c) land for existing trunk infrastructure, acquired post 1st January 1990;

(d) ongoing administration costs of the Infrastructure Contributions Schedule.

Transport, Stormwater, and Public Parks and Community Land Transport, stormwater and public parks and community land infrastructure contributions have been aligned with the charge rate defined in the Integrated Planning Amendment Regulation (No.3) 2008, made under the Integrated Planning Act 2007. Despite other provisions of this planning scheme policy, contributions collected for the transport, stormwater and public parks and community land trunk infrastructure are for the purposes of existing trunk infrastructure and planning for future trunk infrastructure only.

4 As part of the development of its Priority Infrastructure Plan, Council is currently developing trunk infrastructure charges for

transport, stormwater, and public parks and community land. In the interim the application of a contribution in accordance with rate set by the Integrated Planning Amendment Regulation (No.3) 2008 is considered a fair and reasonable average minimum contribution.

Page 16: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 12 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

6.0 Infrastructure Contributions

6.1 Method of calculating the Contribution

The infrastructure contribution applicable to development for each trunk infrastructure network will be calculated in accordance with:

Water Supply: WSIC = [(ED – PC) x CR] x I Where

WSIC = Water Supply Infrastructure Contribution

ED = Equivalent Demand set out in Schedule 9 for Water Supply

PC = recognised Previous Contributions in the form of previous approvals and as of right uses as determined by Council under Section 6.4 of this Policy set out as Equivalent Demand units;

CR = Contribution Rate as set out in Schedule 10 for the Water Supply Contribution Catchment in which the land is situated; and

I = Indexed by the Infrastructure Indexation Unit Rate (IIUR) as determined in Section 6.1.2.

Sewerage: SIC = [(ED – PC) x CR] x I Where

SIC = Sewerage Infrastructure Contribution

ED = Equivalent Demand set out in Schedule 9 for Sewerage

PC = recognised Previous Contributions in the form of previous approvals and as of right uses as determined by Council under Section 6.4 of this Policy set out as Equivalent Demand units;

CR = Contribution Rate as set out in Schedule 10 for the Sewerage Contribution Catchment in which the land is situated; and

I = Indexed by the Infrastructure Indexation Unit Rate (IIUR) as determined in Section 6.1.2.

Page 17: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 13 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Transport: TIC = (ED-PC) x CR

Where:

TIC = Transport Infrastructure Contribution;

ED = Equivalent Demand set out in Schedule 9 for Transport;

PC = recognised Previous Contributions in the form of previous approvals and as of right uses as determined by Council under Section 6.4 of this policy set out as Equivalent Demand units; and

CR = Contribution Rate as set out in Schedule 10 for the Transport Contribution Catchment in which the land is situated.

Note: Council may amend the contribution rate from time to time to align with Schedule 13 – Trunk Infrastructure Charges: Section 21 of the Integrated Planning Amendment Regulation 1998.

Stormwater:

SWIC = (ED-PC) x CR

Where:

SWIC = Stormwater Infrastructure Contribution;

ED = Equivalent Demand set out in Schedule 9 for Stormwater;

PC = recognition of Previous Contributions in the form of previous approvals and as of right uses as determined by Council under Section 6.4 of this policy set out as Equivalent Demand units; and

CR = Contribution Rate as set out in Schedule 10 for the Stormwater Contribution Catchment in which the land is situated.

Note: Council may amend the contribution rate from time to time to align with Schedule 13 – Trunk Infrastructure Charges: Section 21 of the Integrated Planning Amendment Regulation 1998.

Page 18: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 14 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Public Parks and Community Land: PPCLIC = (ED – PC) x CR Where:

PPCLIC = Public Parks and Community Land Infrastructure Contribution;

ED = Equivalent Demand set out in Schedule 9 for Public Parks and Community Land;

PC = recognised Previous Contributions in the form of previous approvals and as of right uses as determined by Council under Section 6.4 of this Policy set out as Equivalent Demand units; and

CR = Contribution Rate as set out in Schedule 10 for the Public Parks and Community land Contribution Catchment in which the land is situated.

Note: Council may amend the contribution rate from time to time to align with Schedule 13 – Trunk Infrastructure Charges: Section 21 of the Integrated Planning Amendment Regulation 1998.

6.1.1 Contribution Rate

Council may from time to time review the infrastructure contribution rates specified in Schedule 10.

6.1.2 Infrastructure Indexation Unit Rate

The following formula is used to determine the ‘Infrastructure Indexation Unit Rate’ by which infrastructure contributions will be indexed annually to take into account inflation and other matters relevant to the capital costs of infrastructure. The IIUR is set on an annual basis (base year June 2006) and presented in Council’s annual Fees and Charges document.

Infrastructure Indexation Unit Rate = 1 + ∆ Producer Price Index5

Where: ∆ Producer Price Index = Current PPI (INDEX) – Base PPI (INDEX) Base PPI (INDEX)

5 ABS Cat No 6427.0 Tables 15 and 16. Output of the General Construction Industry, Index Numbers and Percentage Changes

(Road and Bridge Construction, 4121, Queensland)

Page 19: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 15 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

6.2 Alternative Method of Calculation

In determining the demand for those applications not clearly documented within Schedule 9, or in determining the cost impact of inconsistent or out of sequence development, the Council at its discretion reserves the right for a ‘first principles assessment’ to be undertaken to assess demand, and to consider submissions (supported by appropriate research) made by a consultant on behalf of an applicant. Prior to undertaking a first principles assessment, the applicant must seek approval from Council to undertake the assessment. As part of the process Council will consider the complexity and/or uniqueness of the development to determine if a first principle assessment is warranted. Council will not enter into a first principles assessment where an applicant disagrees with the defined demand rate, identified in Schedule 9, based on isolated observed use. The demand rates are determined by the methodologies of averaged consumption.6 For uses not specifically listed in Schedule 9, the development application is to be accompanied by a first principles assessment and/or appropriately documented research from other locations for Council consideration. When determining demand on a first principles basis, Council will refer to relevant or equivalent levels of development noted within Schedule 9. Otherwise, demands are to be assessed on ‘averaged demand’ criteria as follows:

Water Supply Estimate of mean day maximum month adjusted for local soil conditions; and Calculate EP density as mean day maximum month demand / EP daily allocation of 450L/EP/day (mean day maximum month equals the average day demand measured over a minimum of 365 consecutive days multiplied by 1.5 for domestic purposes or 1.0 for other uses). Sewerage Estimate Average Dry Weather Flow to sewer, and calculate EP density as Average Dry Weather Flow / EP discharge of 250L/EP/day. The demand determined from the above will then be multiplied by the contribution per EP specified in Schedule 10 for the Catchment Area in which the land is situated. Transport ‘First principles’ assessment basis to be based on relevant or equivalent levels of development noted within Schedule 9 - Transport. Stormwater ‘First principles’ assessment basis to be based on relevant or equivalent levels of development noted within Schedule 9 - Stormwater. Public Parks and Community Land ‘First principles’ assessment to be based on relevant or equivalent levels of development noted within Schedule 9 – Public Parks and Community Land.

6 This approach is supported by the Act and associated guidelines.

Page 20: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 16 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

6.3 Payment of the contributions

Infrastructure contributions are required to be paid by the registered owners of property within the contribution catchments for Water Supply, Sewerage, Transport, Stormwater and Public Parks and Community Land specified in the attached Schedules in accordance with the conditions of development approval.

6.4 Recognition of Previous Approvals and ‘As of Right’ Uses

The demand determined in accordance with Schedule 9 may be reduced by the greater of the following, if applicable:

(a) The demand applicable to the existing or last known lawful use of the land (demand for

use in accordance Schedule 9); or (b) The demand applicable to the existing or last known lawful use of the land based on

records of past infrastructure contributions (indexed to current day prices using the recorded index documented in Council’s Annual Fees and Charges); or

(c) The demand applicable to a self assessable residential use on that land permitted at the time of assessment (demand for use in accordance with Schedule 9); or

(d) For existing allotments that are vacant at the time of application, one (1) equivalent demand unit (EDU) per vacant allotment.

If the above exceeds the demand applicable to the proposed development, no monetary credit will be given. Further no offsets will be allowed against other required contributions or works, including between Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land.

6.5 Method and timing of payment

Unless otherwise specified by a condition of development approval or Infrastructure Agreement, payment of the infrastructure contribution (in full or unless agreed otherwise) shall be: (a) for Reconfiguring a Lot, prior to Council approval of the Plan of Survey for registration;

or (b) for assessable Building Work, prior to the issue of a development permit; or (c) for a Material Change of Use, prior to the change or commencement of the use.

6.6 Alternatives to Paying Contributions

6.6.1 Water Supply and Sewerage Infrastructure Contributions

Council may consider alternatives to paying water and sewerage infrastructure contributions including carrying out the capital works for which the infrastructure contribution was fixed, or dedication of land in exchange for a reduction in infrastructure contributions. Council in association with the applicant may consider the following options.

6.6.1.1 Construction of Trunk Infrastructure in Lieu of Contribution

Situation: Trunk Infrastructure required to service development, but not yet available or unplanned in Council’s Capital Works Program.

. Council at its discretion may:

Page 21: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 17 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

(a) include a condition to supply the required trunk infrastructure as part of the development approval; or

(b) enter into an infrastructure agreement with the applicant about supply and/or funding arrangements of the required trunk infrastructure.

Where the cost7 of trunk infrastructure provision by the applicant is less than the applicable infrastructure contribution, then the balance of the infrastructure contribution will be in accordance with the relevant condition of development, or as stated in the relevant trunk infrastructure agreement. Where the cost6 of planned trunk infrastructure provision by the applicant is greater than the applicable infrastructure contribution the additional costs of construction may be, as determined by Council, reimbursed by one of the three methods noted below.

(a) For planned trunk infrastructure, Council will reimburse the balance of the prior

agreed construction cost of Trunk Infrastructure at the time when the infrastructure is constructed,8 where agreement is given by Council to accelerate its delivery within the capital works program;

or

(b) For planned trunk infrastructure, Council will reimburse the balance of the prior agreed construction cost of the Trunk Infrastructure at the time when the infrastructure was budgeted for in Council’s capital works program.

or

(c) For planned trunk infrastructure, Council will determine infrastructure credits which

will be redeemable for future stages of the same network and development.

For unplanned trunk infrastructure, Council may establish a refund agreement, as part of an infrastructure agreement, generally based on the relevant contributions catchment, for which an appropriate proportion of infrastructure contribution collected will be diverted to the refund agreement. All trunk infrastructure works constructed must be consistent with the Plans for Trunk Infrastructure. Prior to any commitments toward trunk infrastructure capital works being carried out by the applicant, the reimbursement option including a payment schedule, if any, shall be agreed and ratified in an Infrastructure Agreement between Council and the applicant.

6.6.1.2 Land Dedication in Lieu of Contribution

Situation: Planned Trunk infrastructure includes land that is located on the site of a development application. Council at its discretion may include a condition to supply the required trunk infrastructure (being land) as part of the development approval.

7 The determination of the value of trunk infrastructure can be agreed by Council review or through tendering in accordance with the Local Government procurement procedure. 8 Suggested reimbursement may be made progressively in accordance with the actual contract payment at on-maintenance of the

works and the actual residual contract payment upon off-maintenance of the works, or as decided with Council.

Page 22: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 18 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Where the cost9 of land dedicated by the applicant, is less than the applicable infrastructure contribution, then the balance of the contribution will be in accordance with the relevant condition of development, or as stated in the relevant infrastructure agreement. Where the cost8 of planned trunk infrastructure, being land is dedicated by the applicant, is greater than the applicable infrastructure contribution then Council may enter into an infrastructure agreement with the applicant to offset the additional contribution by one of the three methods noted below:

(a) For planned trunk infrastructure that is land, Council will reimburse the balance of

the prior agreed construction cost of Trunk Infrastructure at the time when the infrastructure is constructed,10 where agreement is given by Council to accelerate its delivery within the capital works program;

or

(b) For planned trunk infrastructure that is land, Council will reimburse the balance of the prior agreed construction cost of the Trunk Infrastructure at the time when the infrastructure was budgeted for in Council’s capital works program.

or

(c) For planned trunk infrastructure that is land, Council will determine infrastructure

credits which will be redeemable for future stages of the same network and development.

For unplanned trunk infrastructure that is land, Council may establish a refund agreement, generally based on the relevant contributions catchment, for which an appropriate proportion of infrastructure contribution collected, will be diverted to the refund agreement.

6.6.2 Transport, Stormwater and Public Parks Infrastructure Contributions

Council will generally not consider alternatives to paying transport, stormwater and public parks and community land purposes infrastructure contributions. The development of these infrastructure schedules and contributions have not included the provision of future trunk infrastructure (i.e. works or land).

Where future transport, stormwater and public parks and community land purposes infrastructure is conditioned as part of the development approval and it is determined by Council that such infrastructure meets the criteria of “trunk infrastructure”, then Council may at its discretion enter into an infrastructure agreement with the applicant at the applicant’s expense. The purpose of the infrastructure agreement is to provide a framework to enable contribution offsets or refunding arrangements for that portion of trunk infrastructure which is in excess of the development’s fair share contribution.

9 Land cost will be valued in accordance with methodology set down in the Acquisition of Land Act 1967. 10 Suggested reimbursement may be made progressively in accordance with the actual contract payment at on-maintenance of the

works and the actual residual contract payment upon off-maintenance of the works, or as decided with Council.

Page 23: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 19 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

7.0 Infrastructure Agreements

7.1 Situations where an Infrastructure Agreement may be struck

At the discretion of Council an infrastructure agreement with the applicant may be struck under the following situations and subject to the provisions as defined in Section 6.6 of this planning scheme policy:

• trunk infrastructure is being provided in lieu of an infrastructure contribution;

• trunk infrastructure is being provided at a different time to that stated in the capital works program;

• alternative trunk infrastructure is provided to meet the desired standards of service; • trunk infrastructure (unplanned) is provided and is not identified in the capital works

program;

• the value of trunk infrastructure being provided is in excess of an infrastructure contribution, resulting in reimbursement via a refund agreement between Council and the applicant; or

• infrastructure contribution is made at a different time to that stated in the infrastructure contributions condition and/or is proposed to be paid in instalments.

7.2 Infrastructure Agreement Preparation

Infrastructure agreements shall at a minimum address the following issues: • The agreement must conform to the provisions of IPA and the contract laws

applicable in the State of Queensland;

• Must state the applicable networks of trunk infrastructure;

• Must state the method used to calculate the ‘construction value’ of the trunk infrastructure and reporting methods and scope of all ‘on-costs’ to provide for the determination of the ‘establishment cost’.

• Must state the calculated equivalent demand on the network from the proposed development;

• The required contributions or trunk infrastructure to be contributed for each component or hierarchy of the network in accordance with this policy;

• The general date the contributions or infrastructure are to be provided;

• The nature of any security to be lodged and the details of the use and release of such security;

• Details of the trunk infrastructure to be provided and the provision program;

• Details of the responsible entity for the funding, design and construction of the trunk infrastructure including land acquisition;

• Details of the charging credit/offset accrued to the development and that which is sought to be recouped above the applicable contribution or payment for the development;

• Provision for reimbursement to the applicant for the establishment of trunk infrastructure in excess of the contribution or payment in accordance with Section 6.6 of this Policy;

• Document any details and set out procedures for the reimbursement of the proponent for additional infrastructure contributions which arise from the provision of trunk infrastructure;

• Provision of the reimbursement of costs for works external or internal non-trunk infrastructure that is determined to constitute trunk infrastructure under the definitions contained within the Planning Scheme;

Page 24: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 20 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

• Details of any approved temporary works and the costs associated with the operation and maintenance of these items for a period of five years;

• Any other details considered appropriate by the Council; and

• Provisions for unforseen delays and redundancy provisions where a development approval and trunk infrastructure construction activities are held in abeyance. Provisions for Council to revoke any previous Agreement and reinstate the contribution where an alternate party agrees to the construction of the same trunk infrastructure detailed in the agreement.

Infrastructure agreements will be in writing and prepared by the Council at the applicant’s cost, subject to the satisfaction of the Council. Infrastructure agreements shall generally conform to the draft format determined for the agreements by Council from time to time.

8.0 Register of Infrastructure Contributions and Infrastructure Agreements

Council will maintain a register of infrastructure contributions and infrastructure agreements for public inspection. The register will contain the following:

• real property description of land to which the infrastructure contribution or infrastructure agreement applies;

• development approval reference number;

• the amount of the infrastructure contribution levied; and • the amount of the infrastructure contribution unpaid.

Page 25: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 21 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

9.0 Schedules of Demand [Demand density in these schedules is for the purpose of infrastructure planning and provision only]

9.1 Schedule – Water Supply Equivalent Demand Units (EDUs) by Zone for Reconfiguring a Lot

Zone Water Supply EDUs

Residential

Low Density 1 EDU/lot or 9 EDU/hectare whichever is greater

Medium Density 1 EDU/lot or 53 EDU/hectare whichever is greater

Special Residential 1 EDU/lot or 3 EDU/hectare whichever is greater

Rural Character (with Reticulated Water) 1 EDU/lot or 2 EDU/hectare whichever is greater

Rural Character (with No Reticulated Water) NA

Rural NA

Tourist Commercial (Residential Component) 1 EDU/lot or 53 EDU/hectare whichever is greater

Retail/Commercial

Local Business 1 EDU/lot or 17 EDU/hectare whichever is greater

District Business 1 EDU/lot or 35 EDU/hectare whichever is greater

Retail Showrooms 1 EDU/lot or 15 EDU/hectare whichever is greater

Commercial Services 1 EDU/lot or 17 EDU/hectare whichever is greater

Tourist Commercial (Commercial Component) 1 EDU/lot or 17 EDU/hectare whichever is greater

Industry

Light Industry 1 EDU/lot or 10 EDU/hectare whichever is greater

General Industry 1 EDU/lot or 14 EDU/hectare whichever is greater

Other

Special Use First Principles Assessment

9.2 Schedule – Water Supply Equivalent Demand Units (EDUs) by Defined Use11 for Material Change of Use

Defined Use Water Supply EDUs

Residential

Accommodation Building

1 bedroom unit 0.43/Unit

2 bedroom unit 0.68/Unit

3 bedroom unit 1.00/Unit

Motel unit 0.28/Unit

Backpackers/hostel 0.39/Unit

Bed and Breakfast 0.82/Bedroom

Caravan Park (Hectare) or 47/Hectare, or Caravan Park (Site) 0.57/Site (whichever is greater)

Caretaker's Residence 1.00/Dwelling

Dual Occupancy 0.89/Dwelling

Dwelling House 1.00/Dwelling

Multiple Dwelling

1 Bedroom 0.43/Dwelling

2 Bedroom 0.68/Dwelling

3 Bedroom 1.00/Dwelling

Multiple Rural Occupancy 1.00/Dwelling

Retirement Village 0.54/Unit

Rural Workers Accommodation 1/Dwelling

Commercial Car Park NA

Catering Premises

Restaurant/fast food 1.61/100sqm GFA

Catering business 1.07/100sqm GFA

11 Definitions

• ‘Uses’ are as defined in ‘Part 1, Division 4 – Interpretation’ in the Planning Scheme.

Page 26: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 22 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Water Supply EDUs

Commercial Premises

<400sqm GFA 0.36/100 sqm GFA

400-1000sqm GFA 0.61/100sqm GFA

>1000sqm GFA 0.89/100sqm GFA

Hotel

Public Bar 1.36/100sqm GFA

Lounge/beer garden 1.257sqm GFA

Restaurant 1.61/sqm GFA

Accommodation 0.57/room

Function room/nightclub 0.32/100sqm GFA

Local Shop 0.39/100sqm GFA

Medical Centre 0.39/100sqm GFA

Outdoor Sales Premises

Principal use enclosed 0.14/100sqm GFA

Principal use outdoors 0.05/100sqm GFA

Shop

Shopping Centre 0.50/100sqm NA

Single Shop 0.39/100sqm NA

Hairdresser/Beauty salon 0.71/100sqm GFA

Showroom 0.36/100sqm GFA

Storage Facility First Principles Assessment

Tourist Facility First Principles Assessment

Transport Terminal First Principles Assessment

Veterinary Facility 0.42/100sqm GFA

Industrial Extractive Industry First Principles Assessment

Light Industry 2.14/lot

General Industry 3.20/lot

Service Station

Service Station 2.32/site

Food Preparation 1.32/100sqm NA

Special Industry First Principles Assessment

Vehicle Workshop 0.28/100sqm GFA

Waste Facility First Principles Assessment

Community

Airport First Principles Assessment

Cemetery First Principles Assessment

Child Care Centre 0.07/Child

Community Facilities First Principles Assessment

Educational Establishment

Primary School 0.07/student

Secondary School 0.14/student

Boarding School 0.32/student

Hospital 0.93/bed

Institution

Reformative 0.36/bed

General/nursing 0.71/bed

Nursing home 0.54/bedroom

Place of Worship 0.14/seat

Public Utility First Principles Assessment

Special Use First Principles Assessment

Telecommunication Facility First Principles Assessment

Recreational Indoor Recreation First Principles Assessment

Outdoor Recreation First Principles Assessment

Park First Principles Assessment

Rural Agriculture First Principles Assessment

Forestry First Principles Assessment

Grazing First Principles Assessment

Intensive Animal Husbandry First Principles Assessment

Major Aquaculture First Principles Assessment

Page 27: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 23 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Water Supply EDUs

Minor Aquaculture First Principles Assessment

Roadside Stall First Principles Assessment

Rural Service Industry First Principles Assessment

Stockyard First Principles Assessment

Other First Principles Assessment

9.3 Schedule – Sewerage Equivalent Demand Units (EDUs) by Zone for Reconfiguring a Lot

Zone Water Supply EDUs

Residential

Low Density 1 EDU/lot or 9 EDU/hectare whichever is greater

Medium Density 1 EDU/lot or 53 EDU/hectare whichever is greater

Special Residential 1 EDU/lot or 3 EDU/hectare whichever is greater

Rural Character (with Reticulated Water) 1 EDU/lot or 2 EDU/hectare whichever is greater

Rural Character (with No Reticulated Water) NA

Rural NA

Tourist Commercial (Residential Component) 1 EDU/lot or 53 EDU/hectare whichever is greater

Retail/Commercial

Local Business 1 EDU/lot or 17 EDU/hectare whichever is greater

District Business 1 EDU/lot or 35 EDU/hectare whichever is greater

Retail Showrooms 1 EDU/lot or 15 EDU/hectare whichever is greater

Commercial Services 1 EDU/lot or 17 EDU/hectare whichever is greater

Tourist Commercial (Commercial Component) 1 EDU/lot or 17 EDU/hectare whichever is greater

Industry

Light Industry 1 EDU/lot or 10 EDU/hectare whichever is greater

General Industry 1 EDU/lot or 14 EDU/hectare whichever is greater

Other

Special Use First Principles Assessment

9.4 Schedule – Sewerage Equivalent Demand Units (EDUs) by Defined Use12 for Material Change of Use

Defined Use Water Supply EDUs

Residential

Accommodation Building

1 bedroom unit 0.5/unit

2 bedroom unit 0.82/unit

3 bedroom unit 1/unit

Motel unit 0.28/unit

Backpackers/hostel 0.46/bed

Bed and Breakfast 0.82/Bedroom

Caravan Park 0.71/Site

Caretaker's Residence 1.00/Dwelling

Dual Occupancy 0.89/Dwelling

Dwelling House 1.00/Dwelling

Multiple Dwelling

1 Bedroom 0.5/Dwelling

2 Bedroom 0.82/Dwelling

3 Bedroom 1.00/Dwelling

Multiple Rural Occupancy 1.00/Dwelling

Retirement Village 0.64/unit

Rural Workers Accommodation 1.00/dwelling

Commercial

12 Definitions

• ‘Uses’ are as defined in ‘Part 1, Division 4 – Interpretation’ in the Planning Scheme.

Page 28: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 24 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Water Supply EDUs

Car Park NA

Catering Premises

Restaurant/fast food 1.96/100sqm GFA

Catering business 1.43/100sqm GFA

Commercial Premises

<400sqm GFA 0.45/100sqm GFA

400-1000sqm GFA 0.71/100sqm GFA

>1000sqm GFA 1.07/100sqm GFA

Hotel

Public Bar 1.71/100sqm GFA

Lounge/beer garden 1.57/100sqm GFA

Restaurant 1.96/100sqm GFA

Accommodation 0.68/room

Function room/nightclub 0.54/100sqm GFA

Local Shop 0.46/100sqm GFA

Medical Centre 0.46/100sqm GFA

Outdoor Sales Premises

Principal use enclosed 0.21/100sqm GFA

Principal use outdoors 0.07/100sqm GFA

Shop

Shopping Centre 0.61/100sqm NA

Single Shop 0.46/100sqm NA

Hairdresser/Beauty salon 0.89/100sqm GFA

Showroom 0.43/100sqm GFA

Storage Facility First Principles Assessment

Tourist Facility First Principles Assessment

Transport Terminal First Principles Assessment

Veterinary Facility 0.5/100sqm GFA

Industrial Extractive Industry First Principles Assessment

Light Industry 0.25/lot

General Industry 3.93/lot

Service Station

Service station 2.68/site

Food preparation 1.54/100sqm NA

Special Industry First Principles Assessment

Vehicle Workshop 0.28/100sqm GFA

Waste Facility First Principles Assessment

Community Airport First Principles Assessment

Cemetery First Principles Assessment

Child Care Centre 0.3/Child

Community Facilities First Principles Assessment

Educational Establishment

Primary School 0.09/student

Secondary School 0.18/student

Boarding School 0.39/student

Hospital 1.11/bed

Institution

Reformative 0.36/bed

General/nursing 1.00/bed

Nursing home 0.54/bedroom

Place of Worship 0.21/seat

Public Utility First Principles Assessment

Special Use First Principles Assessment

Telecommunication Facility First Principles Assessment

Recreational Indoor Recreation First Principles Assessment

Outdoor Recreation First Principles Assessment

Park First Principles Assessment

Rural Agriculture First Principles Assessment

Page 29: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 25 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Water Supply EDUs

Forestry First Principles Assessment

Grazing First Principles Assessment

Intensive Animal Husbandry First Principles Assessment

Major Aquaculture First Principles Assessment

Minor Aquaculture First Principles Assessment

Roadside Stall First Principles Assessment

Rural Service Industry First Principles Assessment

Stockyard First Principles Assessment

Other First Principles Assessment

9.5 Schedule – Transport Equivalent Demand Units (EDUs) by Zone for Reconfiguring a Lot

Zone Transport EDUs

Residential

Low Density 1 EDU/Lot

Medium Density 1 EDU/Lot

Special Residential 1 EDU/Lot

Rural Character (with Reticulated Water) 1 EDU/Lot

Rural Character (with No Reticulated Water) 1 EDU/Lot

Rural 1 EDU/Lot

Tourist Commercial (Residential Component) 1 EDU/Lot

Retail/Commercial

Local Business 1 EDU/Lot

District Business 1 EDU/Lot

Retail Showrooms 1 EDU/Lot

Commercial Services 1 EDU/Lot

Tourist Commercial (Commercial Component) 1 EDU/Lot

Industry

Light Industry 1 EDU/Lot

General Industry 1 EDU/Lot

Other

Special Use First Principles Assessment

*A First Principles Assessment for Transport will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

9.6 Schedule – Transport Equivalent Demand Units (EDUs) by Defined Use13 for Material Change of Use

Defined Use Transport EDUs

Residential

Accommodation Building 0.8/Dwelling

Bed and Breakfast 0.8/Dwelling

Caravan Park (Site) 0.8/Dwelling

Caretaker's Residence 0.8/Dwelling

Dual Occupancy 0.8/Dwelling

Dwelling House 1/Dwelling

Multiple Dwelling

1 Bedroom 0.8/Dwelling

2 Bedroom 0.8/Dwelling

3 Bedroom 0.8/Dwelling

Multiple Rural Occupancy 0.8/Dwelling

Retirement Village

13 Definitions

• ‘Uses’ are as defined in ‘Part 1, Division 4 – Interpretation’ in the Planning Scheme.

Page 30: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 26 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Transport EDUs

1 Bedroom 0.8/Dwelling

2 Bedroom 0.8/Dwelling

3 Bedroom 0.8/Dwelling

Rural Workers Accommodation 0.8/Dwelling

Commercial Car Park NA

Catering Premises 1/100sqm GFA

Commercial Premises 1/100sqm GFA

Hotel (Public Bar Area) 1/100sqm GFA

Local Shop 0.4/100sqm GFA

Medical Centre 0.4/100sqm GFA

Outdoor Sales Premises

Vehicle Sales 0.4/100sqm GFA

Landscape Supplies 0.4/100sqm GFA

Other First Principles Assessment

Shop 0.4/100sqm GFA

Showroom 0.4/100sqm GFA

Storage Facility 0.4/100sqm GFA

Tourist Facility First Principles Assessment

Transport Terminal First Principles Assessment

Veterinary Facility 1/100sqm GFA

Industrial Extractive Industry First Principles Assessment

Industry 1/100sqm GFA

Service Station 1/100sqm GFA

Special Industry 1/100sqm GFA

Vehicle Workshop 1/100sqm GFA

Waste Facility First Principles Assessment

Community Airport First Principles Assessment

Cemetery First Principles Assessment

Child Care Centre First Principles Assessment

Community Facilities First Principles Assessment

Educational Establishment

Primary School First Principles Assessment

High School First Principles Assessment

Tertiary First Principles Assessment

Hospital First Principles Assessment

Institution First Principles Assessment

Place of Worship First Principles Assessment

Public Utility First Principles Assessment

Special Use First Principles Assessment

Telecommunication Facility First Principles Assessment

Recreational Indoor Recreation First Principles Assessment

Outdoor Recreation First Principles Assessment

Park First Principles Assessment

Rural Agriculture First Principles Assessment

Forestry First Principles Assessment

Grazing First Principles Assessment

Intensive Animal Husbandry First Principles Assessment

Major Aquaculture First Principles Assessment

Minor Aquaculture First Principles Assessment

Roadside Stall First Principles Assessment

Rural Service Industry First Principles Assessment

Stockyard First Principles Assessment

Other First Principles Assessment

*A First Principles Assessment for Transport will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

Page 31: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 27 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

9.7 Schedule – Stormwater Equivalent Demand Units (EDUs) by Zone for Reconfiguring a Lot

Zone Stormwater EDUs

Residential

Low Density 1 EDU/Lot

Medium Density 1 EDU/Lot

Special Residential 1 EDU/Lot

Rural Character (with Reticulated Water) 1 EDU/Lot

Rural Character (with No Reticulated Water) 1 EDU/Lot

Rural 1 EDU/Lot

Tourist Commercial (Residential Component) 1 EDU/Lot

Retail/Commercial

Local Business 1 EDU/Lot

District Business 1 EDU/Lot

Retail Showrooms 1 EDU/Lot

Commercial Services 1 EDU/Lot

Tourist Commercial (Commercial Component) 1 EDU/Lot

Industry

Light Industry 1 EDU/Lot

General Industry 1 EDU/Lot

Other

Special Use First Principles Assessment

*A First Principles Assessment for Stormwater will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

9.8 Schedule – Stormwater Equivalent Demand Units (EDUs) by Defined Use14 for Material Change of Use

Defined Use Stormwater EDUs

Residential

Accommodation Building 1 x (0.7 of site area/400m2)

Bed and Breakfast 1 x (0.7 of site area/400m2)

Caravan Park (Site) First Principles Assessment

Caretaker's Residence 1 x (0.7 of site area/400m2)

Dual Occupancy 1 x (0.7 of site area/400m2)

Dwelling House 1/dwelling unit

Multiple Dwelling

1 Bedroom 1 x (0.7 of site area/400m2)

2 Bedroom 1 x (0.7 of site area/400m2)

3 Bedroom 1 x (0.7 of site area/400m2)

Multiple Rural Occupancy 1 x (0.7 of site area/400m2)

Retirement Village

1 Bedroom 1 x (0.7 of site area/400m2)

2 Bedroom 1 x (0.7 of site area/400m2)

3 Bedroom 1 x (0.7 of site area/400m2)

Rural Workers Accommodation 1 x (0.7 of site area/400m2)

Commercial Car Park First Principles Assessment

Catering Premises 1.0 per 400sqm site area

Commercial Premises 1.0 per 400sqm site area

14 Definitions

• ‘Uses’ are as defined in ‘Part 1, Division 4 – Interpretation’ in the Planning Scheme.

Page 32: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 28 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Stormwater EDUs

Hotel (Public Bar Area) 1.0 per 400sqm site area

Local Shop 1.0 per 400sqm site area

Medical Centre 1.0 per 400sqm site area

Outdoor Sales Premises

Vehicle Sales 1.0 per 400sqm site area

Landscape Supplies 1.0 per 400sqm site area

Other 1.0 per 400sqm site area

Shop 1.0 per 400sqm site area

Showroom 1.0 per 400sqm site area

Storage Facility 1.0 per 400sqm site area

Tourist Facility 1.0 per 400sqm site area

Transport Terminal First Principles Assessment

Veterinary Facility 1.0 per 400sqm site area

Industrial Extractive Industry First Principles Assessment

Industry 1 x (0.9 of site area/400sqm)

Service Station 1 x (0.9 of site area/400sqm)

Special Industry 1 x (0.9 of site area/400sqm)

Vehicle Workshop 1 x (0.9 of site area/400sqm)

Waste Facility First Principles Assessment

Community Airport First Principles Assessment

Cemetery First Principles Assessment

Child Care Centre First Principles Assessment

Community Facilities First Principles Assessment

Educational Establishment

Primary School First Principles Assessment

High School First Principles Assessment

Tertiary First Principles Assessment

Hospital First Principles Assessment

Institution First Principles Assessment

Place of Worship First Principles Assessment

Public Utility First Principles Assessment

Special Use First Principles Assessment

Telecommunication Facility First Principles Assessment

Recreational Indoor Recreation First Principles Assessment

Outdoor Recreation First Principles Assessment

Park First Principles Assessment

Rural Agriculture First Principles Assessment

Forestry First Principles Assessment

Grazing First Principles Assessment

Intensive Animal Husbandry First Principles Assessment

Major Aquaculture First Principles Assessment

Minor Aquaculture First Principles Assessment

Roadside Stall First Principles Assessment

Rural Service Industry First Principles Assessment

Stockyard First Principles Assessment

Other First Principles Assessment

*A First Principles Assessment for Stormwater will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

Page 33: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 29 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

9.9 Schedule – Public Parks and Community Land Equivalent Demand Units (EDUs) by Zone for Reconfiguring a Lot

Zone Public Parks and Community Land EDUs

Residential

Low Density 1 EDU/Lot

Medium Density 1 EDU/Lot

Special Residential 1 EDU/Lot

Rural Character (with Reticulated Water) NA

Rural Character (with No Reticulated Water) NA

Rural NA

Tourist Commercial (Residential Component) 1 EDU/Lot

Retail/Commercial

Local Business NA

District Business NA

Retail Showrooms NA

Commercial Services NA

Tourist Commercial (Commercial Component) NA

Industry

Light Industry NA

General Industry NA

Other

Special Use NA

*A First Principles Assessment for Public Parks and Community Land will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

9.10 Schedule – Public Parks and Community Land Equivalent Demand Units (EDUs) by Defined Use15 for Material Change of Use

Defined Use Public Parks and Community Land EDUs

Residential

Accommodation Building 0.5/Dwelling

Bed and Breakfast 0.5/Dwelling

Caravan Park (Site) 0.5/Dwelling

Caretaker's Residence 0.5/Dwelling

Dual Occupancy 0.5/Dwelling

Dwelling House 1/Dwelling

Multiple Dwelling

1 Bedroom 0.5/Dwelling

2 Bedroom 0.5/Dwelling

3 Bedroom 0.5/Dwelling

Multiple Rural Occupancy 0.5/Dwelling

Retirement Village

1 Bedroom 0.5/Dwelling

2 Bedroom 0.5/Dwelling

3 Bedroom 0.5/Dwelling

Rural Workers Accommodation NA

Commercial

Car Park NA

Catering Premises NA

Commercial Premises NA

Hotel (Public Bar Area) NA

Local Shop NA

Medical Centre NA

15 Definitions

• ‘Uses’ are as defined in ‘Part 1, Division 4 – Interpretation’ in the Planning Scheme.

Page 34: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 30 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Defined Use Public Parks and Community Land EDUs

Outdoor Sales Premises NA

Vehicle Sales NA

Landscape Supplies NA

Other NA

Shop NA

Showroom NA

Storage Facility NA

Tourist Facility NA

Transport Terminal NA

Veterinary Facility NA

Industrial

Extractive Industry NA

Industry NA

Service Station NA

Special Industry NA

Vehicle Workshop NA

Waste Facility NA

Community

Airport NA

Cemetery NA

Child Care Centre NA

Community Facilities NA

Educational Establishment NA

Primary School NA

High School NA

Tertiary NA

Hospital NA

Institution NA

Place of Worship NA

Public Utility NA

Special Use NA

Telecommunication Facility NA

Recreational

Indoor Recreation NA

Outdoor Recreation NA

Park NA

Rural

Agriculture NA

Forestry NA

Grazing NA

Intensive Animal Husbandry NA

Major Aquaculture NA

Minor Aquaculture NA

Roadside Stall NA

Rural Service Industry NA

Stockyard NA

Other First Principles Assessment

*A First Principles Assessment for Public Parks and Community Land will be determined for those development types that do not relate directly to the development purposes listed in Schedule 13 – Trunk Infrastructure Charge Rates: Section 21, of the Integrated Planning Amendment Regulation. The EDUs will be determined by applying an identified demand rate of the closest equivalent development purpose(s) on a case by case basis.

Page 35: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 31 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

10.0 Schedule of Infrastructure Contributions

10.1 Infrastructure contributions – Water Supply

Contribution Catchment Infrastructure Contribution Rate per EDU (2006)

Miriam Vale (W1) 3,025

Agnes Water (W2) 7,946

Seventeen Seventy (W3) 8,340

Bororen (W4) 1,261

10.2 Infrastructure contributions – Sewerage

Contribution Catchment Infrastructure Contribution Rate per EDU (2006)

Seventeen Seventy (S1) 8,780

Agnes Water (S2) 10,311

10.3 Infrastructure contributions – Transport

Contribution Catchment Infrastructure Contribution per EDU

Miriam Vale (TR1) $2000

10.4 Infrastructure contributions – Stormwater

Contribution Catchment Infrastructure Contribution per EDU

Miriam Vale (SW1) $2000

10.5 Infrastructure contributions – Public Parks and Community Land

Contribution Catchment Infrastructure Contribution per EDU

Miriam Vale (PCL1) $2000

Note: Public Parks and Community Land infrastructure contributions are only applicable to all residential lots created or residential unit developments.

Page 36: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 32 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

11.0 Schedule of Capital Works

[Schedule 15 shows the existing and planned future trunk network.] Note: Miriam Vale Shire is currently investigating transport, stormwater and public parks and community land issues for the Shire. Until investigations and Plans for Trunk Infrastructure have been completed, Council will apply an infrastructure contribution based on the regulated infrastructure charge specified in the Act. This charge is considered fair and reasonable as it is the average minimum charge for the provision of trunk infrastructure under the Act.

Page 37: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 33 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

12.0 Schedule - Desired Standards of Service

The following Desired Standards of Service are to be read in conjunction with Council’s adopted technical standards including PART 4: General Development Codes, Division 40, Reconfiguration of a Lot Code, and Division 41, Works, Services and Infrastructure Code. Desired Standards of Service

Water Supply - Planning Standard

Community Outcome

Ensure drinking water complies with the NHMRC Australian Drinking Water Guidelines for colour, turbidity and microbiology. >90% water test compliance for Agnes Water Miriam Vale, and Seventeen Seventy (1770). Bororen not a potable supply.

• Provides uniform quality of water monitored in relation to recognised standards.

• Provide a safe and reliable water supply.

• Safeguards community health.

Comply with Integrated Environmental Management Strategy and associated Environmental Management Plans and Department of Natural Resources planning guidelines for water supply and sewerage.

• Provides for system operation and monitoring in accordance with recognised standards.

• Ensures environmental controls maintained.

• Ensures potable water is provided in a manner consistent with environmental standards.

Reduce Non-Revenue Water. • Extend asset life.

• Defer system augmentation.

• Improve environmental flows.

• Reduced greenhouse gas emissions.

• Reduce extraction of water from source.

• Defer requirement for new water source.

Develop and maintain excellence in appropriate new technologies.

• Reduced cost of energy and chemicals.

• Cost effective service for community.

• Reduced greenhouse gas emissions.

• Reduced environmental effects from chemical production.

Provide infrastructure which minimises whole of life costs.

• Cost effective service for community.

• Reduced energy cost.

• Reduced maintenance costs.

• Reduced overall operation costs.

• Reduced replacement costs.

• Reduction in disposal of waste.

• Reduced environmental effects from chemical production.

Water Supply - Design Standard

Community Outcome

Design water supply infrastructure to comply with:

• Planning Scheme Policy No. 1 - Engineering Standards for Development Works;

• Planning Scheme Policy No. 2 – Engineering Standards for Self Assessable Development;

• Plans for Trunk Infrastructure – Water Supply

• the Water Act 2000; • Water Supply Code of Australia –WSA 03-2002 Version 2.3.

• Provides uniform quality of water monitored in relation to recognised standards.

• Provide a safe and reliable water supply.

• Safeguards community health.

Sewerage - Planning Standard

Community Outcome

Ensure wastewater collection, transportation and treatment system remains effective.

• Reduced impact from blockages, overflows and spills.

• Reduced impact on residents.

• Minimises release of nitrogen and phosphorous to the environment.

• Improved community health.

• Reduced greenhouse gas emissions.

Provide infrastructure which minimises power usage.

• Reduced cost of energy.

• Cost effective service for community.

• Greenhouse gas reduction.

Provide infrastructure which minimises whole of life costs. • Cost effective service for community.

Page 38: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 34 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

• Reduced energy cost.

• Reduced maintenance costs.

• Reduced overall operation costs.

• Reduced replacement costs.

• Reduction in disposal of waste.

• Reduced greenhouse gas emissions.

• Reduced environmental effects from chemical production.

Achieve excellence in appropriate new technologies.

• Reduced cost of energy and chemicals.

• Cost effective service for community.

• Reduced greenhouse gases.

• Reduced environmental effects from chemical production.

Reuse effluent where possible.

• Beneficial use of reclaimed water and biosolids.

• Opportunity for cost recovery for reclaimed water treatment.

• Reduction in use of potable water supply and treatment.

• Reduction in release of nitrogen and phosphorous to the environment.

• Reduction of raw water extraction from source.

Sewerage - Design Standard

Community Outcome

Design wastewater infrastructure to comply with:

• Planning Scheme Policy No. 1 - Engineering Standards for Development Works;

• Planning Scheme Policy No. 2 – Engineering Standards for Self Assessable Development;

• EPA requirements and guidelines;

• Plans for Trunk Infrastructure – Sewerage;

• Department of Natural Resources “Guidelines for Planning and Design of Sewerage Schemes”;

• The Water Act 2000;

• Standard Sewerage Law; and

• The Sewerage Code of Australia.

• Noise control.

• No adverse visual effect.

• Control of overflows from system.

• Improves community health.

• Reduction in contaminated discharges.

• Reduced discharge to environment.

Ensure infiltration and inflow in the sewerage collection and transportation system remains within industry acceptable limits (compliance with Environmental licences, IEMS and associated EMPs).

• Reduced cost of energy for effluent transport, treatment and disposal.

• Minimise customer overflow issues.

• Maximise life of system.

• Reduced overflows to local waterways.

Transport - Planning Standard

Community Outcome

Road Network

Define the road network as a functional Urban and Rural hierarchy and freight routes which supports the Local Government’s urban and rural settlement patterns and commercial and economic activities.

• Protects the amenity of residential communities by removing non-local traffic.

• Improves local safety by removing “through” traffic.

• Maintains reliability of connectivity.

• Reduces fuel consumption and emission levels by sustaining efficient operating speeds.

• Maintains travel speeds in off-peak periods.

• Reduces vehicle operating costs.

• Improves public transport operation by improving travel speeds.

• Supports economic growth by developing efficient and integrated transport networks.

• Minimises through traffic and heavy vehicles in residential areas.

• Limits community severance.

Bikeway and Footpath Network

Provide safe and convenient walk/bikeway network in accordance with the local government’s plans and strategies.

• Reduces fuel consumption and emission levels through the use of efficient transport modes.

• Encouragement of cycling and walking has positive health

Page 39: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 35 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

outcomes.

• Promotes health benefits.

• Improves transport opportunities for local trips.

• Ensures an acceptable level of amenity for users.

Design Standard

Community Outcome

Road Network

Road network system is designed and provided in accordance with:

• Planning Scheme Policy 1 – Engineering Standards for Development Works;

• Planning Scheme Policy 2 – Engineering Standards for Self Assessable Development; and

• Plans for Trunk Infrastructure – Road Network.

• Reduce delays during peak periods.

• Improve safety by reducing vehicle speed differentials.

• Supports efficient and integrated freight movement network.

Bikeway and Footpath Network

Walk/Bikeway network is designed and provided in accordance with Plans for Trunk Infrastructure – Pathway, AustRoads Guide to Traffic Engineering Practice, Part 13 – Pedestrians and Part 14 – Bicycles, and Planning Scheme Policy 1 – Engineering Standards for Development Works.

• Encourage cycling and walking as acceptable alternatives.

• Infrastructure provided meets recognised standards.

Stormwater - Planning Standard

Community Outcome

Provide system of shared stormwater infrastructure allowing free and safe drainage of urban land while maintaining or improving the quality of run-off.

• Minimises inundation of habitable areas.

• Minimises the damage and risk associated with flooding.

• Minimises the impact of development on the ecological health and water quality within waterway corridor.

Ensure the use of Water Sensitive Urban Design and other types of on-site infrastructure to minimise impact on trunk infrastructure

• Provides waterways infrastructure at least life cycle cost.

• Reduces the scale of shared infrastructure by optimising on site solutions.

• Improves water quality at the point of discharge to benefit the waterway corridor’s health.

Ensure sufficient buffers from urban development along waterway corridors for ecological links (including rehabilitation of degraded waterway corridor banks, where required).

• Maintain or improves environment amenity such as scenic values and natural construction.

• Erosion and sedimentation is minimised.

• Negative impacts on adjoining and downstream properties are minimised.

• Protects environmentally sensitive areas from development.

Ensure natural stream processes are maintained within waterway corridors.

• Reduces the need for costly structural treatments of waterway corridor banks.

• Provides for natural processes of accretion, erosion and sedimentation and reduces environmental effects from pollution.

• Increases regional water quality

Stormwater - Design Standard

Community Outcome

Design stormwater infrastructure to comply with:

• Planning Scheme Policy 1 – Engineering Standards for Development Works;

• Planning Scheme Policy 2 – Engineering Standards for Self Assessable Development;

• Queensland Urban Drainage Manual (QUDM);

• EPA requirements and guidelines; and

• Plans for Trunk Infrastructure – Stormwater.

• Free and safe drainage of urban land.

• Maintain or improve water quality and ecological health.

Implement Water Sensitive Urban Design principles to achieve maximum on site quantity and quality treatment and minimise offsite discharge.

• Maximise the water quality within the system.

• Negative impacts on adjoining and downstream properties are minimised.

Implement regional and on-site detention facilities to minimise the impact of peak run-off for the full range of events (Q1 to Q100) from developments, taking into account safety and risk.

• Reduces the cumulative impact from existing and future developments on peak flow levels.

• Reduces the need to increase the size of waterway corridors

Page 40: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 36 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

Design detention basis to maintain pre-development peak flow levels from the development site for all flood events (Q1 to Q100) in accordance with Planning Scheme Policy 1 – Engineering Standards for Development Works. Design Detention Basins in the same catchment to ensure that the coincident peak discharge at downstream control points is not increased.

and underground drainage.

• Increases active and passive recreation opportunities.

• Minimises the impact on the environmental values of downstream waterway corridors by maintaining pre-development flows and velocities.

• Reduces downstream erosion by slowing flow velocities.

Design bridges and culverts with appropriate flood immunity and capacity to convey floodwater, taking into account the Council road hierarchy Construction of bridges and culverts must not adversely impact on the natural environment, such as through the loss of vegetation and undesirable impacts on bio-diversity Design bridges and culverts to maintain fauna and recreational links

• Ensures road crossings operate safely in times of inundation.

• Reduces the risk of flooding for upstream properties.

• Provides opportunities for extended pedestrian and bicycle links.

• Enhances ecological links.

Public Parks & Community Land - Planning Standard

Community Outcome

Provide a connected and accessible network of parks, open space, and community facilities that meets the needs of the Shire’s residents and visitors.

• Provides opportunities for access and increased usage of open space, recreational and community facilities.

• Provides for an appropriate balance of land uses and ensures high levels of amenity in the urban form.

• Provides a basis for a healthy and active community.

Ensure strong linkages and where possible co-location of existing and future parks, open space and community facilities in accordance with the Council’s Parks and Recreation Management Plan (to be completed).

• Ensures utilisation of existing and future assets while maintaining maximum access.

Provide embellishments to public parks, commensurate with the range of activities envisaged.

• Provides open space embellishments that meet the needs of the community by providing a range of facilities for social activities and/or fitness/recreational pursuits.

• Ensures activities are met and contained within designated areas - reducing potential off site impacts to other more sensitive areas in the Shire.

Ensure that existing and future parks, open space and community facilities with significant environmental, waterway or cultural heritage value are managed appropriately.

• Protects and enhances items of cultural interest in the Shire for the benefit of current and future communities in the Shire.

• Provides a basis for tourism opportunities.

• Protection of the Natural landscape ensures maintenance of quality of air, water and land resources reducing negative impacts requiring amelioration.

Public Parks & Community Land - Design Standard

Community Outcome

Public parks and community facilities areas are provided in accordance with relevant standards of provision in Plans for Trunk Infrastructure – Public Parks and Community Land.

• Provides a standard of service for the Shire’s communities as identified by Council’s Parks and Recreation Management Plan

• Land and facilities are developed to optimise layout and use.

Flood immunity for parks and community facilities are achieved in accordance with Council’s Standards for Park and Open Space.

• Ensure adequate provision of safe, accessible and usable facilities.

Access to public parks and community facilities are to be in accordance with Council’s Standards for Park and Open Space.

• Provides community access to a range of park, open space and community facilities.

Public park embellishments are provided in accordance with:

• Council’s Parks and Recreation Management Plan; and

• Plans for Trunk Infrastructure – Public Parks and Community Land.

• Provides a range of park types that are suitability embellished to meeting their purpose within the park hierarchy.

Page 41: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 37 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

13.0 Supporting Information

The following documentation has been used in preparing this planning scheme policy including determination of the scope of capital works and associated contributions:

• GHD (2008), Sewerage Planning Report for Agnes Water/Town of 1770

• Coleridge Water Engineers (2008), Agnes Water & Seventeen Seventy Water Supply & Sewerage Infrastructure, A Summary

• Former Planning Scheme Policy 4.24 (“Determination of Water Supply & Sewerage Contributions On Development Applications”) and 4.1 (“Park Contributions”)

• GHD (2008), Sewerage Planning Report for Agnes Water/Town of 1770

• GHD (2005), Report for 1770 Sewerage Scheme – Pressure Sewerage System

• Parsons Brinkderhoff (2006), Agnes Water Desalination Project – Early Studies Investigations Final Report

• Cardno (2006) Town of 1770 Water Supply Reticulation Planning Report.

• Cardno (2006) Agnes Water-Town of 1770 Benaraby-Agnes Waer Pipeline Cost Report

• Burns Bridge Transactions (2007), Engineering Estimates and Financial Implication of Pipeline and Desalination Options for Agnes Water and 1770

• Strategic Asset Management Plan • Total Asset Management Plan

• GHD (2008) Miriam Vale Shire Council Traffic and Road Infrastructure PIP (Letter Advice) • Miriam Vale Shire Council (2006), Pathways and Bikeways Management Plan

• URS (2008) Final Report – Concept Flood Storage and Conveyance Improvement Assessment at Agnes Water

• Strategic Leisure Group (2008), Miriam Vale Shire Public Open Space and Recreation Plan

• Council Asset data and mapping.

Page 42: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 38 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

14.0 Schedule – Contribution Catchment Maps

Page 43: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

Planning Scheme Policy 3 – Water Supply, Sewerage, Transport,

Stormwater, & Public Parks and Community Land

Infrastructure Contributions Policy

October 2008 Gladstone Regional Council (Miriam Vale Shire) 39 M:\0509-1 Miriam Vale - PIP_ICS\Work\Word\081030_Rep_Miriam Vale ICP.doc

15.0 Schedule – Plans for Trunk Infrastructure

Page 44: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 539 3,911 600 302

MVSC Existing Assets

MIR

IAM

_VA

LE

AG

NE

S_W

AT

ER

1770

BO

RO

RE

N

INT ASSET ID

ASSET NAME

ASSET COST

(2006)

SUBSIDY

TOTAL COST

(2006)

WBE1 Bororen Raw Water Supply 32,473$ -$ 32,473$ Y

WBE3 Miriam Vale Raw Water Supply 37,410$ -$ 37,410$ Y

WTPE1 Miriam Vale Treatment Plant 206,722$ -$ 206,722$ Y

WRE1 Miriam Vale Water Storage 276,062$ -$ 276,062$ Y

WRE2 Agnes Water Water Storage 815,403$ -$ 815,403$ Y

WRE5 1770 Water Storage 6,692$ -$ 6,692$ Y

WRE7 Bororen Water Storage 234,346$ -$ 234,346$ Y

WTPE2 Agnes Water Treatment Plant 243,898$ -$ 243,898$ Y

WIE1 1770 Raw Water Supply 96,223$ -$ 96,223$ Y

WIE2 Agnes Water Raw Water Supply 107,954$ -$ 107,954$ Y

WRE8 1770 Water Storage 3,758$ -$ 3,758$ Y

WRE10 1770 Water Storage 3,758$ -$ 3,758$ Y

WBE4 Miriam Vale Raw Water Supply 4,608$ -$ 4,608$ Y

WBE5 Miriam Vale Raw Water Supply 4,608$ -$ 4,608$ Y

WBE6 Miriam Vale Raw Water Supply 13,923$ -$ 13,923$ Y

WBE7 Miriam Vale Raw Water Supply 13,923$ -$ 13,923$ Y

WBE8 Miriam Vale Raw Water Supply 16,853$ -$ 16,853$ Y

WBE9 Miriam Vale Raw Water Supply 16,853$ -$ 16,853$ Y

Water Supply

Miriam Vale Shire Council

Projected

Dem

ands

(EDU)

WBE2 Bororen Raw Water Supply 32,473$ -$ 32,473$ Y

WRE3 Agnes Water Water Storage 174,869$ -$ 174,869$ Y

WRE4 Agnes Water Water Storage 174,869$ -$ 174,869$ Y

WRE6 1770 Water Storage 6,692$ -$ 6,692$ Y

WRE9 1770 Water Storage 3,758$ -$ 3,758$ Y

INT ASSET ID

ASSET NAME

ASSET DIA (mm)

ASSET MATERIAL

ASSET LENGTH

(L/M)

ASSET COST

(2006)

SUBSIDY

TOTAL COST

(2006)

WME001 Water Main 150 FC 67 8,839$ -$ 8,839$ Y

WME002 Water Main 150 FC 56 7,388$ -$ 7,388$ Y

WME003 Water Main 150 FC 133 17,547$ -$ 17,547$ Y

WME004 Water Main 150 FC 70 9,235$ -$ 9,235$ Y

WME005 Water Main 150 FC 42 5,541$ -$ 5,541$ Y

WME006 Water Main 150 FC 55 7,256$ -$ 7,256$ Y

WME007 Water Main 150 FC 55 7,256$ -$ 7,256$ Y

WME008 Water Main 150 FC 112 14,776$ -$ 14,776$ Y

WME009 Water Main 150 FC 38 5,013$ -$ 5,013$ Y

WME010 Water Main 150 FC 1,233 162,671$ -$ 162,671$ Y

WME011 Water Main 150 FC 1,036 136,681$ -$ 136,681$ Y

WME012 Water Main 150 FC 1,312 173,093$ -$ 173,093$ Y

WME013 Water Main 150 FC 683 90,109$ -$ 90,109$ Y

WME014 Water Main 150 CI 454 59,897$ -$ 59,897$ Y

WME015 Water Main 150 FC 296 39,052$ -$ 39,052$ Y

WME016 Water Main 150 FC 275 36,281$ -$ 36,281$ Y

WME017 Water Main 150 FC 1,052 138,791$ -$ 138,791$ Y

WME018 Water Main 150 FC 28 3,694$ -$ 3,694$ Y

WME019 Water Main 150 FC 91 12,006$ -$ 12,006$ Y

WME020 Water Main 150 FC 10 1,319$ -$ 1,319$ Y

WME021 Water Main 150 uPVC 1,324 123,676$ -$ 123,676$ Y

WME022 Water Main 150 FC 206 27,178$ -$ 27,178$ Y

WME023 Water Main 150 uPVC 129 12,050$ -$ 12,050$ Y

WME024 Water Main 150 uPVC 297 27,743$ -$ 27,743$ Y

WME025 Water Main 150 uPVC 81 7,566$ -$ 7,566$ Y

WME026 Water Main 300 oPVC 59 13,182$ -$ 13,182$ Y

WME027 Water Main 350 DICL 16 9,322$ -$ 9,322$ Y

WME028 Water Main 200 uPVC 76 9,661$ -$ 9,661$ Y

WME029 Water Main 150 uPVC 204 19,056$ -$ 19,056$ Y

WME030 Water Main 300 uPVC 31 6,926$ -$ 6,926$ Y

WME031 Water Main 150 uPVC 50 4,671$ -$ 4,671$ Y

WME032 Water Main 150 uPVC 789 73,701$ -$ 73,701$ Y

WME033 Water Main 150 uPVC 1,940 181,217$ -$ 181,217$ Y

WME034 Water Main 150 DICL 1,012 133,514$ -$ 133,514$ Y

WME035 Water Main 250 DICL 1,041 238,591$ -$ 238,591$ Y

WME036 Water Main 150 uPVC 591 55,206$ -$ 55,206$ Y

WME037 Water Main 150 uPVC 240 22,419$ -$ 22,419$ Y

WME038 Water Main 200 uPVC 713 90,634$ -$ 90,634$ Y

WME039 Water Main 150 uPVC 117 10,929$ -$ 10,929$ Y

WME040 Water Main 150 uPVC 336 31,386$ -$ 31,386$ Y

WME041 Water Main 150 uPVC 265 24,754$ -$ 24,754$ Y

WME042 Water Main 200 uPVC 265 33,686$ -$ 33,686$ Y

WME043 Water Main 150 Cast 43 5,673$ -$ 5,673$ Y

WME044 Water Main 150 - 6 809$ -$ 809$ Y

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 45: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 539 3,911 600 302

MVSC Existing Assets

MIR

IAM

_VA

LE

AG

NE

S_W

AT

ER

1770

BO

RO

RE

N

Water Supply

Miriam Vale Shire Council

Projected

Dem

ands

(EDU)

WME045 Water Main 150 - 33 4,449$ -$ 4,449$ Y

WME046 Water Main 150 - 39 5,258$ -$ 5,258$ Y

WME047 Water Main 150 - 9 1,213$ -$ 1,213$ Y

WME048 Water Main 150 DICL 42 5,541$ -$ 5,541$ Y

WME049 Water Main 150 oPVC 83 7,753$ -$ 7,753$ Y

WME050 Water Main 150 uPVC 42 3,923$ -$ 3,923$ Y

WME051 Water Main 150 uPVC 82 7,660$ -$ 7,660$ Y

WME052 Water Main 250 uPVC 748 152,709$ -$ 152,709$ Y

WME053 Water Main 250 oPVC 316 64,513$ -$ 64,513$ Y

WME054 Water Main 150 oPVC 154 14,385$ -$ 14,385$ Y

WME055 Water Main 150 oPVC 338 31,573$ -$ 31,573$ Y

WME056 Water Main 150 oPVC 123 11,490$ -$ 11,490$ Y

WME057 Water Main 150 oPVC 408 38,112$ -$ 38,112$ Y

WME058 Water Main 150 oPVC 185 17,281$ -$ 17,281$ Y

WME059 Water Main 150 oPVC 112 10,462$ -$ 10,462$ Y

WME060 Water Main 150 oPVC 68 6,352$ -$ 6,352$ Y

WME061 Water Main 150 oPVC 166 15,506$ -$ 15,506$ Y

WME062 Water Main 150 oPVC 35 3,269$ -$ 3,269$ Y

WME063 Water Main 150 oPVC 119 11,116$ -$ 11,116$ Y

WME064 Water Main 150 oPVC 7 654$ -$ 654$ Y

WME065 Water Main 150 oPVC 6 560$ -$ 560$ Y

WME066 Water Main 150 oPVC 7 654$ -$ 654$ Y

WME067 Water Main 150 oPVC 79 7,379$ -$ 7,379$ Y

WME068 Water Main 150 oPVC 8 747$ -$ 747$ Y

WME069 Water Main 150 oPVC 8 747$ -$ 747$ Y

WME070 Water Main 150 oPVC 203 18,962$ -$ 18,962$ Y

WME071 Water Main 150 - 1,614 150,765$ -$ 150,765$ Y

WME072 Water Main 150 - 5 467$ -$ 467$ Y

WME073 Water Main 150 - 45 4,203$ -$ 4,203$ Y

WME074 Water Main 65 POLY 45 1,733$ -$ 1,733$ Y

WME075 Water Main 65 POLY 20 770$ -$ 770$ Y

WME076 Water Main 65 POLY 122 4,699$ -$ 4,699$ Y

WME077 Water Main 65 POLY 29 1,117$ -$ 1,117$ Y

WME078 Water Main 65 POLY 286 11,017$ -$ 11,017$ Y

WME079 Water Main 65 POLY 47 1,810$ -$ 1,810$ Y

WME080 Water Main 65 POLY 69 2,658$ -$ 2,658$ Y

WME081 Water Main 65 POLY 664 25,577$ -$ 25,577$ Y

WME082 Water Main 65 POLY 138 5,316$ -$ 5,316$ Y

WME083 Water Main 65 POLY 12 462$ -$ 462$ Y

WME084 Water Main 65 POLY 75 2,889$ -$ 2,889$ Y

WME085 Water Main 65 POLY 164 6,317$ -$ 6,317$ Y

WME086 Water Main 100 Asbestos Cement 239 20,484$ -$ 20,484$ Y

WME087 Water Main 100 CL 62 5,314$ -$ 5,314$ Y

WME088 Water Main 100 Asbestos Cement 516 44,225$ -$ 44,225$ Y

WME089 Water Main 100 FC 33 3,114$ -$ 3,114$ Y

WME090 Water Main 100 FC 35 3,303$ -$ 3,303$ Y

WME091 Water Main 100 FC 92 8,682$ -$ 8,682$ Y

WME092 Water Main 100 FC 95 8,966$ -$ 8,966$ Y

WME093 Water Main 100 FC 106 10,004$ -$ 10,004$ Y

WME094 Water Main 100 FC 79 7,456$ -$ 7,456$ Y

WME095 Water Main 100 FC 62 5,851$ -$ 5,851$ Y

WME096 Water Main 250 uPVC 116 23,682$ -$ 23,682$ Y

WME097 Water Main 50 uPVC 142 10,393$ -$ 10,393$ Y

WME098 Water Main 100 uPVC 107 9,171$ -$ 9,171$ Y

WME099 Water Main 100 uPVC 38 3,257$ -$ 3,257$ Y

WME100 Water Main 100 uPVC 95 8,142$ -$ 8,142$ Y

WME101 Water Main 100 uPVC 169 14,484$ -$ 14,484$ Y

WME102 Water Main 100 uPVC 130 11,142$ -$ 11,142$ Y

WAF1 LAND ACQUISITION -Lot 20 and 21 1,348,200$ -$ 1,348,200$ Y Y

WREPF1 REPORTS -Item 1.1 Network Analysis Study 48,150$ -$ 48,150$ Y Y

WREPF2 REPORTS -Item 1.3 Bore Water Treatment Study 9,630$ -$ 9,630$ Y Y

WREPF3 REPORTS -Item 1.4 Rainwater Tank Optimisation Study 9,630$ -$ 9,630$ Y Y

WREPF4 REPORTS -Item 1.5 Low Water Use Appliances Study 9,630$ -$ 9,630$ Y Y

TOTAL 6,913,101$ -$ 6,913,101$

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 46: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 539 3,911 600 302

MVSC Future Assets

MIR

IAM

_V

AL

E

AG

NE

S_

WA

TE

R

17

70

BO

RO

RE

N

INT A

SSET ID

ASSET D

ESC

RIP

TIO

N

ASSET C

OST

SU

BSID

Y

CO

NTIN

GEN

CY C

OST

(EXC

. LA

ND

) 20

%

PR

OJE

CT

MA

NA

GEM

EN

T &

DESIG

N C

OST 2

0%

EST C

OST 2

006

(IN

C

CO

NT)

WRF1 RESERVOIR -1.2ML 1770 1,317,524$ 1,223,010$ 263,505$ 263,505$ 621,524$ Y

WRF2 RESERVOIR -4ML WESTERN / COMMERCIAL ZONES 1,059,300$ -$ 211,860$ 211,860$ 1,483,020$ Y

WSF1 DESALINATION PLAN -Items 2.1, 2.2 & 3.1 23,951,075$ 9,580,430$ 4,790,215$ 4,790,215$ 23,951,075$ Y Y

WAF2LAND ACQUISITION -4 ML Reservoir

Western/Commercial Zone200,000$ 200,000$ Y

INT A

SSET ID

ASSET D

ESC

RIP

TIO

N

ASSET D

IA

ASSET L

EN

GTH

ASSET C

OST

SU

BSID

Y

CO

NTIN

GEN

CY C

OST

(EXC

. LA

ND

) 20

%

PR

OJE

CT

MA

NA

GEM

EN

T &

DESIG

N C

OST 2

0%

EST C

OST 2

006

(IN

C

CO

NT)

WMF01 Water Main 250 566 115,552$ -$ 23,110$ 23,110$ 161,773$ Y

WMF02 Water Main 200 164 30,323$ -$ 6,065$ 6,065$ 42,452$ Y

WMF03 Water Main 250 101 20,620$ -$ 4,124$ 4,124$ 28,868$ Y

WMF04 Water Main 200 187 34,576$ -$ 6,915$ 6,915$ 48,406$ Y

WMF05 Water Main 250 54 11,024$ -$ 2,205$ 2,205$ 15,434$ Y

WMF06 Water Main 150 77 7,193$ -$ 1,439$ 1,439$ 10,070$ Y

WMF07 Water Main 150 46 4,297$ -$ 859$ 859$ 6,016$ Y

WMF08 Water Main 300 2162 483,025$ -$ 96,605$ 96,605$ 676,235$ Y

WMF09 Water Main 250 456 93,095$ -$ 18,619$ 18,619$ 130,333$ Y

Miriam Vale Shire CouncilWater Supply

Pro

ject

ed

Dem

ands

(ED

U)

WMF10 Water Main 200 168 31,063$ -$ 6,213$ 6,213$ 43,488$ Y

WMF11 Water Main 375 564 213,994$ -$ 42,799$ 42,799$ 299,592$ Y

WMF12 Water Main 200 473 87,456$ -$ 17,491$ 17,491$ 122,438$ Y

WMF13 Water Main 200 291 53,805$ -$ 10,761$ 10,761$ 75,327$ Y

WMF14 Water Main 250 801 163,529$ -$ 32,706$ 32,706$ 228,941$ Y

WMF15 Water Main 250 18 3,675$ -$ 735$ 735$ 5,145$ Y

WMF17 Water Main 200 956 176,761$ -$ 35,352$ 35,352$ 247,465$ Y

WRETF1 Item 9.1 + 12.1 - 1770 Water and Low Pressure 1,317,524$ 1,223,010$ 263,505$ 263,505$ 621,524$ Y

WMF18 Water Main 150

WMF19 Water Main 150

WMF20 Water Main 200

WMF21 Water Main 200

WMF22 Water Main 200

WMF23 Water Main 200

WMF24 Water Main 150

WMF25 Water Main 200

WMF26 Water Main 200

WMF27 Water Main 200

WMF28 Water Main 200

WMF29 Water Main 200

WMF30 Water Main 200

WMF31 Water Main 200

WMF32 Water Main 150

WMF33 Water Main 150

WMF34 Water Main 150

WMF35 Water Main 200

WMF36 Water Main 200

WMF37 Water Main 200

WMF38 Water Main 200

WMF39 Water Main 150

WMF40 Water Main 150

WMF41 Water Main 150

WMF42 Water Main 150

WMF43 Water Main 150

WMF44 Water Main 200

WMF45 Water Main 250 3328 679,431$ -$ 135,886$ 135,886$ 951,203$ Y

WMF46 Water Main 300 374 83,558$ -$ 16,712$ 16,712$ 116,981$ Y

WMF47 Water Main 200 715 132,201$ -$ 26,440$ 26,440$ 185,081$ Y

WMF48 Water Main 150 1229 114,802$ -$ 22,960$ 22,960$ 160,723$ Y

WMF49 Water Main 250 615 125,556$ -$ 25,111$ 25,111$ 175,778$ Y

WMF50 Water Main 375 177 67,158$ -$ 13,432$ 13,432$ 94,021$ Y

WMF51 Water Main 300 319 71,270$ -$ 14,254$ 14,254$ 99,778$ Y

TOTAL 30,649,387$ 12,026,450$ 6,089,877$ 6,089,877$ 30,802,692$

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 47: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 600 3,911

MVSC Existing Assets 1770

AGNES_W

ATER

INT ASSET ID

ASSET NAME

ASSET COST 2006

SUBSIDY

TOTAL COST 2006

SPSE01 1770 Caravan Park - Pump Station 74,275$ -$ 74,275$ Y

SPSE03 Beach Houses Estate - Pump Station 73,420$ -$ 73,420$ Y

SPSE04 Agnes Street - Pump Station 52,050$ -$ 52,050$ Y

SPSE05 Mango Tree Motel - Pump Station 52,050$ -$ 52,050$ Y

SPSE06 Atlantis Blvd - Pump Station 125,209$ -$ 125,209$ Y

SPSE07 Jeffery Court - Pump Station 192,461$ -$ 192,461$ Y

SPSE08 Thompson Street - Pump Station 145,929$ -$ 145,929$ Y

SPSE09 Aspects - Pump Station 103,288$ -$ 103,288$ Y

Miriam Vale Shire Council

Projected

Dem

ands

(EDU)

Sewerage

SPSE09 Aspects - Pump Station 103,288$ -$ 103,288$ Y

SPSE10 Captain Cook Drive - Pump Station 177,580$ -$ 177,580$ Y

SPSE12 Seventeen Seventy - Pump Station 158,075$ -$ 158,075$ Y Y

STPE02 Treatment Plant 1,262,728$ -$ 1,262,728$ Y

INT ASSET ID

ASSET NAME

ASSET DIA

ASSET MATERIAL

ASSET LENGTH

ASSET COST 2006

SUBSIDY

TOTAL COST 2006

RME1 Rising Main 100 - 315 23,054$ -$ 23,054$ Y

RME3 Rising Main 100 - 285 20,859$ -$ 20,859$ Y

RME4 Rising Main 150 - 201 37,164$ -$ 37,164$ Y

RME5 Rising Main 200 - 619 115,047$ -$ 115,047$ Y

RME6 Rising Main 200 - 1,352 251,281$ -$ 251,281$ Y

RME7 Rising Main 200 - 2,354 437,512$ -$ 437,512$ Y

RME8 Rising Main 200 - 4,246 789,157$ -$ 789,157$ Y

RME11 Rising Main 100 - 386 28,251$ -$ 28,251$ Y

RME12 Rising Main 100 - 305 22,322$ -$ 22,322$ Y

RME13 Rising Main 100 - 394 28,836$ -$ 28,836$ Y

RME14 Rising Main 100 - 9 659$ -$ 659$ Y

RME15 Rising Main 100 - 15 1,098$ -$ 1,098$ Y

RME16 Rising Main 100 - 560 40,985$ -$ 40,985$ Y

GME001 Gravity Main 150 uPVC 43 5,218$ -$ 5,218$ Y

GME002 Gravity Main 150 uPVC 78 9,464$ -$ 9,464$ Y

GME003 Gravity Main 150 uPVC 50 6,067$ -$ 6,067$ Y

GME004 Gravity Main 150 uPVC 50 6,067$ -$ 6,067$ Y

GME005 Gravity Main 150 uPVC 50 6,067$ -$ 6,067$ Y

GME006 Gravity Main 150 uPVC 11 1,335$ -$ 1,335$ Y

GME007 Gravity Main 150 uPVC 33 4,004$ -$ 4,004$ Y

GME008 Gravity Main 150 uPVC 36 4,368$ -$ 4,368$ Y

GME009 Gravity Main 150 uPVC 59 7,159$ -$ 7,159$ Y

GME010 Gravity Main 150 uPVC 26 3,155$ -$ 3,155$ Y

GME011 Gravity Main 150 uPVC 30 3,640$ -$ 3,640$ Y

GME012 Gravity Main 150 uPVC 77 9,343$ -$ 9,343$ Y

GME013 Gravity Main 100 uPVC 386 46,836$ -$ 46,836$ Y

GME014 Gravity Main 225 oPVC 91 21,908$ -$ 21,908$ Y

GME015 Gravity Main 300 oPVC 58 26,196$ -$ 26,196$ Y

GME016 Gravity Main 225 oPVC 54 13,001$ -$ 13,001$ Y

GME017 Gravity Main 225 oPVC 37 8,908$ -$ 8,908$ Y

GME018 Gravity Main 225 oPVC 6 1,445$ -$ 1,445$ Y

GME019 Gravity Main 225 oPVC 17 4,093$ -$ 4,093$ Y

GME020 Gravity Main 225 oPVC 62 14,927$ -$ 14,927$ Y

GME021 Gravity Main 225 oPVC 48 11,556$ -$ 11,556$ Y

GME022 Gravity Main 225 oPVC 29 6,982$ -$ 6,982$ Y

GME023 Gravity Main 225 oPVC 64 15,408$ -$ 15,408$ Y

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 48: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 600 3,911

MVSC Existing Assets 1770

AGNES_W

ATER

Miriam Vale Shire Council

Projected

Dem

ands

(EDU)

Sewerage

GME024 Gravity Main 225 oPVC 55 13,241$ -$ 13,241$ Y

GME025 Gravity Main 225 oPVC 70 16,853$ -$ 16,853$ Y

GME026 Gravity Main 225 oPVC 68 16,371$ -$ 16,371$ Y

GME027 Gravity Main 225 DICL 40 9,630$ -$ 9,630$ Y

GME028 Gravity Main 225 oPVC 63 15,167$ -$ 15,167$ Y

GME029 Gravity Main 225 oPVC 22 5,297$ -$ 5,297$ Y

GME030 Gravity Main 225 oPVC 36 8,667$ -$ 8,667$ Y

GME031 Gravity Main 225 oPVC 33 7,945$ -$ 7,945$ Y

GME032 Gravity Main 225 oPVC 56 13,482$ -$ 13,482$ Y

GME033 Gravity Main 225 oPVC 57 13,723$ -$ 13,723$ Y

GME034 Gravity Main 225 oPVC 65 15,649$ -$ 15,649$ Y

GME035 Gravity Main 150 oPVC 60 7,280$ -$ 7,280$ Y

GME036 Gravity Main 150 oPVC 45 5,460$ -$ 5,460$ Y

GME037 Gravity Main 150 oPVC 16 1,941$ -$ 1,941$ Y

GME038 Gravity Main 150 oPVC 32 3,883$ -$ 3,883$ Y

YGME039 Gravity Main 150 oPVC 31 3,761$ -$ 3,761$ Y

GME040 Gravity Main 225 oPVC 37 8,908$ -$ 8,908$ Y

GME041 Gravity Main 225 oPVC 50 12,038$ -$ 12,038$ Y

GME042 Gravity Main 225 oPVC 83 19,982$ -$ 19,982$ Y

GME043 Gravity Main 225 oPVC 49 11,797$ -$ 11,797$ Y

GME044 Gravity Main 225 oPVC 74 17,816$ -$ 17,816$ Y

GME045 Gravity Main 225 oPVC 40 9,630$ -$ 9,630$ Y

GME046 Gravity Main 300 oPVC 30 13,549$ -$ 13,549$ Y

GME047 Gravity Main 300 oPVC 79 35,680$ -$ 35,680$ Y

GME048 Gravity Main 300 oPVC 79 35,680$ -$ 35,680$ Y

GME049 Gravity Main 300 oPVC 79 35,680$ -$ 35,680$ Y

GME050 Gravity Main 300 oPVC 71 32,067$ -$ 32,067$ Y

GME051 Gravity Main 300 oPVC 50 22,582$ -$ 22,582$ Y

GME052 Gravity Main 300 oPVC 56 25,292$ -$ 25,292$ Y

GME053 Gravity Main 300 oPVC 55 24,841$ -$ 24,841$ Y

GME054 Gravity Main 300 oPVC 81 36,583$ -$ 36,583$ Y

GME055 Gravity Main 300 oPVC 56 25,292$ -$ 25,292$ Y

GME056 Gravity Main 300 oPVC 57 25,744$ -$ 25,744$ Y

GME057 Gravity Main 300 oPVC 53 23,937$ -$ 23,937$ Y

GME058 Gravity Main 300 oPVC 54 24,389$ -$ 24,389$ Y

GME059 Gravity Main 300 oPVC 68 30,712$ -$ 30,712$ Y

GME060 Gravity Main 300 oPVC 65 29,357$ -$ 29,357$ Y

GME061 Gravity Main 150 oPVC 23 2,791$ -$ 2,791$ Y

GME062 Gravity Main 225 uPVC 59 14,204$ -$ 14,204$ Y

GME063 Gravity Main 225 uPVC 60 14,445$ -$ 14,445$ Y

GME064 Gravity Main 225 uPVC 32 7,704$ -$ 7,704$ Y

GME065 Gravity Main 225 uPVC 80 19,260$ -$ 19,260$ Y

GME066 Gravity Main 100 uPVO 636 77,171$ -$ 77,171$ Y

GME067 Gravity Main 100 uPVC 533 64,673$ -$ 64,673$ Y

GME068 Gravity Main 225 uPVC 21 5,056$ -$ 5,056$ Y

GME069 Gravity Main 225 - 240 57,780$ -$ 57,780$ Y

GME070 Gravity Main 225 - 233 56,095$ -$ 56,095$ Y

GME071 Gravity Main 225 - 229 55,132$ -$ 55,132$ Y

GME072 Gravity Main 225 - 405 97,504$ -$ 97,504$ Y

GME073 Gravity Main 225 - 123 29,612$ -$ 29,612$ Y

GME074 Gravity Main 225 - 347 83,540$ -$ 83,540$ Y

GME075 Gravity Main 150 oPVC 45 5,460$ -$ 5,460$ Y

GME076 Gravity Main 150 oPVC 3 364$ -$ 364$ Y

GME077 Gravity Main 150 oPVC 22 2,669$ -$ 2,669$ Y

GME078 Gravity Main 150 oPVC 35 4,247$ -$ 4,247$ Y

GME079 Gravity Main 150 oPVC 10 1,213$ -$ 1,213$ Y

GME080 Gravity Main 150 oPVC 55 6,674$ -$ 6,674$ Y

GME081 Gravity Main 150 oPVC 79 9,586$ -$ 9,586$ Y

GME082 Gravity Main 150 oPVC 18 2,184$ -$ 2,184$ Y

GME083 Gravity Main 150 oPVC 7 849$ -$ 849$ Y

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 49: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 600 3,911

MVSC Existing Assets 1770

AGNES_W

ATER

Miriam Vale Shire Council

Projected

Dem

ands

(EDU)

Sewerage

GME084 Gravity Main 150 oPVC 35 4,247$ -$ 4,247$ Y

GME085 Gravity Main 150 oPVC 31 3,761$ -$ 3,761$ Y

GME086 Gravity Main 150 oPVC 18 2,184$ -$ 2,184$ Y

GME087 Gravity Main 150 oPVC 34 4,125$ -$ 4,125$ Y

GME088 Gravity Main 300 oPVC 25 11,291$ -$ 11,291$ Y

GME089 Gravity Main 150 oPVC 70 8,494$ -$ 8,494$ Y

GME090 Gravity Main 150 oPVC 65 7,887$ -$ 7,887$ Y

GME091 Gravity Main 300 oPVC 10 4,516$ -$ 4,516$ Y

GME092 Gravity Main 300 oPVC 3 1,355$ -$ 1,355$ Y

GME093 Gravity Main 225 oPVC 6 1,445$ -$ 1,445$ Y

GME094 Gravity Main 250 oPVC 4 1,190$ -$ 1,190$ Y

GME095 Gravity Main 300 oPVC 17 7,678$ -$ 7,678$ Y

GME096 Gravity Main 300 oPVC 83 37,487$ -$ 37,487$ Y

GME097 Gravity Main 300 oPVC 59 26,647$ -$ 26,647$ Y

GME098 Gravity Main 300 oPVC 16 7,226$ -$ 7,226$ Y

YGME099 Gravity Main 300 oPVC 22 9,936$ -$ 9,936$ Y

GME100 Gravity Main 225 oPVC 9 2,167$ -$ 2,167$ Y

SREPF01 Report - Item 1.2 - - - 48,150$ -$ 48,150$ Y Y

SREPF02 Report - Item 1.3 - - - 24,075$ -$ 24,075$ Y Y

SREPF03 Report - Item 1.4 - - - 38,520$ -$ 38,520$ Y Y

SREPF04 Report - Item 1.5 - - - 48,150$ -$ 48,150$ Y Y

SREPF05 Report - Item 1.6 - - - 38,520$ -$ 38,520$ Y Y

SREPF06 Report - Item 1.7 - - - 9,630$ -$ 9,630$ Y Y

SREPF07 Report - Item 1.8 - - - 48,150$ -$ 48,150$ Y Y

SREPF08 Report - Item 1.9 - - - 4,815$ -$ 4,815$ Y Y

SREPF09 Report - Item 2.1 - - - 9,630$ -$ 9,630$ Y Y

SREPF10 Report - Item 2.2 - - - 9,630$ -$ 9,630$ Y Y

SREPF11 Report - Item 2.3 - - - 19,260$ -$ 19,260$ Y Y

SREPF12 Report - Item 2.4 - - - 48,150$ -$ 48,150$ Y Y

TOTAL 6216872.0 -$ 6,216,872$

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 50: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 600 3,911

MVSC Future Assets 1770

AGNES_W

ATER

INT A

SSET ID

ASSET D

ESC

RIP

TIO

N

ASSET C

OST

SU

BSID

Y

CO

NTIN

GEN

CY C

OST

(EXC

. LA

ND

) 20%

PR

OJE

CT M

AN

AG

EM

EN

T

& D

ESIG

N C

OST 2

0%

EST C

OST 2

006

(INC

CO

NT)

SPSF1 Pump Station - PS22 240,750$ -$ 48,150$ 48,150$ 337,050$ Y

SPSF2 Pump Station - PS21 240,750$ -$ 48,150$ 48,150$ 337,050$ Y

SPSF3 Pump Station - 21-03 LIFT STATION 115,560$ -$ 23,112$ 23,112$ 161,784$ Y

SPSF4 Pump Station - BP02 192,600$ -$ 38,520$ 38,520$ 269,640$ Y

SPSF5 Pump Station - BP21 192,600$ -$ 38,520$ 38,520$ 269,640$ Y

SPSF6 Pump Station - BP03 192,600$ -$ 38,520$ 38,520$ 269,640$ Y

SPSF7 Pump Station - BP22 192,600$ -$ 38,520$ 38,520$ 269,640$ Y

STPF1 Treatment Plant

STPF1a STP Upgrade Items - Stage Pipework & Irrigation Equip( Item 6.1 and 6.3) 120,375$ -$ 24,075$ 24,075$ 168,525$ Y Y

STPF1bSTP Upgrade Items - Bypass pipework & Oxidation Ditch TP (Item 6.2 and

6.5)7,861,354$ 3,144,557$ 1,572,271$ 1,572,271$ 7,861,339$ Y Y

STPF1c STP Upgrade Items - Wet weather storage (Item 7.1) 1,420,042$ -$ 284,008$ 284,008$ 1,988,059$ Y Y

STPF1d STP Upgrade Items - Wet weather storage (Item 7.2) 1,420,042$ -$ 284,008$ 284,008$ 1,988,059$ Y Y

STPF1e STP Upgrade Items - Power supply (Item 6.8) 240,750$ -$ 48,150$ 48,150$ 337,050$ Y Y

Miriam Vale Shire Council

Pro

ject

ed

Dem

ands

(ED

U)

Sewerage

STPF1e STP Upgrade Items - Power supply (Item 6.8) 240,750$ -$ 48,150$ 48,150$ 337,050$ Y Y

STPF1f STP Upgrade Items - New Irrigation area (Item 8.1) 905,220$ -$ 181,044$ 181,044$ 1,267,308$ Y Y

STPF1g STP Upgrade Items - Bypass pipework & Oxidation Ditch TP (Item 6.6) 7,861,354$ 3,144,557$ 1,572,271$ 1,572,271$ 7,861,339$ Y Y

STPF1h STP Upgrade Items - Bypass pipework & Oxidation Ditch TP (Item 6.7) 7,861,354$ 3,144,557$ 1,572,271$ 1,572,271$ 7,861,339$ Y Y

INT A

SSET ID

ASSET D

ESC

RIP

TIO

N

ASSET D

IA

ASSET L

EN

GTH

ASSET C

OST

SU

BSID

Y

CO

NTIN

GEN

CY C

OST

(EXC

. LA

ND

) 20%

PR

OJE

CT M

AN

AG

EM

EN

T

& D

ESIG

N C

OST 2

0%

EST C

OST 2

006

(INC

CO

NT)

RMF01 Rising Main 200 7111 1,321,643$ -$ 264,329$ 264,329$ 1,850,300$ Y

RMF02 Rising Main 200 1507 280,090$ -$ 56,018$ 56,018$ 392,126$ Y

RMF03 Rising Main 150 570 105,391$ -$ 21,078$ 21,078$ 147,547$ Y

SRETF1 1770 Retic and PS - Item 5.1 3,149,984$ 1,574,505$ 629,997$ 629,997$ 2,835,473$ Y Y

SPSF8 Pump Station

RMF04 Rising Main

RMF05 Rising Main

RMF06 Rising Main

RMF07 Rising Main

RMF08 Rising Main

RMF09 Rising Main

RMF10 Rising Main

RMF11 Rising Main

RMF12 Rising Main

RMF13 Rising Main

RMF14 Rising Main

RMF15 Rising Main

RMF16 Rising Main

RMF17 Rising Main

RMF18 Rising Main

RMF19 Rising Main

RMF20 Rising Main

RMF21 Rising Main

RMF22 Rising Main

GMF01 Gravity Main 150 256 31,063$ -$ 6,213$ 6,213$ 43,488$ Y

GMF02 Gravity Main 150 157 19,050$ -$ 3,810$ 3,810$ 26,670$ Y

GMF03 Gravity Main 150 71 8,615$ -$ 1,723$ 1,723$ 12,061$ Y

GMF04 Gravity Main 150 49 5,946$ -$ 1,189$ 1,189$ 8,324$ Y

GMF05 Gravity Main 150 534 64,794$ -$ 12,959$ 12,959$ 90,712$ Y

GMF06 Gravity Main 150 43 5,218$ -$ 1,044$ 1,044$ 7,305$ Y

GMF07 Gravity Main 225 797 191,878$ -$ 38,376$ 38,376$ 268,629$ Y

GMF08 Gravity Main 150 251 30,456$ -$ 6,091$ 6,091$ 42,638$ Y

GMF09 Gravity Main 225 384 92,448$ -$ 18,490$ 18,490$ 129,427$ Y

GMF10 Gravity Main 225 723 174,062$ -$ 34,812$ 34,812$ 243,687$ Y

GMF11 Gravity Main 150 158 19,171$ -$ 3,834$ 3,834$ 26,839$ Y

GMF12 Gravity Main 150 70 8,494$ -$ 1,699$ 1,699$ 11,892$ Y

GMF13 Gravity Main 150 48 5,824$ -$ 1,165$ 1,165$ 8,154$ Y

GMF14 Gravity Main 300 485 219,049$ -$ 43,810$ 43,810$ 306,669$ Y

GMF15 Gravity Main 300 292 131,881$ -$ 26,376$ 26,376$ 184,633$ Y

GMF16 Gravity Main 300 692 312,540$ -$ 62,508$ 62,508$ 437,556$ Y

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy

Page 51: Planning Scheme Policy 3 – Water Supply, Sewerage, · PDF filePlanning Scheme Policy 3 – Water Supply, Sewerage, Transport, Stormwater, & Public Parks and Community Land Infrastructure

SCHEDULE 11

2026 600 3,911

MVSC Future Assets 1770

AGNES_W

ATER

INT A

SSET ID

ASSET D

ESC

RIP

TIO

N

ASSET C

OST

SU

BSID

Y

CO

NTIN

GEN

CY C

OST

(EXC

. LA

ND

) 20%

PR

OJE

CT M

AN

AG

EM

EN

T

& D

ESIG

N C

OST 2

0%

EST C

OST 2

006

(INC

CO

NT)

Miriam Vale Shire Council

Pro

ject

ed

Dem

ands

(ED

U)

Sewerage

GMF17 Gravity Main 150 756 91,732$ -$ 18,346$ 18,346$ 128,425$ Y

GMF18 Gravity Main 225 1039 250,139$ -$ 50,028$ 50,028$ 350,195$ Y

GMF19 Gravity Main 150 623 75,594$ -$ 15,119$ 15,119$ 105,832$ Y

SDEC1 Decommisioning - PS08 5,778$ -$ 1,156$ 1,156$ 8,089$ Y

SDEC2 Decommisioning - PS06 5,778$ -$ 1,156$ 1,156$ 8,089$ Y

SDEC3 Decommisioning - Lot 5 4,815$ -$ 963$ 963$ 6,741$ Y

TOTAL 35,669,384$ 11,008,176$ 7,133,877$ 7,133,877$ 38,928,962$

Planning Scheme Policy 3 - Water Supply, Sewerage, Transport, Stormwater, and Public Parks and Community Land Infrastructure Contribution Policy